Loading...
HomeMy WebLinkAbout9.0.8 Billing TemplateGARFIELD COUNTY STAFF BILLING Project: Hunt Ranch Preliminary Plan Owner: Hunt Ranch LLC Representative: Doug Dotson Staff: Craig Richardson Base Fee: Date Description of Work Performed Code Hours 1/4/2008 Completion Review a 1 1/7/2008 TC Review, letter sent b 3 2/6/2008 Application referrals (postage $88.20) j -Tech only 1 2/27/2008 Staff Report d 2.5 3/4/2008 Staff Report d 2 3/5/2008 Staff Report d 2 3/12/2008 PC Meeting Cont. Requested g 0.5 3/20/2008 Meeting with Applicant reps g 1 4/14/2008 Staff Report d 1.5 4/16/2008 Staff Report d 1 4/23/2008 PC Public Hearing g 4 5/15/2008 Phone Conference with Applicant reps h 1 8/13/2008 Staff Report and BOCC packet prep d 2 8/18/2008 BOCC Meeting/public hearing g 0.5 10/1/2008 Meeting with Director and Legal m 1 10/2/2008 Staff Report and Exhibit updates d 2 10/6/2008 Staff Report d 1 Total Hours 27 Fee Calculation Director 2 Hrs @ $ 50.50 = $ 101.00 Asst. Director $ 600.95 Hrs @ $ 45.50 = $ - Sr. Planner 26 Hrs @ $ 40.50 = $ 1,053.00 Plan. Tech. 1 Hrs @ $ 33.75 = $ 33.75 Secretary Hrs @ $ 30.00 = $ - Total Fee $ 1,187.75 Total Other Charges $ 88.20 Grand Total $ 1,275.95 Base Fee (Minus) $ 675.00 Balance Due $ 600.95 NOTES: 1. Codes: a. CR(Completion Review) b. TE (Technical Compliance Review) c. AR (Application Review) d. RW (Report Writing) e. RA (Review Agency Reporting) f. SV (Site Visit) g. MH (Meetings and Hearings) h. TC (Telephone Conference) i. GIS (Geographic Information Systems) j. AS (Administrative Support) k. M (Misc., postage, copies, fax) 2. Misc. Expense: Photo Copies ($0.25/page) 3. Fees: Base Fee is an estimate of the average number of hours of staff tin an application, multiplied by an hourly rate for the personnel involved. recognizes that the land use application process time varies and that an Apl pay for the total cost of the review which may require additional billing. Ha based on the hourly salary, and fringe benefits costs of the respective positir with an hourly overhead cost of the office will be used to establish the actual c staff time devoted to the review of a particular project. ne devoted to The Board plicant should urly rates are ms combined :ost of County