HomeMy WebLinkAbout4.01 Collateral Release - Memo to BOCC 10.19.2015Memo To: Board of County Commissioners From: Kathy Eastley Date: 10/19/15 Re: Ironbridge Phase III, Filing 1 Subdivision Improvements Agreement On September 21, 2015 the Board of County Commissioners approved a final plat and Subdivision Improvements Agreement for Ironbridge Phase III, Filing 1 Subdivision. The subdivision of the property required certain improvements that were memorialized in an Improvements Agreement and collateralized with an Escrow Agreement held by Land Title Guarantee. The Applicant has adequately demonstrated partial completion of the required improvements with submittal of a letter and revised cost estimates from a licensed engineer certifying to completion and cost of those improvements completed. Staff recommends approval of the request and authorization for the Chairman to sign the `Acknowledgement of Partial Satisfaction and Direction to Release Funds Related to Escrow Agreement' for the release of $149,712.50 to an authorized representative of Blue Heron Properties, LLC. ACKNOWLEDGMENT OF PARTIAL SATISFACTION AND DIRECTION TO RELEASE FUNDS RELATED TO ESCROW AGREEMENT Recitals 1. Blue Heron Properties, LLC, a Colorado Limited Liability Company (Blue Heron), entered into a Subdivision Improvements Agreement ("SIA") with the Board of County Commissioners of Garfield County, Colorado ("BOCC") dated September 21, 2015 recorded on September 22, 2015 at Reception Number 868310 in the records of the Garfield County Clerk and Recorder. 2. Collateral for the public improvements for the SIA is held by Land Title Guarantee Company pursuant to an Escrow Agreement recorded on , 2015 at Reception Number in the records of the Garfield County Clerk and Recorder ("Escrow Agreement"). 3. Blue Heron has presented certification to the BOCC from a licensed engineer that a portion of the construction of Improvements has occurred in accordance with the SIA for Ironbridge Phase III Filing 1 and requests that the collateral amount be decreased based upon the partial completion. Acknowledgment NOW THEREFORE, at the request of Blue Heron and in consideration of the premises and the prior agreements contained in the SIA and Escrow Agreement, the BOCC hereby: 1. Acknowledges partial satisfaction of the security requirements of the SIA based upon the documentation provided by Blue Heron; 2. Authorizes disbursement of funds from the Escrow Account in the amount of $149,712.50, resulting in a remaining balance of $641,582.50; and 3. Authorizes and directs Land Title Guarantee to release the funds held in the Escrow Account to an authorized representative of Blue Heron. BOARD OF COUNTY COMMISSIONERS ATTEST: OF GARFIELD COUNTY, COLORADO Clerk to the Board By: Date: John Martin, Chairman An Empbyee-Owned Campam October 12th, 2015 Kathy Eastley, County Planner Garfield County Building and Planning Department 108 8'h Street, Suite 201 Glenwood Springs, CO 81601 Re: Ironbridge Phase 111, Filing 1 --- Partial Release of Collateral Request Number One (1) HCE Project No. 2141026.00 Dear Kathy: On behalf of Blue Heron Properties, LLC the Owner of Ironbridge Phase 111, Filing 1, and in accordance with the terms of the Subdivision Improvements Agreement by and between the Board of County Commissioners of Garfield County and the Owners, this letter serves as the first request for partial escrowed collateral release: The contractor has completed Topsoil Stripping, Stockpile and Placement, partial Erosion and Sediment Control and a large portion of the mass Earthwork line items along with purchasing all of the required piping, manholes and grates for the storm sewer system that will be installed during this phase of construction. Please see attached Engineers Estimate for percentages completed. High Country Engineering, Inc. (HCE) has been on site as needed to observe the construction of the project and certify that: 1. All costs for which the release is being requested have been incurred in connection with the construction and material purchases for the improvements; 2. All work performed and materials supplied are in accordance with the plans and specifications; 3. All work has been performed in a workmanlike manner; 4. No funds are being requested for work not completed, or for materials not installed or stored on site: total release requested is for $149,712.50 for materials and labor. The contractors' invoices, checks payable and lien releases have been attached for backup to this escrow release. 1517 Blake Avenue, Suite 101 Glenwood Springs, CO 81601 telephone (970) 945-8676 fax (970) 945-2555 Garfield County Community Development October 12t, 2015 Page 2 of 2 Cost Estimate Original Total Previously Released 1st Collateral Release Funds Remaining Phase 111 Public Improvements $791,295.00 $0.00 $149,712.50 $641,582.50 Garfield County Revegetation Payment $30,000.00 $0.00 $0.00 $30,000.00 TOTAL $82I,295.00 $0.00 $149,712.50 $671.582.50 Please see the enclosed summaries of the materials that have been purchased and are currently on the site awaiting installation. We are requesting the funds in the amount of $149,712.50 be released and considered complete. This leaves $641,582.50 to complete the remainder of the public improvements with the County and $30,000 for revegetation. Please contact me if you have any questions or need additional information. Sincerely, HIGH COUNTRY ENGINEERING, INC. Matthew Langhorst, P.E. Project Manager Cc: Eric Foerster — lronbridge Karl Hanlon — Karp, Neu, Hanlon, PC REQUEST FOR PARTIAL RELEASE OF ESCROW FUNDS Board of County Commissioners Garfield County, Colorado c/o Director of Community Development 108 8th Street, Suite 401 Glenwood Springs, CO 81601 RE: Ironbridge Subdivision This request is written to formally notify the BOCC of work completed for the Ironbridge Subdivision. As Owner [or On behalf of the Owned, we request that the BOCC review the attached Engineer's Certificate of Partial Completion and approve a reduction in the amount held by Land Title Guarantee Company in Escrow No. 519857 (the "Escrow Funds") in the amount of $ 149,712.50, to a reduce the Escrow Funds to $ 641,582.50. The local Escrow Account Manager at Land Title Guarantee Company is Bob Rulan, 1317 Grand Ave., Suite 200, Glenwood Springs, CO 81601, Phone: 970-945-2610. Attached is the certified original cost estimate and work completed schedule, showing: Engineers Cost Estimate Work Completed. Reduced Face Amount of Escrow Funds $ 791,295.00 $ 149,712.50 $ 641,582.50 Based on periodic observation and testing, the construction has been completed, to date, in accordance with the intent of the plans and specifications that were reviewed and approved by the BOCC or its representatives and referenced in Paragraph 2 of the Subdivision Improvements Agreement between the BOCC and the Owner. If further information is needed, please contact Matthew Langhorst, at High Country Engineering, Inc. at 970-945-8676. or Owner Owner's Representative/Engineer APPROVED: Name: Office: IRONBRIDGE SUBDIVISION- PHASE 3- FILING 1 High Country Engineering, Inc SUMMARY OF RUING 91 I NFRAS'rRugruRE OM •.F,SaxRQW XfiLEASE 9.12015, Updated 10/12/15 ITEM HCE JOB NO. 2141026 00 1 Pjecn 214'tC2rA xc•11CostEn2141026 Ph III - Filing 1 - 94115 ;QUANTITY UNIT E UNIT COST E COST EPerientageCompleteEEscrowRelease Gridbg inrd Lr rikitilrk Earthwork - Unclassified Excavation Topsoil Stripping, Stockpile and Placement Erosion and Sediment Control Blanket; Slopes Steeper than 3 1 3" Asphalt 8" Class 6 ABC Under Asphalt, Cross Faro, Curb 8 Gutter and Walks 26" Mountable Curb & Gutter Class 1 Ground Sign (Street, Siop, Speed, yield)6! Asphalt Pedestrian Path: 1 i i i t 30,000 6,000 3,200 34,630 930 t 3,000: t t 10,400 t C Y f Y S Y S F C Y . L F Each 5 F I 1 i i i t 53 50 55.00 $9 50 S2 95 545.00 525 00 5300.00E 52.00E 1» ; t 1 t 5105.000 00 530,000 00 530,400.00 5102,070 00 541,850.00 575,000 00 51,800 00 520,800 00 5406,920.00 i t 85°. 100°. 50°. 5 89,250 00 S 30,000 00 S 15,200 00 1 i 1 i I 5 134,450,00 Dolnaairfakr -pipe price includes trenching and fittings - 10" DLP., Class 51 Water Main 10" Gate Valve 10" End Cap Fire Hydrant Assembly w 6" Gine Valve I" Water Service WaterlSewer Crossing Encasement WaterlStorm Sewer Crossing Connect to Existing 10" Water Stub t E 1 1 1,230 4 1 l 1 2 201 2 1 1 i = i Each • i L F i t1 E Each ; 1 E Each Each Each i Each I Each i i 590.00 52,750.00 5500 00 56,500.00 51,500.00 52,200.00 51,200 00 51,200.00 t i i i 1 i 5110,700 00 511,000 00 t 5500 00 S 513,000 00 530,00000 54,400 00 52,200 00 51,200 00 i 5173,000.00 E t E a i i 0'. 0°. 0°. 0°. 0'. 0°. 0°. 0°. t S • E $ - 1 t S - 1 E 5 - S S - $ - S - -••• 5 -price includes trenching and fittings• 8" SDR-3S Sewer Pipe 4' Dia. Manhole Connect to Existing Sewer Manhole 4" Sewer Service 1,4G0 8 I 22 L F Each Each Each t 560.00 51,800.00 1 53,000 00 i 51,100.00 t. r i 584,000.00 538,400 00 53.000.00 524,200.00 5149,600.00 0°. 0°. 0'. 0°. 1 15 - 5 - 5 - S - Statr Sewerand .. wee` a ikei 18" ADS-NI 2 18" ADS Flared End Staten 5' Stone Manhole Single Combination Curb Opening with Grate Inlet « »..» 375 1 I 2 1 L F Ea:h Each Ea:h 1 S35 00 5300.00E 53,600.00 51.000.00 ? 513,125 00 5300 00 53,600 00 56,000 00 523,025.00 50'. 50°. 50'. 50°. 1 S 6.562 50 S 15000 5 1.800.00 5 3,000.00 5 11.512 50 Shdki tilkla .. _ 4' Shallow 1 tility Trench (Telephone Cable, Electric, Gas) 2' Tdcphone and Cable Conduit and Conduit Installation Gas Service Piping Installation (pipe furnished by utility) I i • 2.500 2,500 2,500 1 L F ! L F L F 1 , 58.00E 51 00 54 50 E E 520,000 00 57,500.00 511 250 00 538,750,00 50. 5 3.750 00 S 3,750 00 Total Installed Infrastructure Pace Estimatei Escrow Release Amount a 1 Rcmatng Amount in Escrow i i 1 i t 1 S 791,295.00 1 i 1 t E 5 791,295.00 i i ; 5 149,712,50 E$ 641,582.50 1011 001 510 INVOICE ACCOUNT NO. DATE AMOUNT DISCOUNT NET 9/29/2015 15-199 135,269.06 0.00 135,269.06 CHECK DATE Check: 001510 CHECK NO. VENDOR NAME 9/30/2015 Hobbs Excavating LLC DISCOUNTS NET PAID 135,269.06 7#1E KEY TO DOCU .1 P T SECUMTV HEAT ACTIVATED THUMB PRINT . ADDITIONAL SECURITY FLATLRES INCLUDED • SEE BACK A OR DETAIL .5 Blue Heron Development Company 430 Ironbridge Drive Glenwood Springs, CO 81601 970.384.0630 SPRINGS ROSE OFFICE 23-2!1020 ['bank 1301 GRA DNWOOE GLENW00D SPRINGS, CO 81601001510 USBANKCOM CHECK NO. DATE PAY *ONE HUNDRED THIRTY-FIVE THOUSAND TWO HUNDRED SIXTY-NINE AND 06 / 100 TO THE ORDER OF Hobbs Excavating LLC 1760 Gupsum Creek Road Gypsum, CO 81637 HOBBS 9/30/2015 ‚.001510111 1: 10 20000 211: 10 3613 3469409101 AMOUNT ********135,269.06* ..S N"moi +T' w / INVOICE ACCOUNT NO. DATE AMOUNT DISCOUNT NET 9/29/2015 15-149 135,269.06 0.00 135,269.06 CHECK DATE CHECK NO. VENDOR NAME Check: 001510 9/30/2015 Hobbs Excavating LLC DISCOUNTS NET PAID 135,269.06 001510 INVOICE ACCOUNT NO. DATE AMOUNT DISCOUNT 001511 INVOICE ACCOUNT NO. DATE AMOUNT DISCOUNT NET 9/30/2015 15-154 73,950.00 0.00 73.950.00 CHECK DATE CHECK NO. Check: 001511 VENDOR NAME 10/1/2015 Hobbs Excavating LLC DISCOUNTS NET PAID 73,950.00 THE KEY TO DOC I,PMENTSECURITY * 1EATACf1VATEDTHU 443 PRINT • AODRIONAL SECURITY FEATURES INCLUDED SEE SACK FOR DETAILS Blue Heron Development Company 430 Ironbridge Drive Glenwood Springs, CO 81601 970.384..0630 23.2/1020 =bank CHECK NO. GLENWOOD SPRINGS ROSE OFFICE 1901 GRAND AVE • GLENWOOD SPRINGS, CO 81401 USBANICCOM DATE PAY *SEVENTY-THREE THOUSAND NINE HUNDRED FIFTY AND XX / 100 TO THE ORDER OF Hobbs Excavating LLC 1760 Gupsum Creek Road Gypsum, CO 81637 HOBBS 10/1/2015 n■00L5LLIP 1:Lo200002LI: L0368346940To 001511 AMOUNT *********73,950.00* .7 CHECK DATE CHECK NO VENDOR NAME DISCOUNTS NET PAID 001511 Hobbscc��33Excavating and Trucking LLC (Since 19 hypsum Creek Rd Gypsum, CO 81637 BILL TO Blue Heron Developement Co. 430 Ironbridge Drive Glenwood Spings, CO 81601 Invoice DATE INVOICE NO. 9/30/2015 15-154 Comments ITEM DESCRIPTION QTY RATE AMOUNT As bid mobilization 2,500.00 2,500.00 As bid cut to fill 10,000 4.50 45,000.00 As bid strip topsoil to stock pile 6,000 2.875 17,250.00 As bid install silt fence 3,500 2.20 7,700.00 As bid tracking pad 1,500.00 1,500.00 CODE -DEPT OV .1o'"" DESCRIPTION--=s'`�-�` ct`r rvc= AA JUNT 13J i.t-4— APPROVAL Fc Thank you, HOBBS EXCAVATING AND TRUCKING Tota! $73,950.00 CONDITIONAL WAIVER AND RELEASE UPON PROGRESS PAYMENT Upon receipt by the undersigned of a check from Blue Heron Properties LLC in the sum of $73,950,00 payable to Hobbs Excavating LLC and when the check has been properly endorsed and has been paid by the bank upon which it is drawn, this document shall become effective to release any mechanic's lien, stop notice, or bond right the undersigned has on the job of Blue Heron Development Company located in Garfield County, Colorado to the following extent. This release covers a progress payment for labor, services, equipment or material furnished to Blue Heron Development Company through 9/30/15 only and does not cover any retentions retained before or after the release date; extras furnished before the release date for which payment has not been received; extras or items furnished after the release date. Rights based upon work performed or items furnished under a written change order which has been fully expected by the parties prior to the release date are covered by this released unless specifically reserved by the claimant in this release. This release of any mechanics' lien, stop notice, or bond right shall not otherwise affect the contract rights, including rights between parties to the contract bases upon a rescission, abandonment, or breach of the contract, or the right of the undersigned to recover compensation for furnished labor, services, equipment, or material covered by this release if that furnished labor, services, equipment, or material covered by the release was not compensated by the progress payment. Before any recipient of this document relies on it, said party should verify evidence of payment to the undersigned. Dated: October 1, 2015 Subcontractor: Hobbs Excavating LLC // // BY_ . Title: HOBBS EXCAVATING LLC Since 1973' 1760 GYPSUM CREEK ROAD GYPSUM , CO. 81637 970 BILL TO Blue Heron Developement Co. 430 Ironbridge Drive Glenwood Spings, CO 81601 r) Invoice DATE INVOICE NO, 8/31/2015 15-149 ! Comments ITEM DESCRIPTION QTY RATE AMOUNT Material- Material- concrete materials needed for phase 3 filing 1 pipe parts for phase 3 filing 1 q^�E'„r1 r: 60 -- O n .0 I ) ! 1 Iuun.w.a.rwu.ruM.s I:�) a{{��40 P r : CONDITIONAL WAIVER AND RELEASE UPON PROGRESS PAYMENT Upon receipt by the undersigned of a check from Blue Heron Properties LLC in the sum of $135,269.06 payable to Hobbs Excavating LLC and when the check has been properly endorsed and has been paid by the bank upon which it is drawn, this document shall become effective to release any mechanic's lien, stop notice, or bond right the undersigned has on the job of Blue Heron Development Company located in Garfield County, Colorado to the following extent. This release covers a progress payment for labor, services, equipment or material furnished to Blue Heron Development Company through 9/30/15 only and does not cover any retentions retained before or after the release date; extras furnished before the release date for which payment has not been received; extras or items furnished after the release date. Rights based upon work performed or items furnished under a written change order which has been fully expected by the parties prior to the release date are covered by this released unless specifically reserved by the claimant in this release. This release of any mechanics' lien, stop notice, or bond right shall not otherwise affect the contract rights, including rights between parties to the contract bases upon a rescission, abandonment, or breach of the contract, or the right of the undersigned to recover compensation for furnished labor, services, equipment, or material covered by this release if that furnished labor, services, equipment, or material covered by the release was not compensated by the progress payment. Before any recipient of this document relies on it, said party should verify evidence of payment to the undersigned. Dated: September 30, 2015 Subcontractor: Hobbs Excavating LLC Bv:l.% Title: