Loading...
HomeMy WebLinkAboutApplication- PermitJob Address GARFIELD COUNTY BUILDING, SANITATION and PLANNING DEPARTMENT 109 8th. Street, Suite 303 Glenwood Springs, CO 81601(910) 945-8212 No. 8492 gfq Nature of Work Building Permit Use of Building PR II ma Owner RICA Contractor Jiatuk Amount of Permit$ 1,(0544n Date Clerk . ,.,ri w...,f �<. r..tii .11i .1 J GARFIELD COUNTY BUILDIIN'G PERMIT APPLICATION INSPECTION LINE: (970)384-5003 T LEPHONE: (970) 945.8212 GARFIELD COUNTY (GLENWOOD SPRINGS), COLORADO PERMIT NO. _��J PARCEI.JSCHBDU1,F NO. at LOT NO. BLOC -1(N°. SUBDIVISION/EXEMPTION 1 2 3 5 '7 Atex T�QN axnlrtitL e i®rv.5I tz ucrm&w aQ- Fr. OFBURUWV 5o 6 7 8 WBap UU[LDLVtl ©a is 4 7 WORK: 105 d 1a Kv-r .t 2 ),5 �.1Ln4CNr7ADir T� a /L q 70 5::22,377 D aZ D � A �G( t� GE-i02P--rok3U.strb.T.NG ANEW oAD0111Oi1 9 OAdA4a- 10 Da4VIAVAY 4SRM1T VALE:ATM CS SirCalai aAzTEMTto2I rN cm2 QaIIQinaGEDISFwAt. EPTIO ACIIIIMD VALE;Ai1U4 O g3 a6C2A4 7:Qt1MIlOttq: fitu<&1'4114 .4] 0' SF=Pt%Ni1-l70.4 Ci4N 6.t,.14.Pr c, EgSffi1' }z OFFLOCJL7 allots 011322W113 cDOUDIS a rrEPLAN (01 (N3. TO NOTICE A SEPARATE ELECTRICAL PERMIT IS REQUIRED AND 14U4T HE 1&SUED BY THE STATE OF COLORADO THIS PERMIT BECOMES NULL AND VOID IR' WORK OR CONSTRUCTION AUTHORIZED IS NOT COMMENCED WITHIN LUQ DAYS, OR IF CONSTRUCTION OR WORK IS SUSPENDED OR A©ANDoNNDFOIL A PERIOD OF RSQ DAYS AT ANY TIME METER WORK IS COMMENCED_ I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW HIE SAME TO BE TRUE AND CORRECT. ALL PROVISIONS OF LAWS GOVERNING THIS TYPE OF WORK WILL BE COMPLIED WITH WHETH .R SPECIFIED) HAREIN OR NOT. THE. GRANTING OF A PERMIT DOES NOT PRESUME TO GIVE AUTHORITY TO VIOLATE ORGAN THE PROVISIONS OF ANY OTHER STAT I OR LOC ; W REGULATING �r STRUCTRON OR. THE PERFORMANCE OE C • ' ✓� ON. 42,12,C11-0.(441 etALLO/Art,, LANCHECSCFER: 6 53 . �z PERMIT FEE. ) �I,(.I . S TOTAL FEE ) fl DATE PM1 ISSUED: OCC: GROUP: CONST: %TYPE: SETBACKS: ZONING: BuiESiDg A. • ate Plwtl itg ' AppravalIDste MANU. HOME: ISDS NO. &FEE: AGREEMENT PERMISSION IS BEREITY :MINTED TO TIEE APPLICANT AS OWNER, CONTRACTOR AND/OR TEE AGENT OF THE CONTRACTOR OR OWNER TO CONS TP 1fCT TILE STRUCTURE AS DETAILED ON PLANS AND SPECIFICATIONS SUBMITTED TO ANT) REVIEWED BY THE BUII.DiNGDEPARTMENT, IN CONSIDERATION OF THE ISSUANCE OF THIS PERMIT, THE STONER HEREBY AGREES TO COMPLY WITH ALL BUII.111NG CODES AND LAND USE REGULATIONS ADOPTED BY GAIIFIL•LD COUNTY PURSUANT TO AUTHORITY GIVEN IN 30.48.201 CRS AS AMENDED. THE SIGNER FURTHER AGREES THAT 1F THE ABOVE SAID ORDINANCES ARE NOT FULLY COMPLIED WI H IN THE LOCATION, ERECTION, CONSTRUCTION AND USE OF THE ABOVE DESCRIBED STRUCTURE, TTIE PERMIT MAY THEN BE REVOKED BY NOTICE FROM TRIP COUNTY AND THAT THEN AND THERE rr SHALL BECOME NULL AND VOID. CORRECTIONTHE ING OFP1CIAL FROM THEREAFTER PIQuIRENO THE CE OF FERRORS I SAID PLANA PERMIT BASED S, SPECIFICATIONS SPECIFICATIONS OTHER DDAT�A ORATA SHALL NOT PREVE'NT THE FRO PREVENTING BUILDING OPERATION BEM CARRIED ON TUERJIUNDL•R WHEN IN VIOLATION OF THIS CODE OR ANY OTHER ORDINANCE OR REGULATION OF THIS JURISDICTION THE REVIEW DP THE SMUTTED PLANS AND SPACIFICATIONS AND INSPECTIONS CONDUCTED THEIIEAFTIRI DOES NOT CONSTITUTE AN ACCEPTANCE OF ANY RESPONSIBILITIES OR LIABILITIES BY GABFIEID COUNTY FOR ERRORS, OMISSIONS OR DISCREPANCIES. THE RESPONSIBILITY l.UR ; HESE RTT NIS AND I1I1LPMENTATIDN DINGING CONSTRUCTION RESTS SPECIFICALLY WITH THE ARCHITECT, DESIGNER, BUILDER AND OWNER_ COMMENTS ARE INTENDRDTO BE CONSERVATIVE AND IN SUPPORT OF TUU OWNERS INTEREST. Garfamoo3 I HEREBY ACKNOWLEDGE THAT I HAVE READ AND UNDERSTAND TEE AGREEMENT ABOVE. (INITIAL) �c} Lk The following items are required by Garfield County for a final inspection: 1. A final Electrical Inspection from the Colorado State Electrical Inspector; 2. Permanent address assigned by Garfield County Building Department posted where readily visible from access road; 3. A finished roof, a lockable house, complete exterior siding, exterior doors and windows installed, a complete kitchen with cabinets, a sink with hot & cold running water, non-absorbent kitchen floor coverings, counter tops and finished walls, ready for stove and refrigerator, all necessary plumbing; 4. A complete bathroom, with washbowl, tub or shower, toilet stool, hot and cold running water, non-absorbent floors and walls finished and a privacy door; 5. All steps outside or inside over three (3) steps must have handrails, guard rails on balconies or decks over 30" high constructed to all 1994 UBC ,requirements; 6. Outside grading done to where water will detour away from the building; 7. Exceptions to the outside steps, decks and grading may be made upon the demonstration of extenuating circumstances, i.e. weather, but a Certificate of Occupancy will not. be issued until all the required items are completed and a final inspection made. A CERTIFICATE OF OCCUPANCY WILL NOT BE ISSUED UNTIL ALL THE ABOVE ITEMS HAVE BEEN COMPLETED. *CANNOT OCCUPY OR USE DWELLING UNTIL A CERTIFICATE OF OCCUPANCY (C.O.) IS ISSUED. OCCUPANCY OR USE OF DWELLING WITHOUT A C.O. WILL BE CONSIDERED AN ILLEGAL OCCUPANCY AND MAY BE GROUNDS FOR VACATING PREMISES UNTIL IL ABOVE CONDITIONS ARE MET. I understand and agree to abide by the above conditions for occuparicA Itse and the issuance of a Certificate of Occupancy fox the dwelling under building permit # Signature Date bpcont 4z 11.) se atAM,0191,74.4 COUNTY OF GARFIELD - BUILDING DEPARTMENT CORRECTION NOTICE 109 8th St. Suite 303 Glenwood Springs, Colorado Phone 945-8212 Job located at /z- dA 215' (JT) Permit No. 0417,-, I have this day inspected this structure and these I premises and found the following corrections needed: 1 , r tm`l eJ So nn t4k, ,4t ice"` c1 I jj ` You are hereby notified that the above correction must be inspected before covering. When correction(s) have been made, call for inspection. Date i 19 Phone 946-8212 Building inspector <4,-, • ttieY t.Lo J ( Uri As of January 1, 1999: Plans to be included for a Building Permit must be on draft paper at least 18"x 24"" and drawn to scale- Plans must include a floor plan, a concrete footing and foundation plan, elevations ail sides with decks, balcony steps, hand rails and guard rails, windows and doors, including the finish grade line, A section showing in detail, from the bottom of the footing to the top ofthe roof, including re -bar, anchor bolts, pressure treated plates, floor joists, wall studs and spacing, insulation, sheeting, house -rap, (which is required), siding or any approved building material. A window schedule. A door schedule. A floor framing plan, a roofing framing plan, roof must be designed to withstand a 40# per ft. up to 7,000 F.D.S. and an 80 M,P.H. wind. All sheets to be identified by number and indexed. All ofthe above requirements must be met or your plans will be returned. Applicants are required to indicate appropriately and to submit completed checklist at time of application for a permit; 1. Is a site plan included that indicates the distance ofthe proposed building or addition to Property Sines, other buildings, set back easements and utility easements? Yes i/ No Not necessary for project 2. Are the plans submitted for application construction drawings and not drawings that are stamped or *narked identifying them as "Not for construction, for permit issuance only", "Approval drawings only", "For permit issuance only'' or similar language? Yes V� NoNot necessary for this project 3. Does the site plan include the location, including the distances to property lines, wells, (on subject property and adjacent properties), streams or water courses of the I. S.D, S (Individual Sewage Disposal System) and has the system been designed, stamped and signed by Colorado registered engineer? Yes No Not necessary for this project 4. Does the site plan indicate the location and direction ofthe State, County or private road accessin the property? Yes No Not necessary for this project 2 5. Do the plans include a foundation plan indicating the size, location and spacing of all reinforcing steel in accordance with the uniform building code or per stamped engineered design? Yes t" No NOt necessary for this project 6. If the building is a pre-engineered structure, is there a stamped, signed engineered foundatio plan for this building? Yes l No Not necessary for this project 7. Do the plans indicate the location and size of ventilation openings for under floor crawl spaces and the clearances required between wood and earth?,— Yes No Not necessary for project V 8. Do the plans indicate the size and location of the ventilation openings for the attic, roof joist spaces and soffits? Yes No Not necessary for this project 1 9: Do the plans include design loads as required under the Uniform Building Code for roof snowloads (a minimum of 40 pounds per square foot in Garfield County)? Yes i/ No Not necessary for this project 10. Do the plans include design loads as required for floor loads under the Uniform Building Code Section 2304 and Tables 23-A and 23-B? Yes 1 No Not necessary for this project____ 11. Does the plan include a building section drawing indicating foundation, wall, floor and roof cons miction? Yes No Not necessary for this project I2. is the whyd's- peed and exposure design included in the plan? Yes No Not necessary for this project 13. Does the building section drawing include size and spacing of floor joists, wall studs, ceiling�oi ‘roof rafters or joists or trusses? Yes i/ No Not necessary for this project 14. Does the b9ilding section drawing or other detail include the method of positive conne0p6 of all columns and beams? Yesy No Not necessary for this project 3 r. Lel • 15. Does the plan indicate the height of the building or proposed addition from the highest point of the building or addition measured at mid span between the ridge and the cave down toting grade contours? Yes eNo_ Not necessary for this project 16. Does the plan include any stove or zero clearance fireplace planned for installation including make and model and Colorado Phase 11 certifications or Phase B EPA certification? Yes No Not necessary for this project 17. Does the plan include a masonry fireplace including a fireplace section indicating design to comply with the Uniform Building Code Chapter 37? Yes No Not necessary for this project 18, Does the plan include a window schedule or other verification that egress/rescue windows from sleeping rooms and/or basements comply with the requirements of the Uniform Building Code? Yes No Not necessary for this project 19. Does the plan include a window schedule or other verification that windows provide . natural li t and ventilation for all habitable rooms? Yes V No Not necessary for this project 20. Do the plans indicate the location of glazing subject to human impact such as glass doors, glazing immediately adjacent to such doors; glazing adjacent to any surface nocnally used as a walking surface; sliding glass doors; fixed glass'panels; shower doors and tub enclosur nand specify safety glazing for these areas? Yes No Not necessary for this project 21. Do the plans include a complete design for all mechanical systems planned for installation in this building? , Yes No Not necessary for this project / 22. Have all areas in the building been accurately identified for the intended use? (Occupancy as identified in the Uniform Building Code Table 5-A) Yes No Not necessary for this project 1 23. Does the plan indicate the quantity, form, use and storage of any li zardous materials that may be in use in this building? Yes No Not necessary for this project 4 24. Is the location of all natural and liquid petroleum gas furnaces, boilers and water heaters indicated on the plan? Yes No Not necessary for this project 25: Do the plans indicate the location and dimension of restroom facilities and if more than four employees and both sexes are employed, facilities for both se es? Yes No Not necessary for this project 26. Do the plans indicate that restrooms and access to the building are handicapped accessible? Yes No Not necessary for this project 27. Nave two (2) complete sets of construction drawings been submitted with the application? Yes ✓ No Not necessary for this project 28. Have you designed or had this plan designed while considering building and other construction code requirements? Yes No Not necessary for this project 29. Does the plan accurately indicate what you intend to construct and what will receive a final inspection by the Garfield County Building Department? Yes No 30. Do you understand that approval for design andior construction changes are required prior to the implementation of these changes? Yes V '. No 3l . Do you understand that the Building Department will collect a "Plan Review" fee from you at the tirne of application and that you will be required to pay the "Permit" fee as well as any "Sceptic System" fees required, at the time you pick up your building permit? Yes V Nv 32. Are you aware that you are required to call for all inspections required under the Uniform Building Code including approval on a final inspectionyriior to receiving a Certificate of Occupanpy and occupancy of the building? Yes V No 33. Are you aw re that the person signing the Permit Application whether the "Owner", "Agent of lie Owner", "General Contractor", "Contractor" or otherwise, signing the applic tn is the party responsible for the project complying with the Uniform Codes? Yes No 5 34. Are you aware that twenty-four (24) hour notice is required for all inspections? Inspections will be made from Battlement Mesa to West Glenwood in the mornings and from Glenwood Springs to Carbondale, in the afternoon. Morning inspections must be called in by 12:00 p.m. the day before; afternoon inspections must be called in by 4:00 p.m. the day before. Failure to give twenty -Four (24) hour notice for inspections will delay your inspection one (1) day. Inspections are to be called in to 384-5003. 35. Are you aware that prior to issuance of a building permit you are required to show proof ofa driveway access permit or obtain a statement from the Garfield County Road & Bridge Department stating one is not necessary? You can contact the Road & Bridge Department at 62 641. Yes No 36. Do you understand that you will be required to hire a State of Colorado Licensed Electrician and Plumber to perform installations and hookups? The license number will be required at tim o inspection. Yes No 37. Are you aware, that on the front of the building permit application you will need to fill in the Parcell Schedule Number for the lot you are applying for this permit on prior to issuance of the ui ng permit? Your attention in this is appreciated. Yes No I hereby acknowledge that I have read, understand, and answered these questions to the best of my a)ility. 70 date Phone: T7o - 2 Li 3— 46 til (days); ?w- 2.143 --146 4Z (evenings) Project Name: G id 14A--Tok `13 t.) ZL. ® N L. Project Address: CC:I O r iZfl Z.15 'A-rL -CHUTE Co J t:,35 6 LcD; p -n- o�. a C • 0 Cr 0 CO 0 (n '0 m o a a a c c 0,c IV,' ' �v, (0 c c 0 '3 a 1a.O. ..� -p z 0 m 0 3 (0 0rn ro CO 0 Q 0C - o i3 C° - a x a a -n Co SNOI13 dSNI .73 CO -s d o ualina z 0 'ON IaOaed S,JOSSOSSd