HomeMy WebLinkAboutLetter from Engineer 12.29.2015CONTRACTORS YARD
Engineer's Opinion of Probable Construction Cost
SE Job # 15219.01
December 28, 2015
NATURE OF WORK
ITEM [0
QUANTITY
UNIT
UNIT COST
ITEM JOB
YERALL SITE
MI MOBILIZATION
JOB LS S 5.000.00
S 5.000.00
SUBTOTAL OVERALL SITE=
0 $ 6,000.00
SITE
RI
PLACE TOPSOIL 6" THICK
381
CY
5 12.00
$ 4.572.00
R2
EXCAVATION
JOB
LS
5 1,500.00
$ 1,500.00
R3
CLASS 6
32
CY
$ 45.00
5 1,440.00
R4
TEMPORARY BMP's
JOB
LS
5 2,500.00
5 2.500.00
SUBTOTAL SITE=
, 5 10,012.00
LANDSCAPING
L1 IREVEGATATION AND RESEEDING WITH NATIVE
1 047IACRE 15 3,500.00 1 5 1,645.00
SUBTOTAL LANDSCAPING=TS
1,645.00
CIVIL FEES
C1 ISURVEY. CONSTRUCTION OBSERVATION. TESTING AND AS•BULLTS
1 1 ILS 1 $ 1.000.00 $ SA00.00
SUBTOTAL CIVIL FEES=
SUB TOTAL
1 S 1,000.00
17,657.00
10% CONTINGENCY 1.765.70
TOTAL 19,422.70
COST ESTIMATE FOR DRIVEWAY TO CONNECT TO COUNTY ROAD 116,
TOPSOIL, REVEGETATION AND EROSION CONTROL,
Note: This opinion of probable Cost was prepared for budget purposes only.
Sopris Engineering, LLC. cannot be held responsible for variances from this estimate as actual cost may vary due to bid and market fluctuations.