Loading...
HomeMy WebLinkAboutReinforcement Steel Inspection Report 09.03.2015GeoCa HEPWORTH - PAWLAK GEOTECHNICAL 5020 County Road 154 Glenwood Springs, CO 81601 Phone: 970-945-7968 Fax: 970-945.8454 hoaeoehooeotech.com REINFORCEMENT STEEL INSPECTION REPORT Client. Silich Construction Inc. Job No.: 115 066F Day: Thursday Attn: Hayden Horsford Date: 913115 303 AABC, Suite J Page: 1 of 1 Aspen, Colorado 81611 Project: Proposed Residence, Lot 172, Ironbridge Development, 21 Bent Grass, Garfield County, Colorado Area of Inspection: Rebar and tendons for foundation post -tension slab Reference Documents Structural Plans Used: Sheets F1.0, FD1 Inspection Notes: Inspection Status: Q Preliminary 0 Final 0 Concrete reinforcement as noted above was judged to be in reasonable conformance with the referenced construction documents. 0 Exceptions Noted Missing tendon C and tendons are set up to pull in opposite direction of plans Verbal Eric with Silich Construction was informed that structural engineer would Communication have to sign off on missing tendon and pulling tendons in opposite direction. Distribution Aspen Signature Homes o6 Ironbridge, LLC - Uwyd Ecclestone {lecclestc+ pbrhtl.riet} Silich Construction— Eric Untjorlige nkierlf.icf�hne�,carr,} Silich Construction — John Silich(John I1cF,cons uctfaa,.c 6m1 Paul Weiser Steven L. Pawlak, P.E. Field Technician Reviewed By