Loading...
HomeMy WebLinkAboutConcrete Test Report 09.14.2015HEPWORTH-PAWLAK GEOTECHNICAL 5020 County Road 154 Glenwood Springs, CO 81601 Phone: 970.945-7988 Fax: 970-945.8454 hpgeo@hpgeotech.com CONCRETE TEST REPORT Silich Construction Inc. Attn: Hayden Horsford 303 AABC, Suite J Aspen, Colorado 81611 Job No. 115 066F Date Cast: 09-14-15 Sheet: 1 of 1 Project: Proposed Residence, Lot 172, Ironbridge Development, 21 Bent Grass, Garfield County, Colorado Placement Location: Grade Beams and Post Tension Slab Supplier: United Truck No: 6042 Ticket No: 33305302 Mix Design: 37010550 Method of Placement: Pump Time Sampled: 8:20 am Air Temp: 49° Concrete Temp: 68° Water Added: None Time Batched: Time Arrived: Time Placed: 7:39 am 8:05 am 8:10 am Sample Point: Wet Unit Wt: 143.8 pcf Slump: 4% in. Air Content 4.0 Load Size (Yds). Yds Delivered: Yds Ordered: Truck Discharge Communication: Chris Cross with United was informed of our field test results. 10 10 10 Time Cylinders Cast: 8:30 am initial Cure Time On Site: 1 day Field Storage: Insulated water bath Date in Lab: 09-15-15 Cylinder Temperature at Pick Up: 69° Min/Max: 60°172° Compressive Strength Data 2015 Lab Number Age Days Date Load lbs Diameter in Area in2 Compressive Strength (psi) 28 Day Avg. (psi) 673A 3 09-17-15 52,400 4.01 12.63 4150 7270 673B 7 09-21-15 69,400 4.01 12.63 6500 673C 28 10-12-15 91,400 4.01 12.63 7240 673D 28 10-12-15 92,100 4.01 12.63 7290 673E Ho1d156 Discarded pecified Strength for Structure: psi at 28 days Specified Strength for Mix: 4500 psi at 28 days Notes: One gallons of plasticizer was added on-site prior to placement to increase slump. Distribution: Aspen Signature Homes of Ironbridge, LLC - Liwyd Ecciestone t14c420wobi Hi not) Mitch Construction— Hayden Horsford [ rgrd lctsonstrurskn.ucRmj Silich Construction — John Silich Ijohtsprili t n n) United —Hotly Martin y 14ti United -Misty Grosse ty„M Imfri fig Tom Westhoff, CET David A. Young, P.E. Field Technician Reviewed By