Loading...
HomeMy WebLinkAboutApplication- PermitNo 11199 Assessor's Parcel No 2135-321-00-009 Date 12/29/2008 Job Address Owner Address BUILDING PERMIT CARD sec 32, T5S, R96W, 6th P.M. Marathon Oil Co. Contractor Address Setbacks: Front Rear RH storage building Soils Test Footing K&G Enterprises Foundation Grout Underground Plumbing Rough Plumbing Framing Insulation Roofing Drywall Gas Piping 743 Horizon Dr. #220 GJ Phone # 970-245-5233 2525 High Country Ct. GJ hone # 970-245-2046 LH Zoning INSPECTIONS NOTES Weatherproofing Mechanical Electrical Rough (State) Electrical Final (State) Final /Checklist Completed? Certificate Occupancy # Date Septic System # Date Final Other (continue on back) Garfield County Building & Planning Department 108 8th Street, Suite #401 Glenwood Springs, Co. 81601 Office:970-945-8212 Fax: 970-384-3470 Inspection Line: 970-384-5003 Building Permit No. Parcel No: Locality: Job Address: Use of Building: 2135-321-00-009 SE/4, SE/4, Sec 32, T5S, R96W, 6th PM storage building Owner : Contractor: Marathon Oil Company K&G Enterprises Fees: Plan Check: $ 450.29 Bldg Permit: $ 692.75 Total Fees: $ 1,143.04 Septic: Other Fees: Clerk: \6cmo 561(1, Date: '1 . GARFIELD COUNTY BUILDING PERMIT APPLICATION 108 8th Street, Suite 401, Glenwood Springs, Co 81601 Phone: 970-945-8212 / Fax: 970-384-3470 / Inspection Line: 970-384-5003 www.garfield-county.com POP 1 2 9 0 8 1 Parcel No: (this information is available at the assessors office 970-945-9134) 2135-321-00-009 2 Job Address: (if an address has not been assigned, please provide Cr, Hwy or Street Name & City) or and legal description SE/4, SE/4, Section 32, T5S, R96W, 6th P.M. 3 Lot No: NA Block No: NA Subd./ Exemption: NA 4 Owner: (property owner) Marathon Oil Company Mailing Address: 793 Horizon Ct., Ste .220 Grand Junction, Co 81506 ph: 970-245-5233 Alt Ph; - 970-778-1084 5 Contractor: K&G Enterprises Mailing Address: 2525 High Country Ct Grand Junction, Co 81501 Ph: 970-245-2046 Alt Ph: 6 Architect / Engineer: Lester Buildings Mailing Address: Lester Prairie, MN Ph: 800-826-4439 x5000 Alt Ph: 7 Sq. Ft. of Building: 2 Bldgs. - 600 & 1360 Sq. Ft. or Acres of Lot: 880 Height: 13.5 ft No. of Floors: 1 8 : Buildings will be used to house pipe manifolds and pumps for a ater ipeline system permitted via a Pipeline Development Plan Review 9 Describe Work: Construction of pole -barn type buildings on land previously disturbed for Marathon's laydown yard permitted by Garfield County 10 Class of Work: KNew ❑ Alteration ❑ Addition 11 Garage: NA o Attached ❑ Detached Septic: NA ISDS ❑ Community 12 Driveway Permit:NA - using existing permitted acce,- Garden Gulch Road Owners valuation of Work: $ 30,000 and 40,000 Authority. This application for a Building Permit must be signed by letter of authority, signed by the Owner, must be provided A Building Permit cannot be issued without proof of legal NOTICE the Owner of the property, described above, or an authorized agent. If the signature below is not that of the Owner, a separate with this Application. and adequate access to the property for purposes of inspections by the Building Department. Electrical Permit, (2) County ISDS Permit, (3) another permit required for use on the property identified above, e.g. State or Discharge Permit. is not commenced within 180 days of the date of issuance and if work is suspended or abandoned for a period of 180 CERTIFICATION contained above is true and correct. I understand that the Building Department accepts the Application, along with the plans based upon my certification as to accuracy. a Building Permit will be issued granting permission to me, as Owner, to construct the structure(s) and facilities detailed on and my agents will comply with provisions of any federal, state or local law regulating the work and the Garfield County Building Regulation(s)). 1 acknowledge that the Building Permit may be suspended or revoked, upon notice from the County, if the location, are not in compliance with County Regulation(s) or any other applicable law. described above, to inspect the work. I further acknowledge that the issuance of the Building Permit does not prevent the if any, discovered after issuance; or (2) stopping construction or use of the structure(s) or facility(ies) if such is in violation work by the Building Department do not constitute an acceptance of responsibility or liability by the County of errors, omissions compliance with federal, state and local laws and County Regulations rest with me and my authorized agents, including without THE NOTICE & CERTIFICATION ABOVE: 11/24/08 Leval Access. Other Permits. Multiple separate permits may be required: (1) State County Highway/ Road Access or a State Wastewater Void Permit. A Building Permit becomes null and void if the work authorized I hereby certify and specifications Assuming the submittals In consideration Code, ISDS construction I hereby grant Building Official of County Review of or discrepancies. limitation I HEREBY OWNERS days after commencement. that I have read this Application and that the information and other data submitted by me or on my behalf (submittals), completeness of the submittals and approval of this Application, reviewed by the Building Department. of the issuance of the Building Permit, I agree that I regulations and applicable land use regulations (County or use of the structure(s) and facility(ies), described above, permission to the Building Department to enter the property, from: (1) requiring the correction of errors in the submittals, Regulation(s) or any other applicable law. this Application, including submittals, and inspections of the As the Owner, 1 acknowledge that responsibility for my architect designer, engineer and/ or builder. ACKNOWLEDGE THAT I HAVE READ AND UNDERSTAND SIGNATURE DATE STAFF USE ONLY Special Conditions: Adjusted Valuation: 9023! •2S" Plan Check Fee: 440.21 Permit Fee: la92'7S- Manu home Fee: Misc Fees: ISDS Fee: Total Fees: 1I44.614 Fees Paid: 513.99 Balance Due: 6a9,05 BP No & Issue Date: ISDS No & Issued Date: glee /i -'f4 Setbacks: OCC Group: Const Type: Zoning: BLDG DEPT: i. NG DE • APP OVAL DATE APPROVAL DATE The following items are required by Garfield County for a final Inspection: 1) A final Electrical Inspection from the Colorado State Electrical Inspector. 2) Permanent address assigned by Garfield County Building Department and posted at the structure and where readily visible from access road. 3) A finished roof; a lockable building; completed exterior siding; exterior doors and windows installed; a complete kitchen with cabinets, sink with hot & cold running water, non-absorbent kitchen floor covering, counter tops and finished walls, ready for stove and refrigerator; all necessary plumbing. 4) All bathrooms must be complete, with washbowl, tub or shower, toilet, hot and cold running water, non-absorbent floors, walls finished, and privacy door. 5) Steps over three (3) risers, outside or inside must be must have handrails. Balconies and decks over 30" high must be constructed to all IBC and IRC requirements including guardrails. 6) Outside grading completed so that water slopes away from the building; 7) Exceptions to the outside steps, decks, grading may be made upon the demonstration of extenuating circumstances., i.e. weather. Under such circumstances A Certificate of Occupancy may be issued conditionally. 8) A final inspection sign off by the Garfield County Road & Bridge Department for driveway installation, where applicable; as well as any final sign off by the Fire District, and/or State Agencies where applicable. A CERTIFICATE OF OCCUPANCY (C.O.) WILL NOT BE ISSUED UNTIL ALL THE ABOVE ITEMS HAVE BEEN COMPLETED. A C.O. MAY TAKE UP TO 5 BUSINESS DAYS TO BE PROCESSED AND ISSUED. OWNER CANNOT OCCUPY OR USE DWELLING UNTIL A C.O. IS ISSUED. OCCUPANCY OR USE OF DWELLING WITHOUT A C.O. WILL BE CONSIDERED AN ILLEGAL OCCUPANCY AND MAY BE GROUNDS FOR VACATING PREMISES UNTIL ABOVE CONDITIONS ARE MET. I understand and agree to abide by the above conditions for occupancy, use and the issuance of a C.O. for the building identified in the Building Permit. 11/24/08 OWNERS SIGNATURE DATE Bapplicationdecember2007 parcel 2135-321-00-009 / sec 32, t5s, r96w Marathon Oil Co. Applicant Address Date VALUATION FEE DETERMINATION Subdivision Lot/Block Contractor Finished (Livable Area): Main sq.ft Upper sq.ft Lower sq.ft Other sq.ft X $74.68 Total Square Feet 0 sq.ft Valuation Basement: Unfinished Conversion of Unfinished to Finished Total Valuation Garage: Carport: Total Valuation Crawl Space Total Valuation Decks/ Patios Covered Open Total Valuation Type of Construction: Occupancy: Storage, Building #1 Storage, Building #2 Valuation sq.ft X $41.00 sq.ft X $33.68 sq.ftX $18.00 sq.ft X $12.00 sq.ft X $9.00 sq.ft X $24.00 sq.ft X $12.00 Commercial 1200 675 sf X sf X sf X sf X sf X sf X $29.99 $29.99 0.00 0.00 0.00 0.00 0.00 35,9 FY. 56,231.25 Total Valuation 56,231.25 42. Do you understand that if you are planning on doing any excavating or grading to the property prior to issuance of a building permit that you will be required to obtain a grading permit? Yes X Not necessary for this project Gradingpermit will be obtained as part of the Pipeline Development Plan Review process 43. Did an Architect seal the plans for your commercial project? State Law requires any commercial project with occupancy of more than 10 persons as per Section 1004 of the IBC to prepare the plans and specifications for the project. Yes Not Necessary for this project X I hereby acknowledge that I have read, understand, and answered these questions to the best of my ability. Signature 11/24/08 Date Phone: 970-245-5233 (days); 970 778 1084 (evenings) ProjectName: Marathon Water Pipelines Manifold Building Project Address: SE/4, SE/4, Section 32, T5S, R96W, 6th P.M. Note: On any of these questions you may be required to provide this information. If required information is not supplied, delays in issuing the permit are to be expected. Work may not proceed without the issuance of the permit. *If you have answered "Not necessary for this project" on any of the questions and it is determined by the Building Official that the information is necessary to review the application and plans to determine minimum compliance with the adopted codes, please expect the following: A. The application may be placed behind more recent applications for building permits in the review process and not reviewed until required information has been provided and the application rotates again to first position for review. B. Delay in issuance of the permit. C. Delay in proceeding with construction. BpcommDec2007 7