HomeMy WebLinkAboutApplication- PermitNa. 8117
GARFIELD COUNTY
BUILDING, SANITATION
and PLANNING DEPARTMENT
109 8th. Street, Suite 303
Glenwood Springs, CO 81501(970) 945-8212
Job Address ©11° F:a () l /J - e°[ 0:0 P1‘5 -a. / 0 `
Nature of Work Building Permit
Use of Building
Owner
oNN.frik,u-e,e46)*, bcyloun&_
Contractor
Amount of Permit$ W / ! • f
Date
6s,!-Nfi.0b Of_ex
C��lClerk
T
GARFIELD COUNTY BUILDING PERMIT APPLICATION
GARFIELD COUNTY (GLENWOOD SPRINGS), COLORADO
3LEPHONE: (970) 945.8212 INSPECTION LINE: (970)384 5003
PARCEL/SCHEDULE NO.
PERMIT NO.
OB ADDRESS: 0( I © &,c+{ eJR.. (/-- .1'. 14— Vb 0/ t 5.---
I
LOT NO. -7 BLOCK NO. SUBDIVISION/EXEMPTION U 6 kcc-ej
ba.,..i s
Z
)�/ I1 e
o awe_ Qat, 4 LLC. „ler,
lLt-01 W 4.I1.�Au e.
ADDRESS
�tehu�;oUd , Go
3v ,2 �{
PH { -1537
3
ON`11A" R 1C -t � .-�"? `{ w (� ADDRESS EeViwooc i . W
/�j
'H. 3(�r '�Q,{J.
�y y�L
I'C'AO: /ti.f��U
4
(t%
tll `
IICNO:
AF.CHMIZDEN
NJ
5
SQ. OFBUQDINCr (� (
� OF
p . . i
"`�Y l ]�j
«� , 2� a o '5)
AO...-
(191-
t
6
USE OFBVRDING �J
•
__._,
7
DRs:MEWORK:
8
caAaB of WORK: OADDffIO °ALTERATION MOVE °REMOVE
9
GARAGE: =NOSE °DOOBIE CARPORT. =NOME• DOUBLE
10
bDRIVEWAY P t 1:14../ SHE SEWAGE DISPOSAL(BFFII) °SHEE FLAN
VALUATION OF WORK, t ADWI SIFD VALVAIION1 /3-5 /
d' .1 f (Jl• (JD
f 1 di/
SPECIAL °CMD TONS:
A SEPARATE
COLORADO.
THIS PERMIT
AUTHORIZED
WORK IS
AFTER WORK
I HEREBY
KNOW THE
GOVERNING
HEREIN
AUTHORITY
LOCAL
CONSTRUCTION.hi
NOTICE/
ELECTRICAL PERMIT IS REQUIRED AND MUST BE ISSUED BY THE STATE OF
BECOMES NULL AND VOID IF WORK OR. CONSTRUCTION
IS NOT COMMENCED WITHIN 180 DAYS, OR IF CONSTRUCTION OR
SUSPENDED OR ABANDONED FOR A PERIOD OF 180 DAYS AT ANY TIME
IS COMMENCED.
CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND
SAME TO BE TRUE AND CORRECT. ALL PROVISIONS OF LAWS
THIS TYPE OF WORK WILL BE COMPLIED WITTi WHETHER SPECIFIED
OR NOT. THE Q.ANTING OF .A PERMIT DOES NOT PRESUME TO GIVE
TO VIOLATE OR CANCEL THE PROVISIONS OF ANY OTHER STATE OR
LAW TING CONSTRUCTION OR THE PERFORMANCE OF
Dateb�Fi
PLAN CHECK PEE:Z r f 4 _ ct
rl
PERMIT PEE ,/, et"� 6, ....7 e"
1!Y ,} J
DATE PERMIT ISSUED:
f _ / / [
( b i
OCC: GROUP: CONST: TYPE:
_e1 F (� f v r ��
i Uf l
ZONING:
SETBACKS:
!
Signature of Owner, Contractor or authorized agent having nod and t udetatood oti above.
b///! lr J�� �`� ""�
,�(
MANU.HOME: `i' 200,O0
ISDSNO.&Eit SDOB
, _ ..
Approval/Date Planning Dept. Approval/Date
Building Deft
AGREEMENT
PERMISSION IS HEREBY GRANTED TO DIE APPLICANT AS OWNER, CONTRACTOR AND/OR THE AGENT OF DIE CONTRACTOR OR OWNER TO CONSTRUCT THE STRUCTURE AS
DETAILED ON PLANS AND SPECIFICATIONS SUBMiTTEDTO AND REVIEWED BY THE BUILDING DEPARTMENT.
IN CONSIDERATION OF THE ISSUANCE OF THIS PERMIT, THE SIGNER HEREBY AGREES TO COMPLY WITH ALL BUILDING CODES AND LAND USE REGULATIONS ADOPTED BY
GARFIELD COUNTY PURSUANT TO AUTHORITY GIVEN JN 30.28.201 CRS AS AMENDED. THE SIGNER FURTHER AGREES THAT IF THE ABOVE SAID ORDINANCES ARE NOT FULLY
COMPLIED WITH IN THE LOCATION, ERECTION, CONSTRUCTION AND USE OF THE ABOVE DESCRIBE/) STRUCTURE, THE PERMIT MAY TIEN BE REVOKED BY NOTICE FROM
DIE COUNTY AND THAT THEN AND THERE IT SHALL BECOME NULL AND VOID.
THE ISSUANCE OF A PERMTT BASED UPON PLANS, SPECIFICATIONS AND OTHER DATA SHALL NOT PREVENT THE BUILDING OFFICIAL FROM THEREAFTER REQUIRING THE
CORRECTION OF ERRORS IN SAID PLANS, SPECIFICATIONS AND OTHER DATA OR FRO PREVENTING BUILDING OPERATION BEING CARRIED ON THEREUNDER WHEN IN
VIOLATION OFTHIS CODE OR ANY OTHER ORDINANCE OR REGULATION OF THIS JURISDICTION.
THE REVIEW OF THE SUBMITTED PLANS AND SPECIFICATIONS AND INSPECTIONS CONDUCTED THEREAFTER DOES NOT CONSTTTITTE AN ACCEPTANCE OF ANY
RESPONSIBIi IDES OR LIABILITIES BY GARFIELD COUNTY FOR ERRORS, OMISSIONS OR DISCREPANCIES. THE RESPONSB3IUTY FOR THESE ITEMS AND IMPLEMENTATION
DURING CONSTRUCTION RESTS SPECIFICALLY WITH THE ARCHITECT, DESIGNER, BUILDER AND OWNER. COMMENTS ARE INTENDED TO BNS RVATIVE AND IN SUPPORT
OF THE OWNERS INTEREST.
Garfonn.003 I HEREBY ACKNOWLEDGE THAT IHAVE READ AND UNDERSTAND THE AGREEMENT ABOVE. (INT1TALI
d iaoq .try 100�
gi? )
The following items are required by Garfield County for a final inspection:
1. A final Electrical Inspection from the Colorado State Electrical Inspector;
2. Permanent address assigned by Garfield County Building Department posted where readily
visible from access road;
3. A finished roof, a lockable house, complete exterior siding, exterior doors and windows
installed, a complete kitchen with cabinets, a sink with hot & cold running water, non-absorbent
kitchen floor coverings, counter tops and finished walls, ready for stove and refrigerator, all
necessary plumbing;
4. A complete bathroom, with washbowl, tub or shower, toilet stool, hot and cold running water,
non-absorbent floors and walls finished and a privacy door;
5. All steps outside or inside over three (3) steps must have handrails, guard rails on balconies or
decks over 30" high constructed to all 1994 UBC requirements;
6. Outside grading done to where water will detour away from the building;
7. Exceptions to the outside steps, decks and grading may be made upon the demonstration of
extenuating circumstances, i.e. weather, but a Certificate of Occupancy will not be issued until
all the required items are completed and a final inspection made.
A CERTIFICATE OF OCCUPANCY WILL NOT BE ISSUED UNTIL ALL THE ABOVE
ITEMS HAVE BEEN COMPLETED.
****CANNOT OCCUPY CRUSE DWELLING UNTIL A CERTIFICATE OF OCCUPANCY
(C.O.) IS ISSUED. OCCUPANCY OR USE OF DWELLING WITHOUT A C.O. WILL BE
CONSIDERED AN ILLEGAL OCCUPANCY AND MAY BE GROUNDS FOR VACATING
PREMISES UNTIL ABOVE CONDITIONS ARE MET.
I understand and agree to abide by the above conditions for occupancy use and the issuance of a
Certificate of Occupancy for the dwelling under building permit # 4( /1?
Signature Date
bpcont
74/o
7-4 k Cees betty.
fv0- Ing4?= 1‘95 404n
cipe i 571P@ IR' :7,k:33/peal!.
a'71302q
4 :?5
Report Date: November 5, 2001
Client: Peter Wailer
Radon Test Address: 0110 Esther Court, Silt, CO
Overall Average: 2.5 pCi/L
This is the report of a radon gas screening measurement. The mea-
surement was performed using a continuous radon monitor (CRM), and
was performed in conformance with test protocols established by the US
Environmental Protection Agency in the document entitled "Protocols for
Radon and Radon Decay Product Measurements in Homes."
The report in the adjacent column is a photocopy of the actual report
that was obtained form the CRM upon completion of the measurement
period.
The measurement period was 48 hours.
Test date Start: October 31, 2001
End: November 2, 2001
During the measurement period radon gas measurements were
recorded once every hour.
The serial number of the CRM deployed for this measurement is:
11793014
Explanation of Report Data:
Tabular Data: This portion of the report provides a numerical listing of
the radon gas measurements that were made throughout the measure-
ment period.
Average: This portion of the report gives the average radon gas
concentration measured during the entire measurement period. This
average is computed in two ways. The "Overall Average" is the simple
average of all of the values listed in Tabular Data. The "EPA Average"
is the simple average of all of the values listed in Tabular Data, except
those values recorded during the first four hours of the measurement
period. The "EPA Average" is computed in a manner consistent with
the protocols cited above.
profe sit nal
Radon Monitor
Start rate /4f3 iJd I
Start Time /1:00 aph
Serial #
Location: Matil F'Io r
Sisnature: C
Data in pCisl
Time Interval 1 Hr
1.8 2.1 1.4
2.5 1.8 1.0
1.4 2.1 1.0
2.1 1.8 3.2
2.5 2.9 2.5
4.0 1.4 3.2
3.6 4.0 3.2
3.2 3.2 4.0
2.9 4.3 2.5
2.9 1.8 4.7
1.8 1.:: 1.4
1.8 2.9. 2.9
1.8 2.1 2.1
1.8 2.9 2.5
4.3 3.2 2.1
1.8 2.1 2.5
Overall Avl.= 2.5
EPA Protocol Pis}s.= 2.6
Other Information: In the printout, the letter "p" or "T" may appear next to a given value. The "p" indicates
that, during this measurement interval, the power was disconnected from the CRM. The "T" indicates that,
during this measurement interval, the CRM was disturbed or moved.
XThe radon gas measurement was completed and there is no evidence that the CRM was tampered with
in any way. Therefore, the average values contained in this report reflect the radon gas concen-
tration at the time of the test and should not be construed as either predictive or supportive of a similar
measurement conducted at another time in the same structure.
0 The radon gas measurement was completed and there is evidence that the CRM may have been
tampered with during the measurement period. Therefore, the measurement values are not consid-
ered valid, and further testing is recommended.
Please consult the attached EPA guidelines to interpret the results of this measurement. Building
Inspection Services, Inc. does not accept any responsibility for health, financial, or other issues that may arise
form the disposition or interpretation of this measurement result. This result is confidential and will not be
released to anyone else without you permission.
If you have any questions on the results please contact Building Inspection Services, Inc.
Interpretation of Radon Test Results
There are two possible outcomes of a screening measurement: (1) if the result is at or above 4 pCi/L
(picocurries per liter of air), mitigation of the radon concern is recommended; (2) if the result is below 4 pCi/L,
no action is necessary. However, the EPA believes that any radon exposure carries some risk, therefore,
follow-up testing four times in a year (once each season) is recommended to obtain a more accurate radon
exposure picture of the home.
The following recommendations are summarized from EPA's Home Buyer's and Seller's Guide to Radon:
If your Screening Measurement Result is below 4 pCiIL:
Follow-up measurements are probably not required if the screening measurement was made in the lowest
livable area of your home under closed -house conditions. EPA estimates that the average indoor radon level
is about 1.3 pCi/L. The U.S. Congress has set a long-term goal that indoor radon levels be no more than
outdoor levels. EPA estimates that the average outdoor radon level is about 0.4 pCi/L. While this goal is not
yet technologically achievable in all cases, most homes today can be reduced to less that 2 pCi/L.
If your screening measurement results are 4 pCi/L or higher:
The EPA recommends that a qualified radon mitigation company be contacted to make corrections.
This test did not include a test for the amount of radon in the water supply. Note that federal standards may
be imposed on public water supplies in the near future. Determination of the amount of radon in the water
can only be determined by a separate testing methodology.
This test was performed by Charles Lanci, Residential Measurement Provider ID#100321 RT
t .r
KURTZ & ASSOCIATES, INC.
5012 County Road 154
Glenwood Springs, CO 81601
Date: November 16, 2001
RECEIVED NOV S 2001
STRUCTURAL CONSULTANTS
Phone (970) 945 6305
Fax (970) 945 1093
MEMORANDUM
TO WHOM IT MAY CONCERN
Re: Foundation Design Ukele Acres Subdivision: Highway 6 and County Road 216,
Garfield County, CO.
Our office is the structural engineer of record for the foundation systems for
modular homes to be placed on the following five lots: Lot 1, Lot 2, Lot 3, Lot 7, and
Lot 9.
Prior to commencing with design of the foundations we reviewed the following
information provided by Hepworth-Pawlak Geotechnical, Inc.:
1. "Geologic Hazards Assessment, Proposed Smith Subdivision, Highway 6 and
Road 216, Garfield County, Colorado" (October 25, 1999).
2. "Preliminary Geotechnical Study: Proposed Smith Subdivision, Highway 6 and
County Road 216, Garfield County, Colorado" (November 11, 1999).
The preliminary report included borings on four of the five subject lots: Lot 1,
Lot 3, Lot 7, and Lot 9. Consequently, Hepworth-Pawlak provided our office with site
specific soils information for those four lots. An allowable soil bearing pressure of 1200
PSF was provided, and utilized in the foundation design for Lot 1, Lot 3, and Lot 9. An
allowable soil bearing pressure of 800 PSF was provided, and utilized in the foundation
design for Lot 7.
An assumed soil bearing pressure of 1200 PSF was provided and utilized in the
foundation design for Lot 2. For this lot it is recommended that Hepworth-Pawlak
examine the site to verify the assumed soil bearing pressure.
41/4;419.° Afei
SAY ,��.
V0/14/V1 11)4 1U:11 VESA t NU Lar !VD! rALtuit2 U1KC(.1 tiuualLYt
f. 4` r
Summit Crest
HOMES'
Colorado Built
August 7, 2001
Factory Direct Housing
2440 Airport Rd
Rifle, Co 81650
Garfield County Building Department
Customer: Ukele Acres Subdivision, Lots 1, 2, 3, 7, 9, Esther Ct, Silt
To Whom It May Concern:
The homes to be built for the Ukele Subdivision, model 439-1ot 1, model 266 -lot 9,
model 835 -lot 2, model 572 -lot 3, model. 265-Iot 7 will be built to the UBC code with a
40Lb snow load and meets Zone 3 insulation requirements. Please see the attached sheet
for UBC wind Zone requirements. These homes have R-44 ceiling insulation, and 2x6
walls with R-19. Please feel free to call if you have any questions. 1-800-818-2632.
Sincerely,
Michelle Anderson
Zone Manager
Summit Crest Homes
2221 Clayton Lane • RO. Bax 10 • Berthoud, Colorado 80513
(970) 5322632 • Fax (970) 532-4352
+.uuc
Uti/14/U1 TUb 1U;315 !'AA }3!U L51 IUD! tAl:'IUltl U1tCt:l;1' HUUSlnli
e a
� a
iNF LDPor TSP#W !y. - Z
--: B r o a) a cs+ nvxpp O
gi�, 70ffi
ssr rrt
x* rz
tspr17ESA Q1-4 0Q,
Q<C1N porn• SS
gm,
a, -i-l_cpmemmr
Vragiakt 15pg
.RWVIAMAr-4.4
TE PZ4g44;r jOA
Q�CJ�rnrn�� ►'� ,. v
zC1D ;e M • LFgW W
MVM V141/
Pil pmz, —+ �W rJ
Wg
e
.�rYi �EP� nVI ° G
d --m4 ��N ~ n if
x
n
A2g n=i �r1 z
y,70
V'
V24 a
rf
(<73 .1.1- - e FP
h � r m .
om
. N N N m
SI W
t p m R Z y
lY
z
NV id 100 -"Id
1
LD
LO
SAWOH iga 0 .LIJNfl
, A- 1JI—03-20H1 09:46
CHRMPION COLORADO
D
Ddu
Zo Fn
z�
x
lltZy
-I -
~MI NIFI
��t•I a
11111.11211111.1
1111111111111.111111
111•111111111
o11%1
■_UMWo
TAlirmit}
Witiog
wow�©;
Fah r•mumh.
Ai
rn
1 � au11' i
111iiki 1al
o X dE:
o te 9 11111.1111.1.111 r t a! 111111111M■1
L! .
_0, aste '9. r1Nt�
-r
970 532 4352 P.28/28
'AEC p
Q
VIM Er...
wino
OOP
AJJ
�sl
�+GG'Sr Y L5i?5 .Sltd'Id
4
ij
•
•
al
411
I �I
TOTAL P.28
Cf
rg ;11
(21_OII
l
PROVIDE (5) -
*4 • 6" O.G.
ADDN`L FTS,
REINP.
iA
1
FTC
STEP
G1
i
1
SI
FTG
6"
4..01111M1111111/1/1
$,Var
‘(.;P:
a
as •°
jrl���F,��t1t�'�U�
KURTZ
ASSOG 1 ATES,
NG.
5012 COUNTY RD . 154
GLEN 1OOD SPRINGS,
COLORADO
(011O) Q45-b3O5
RESIDENCE
LOT No. 1
MODLE 2810-U-265
UKELE ACRES
SUBDIVISION
14161 -MAY 6 AND
COUNTY
ROAD 216
GARF I ELD COUNTY,
COLORADO
GENERAL
CONTRACTOR:
INSPECTION WILL NOT BE MADE UNLESS
THIS CARD IS POSTED ON THE JOB
24 HOURS NOTICE REQUIRED FOR INSPECTIONS
BUILDING PERMIT
GARFIELD COUNTY, COLORADO
Date Issued. ...Zoned Area Permit No.( rt
AGREEMENT
In consideration of the issuance of this permit, the applicant hereby agrees to comply with all
laws and regulations related to the zoning, location; construction and erection of the proposed
structure for which this permit is granted, and further agrees that if the above said regulations
are not fully complied with in the zoning, location, erection and construction of the above
described structure, the permit may then be revoked by notice from the County Building
Inspector and M LATELY BECOM.. L ND VOID.
aP
Use
q fem.
Address or I. gal Descri do I V
Owner,„\ iteS teve . Contractor
Setbacks Front Side Side Rear
This Card Must Be Posted So It is Plainly Visible From The Street Until Final Inspection.
INSPECTION RECORD
Footing q_A,,01 ,A,,
Foundation ?-&O( .,-,,,_#_____e_44
Underground Plumbing
Insulation
Rough Plumbing
Drywall
Chimney & Vent
Electric Fina (by/State Insp tor) fin. // 0/
Gas Piping
Final el
% (
Electric Rough (By State Inspector)
Septic Final i g (,)/ .,,,,---____..-
,,,,—___..-Framing
FramingSa.t ,✓a /61/ek,d
(To include Roof in 8' . ce and Window
and Doors installed).
Notes:
1
ALL LISTED ITEMS MUST BE INSPECTED AND APPROVED BEFORE COVERING -
WHETHER INTERIOR OR EXTERIOR, UNDERGROUND OR ABOVE GROUND.
THIS PERMIT IS NOT TRANSFERABLE
Phone 384-5003 109 8th Street County Courthouse Glenwood Springs, Colorado.
APPROVED DO NOT DESTROY THIS CARD
Date !� By
IF PLACED OUTSID - COVER WITH CLEAR PLASTIC
4