HomeMy WebLinkAboutEngineer Report2015.11.03
Blake Pilland
RM Construction
151 Clubhouse Dr, New Castle, CO 81647
RE: Truss blocking I Tiffany Residence, Silt Mesa
Project 2015-12
Blake:
URNI[;];
STRUCTURAL ENGINEERING
p. 970 319 4791
e. joe@urnisestructural corn
It is my understanding that the trusses installed on the Tiffany residence in Silt Mesa did not
include blocking detailed on both structural and architectural drawings.
Contractor shall verify that Simpson H2 .5 trusses were installed on each truss per detail 1/S-502.
Assuming that these clips were installed, blocking between trusses is not required.
Please let me know if I can be of further assistance.
Regards,
Jr isel~~
ni e Structural Engineering
p. 970 319 4791
e.joe@UrniseStructural.com