HomeMy WebLinkAboutApplication- PermitNo. 8207
GARFIELD COUNTY
BUILDING, SANITATION
and PLANNING DEPARTMENT
109 8th. Street, Suite 303
Glenwood Springs, CO 81601(970) 945-8212
Job Address - i `I 0 H W [. f 13 . Jl � -��� C _ V 9I4¢ St
Nature of Work Building Permit
Use of Building ,t,.)
inn /I mot
Owner Y'CZr‘. 6— 12 nar i
Contractor �Li.J-�
-i\i{]
Amount of Permits `t
Dater 1 (9, aC50 1
Clerk
GARFIELD COUNTY BUILDING PERMIT APPLICATION
GARFIELD COUNTY (GLENWOOD SPRINGS) COLORADO INSPECTION LINE: (970) 3H4 X003
TELEPHONE: (970) 945-8212
PERMIT NO.
Apt°7
PARCEL/SCHEDULE NO.
JOB ADDRESS: 7i 10 L f w [1... � ... ies*'�'" 1 'ems (--.0�•'h '16,s-5
1
LOT NO. ��vvBLOCK NO. SUBDIVISION/EXEMPTION
r
2
OWNER 6; e t-,, 5 #24:01�'
ADDRFl�9�{��](..f O 774- O' S ica/O
PSV G !tl
MUD: e�y-
i 2 S
3
CDNIRACCDR C ( f
ADDRESS
PH
LG NO:
4
ARCY1IECDENC2NEBP. /++
� )�
ADDRESS
PH
LICNO:
5
mg. Fr. OF BUILDING "."1
5-0 6
sq. Fr. OP TATf) A @ *C /
DOOM 2D /
NO. OP FLOORS/
6
UaEOPBUILDING
W't i I S I,,._,e (-
,SAW
DESCRIBE WORK, 'o &- ', -cc`r e ( S ' dl'vok 4- acs c F
p
U
CIA9SOFWORK °ADDITION DAL FRAIION 'MOVE DRF�VE
7DR1Vi•'t4AY
GARAGE: 081NE ❑DOUBLE CARPORT: QS1N .E ODOUR E
GARAGE:ca
n
10'ON
/o PERMIT SITE SEWAGE DISPOSAL (SEPTIC) oaTIEPLAN
VALDAIIONOFR'OR[: 3 /(/ AD]USIEDVALUATION:$ -' /xi 67S--, 6
fel c :: ; , Q i if) /..... - - -
-174
NOTICE
A SEPARATE ELECTRICAL PERMIT I5 REQUIRED AND MUST BE ISSUED BY THE STATE OF
COLORADO.
THIS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUCTION
AUTHORIZED IS NOT COMMENCED WfiHIN 180 DAYS, OR IF CONSTRUCTION OR
WORK IS SUSPENDED OR ABANDONED FOR A PERIOD OF 180 DAYS AT ANY TIME
AFTER WORK IS COMMENCED.
I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND
KNOW THE SAME TO BE TRUE AND CORRECT. ALL PROVISIONS OF LAWS
GOVERNING THIS TYPE OF WORK WILL BE COMPLIED WITH WHETHER SPECIFIED
HEREIN OR NOT. THE GRANTING OF A PERMIT DOES NOT PRESUME TO GIVE
AUTHORITY TO VIOLATE OR CANCEL THE PROVISIONS OF ANY OTHER STATE OR
LOCAL LAW G NSTRUCTION OR THE PERFORMANCE OF
CONSTRUCTION, _
f
Date `� U
PLAN CHECK PEE: be,
JI `
/ .i c e.9
PERMIT FEE: Sr
-7o6 .
£ 0
•
TOTAL FEE: DATE PERMIT ISSUED:
( J ( C, ((. 0/D
I
OCC: GROUP: CONST: TYPE: } i f
r-- 1 v - k
ZONING:
SETBACKS:
Signature of Own , or or au ho}rized agent .: ,� . ..d. underst. • , .. ti.: ,. .
ir
J I — f �... ( ,,..`,� . ' l ` Ji
l /1/� ''
0 :
ISDS NO. Sc FEE:
, I... a
Budding Dept. ate �� ;*s. _ AppTovaUD
AGREEMENT
PERMISSION IS HEREBY GRANTED TO THE APPLICANT AS OWNER, CONTRACTOR AND/OR THE AGENT OF THE CONTRACTOR OR OWNER TO CONSTRUCT THE STRUCTURE AS
DETAILED ON PLANS AND SPECIFICATIONS SUBMFITED TO AND REVIEWED BY THE BUU.DINGDEPARTMENT.
IN CONSIDERATION OF THE ISSUANCE OF THIS PERMIT, THE SICS'IER HEREBY AGREES TO COMPLY WITH ALL BU1 DING CODES AND LAND USE REGULATIONS ADOPTED BY
GARFIELD COUNTY PURSUANT TO AUTHORITY GIVEN IN 3028.201 CRS AS AMENDED. THE SIGNER FURTIIER AGREES THAT IF THE ABOVE SAID ORDINANCES ARE NOT FULLY
COMPLIED WITH IN THE LOCATION, ERECTION, CONSTRUCTION AND USE OF THE ABOVE DESCRIBED STRUCTURE, THE PERMIT MAY THEN BE REVOKED BY NOTICE FROM
THE COUNTY AND TIIAT THEN AND THERE FT SHALL BECOME NULL AND VOID.
THE ISSUANCE OF A PERMIT BASED UPON PLANS, SPECIFICATIONS AND OTHER DATA SHALL NOT PREVENT THE BUILDING OFFICIAL FROM THEREAFTER REQUIRING THE
CORRECTION OF ERRORS IN SAID PLANS, SPECIFICATIONS AND OTHER DATA OR FRO PREVENTING BUILDING OPERATION BEING CARRIED ON THEREUNDER WHEN IN
VIOLATION OF THIS CODE OR ANY OTHER ORDINANCE OR REGULATION OF THIS JURISDICTION.
THE REVIEW OF THE SUBMITTED PLANS AND SPECIFICATIONS AND INSPECTIONS CONDUCTED THEREAFTER DOES NOT CONSTITUTE AN ACCEPTANCE OF ANY
RESPONSIBILTPIES OR LIABILTI'1ES BY GARFIELD COUNTY FOR ERRORS, OMISSIONS OR DISCREPANCIES. THE RESPONSIBILITY FOR THESE ITEMS AND IMPLEMENTATION
DURING CONSTRUCTION RESTS SPECIFICALLY WITH THE ARCHITECT, DESIGNER, BUILDER AND OWNER. COMMENTS ARE INTENDED TO BE CONSERVATIVE AND IN SUPPORT
OF THE OWNERS INTEREST.
Garform.003 I HEREBY ACKNOWLEDGE THAT I HAVE READ AND UNDERSTAND THE AGREEMENT ABOVE. (N1T1ALj
AcP
14 /II
11 in (t .2'
The following items are required by Garfield County for a final inspection:
1. A final Electrical Inspection from the Colorado State Electrical Inspector;
2. Permanent address assigned by Garfield County Building Department posted where readily
visible from access road;
3. A finished roof, a lockable house, complete exterior siding, exterior doors and windows
installed, a complete kitchen with cabinets, a sink with hot & cold running water, non-absorbent
kitchen floor coverings, counter tops and finished walls, ready for stove and refrigerator, all
necessary plumbing;
4. A complete bathroom, with washbowl, tub or shower, toilet stool, hot and cold running water,
non-absorbent floors and walls finished and a privacy door;
5. All steps outside or inside over three (3) steps must have handrails, guard rails on balconies or
decks over 30" high constructed to all 1994 UBC requirements;
6. Outside grading done to where water will detour away from the building;
7. Exceptions to the outside steps, decks and grading may be made upon the demonstration of
extenuating circumstances, i.e. weather, but a Certificate of Occupancy will not be issued until
all the required items are completed and a final inspection made.
A CERTIFICATE OF OCCUPANCY WILL NOT BE ISSUED UNTIL ALL THE ABOVE
ITEMS HAVE BEEN COMPLETED.
****CANNOT OCCUPY OR USE DWELLING UNTIL A CERTIFICATE OF OCCUPANCY
(C.O.) IS ISSUED. OCCUPANCY OR USE OF DWELLING WITHOUT A C.O. WILL BE
CONSIDERED AN ILLEGAL OCCUPANCY AND MAY BE GROUNDS FOR VACATING
PREMISES UNTIL ABOVE CONDITIONS ARE MET.
I understand and agree to abide by the above conditions for occupancy, use and the issuance of a
Certificate of Occupancy for the dwelling under building permit #
ature
bpcont
Date
triwy.13
S & k G l --e, r9
SRIA/ r�tcc,(- S Nom9
-706.00
� �6
As of January 1, 1999:
Plans to be included for a Building Permit must be on draft paper at least 18"x 24"" and drawn to
scale.
Plans must include a floor plan, a concrete footing and foundation plan, elevations all sides with
decks, balcony steps, hand rails and guard rails, windows and doors, including the finish grade
line. A section showing in detail, from the bottom of the footing to the top of the roof, including
re -bar, anchor bolts, pressure treated plates, floor joists, wall studs and spacing, insulation,
sheeting, house -rap, (which is required), siding or any approved building material.
A window schedule. A door schedule.
A floor framing plan, a roofing framing plan, roof must be designed to withstand a 40 per ft. up
to 7,000 F.O.S. and an 80 M.P.H. wind.
All sheets to be identified by number and indexed. All of the above requirements must be met or
your plans will be returned.
Applicants are required to indicate appropriately and to submit completed checklist at time
of application for a permit:
1. Is a site plan included that indicates the distance of the proposed building or addition to
Property lines, other buildings, set back easements and utility easements?
Yes & No Not necessary for project
2. Are the plans submitted for application construction drawings and not drawings that are
stamped or marked identifying them as "Not for construction, for permit issuance only",
"Approval drawings only", "For permit issuance only" or similar language?
Yes (. No Not necessary for this project
3. Does the site plan include the location, including the distances to property lines, wells, (on
subject property and adjacent properties), streams or water courses of the I. S.D.S
(Individual Sewage Disposal System) and has the system been designed, stamped and
signed by a Colorado registered engineer?
Yes No / Not necessary for this project
4. Does the site plan indicate the location and direction of the State, County or private road
accessin e property?
Yes No Not necessary for this project
2
5. Do the plans include a foundation plan indicating the size, location and spacing of all
reinforcing steel in accordance with the uniform building code or per stamped engineered
design?
Yes No Not necessary for this project
6. If the building is a pre-engineered structure, is there a stamped, signed engineered
foundation plan for this building?
Yes No / Not necessary for this project
7. Do the plans indicate the location and size of ventilation openings for under floor crawl
spaces and the clearances required between wood and earth?
Yes No Not necessary for project
8. Do the plans indicate the size and location of the ventilation openings for the attic, roof
joist spaces and soffits?
Yes No Not necessary for this project V
9. Do the plans include design loads as required under the Uniform Building Code for roof
snowloads, (a minimum of 40 pounds per square foot in Garfield County)?
Yes No Not necessary for this project
10. Do the plans include design loads as required for floor loads under the Uniform Building
Code Section 2304 and Tables 23-A and 23-B?
Yes No Not necessary for this project
11. Does the plan include a building section drawing indicating foundation, wall, floor and
roof cons ction?
Yes / No Not necessary for this project
12.. - Is the wind speed and gfosure design included in the plan?
Yes No
Not necessary for this project
13. Does the building section drawing include size and spacing of floor joists, wall studs,
ceiling joists, roof rafters or joists or trusses?
Yes No Not necessary for this project
14. Does the building section drawing or other detail include the method of positive
connection of all columns and beams?
Yes No Not necessary for this project
3
15. Does the plan indicate the height of the building or proposed addition from the highest
point of the building or addition measured at mid span between the ridge and the eave
down to existing grade contours?
Yes No Not necessary for this project
16. Does the plan include any stove or zero clearance fireplace planned for installation
including make and model and Colorado Phase I1 certifications or Phase 11 EPA
certification?
Yes No V Not necessary for this project
17. Does the plan include a masonry fireplace including a fireplace section indicating design to
comply with the Uniform Building Code Chapter 37?
Yes No � Not necessary for this project /
18. Does the plan include a window schedule or other verification that egress/rescue windows
from sleeping rooms and/or basements comply with the requirements of the Uniform
Building Code?
Yes No Not necessary for this project
19. Does the plan include a window schedule or other verification that windows provide
natural light and ventilatio for all habitable rooms?
Yes No Not necessary for this project
20. Do the plans indicate the location of glazing subject to human impact such as glass doors,
glazing immediately adjacent to such doors; glazing adjacent to any surface normally used
as a walking surface; sliding glass doors; fixed glass panels; shower doors and tub
enclosures and specify safety glazing for these areas?
Yes No Not necessary for this project
21. Do the plans include a complete design for all mechanical systems planned for installation
in this building?
Yes No Not necessary for this project
22. Have all areas in the building been accurately identified for the intended use? (Occupancy
as identified in the Uniform Building Code Table 5-A)
Yes No -- Not necessary for this project
23. Does the plan indicate the quantity, form, use and storage of any hazardous materials that
may be in use in this building?
Yes No / Not necessary for this project /
4
24. Is the location of all natural and liquid petroleum gas furnaces, boilers and water heaters
indicated on n the plan?
Yes No / Not necessary for this project
25. Do the plans indicate the location and dimension of restroom facilities and if more than
four employees and both sexes are employed, facilities for both sexes?
Yes No Not necessary for this project
26. Do the plans indicate that restrooms and access to the building are handicapped
accessible?
Yes No Not necessary for this project
27. Have two ) complete sets of construction drawings been submitted with the application?
Yes No Not necessary for this project
28. Have you designed or had this plan designed while considering building and other
construction code requirements?
Yes" No Not necessary for this project
29. Does the plan accurately indicate what you intend to construct and what will receive a
final in�ctionIbyy the Gaff eld County Building Department?
Y
30. Do you understand that approval for design and/or construction changes are required
prior to the implementation of these changes?
Yes . No
31. Do you understand that the Building Department will collect a "Plan Review" fee from
you at the time of application and that you will be required to pay the "Permit" fee as well
as any "Se tic System" fees required, at the time you pick up your building permit?
Yes No
32. Are you aware that you are required to call for all inspections required under the Uniform
Building Code including approval on a final inspection prior to receiving a Certificate of
Occupa7 and occupancy of the building?
Yes No
33. Are you aware that the person signing the Permit Application whether the "Owner",
"Agent of the Owner", "General Contractor", "Contractor" or otherwise, signing the
applicatio is the party responsible for the project complying with the Uniform Codes?
Yes No
5
34. Are you aware that twenty-four (24) hour notice is required for all inspections?
Inspections will be made from Battlement Mesa to West Glenwood in the mornings
and from Glenwood Springs to Carbondale, in the afternoon. Morning inspections
must be called in by 12:00 p.m. the day before; afternoon inspections must be called
in by 4:00 p.m. the day before. Failure to give twenty-four (24) hour notice for
inspections will delay your inspection one (1) day. Inspections are to be called in to
384-5003.
35. Are you aware that prior to issuance of a building permit you are required to show proof
of a driveway access permit or obtain a statement from the Garfield County Road &
Bridge Department stating -o -e is -not -necessary?- You—can-contact the Road & Bridge
Department t 625-8601.
Yes No
36. Do you understand that you will be required to hire a State of Colorado Licensed
Electrician and Plumber to perform installations and hookups? The license number will be
required attim of inspection.
Yes No
37. Are you aware, that on the front of the building permit application you will need to fill in
the Parcell Schedule Number for the lot you are applying for this permit on prior to
issuance of the uilding permit? Your attention in this is appreciated.
Yes No
I hereby acknowledge that I have read, understand, and answered these questions to
the best of my/aiility.
Signature
Phone: 96 g O/Zs(days); 876- Z� jevenings) C e g j y y -3.2 G�-
Project Name: ,SikwVIA,M ►? �- f `�
Project Address: Ai, 13
6
No CZG.0"1
Job Address
t�d
Assessor's Parcel No.
Date tk! Rohl
BUILDING PERMIT CARD
-10
Owner 5'ro - i Ecnr. -cv
Contractor
Setbacks: Front
Address Stt.- t Cm S15- Phone # `Z "2.g 24)
$"14- �2.d
tt L' Phone # g4?b t
Zoning
Address
Rear RH LH
"INSPECTIONS
Soils Test 5S
Footing pi` `Ok .f .5,
Foundation
Grout
Underground Plumbing
Rough Plu{ra
Framing
r - 3 /- k'i1x--
Insulation
Roofing
Drywall
Gas Piping
NOTES
Weatherproofing
Mechanical
Electrical Rough (State)
Electrjpai Final State)
Final.>3/ 03 hecklist
Certificate Occupancy #
Date
Septic System #
Date NIA
Final
Other
Completed?
(continue on back)