HomeMy WebLinkAboutApplication- PermitINSPECTION WILL NOT BE MADE UNLESS
THIS CARD IS POSTED ON THE JOB
24 HOURS NOTICE REQUIRED FOR INSPECTIONS
BUILDING PERMIT
GARFIELD COUNTY, COLORADO
Date Issuegi .10i Zoned Area Permit No I
AGREEMENT
In consideration of the issuance of thispermit, the applicant hereby agrees to comply with al
Taws and regulations related to the zoning, location; construction and erection of the proposer
structure for which this permit is granted, and further agrees that if the above said regulation;
are not fully complied with in the zoning, location, erection and construction of the abov(
described structure, thepermit may then be revoked by notice from the County Buildini
Insp.ec or and IMMEDIATELY. BECOME NULL AND VOID.
Use::,.!
Address o gal Descriptio
n
Setbacks Front Side Side Rgar
This Card Must Be Posted So It is Plainly Visible From The Street Until Final Inspection.
INSPECTION RECORD
Foundation 9 -. r L{ -
A
Underground Plumbing
Rough Plumbing
Chimney & Vent i)
Gas Piping l t -- 6' -_
Electric Rough ;(By State Inspector
Framing /
(To include Roof in place and Windows
and Doors installed).
Septic Final
Notes:
ALL LISTED ITEMS MUST BE INSPECTED AND APPROVED BEFORE COVERING -
WHETHER INTERIOR OR EXTERIOR, UNDERGROUND OR ABOVE GROUND.
• THIS PERMIT IS NOT TRANSFERABLE
Phone 384-5003 109 8th Street County Courthouse Glenwood Springs, Colorado.
APPROVED DO NOT DE ":TROY THIS CARD
Date .r. ': By
PLACED OUTSIDE f C ER WITH CLEAR PLASTIC
No. 8113
GARFIELD COUNTY
BUILDING, SANITATION,
and PLANNING DEPARTMENT
109 8th, Street, Suite 303
Glenwood Springs, CO 81601(970) 915-8212
Job Address Oct Io 5 /gee • /4(.41.rd'erJ '/, o i
Nature of Work Building Pe/mit 61/,thirger4LiC3
Use of Building qadl-40.-'(2f-e--
OwneraA,
Contractor 71/1 -e'1 --
Amount of Permit$ 4,47
39 J
Date
Pe-vitaef-Q-t-: 0/39Pla4k- CQ-e-i-caree
3cl 44.
=�
a�f abl)I
Clerk
GARFIELD COUNTY BUILDING PERMIT APPLICATION
GARFIELD COUNTY (GLENWOOD SPRINGS), COLORADO
TELEPHONE: (970) 945-8212 INSPECTION LINE: (970)384-5003
PERMIT NO. PARCEL/SCHEDULE NO.
JOB ADDRESS: D 9(ec W�fT+A RZA l,J S CO g-1 Co C j
1
LOT NO. BLOCK NO. SUBDIVISIONE?EMP'TION f .n }ft� 3
2
OWNER f%'K!/ 6
ADDRESS 9of ovcsirAmIlizjec`.
PH941‘r�z;wt
rpt
3
CONTRACTOR A 6
`h,YVf
ADDRESS 6.7jJ 5 eb view J1
�
PH"
LTC. NO:
4
ARCH lECUENGINEFR,L
ADDRESS
IR
LIC NO:
5
SQ. FT. OF BUDDING g69 6Oj
SQ. FT. OF LOT e 2- f
/
}QIGII jy
/
NO. FLOORS
6
USE QF B WLDING
7
DESCRIBE WORK /./J /f V'+fZ ,4i o, 6 • ofiv
8
CLASS OF WORK: �w DADumON °ALiEMiON °MOVE °REMOVE
9
OARAG : 1Lwft wE f. 4.0 CARPORT: MINGLE ODOUBLE
10
a DRIVEWAY PERMIT OM SITE SEWAGE DISPOSAL(SFFIIC) aS71EPLAN
VALUATION OF WORK: S ADNTTED VALUATION.
SPECIAL CONDITIONS:
NOTICE
A SEPARATE ELECTRICAL PERMIT IS REQUIRED AND MUST BE ISSUED BY THE STATE OF
COLORADO.
THIS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUCTION
AUTHORIZED IS NOT COMMENCED WITHIN 180 DAYS, OR IF CONSTRUCTION OR
WORK IS SUSPENDED OR ABANDONED FOR. A PERIOD OF 180 DAYS AT ANY TIME
AFTER WORK IS COMMENCED.
I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND
VW THE SAME TO BOF WOUERK AND CORRECT. ALL PROVISIONS WTHER OF LAWS
GOVERNING THIS TYPE OF WORK WILT, BE COMPLIED W1TH WHETHER SPECIFIED
HEREIN OR NOT. THE GRANTING OF A P ' 1 DOES NOT PRESUME TO GIVE
AUTHO' r • 'a • IOLATE • ' CANCEL THE; . OVISIONS OF ANY OTHER STATE OR
LOCAL . W a •+' CONSTR - ", ON OR THE PERFORMANCE OF
CONSTR
fi/= v:/J Date i? `"O rOf
(
PLAN CHECK FEE: Vy 1
`.. 2.(
,[
PERNffTFEE: yj *�+-�
i" 2—.i / Z S -
TOTAL FEJ DATE PERMIT ISSUED;
3 q i lt G
OCC: GROUP: �� CONST: TYPE: ,
V r'
ENING
SETBACKS:
SignOwner,
' (
Contactor or Euth agent having mad and understood notice above.
0 ^ � ai
n -_ "
MANU. HOME:
ISDS NO. & FEE:
e
Building t. ate Planning Dept. I/DatT
�
AGREEMENT
PERMISSION TS HEREBY GRAN FED TO THE APPLICANT AS OWNER, CONTRACTOR AND/OR THE AGENT OF THE CONTRACTOR OR OWNER TO CONSTRUCT THE STRUCTURE AS
DETAILED ON PLANS AND SPECIFICATIONS SUBMITTED TO AND REVIEWED BY THE BUILDING
IN CONSIDERATION OF THE ISSUANCE OF THIS PERMIT, THE SIGNER HEREBY AGREES TO COMPLY WITH ALL BUILDING CODES AND LAND USE REGULATIONS ADOPTED BY
GARFIELD COUNTY PURSUANT TO AUTHORITY GIVEN IN 30.28.201 CRS AS AMENDED. THE SIGNER FURTHER AGF. ES THAT IF THE ABOVE SAID ORDINANCES ARE NOT FULLY
COMPLIED WITH IN THE LOCATION, ERECTION, CONSTRUCTION AND USE OF THE ABOVE DESCRIBED STRUCTURE, THE PERMIT MAY THEN BE REVOKED BY NOTICE FROM
THE COUNTY AND THAT THEN AND THERE IT SHALL BECOME NULL AND VOID.
THE ISSUANCE OF A PERMIT BASED UPON PLANS, SPECIFICATIONS AND OTHER DATA SHALL NOT PREVENT THE BUILDING OFFICIAL FROM THEREAFTER REQUIRING THE
CORRECTION OF ERRORS IN SAID PLANS, SPECIFICATIONS AND OTHER DATA OR FRO PREVENTING BUILDING OPERATION BEING CARRIED ON THEREUNDER WHEN IN
VIOLATION OF THIS CODE OR ANY OTHER ORDINANCE OR REGULATION OF THIS JURISDICTION.
THE REVIEW OF THE SUBMITTED PLANS AND SPECIFICATIONS AND INSPECTIONS CONDUCTED THEREAFTER DOES NOT CONSTITUTE AN ACCEPTANCE OF ANY
RESPONSIBILITIES OR LIABILITIES BY GARFIELD COUNTY FOR ERRORS, OMISSIONS OR DISCREPANCIES. THE RESPONSIBILITY FOR THESE ITEMS AND IMPLEMENTATION
DURING CONSTRUCTION RESTS SPECIFICALLY WITH THE ARCHITECT, DESIGNER, BUILDER AND OWNER COMMENTS ARE INTENDED TO BE
E�TTVE AND IN SUPPORT
OF THE OWNERS INTEREST.
Garform.003
at l 1 HEREBY ACKNOWLEDGE THAT I HAVE READ AND UNDERSTAND THE AGREEMENT ABOVE. (INITIAL)
a
The following items are required by Garfield County for a final inspection:
1. A final Electrical Inspection from the Colorado State Electrical Inspector;
2. Permanent address assigned by Garfield County Building Department posted where readily
visible from access road;
3. A finished roof, a lockable house, complete exterior siding, exterior doors and windows
installed, a complete kitchen with cabinets, a sink with hot & cold running water, non-absorbent
kitchen floor coverings, counter tops and finished walls, ready for stove and refrigerator, all
necessary plumbing;
4. A complete bathroom, with washbowl, tub or shower, toilet stool, hot and cold running water,
non-absorbent floors and walls finished and a privacy door;
5. All steps outside or inside over three (3) steps must have handrails, guard rails on balconies or
decks over 30" high constructed to all 1994 UBC requirements;
6. Outside grading done to where water will detour away from the building;
7. Exceptions to the outside steps, decks and grading may be made upon the demonstration of
extenuating circumstances, i.e. weather, but a Certificate of Occupancy will not be issued until
all the required items are completed and a final inspection made.
A CERTIFICATE OF OCCUPANCY WILL NOT BE ISSUED UNTIL ALL THE ABOVE
ITEMS HAVE BEEN COMPLETED.
****CANNOT OCCUPY OR USE DWELLING UNTIL A CERTIFICATE OF OCCUPANCY
(C.O.) IS ISSUED. OCCUPANCY OR USE OF DWELLING WITHOUT A C.O. WILL BE
CONSIDERED AN ILLEGAL OCCUPANCY AND MAY BE GROUNDS FOR VACATING
PREMISES UNTIL ABOVE CONDITIONS ARE MET.
I understand and agree abide by the above conditions for occupancy, use and the issuance of a
Certifica = . Occupcy fo, j.lie dwelling under building permit # 13 .
Signature
bpcont
T--20 o
Date
®.
VO4 16vcr 7.db =
X31<zs
o `-(y.R.-= Isq. of
WESTBANK RANCH
Homeowners Association
P.O. Box 2703
Glenwood Springs, CO 81 602
August 10, 2001
Richard A. Nash
0965 Westbank Road
Glenwood Springs, Colorado 81601
Dear Richard
This letter confirms your application to increase your garage at the
above address. You have been approved to go ahead with your
project. Please make sure of the following:
1. Shingles must be a 40 year architectural grade
2. Siding will match existing garage
At the time the roofing material is delivered, please contact myself
or a board member to make sure the material is correct. This
protects you and also the homeowners association, mistakes
sometimes do happen.
Thank you for following the proper approval process.
Sin erely
Brook J. Robison
Covenants Director
January 1, 1999
Plans to be included for a Building Permit, must be on drafting paper at least 18"x24" and drawn to
scale.
Plans must include a floor plan, a concrete footing and foundation plan, elevations all sides with
decks, balcony, steps, hand rails and guard rails, windows and doors, including the finish grade line. A
section showing in detail, from the bottom of the footing to the top of the roof, including re -bar,
anchor bolts, pressure treated plates, floor joists, wall studs and spacing, insulation, sheating, house -
rap, (which is required), siding or any approved building material.
A window schedule. A door schedule.
A floor framing plan, a roof framing plan, roof must be designed to withstand a 40# per ft. up to
7,000 F.O.S. and an 80 M.P.H. wind.
All sheets to be identified by number and indexed. All of the above requirements must be met or your
plans will be returned.
1. Is a site plan included that indicates the distances of the proposed building or addition to
property lin - :, other buildings, setback easements and utility easements?
Yes
2. Does the site plan include the location of the I. S.D. S. (Individual Sewage Disposal System)
and the distances to property lines, wells (on subject property and adjacent properties),
streams or water courses?
Yes ✓
3. Does the site plan indicate the location and direction of the County or private road accessing
the property?
Yes c/
4. Dothe plans include a foundation plan indicating the size, location and spacing of all
reinforcing steel in accordance with the uniform building code or per stamped engineered
design?
Yes !/
5. Do the plans indicate the location and size of ventilation openings for under floor crawl
spaces and the clearances required between wood and earth?
Yes 71.
2
16. Do the plans indicate the location of glazing subject to human impact such as glass doors,
glazing immediately adjacent to such doors; glazing adjacent to any surface normally used as a
walking surface; sliding glass doors; fixed glass panels; shower doors and tub enclosures and
specify safety gl ng for these areas?
Yes f No
17. Is the location of all natural and liquid petroleum gas furnaces, boilers and water heaters
indicated on thee plan?
Yes ✓ No
18. Do you understand that if you are building on a parcel of land created by the exemption
process or the subdivision process, are building plans in compliance with all plat notes and/or
covenants?
Yes � No
19. Do you understand that if you belong to a homeowners association, it is your responsibility to
obtain written permission from the associations if required by that association, prior to
submitting an application for a building permit? If you do not have written permission from
the association, do you_understand that the plan check fee will not be refunded should the
architectural co ee deny or reject your building plans?
Yes No
20. Will this be the gnly residential structure on the parcel?
Yes No If no -Explain:
21. Have two (2) co plete sets of construction drawings been submitted with the application?
Yes %�
22. Do you understa that the minimum size a home can be on a lot is a 20ft. x 20ft.?
Yes t/ No
23. Have you designed or had this plan designed while considering building and other
construction requirements?
Yes No
24. Does the plan accurately indicate what you intend to construct and what will receive a final
inspection by t eld County Building Department?
Yes No
25. Do you understanthat approval for design and/or construction changes are required prior to
the applicatio f these changes?
Yes No
4
6. Do the plans indicate the size and location of ventilation openings for the attic, roofloist
spaces's and soffits?
Yes
7. Do the plans include design loads as required by Garfield County for roof snow loads, (a
minimum of 40 pounds per square foot up to & including 7,000 feet above sea level), floor
loads and windd"s?
Yes
8. Does the plan include a building section drawing indicating foundation, wall, floor and roof
construction?
Yes
9. Does the building section drawing include size and spacing of floor joists, wall studs, ceiling
joists, roof rafter r joists or trusses?
Yes
10. Does the building section drawing or other detail include the method ofpositive connection of
all columns and heath's?
Yes
11. Does the plan indicate the height of the building or proposed addition from the highest point
of the building or addition measured at mid span between the ridge and the eave down to
existing gradtours?
Yes
12. Does the plan include any stove or zero clearance fireplace planned for installation including
make and model and Colorado Phase II certifications or phase H EPA certification?
Yes No X
13. Does the plan include a masonry fireplace including a fireplace section indicating design to
comply with the Uniform Building Code Chapter 37?
Yes No
14. Does the plan include a window schedule or other verification that egress/rescue windows
from sleeping rooms and/or basements comply with the requirements of the Uniform Building
Code?
Yes ✓ No
15. Does the plan include a window schedule or other verification that windows provide natural
light and ventilatipn1or all habitable rooms?
Yes ✓ No
3
26. Do you understand that the Building Department will collect a "Plan Review" fee from you at
the time of application and that you will be required to pay the "Permit Fee" as well as any
"School Impact" or "Septic System" fees required, at the time you pick up your building
permit?
Yes No
27_ Are you aware that twenty-four (24) hour notice is required for all inspections?
Inspections will be made from Battlement Mesa to West Glenwood in the mornings and
from Glenwood Springs to Carbondale in the afternoon. Morning inspections must be
called in by 12:00 p.m. the day before; afternoon inspections must be called in by 4:00
p.m. the day before. Failure to give twenty-four (24) hour notice for inspections will
delay your i ection one (1) day. Inspections are to be called in to 384-5003.
Yes No
28. Are you aware that you are required to call for all inspections required under the Uniform
Building Code including.. approval on a final inspection prior to receiving a Certificate of
Occupancy and ocatpancy of the building?
Yes f�"F"' No
29. Are you aware that the person signing the Permit Application, whether the "Owner", "Agent
of the Owner", "General Contractor", "Contractor" or otherwise, is the party responsible for
the project compl ' gwith the Uniform Building Code?
Yes No
30. Are you aware that prior to issuance of a building permit you are required to show proof of a
driveway access permit or obtain a statement from the Garfield County Road & Bridge
Department stating one.isnot necessary? You can contact the Road & Bridge Department at
625-8601.
Yes j/ No
31. Do you understand that you will be required to hire a State of Colorado Licensed Electrician
and Plumber to perform installations and hookups, unless you as the homeowner are
performing the work? Ther nse number of the person performing the work will be required
at time of applicable ' ection.
Yes No
32. Are you aware, that on the front of the Building Permit Application you will need to fill in the
Parcel/Schedule Number for the lot you are applying for this permit on prior to issuance of a
building permit? Yo tention in this is appreciated.
Yes No
5
I hereby acknowledge at I have read, understand and answered these questions to the
st of j; ability.
c1
gnature date
Phone:
4<73Z9 (days),
Project Name:
6�9( - iX jf £ 5 (0 (6G /
Project Address: �i
' (evenings)
Notes:
If you have answered "No" on any of the questions, you may be required to provide this information
at the request of the Building Official prior to beginning the plan review process. Delays in issuing
the permit are to be expected. Work may not proceed without the issuance of a permit. If it is
determined by the Building Official that additional information is necessary to review the application
and plans to determine minimum compliance with the adopted codes, the application may be placed
behind more recent applications for building permits in the review process and not reviewed until
required information has been provided and the application rotates again to first position for review,
delay in issuance of the permit or delay in proceeding with construction.
bpminreq
8/00
6