HomeMy WebLinkAboutLetter from Engineer 12.29.2015CONTRACTORS YARD Engineer's Opinion of Probable Construction Cost SE Job # 15219.01 December 28, 2015 NATURE OF WORK ITEM [0 QUANTITY UNIT UNIT COST ITEM JOB YERALL SITE MI MOBILIZATION JOB LS S 5.000.00 S 5.000.00 SUBTOTAL OVERALL SITE= 0 $ 6,000.00 SITE RI PLACE TOPSOIL 6" THICK 381 CY 5 12.00 $ 4.572.00 R2 EXCAVATION JOB LS 5 1,500.00 $ 1,500.00 R3 CLASS 6 32 CY $ 45.00 5 1,440.00 R4 TEMPORARY BMP's JOB LS 5 2,500.00 5 2.500.00 SUBTOTAL SITE= , 5 10,012.00 LANDSCAPING L1 IREVEGATATION AND RESEEDING WITH NATIVE 1 047IACRE 15 3,500.00 1 5 1,645.00 SUBTOTAL LANDSCAPING=TS 1,645.00 CIVIL FEES C1 ISURVEY. CONSTRUCTION OBSERVATION. TESTING AND AS•BULLTS 1 1 ILS 1 $ 1.000.00 $ SA00.00 SUBTOTAL CIVIL FEES= SUB TOTAL 1 S 1,000.00 17,657.00 10% CONTINGENCY 1.765.70 TOTAL 19,422.70 COST ESTIMATE FOR DRIVEWAY TO CONNECT TO COUNTY ROAD 116, TOPSOIL, REVEGETATION AND EROSION CONTROL, Note: This opinion of probable Cost was prepared for budget purposes only. Sopris Engineering, LLC. cannot be held responsible for variances from this estimate as actual cost may vary due to bid and market fluctuations. 15219 cost estimatexlsxts