HomeMy WebLinkAbout3.0 Permit - Encroaching in Public ROW■111 t1++ PV ' MIII1I NIL WItl''>MALIKAli 11111
Reception#: 746995
04/21/2008 04.41:59 PM Jean Rlberico
1 of 3 Rec Fee:$l6.00 Doc Fee.0.00 GARFIELD COUNTY CO
GARFIELD COUNTY
APPLICATION ANI) PERMIT
FOR PRE-EXISTING INSTALLATION(S )ENCROACHING IN A PUBLIC
RIGHT-OF-WAY, Section 3.2.4 Road Right -of -Way Use Regulation
Applicant / Permittee's Name: Upper Divide, LLC, a Colorado limited liability company, and its
successors in interest ("Permittee")
Address: P.O. Box 1220, Carbondale, CO 81623
Installation Type: PRE-EXISTING encroachment(s), specifically three (3) sheds, one (1) solar
panel, one (1) satellite dish, one (1) spigot and fence lines which demarcated the property
boundaries prior to dedications of additional County Road 313 right-of-way, all as shown on the
Final Plat of Upper Divide Subdivision Exemption ("Installation(s)")
Location (public highway name/designation): COUNTY ROAD 313
The Board of Commissioners of Garfield County, Colorado ("BOCC") and Permittee recognize
and agree that the Installation(s) were pre-existing at the date of request by Permittee for
permission to leave the Installation(s )in the public right-of-way and no portion of the
Installations(s) are located on the traveled surface of the public right-of-way. Permission to retain
the above-described Installation(s) at the location specified is granted, subject to the following
terms, conditions and special provisions:
1. The Installation(s) are presently owned by the Permittee, shall be maintained by the Permittee
and shall remain in the public right-of-way at no expense whatsoever to the BOCC. Provided,
however, that said fence lines shall be removed from the right-of-way prior to issuance of driveway
access permits.
2. Should the Installation(s) be removed or replaced by the Permittee, the encroachment permitted
herein will no longer be permitted, and no replacement shall be constructed within the public
right -of --way.
3. In the event any changes are made to the public right-of-way that would necessitate removal and
relocation of Installation(s), Permittee shall do so promptly at its own expense upon written
request from the BOCC. Should the Permittee fail to accomplish such relocation at Permittee's
cost, the County may revoke the Permit, remove the Installation(s) and charge the full cost of such
removal to the Permittee.
4. Permittee shall be responsible for any repairs to the public right-of-way, including the traveled
surface, necessitated by the presence, use, removal, alteration, improvement or maintenance of the
Installation(s).
5. Permittee shall hold harmless the BOCC and its representatives, agents and employees from any
and all claim, liability, loss, cost and expense which may arise out of or be connected with the
Installation(s), including without limitation the maintenance, alteration, improvement, removal,
presence or use of the Installation(s) or any work or facility connected therewith, whether by an act
1
Rev. O]/18/08
11111E4E1171MNI�����U���1�11�6 14�'� ��,I �fM�� 1Ill
Reception#. 746995
04121(2008 04:41:59 P11 Jean Alberico
2 of 3 Rec Fee $16.00 Doc Fee:0.00 GARFIELD COUNTY CO
or omission of the Permittee or any of its agents or representatives. The Permittee shall be
responsible for and shall pay for any and all damages and the costs of defense arising out of such, as
well as pay for damage to County property.
6. The Permittee shall provide the BOCC with a Certificate of Insurance, including public liability
and property damage insurance in the minimum amounts of $150,000 per person and $600,000 per
occurrence, written by a company authorized to do business in the State of Colorado and
containing a provision that the insurance shall not be cancelled, terminated, changed or modified
without ten (10) days written notice to the BOCC. The Certificate of Insurance shall name the
BOCC as an additional insured pursuant to the terms of the Permit.
7. No open trench is permitted in or on the traveled surface of the public right-of-way after dark.
8. Any materials from excavation related to the Installation(s) shall be removed from the traveled
surface of the public right-of-way each day before dark.
9. Permittee shall maintain the Installation(s) at all times in order to prevent movement of water
and debris onto the traveled surface of the public right-of-way.
10. If the BOCC so requires, Permittee shall mark the Installation(s) at designated locations in a
manner acceptable to the BOCC or their representative(s), as needed for the safety and welfare of
the public.
11. Permittee shall advise the Garfield County Road and Bridge Department at least forty-eight
(48) hours in advance of the time at which work on the Installation(s) is to commence.
12. The public shall be protected during any work on the Installation(s) with proper warning signs
or signals, both day and night. Warning signs and signals shall be installed by and at the expense of
the Permittee and in accordance with directions given by the BOCC or their representative(s).
13. The BOCC is not responsible for any damage that may result to the Installation(s) located in
the public right-of-way during maintenance of the traveled surface or any other portion of the
public right-of-way.
14. Permittee shall shut off gas, electric, water and other utility lines and remove all combustible
materials from the public right-of-way when requested to do so by the BOCC, as deemed
appropriate by the County for road construction, maintenance operations or other public need.
15. Should any portion of the public right-of-way be disturbed during maintenance, alteration,
improvement, removal, presence or use of the Installation(s) or a portion of the Installation(s), the
Permittee shall restore the area within the public right-of-way to its pre-existing condition.
16. Any backfilling in the public right-of-way and/or cutting of the traveled surface, whether or not
asphalt, shall require a separate permitting process with the Garfield County Road and Bridge
Department, which permit shall define the methodology, materials, equipment and operational
2
Rev. 01/18/08
1111DIE�l'1 ,�aIJ�,�tL�IIII
Reception# 746995
04/21/2008 04:41:59 PM Jean Alberico
3 of 3 Rec Fee:$16.00 Doc Fee.0.00 GARFIELD COUNTY CO
procedures to be used.
17. Where reference is made herein to representative(s) of the BOCC, such representative shall be
the District Road Supervisor or Director of the Road and Bridge Department, unless otherwise
specified in writing by the BOCC.
18. This Permit relates only to the public right-of-way and is not a grant of permission to enter into
private property adjacent to the right-of-way or alter or disturb installation(s) existing within the
right-of-way installed or owned by other parties.
19. This permit is not a substitute for compliance with any land use permit othe
'ise required by
the BOCC.
20. The fee established by the BOCC for this Permit is
Special Provisions:
In making this application and accepting this Permit, the undersigned Permittee or its/his/her
authorized representative verifies that s/he has read and understands all of the foregoing provisions
and has authority to sign for and bind the Permittee, and that by virtue of his/her signature, below,
the Permittee is bound by all the conditions set forth herein if the Permit is approved and executed
by the BOCC, below.
Permittee: UPPER DIVIDE, LLC
By: LJ t <Am k
Title: Manager
Date: �- {T ' CSD , 2008
5�-
APPROVED AND GRANTED this of — day of %*N , 2008.
BOARD OF s .1 TY COMMISSIO
ATTEST:
Ck to the Board
Rev. 01/18/08
3
ARFIEL
By
Chai
RADO