Loading...
HomeMy WebLinkAboutApplication- PermitINSPECTION WILL NOT BE MADE UNLESS THIS CARD IS POSTED ON THE JOB 24 HOURS NOTICE REQUIRED FOR INSPECTIONS BUILDING PERMIT GA FIELD COUNTY, COLORADO Date Issue . . Zoned Area Permit No %OtIV4 AGREEMENT In consideration of the issuance of this permit, the applicant hereby agrees to comply with all laws and regulations related to the zoning, location; construction and erection of the proposed structure for which this permit is granted, and further agrees that if the above said regulations are not fully complied with in the zoning, location, erection and construction of the above described structure, the permit may then be revoked by notice from the County Building Insuector aid IMMEDI TELY BECOME NULL AND VOID. Use 91a 3‘?& a45 _p. am. it w Address o Legal Deerip 11, ah Contactor Setbacks Front Side Side Rear This Card Must Be Posted So It is Plainly Visible From The Street Until Final Inspection. INSPECTION RECORD Footing,. 4-0 Foundation i----% , -' CV 4#/ -/--- Underground Plumbing Via Insulation AA Ar Rough Plumbing Drywall Chimney & Vent Electric Final (by State Inspector)1,I _ : Gas Piping ) Final it. Q?.42 43. Electric Rough (By State Inspector) n; ` ,,,, Septic Final iv, g Framing /-.07.402. (To include Roof in place and Windows and Doors installed). Notes: ALL LISTED ITEMS MUST BE INSPECTED AND APPROVED BEFORE COVERING - WHETHER INTERIOR OR EXTERIOR, UNDERGROUND OR ABOVE GROUND. THIS PERMIT IS NOT TRANSFERABLE Phone 384-5003 109 8th Street County Courthouse Glenwood Springs, Colorado. APPROVED Date ' . By IF PLACED OUTSIDE COVER WITH CLEAR PLASTIC GARFIELD COUNTY BUILDING, SANITATION and PLANNING DEPARTMENT 109 Stb. Street, Suite 303 Glenwood Spriggs, CO 81601(970) 945-8212 No. 8094 Job Address 341 ? u t t rzaQ ((2 . � a -o '.v- G g f Nature of Work Building Permit Use of Building Owner Contractor Amount of Permit$ 575 : 9, 1 o ca — b •c S!5 a/ Date (4/b, r / flti Clerk GARFIELD COUNTY BUILDING PERMIT APPLICATION GARFIELD COUNTY (GLENWOOD SPRINGS), COLORADO TELEPHONE: (970) 9454212 PERMIT NO. g 0 9 INSPECTION LINE: (970)384-5003 PARCEL/SCHEDULE NO.4 3 3 91 4r, 9 s �. JOB ADDRESS: y ... y RI 4 C f/, 1 LOT NO. BLOCK NO. SUBDIVISION/EXEMPTION 2 OWE �r; a n // a, 1^I^ is /1 ¢ w ADDRESS ,3 77 0 - a 93 da C s *I int 97o -•&,-/-3115 WK PJC 97o -9d s - y), 6,1 3 CONTRACTOR J e /JT (j ADDRESS PIC LIC NO: 4 ARCHITECT/ENGINEER ADDRESS PIC lICNO: 5 SQ. FT. OF BUILDING /01 �P J u 4,. Ft. SQ. FT. OF LOT HEIGHT i _ 17 NO. OF FLOORS ! 6 USE OF BUILDING /I - A ill C.1..- r� A �-�tf v 7 i DESCRIBE WORK: if �1 tf /tett C. Oil ..'tea.<.l'Q.t 8 CLASS OF WORK: XSZEWaADDIIION aALTIRATION [MOVE aREMOVE 9 OARAOE: MINGLE WOKE CARPORT: OBINCEE aDOUBIE 10 a DRIVEWAY PERMIT DON SITE SEWAGE E'IsPOSAL(SEPTIC) 4,./ aSTIEPIAN VALUATION OF WORK: E ADJUSTED VALUATION:S o 1 /I _ 9/ h . AJC. / �yV SPECIAL CONDIIIONS: NOTICE A SEPARATE ELECTRICAL PERMIT IS REQUIRED AND MUST BE ISSUED BY THE STATE OF COLORADO. THIS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUCTION AUTHORIZED IS NOT COMMENCED WITHIN 180 DAYS, OR IF CONSTRUCTION OR WORK IS SUSPENDED OR ABANDONED FOR A PERIOD OF 180 DAYS AT ANY TIME AFTER WORK IS COMMENCED. I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED TIES APPLICATION AND KNOW THE SAME TO BE TRUE AND CORRECT. ALL PROVISIONS OF LAWS GOVERNING THIS TYPE OF WORK WILL BE COMPLIED WHIT WHETHER SPECIFIED HEREIN OR NOT. THE GRANTING OF A PERMIT DOES NOT PRESUME TO GIVE AUTHORITY TO VIOLATE OR CANCEL THE PROVISIONS OF ANY OTHER STATE OR LOCAL LAW REGULATING CONSTRUCTION OR THE PERFORMANCE OF CONSTRUCTION. F % . PLAN CHEM FEE: - [, L %2 • (G PERMIT FEE: . /G J 3 f 2 _ '. 3- TOTAL FEE: f,� f DATE PERMIT ISSUED: � / -P 3- F j - 2` OCC: GROUP: CONST: TYPE: , / f V - I�CKI ZO '� G: SETBACKS: il Signal= of Owner, Contractor ar authorized agent . 1 . • t Signaf� V/ Jr/ `/ , // f / I �ann 4 . HOME: ISDS NO. &FEE: Building . pptovaVDate mg a , , . P ate AGREEMENT PERMIS SION IS HEREBY GRANTED TO THE APPLICANT AS OWNER, CONTRACTOR AND/OR THE AGENT OF THE CONTRACTOR OR OWNER TO CONSTRUCT THE STRUCTURE AS DETAILED ON PLANS AND SPECIFICATIONS SUBMITTED TO AND REVIEWED BY THE BUILDING DEPARTMENT. IN CONSIDERATION OF THE ISSUANCE OF THIS PERMIT, THE SIGNER HEREBY AGREES TO COMPLY WITH AIL BUILDING CODES AND LAND USE REGULATIONS ADOPTED BY GARFIELD COUNTY PURSUANT TO AUTHORITY GIVEN IN 30.28.201 CRS AS AMENDED. THE SIGNER FURTHER AGREES THAT IF THE ABOVE SAID ORDINANCES ARE NOT FULLY COMPLIED WITH IN THE LOCATION, ERECTION, CONSTRUCTION AND USE OF THE ABOVE DESCRIBED STRUCTURE, THE PERMIT MAY THEN BE REVOKED BY NOTICE FROM THE COUNTY AND THAT THEN AND THERE IT SHALL BECOME NULL. AND VOID. THE ISSUANCE OF A PERMIT BASED UPON PLANS, SPECIFICATIONS AND OTHER DATA SHALL NOT PREVENT THE BUILDING OFFICIAL FROM THEREAFTER REQUIRING THE CORRECTION OF ERRORS IN SAID PLANS, SPECIFICATIONS AND OTHER DATA OR FRO PREVENTING BUILDING OPERATION BEING CARRIED ON THEREUNDER WHEN IN VIOLATION OF THIS CODE OR ANY OTHER ORDINANCE OR REGULATION OF THIS JURISDICTION. THE REVIEW OF THE SUBMITTED PLANS AND SPECIFICATIONS AND INSPECTIONS CONDUCTED THEREAFZER DOES NOT CONSTITUTE AN ACCEPTANCE OF ANY RESPONSIBILITIES OR LIABILITIES BY GARFIELD COUNTY FOR ERRORS, OMISSIONS OR DISCREPANCIES. THE RESPONSIBILITY FOR THESE ITEMS AND IMPLEMENTATION DURING CONSTRUCTION RESTS SPECIFICALLY WITH THE ARCHITECT, DESIGNER, BUILDER AND OWNER. COMMENTS ARE INTENDED TO BE C•NSERVATIVE AND IN SUPPORT OF THE OWNERS INTEREST. Garfonn.003 I HEREBY ACKNOWLEDGE THAT I HAVE READ AND UNDERSTAND THE AGREEMENT ABOVE. (INITIAL) -pCkTeLI 12 U51)1r11/09' The following items are required by Garfield County for a final inspection: 1. A final Electrical Inspection from the Colorado State Electrical Inspector; 2. Permanent address assigned by Garfield County Building Department posted where readily visible from access road;. 3. A finished roof, a lockable house, complete exterior siding, exterior doors and windows installed, a complete kitchen with cabinets, a sink with hot & cold running water, non-absorbent kitchen floor coverings, counter tops and finished walls, ready for stove and refrigerator, all necessary plumbing; 4. A complete bathroom, with washbowl, tub or shower, toilet stool, hot and cold running water, non-absorbent floors and walls finished and a privacy door; 5. All steps outside or inside over three (3) steps must have handrails, guard rails on balconies or decks over 30" high constructed to all 1994 UBC requirements; 6. Outside grading done to where water will detour away from the building; 7. Exceptions to the outside steps, decks and grading may be made upon the demonstration of extenuating circumstances, i.e. weather, but a Certificate of Occupancy will not be issued until all the required items are completed and a final inspection made. A CERTIFICATE OF OCCUPANCY WILL NOT BE ISSUED UNTIL ALL THE ABOVE ITEMS HAVE BEEN COMPLETED. ****CANNOT OCCUPY OR USE DWELLING UNTIL A CERTIFICATE OF OCCUPANCY (C.O.) IS ISSUED. OCCUPANCY OR USE OF DWELLING WITHOUT A C.O. WILL BE CONSIDERED AN ILLEGAL OCCUPANCY AND MAY BE GROUNDS FOR VACATING PREMISES UNTIL ABOVE CONDITIONS ARE MET. I understand and agree to abide by the above conditions for occupancy use and the issuance of a Certificate of Occupancy for the dwelling under building permit # i q 6- r6.- v 1 Signature Date bpcont 3970 a43 January 1, 1999 Plans to be included for a Building Permit, must be on drafting paper at least 18"x24" and drawn to scale. Plans must include a floor plan, a concrete footing and foundation plan, elevations all sides with decks, balcony, steps, hand rails and guard rails, windows and doors, including the finish grade line. A section showing in detail, from the bottom of the footing to the top of the roof, including re -bar, anchor bolts, pressure treated plates, floor joists, wall studs and spacing, insulation, sheating, house - rap, (which is required), siding or any approved building material. A window schedule. A door schedule. A floor framing plan, a roof framing plan, roof must be designed to withstand a 40# per ft. up to 7,000 F.O.S. and an 80 M.P.H. wind. All sheets to be identified by number and indexed. All of the above requirements must be met or your plans will be returned. Is a site plan included that indicates the distances of the proposed building or addition to property lines, other buildings, setback easements and utility easements? Yes 2. Does the site plan include the location of the I. S.D.S. (Individual Sewage Disposal System) and the distances to property lines, wells (on subject property and adjacent properties), streams or w ter courses? Yes 3. Does the site plan indicate the location and direction of the County or private road accessing the grope Yes 4. Dothe plans include a foundation plan indicating the size, location and spacing of all reinforcing steel in accordance with the uniform building code or per stamped engineered design? Yes / 5. Do the plans indicate the location and size of ventilation openings for under floor crawl spaces and t e clearances required between wood and earth? Yes L 2 Do the plans indicate the size and location of ventilation openings for the attic, roofjoist spaces's and soffits? Yes 7 Do the plans include design loads as required by Garfield County for roof snow loads, (a minimum of 40 pounds per square foot up to & including 7,000 feet above sea level), floor loads and windads? Yes 8. Does the plan include a building section drawing indicating foundation, wall, floor and roof construction?/ Yes [� 9. Does the building section drawing include size and spacing of floor joists, wall studs, ceiling joists, roof rafters or joists or trusses? Yes 10. Does the building section drawing or other detail include the method ofpositive connection of all columns anti beams? Yes 11. Does the plan indicate the height of the building or proposed addition from the highest point of the buildin or addition measured at mid span between the ridge and the eave down to existing grad contours? Yes 12. Does the plan include any stove or zero clearance fireplace planned for installation including make and model and Colorado Phase II certifications or phase II EPA certification? Yes No 13. Does the plan include a masonry fireplace including a fireplace section indicating design to comply with the Uniform Building Code Chapter 37? Yes No 14. \ Does the plan include a window schedule or other verification that egress/rescue windows from sleeping rooms and/or basements comply with the requirements of the Uniform Building Code? Yes No 15'\ Does the plan include a window schedule or other verification that windows provide natural light and ventilation for all habitable rooms? Yes No 3 16. Do the plans indicate the location of glazing subject to human impact such as glass doors, glazing immediately adjacent to such doors; glazing adjacent to any surface normally used as a walking surface; sliding glass doors; fixed glass panels; shower doors and tub enclosures and specify safety glazing for these areas? Yes No 17. \\k Is the location of all natural and liquid petroleum gas furnaces, boilers and water heaters indicated on the plan? Yes No 18. A, Do you understand that if you are building on a parcel of land created by the exemption process or the subdivision process, are building plans in compliance with all plat notes and/or covenants? Yes No 19. Do you understand that if you belong to a homeowners association, it is your responsibility to obtain written permission from the association, if required by that association, prior to submitting an application for a building permit? If you do not have written permission from the association, do you understand that the plan check fee will not be refunded should the architectural committee deny or reject your building plans? Yes No 20. Will this be e only residential structure on the parcel? Yes No If no -Explain: Have two (2) complete sets of construction drawings been submitted with the application? Yes 22 Do you understand that the minimum size a home can be on a lot is a 20ft. x 20ft.? Yes No 23. Have you designed or had this plan designed while considering building and other constru ion code requirements? Yes No 24. Does the plan accurately indicate what you intend to construct and what will receive a final inspectiby the Garfield County Building Department? Yes ' No 25. Do you understand that approval for design and/or construction changes are required prior, to the appii tion of these changes? Yes V No 4 26. Do you understand that the Building Department will collect a "Plan Review" fee from you at the time of application and that you will be required to pay the "Permit Fee" as well as any "School Imp " or "Septic System" fees required, at the time you pick up your building permit? Yes V No 27. Are you aware that twenty-four (24) hour notice is required for all inspections? Inspections will be made from Battlement Mesa to West Glenwood in the mornings and from Glenwood Springs to Carbondale in the afternoon. Morning inspections must be called in by :00 p.m. the day before; afternoon inspections must be called in by 4:00 p.m. the ay before. Failure to give twenty-four (24) hour notice for inspections will delay y r inspection one (1) day. Inspections are to be called in to 384-5003. Yes No 28. Are you aware that you are required to call for all inspections required under the Uniform Building Co including approval on a final inspection prior to receiving a Certificate of Occupanc and occupancy of the building? Yes No 29. Are you aware hat the person signing the Permit Application, whether the "Owner", "Agent of the Owne , "General Contractor", "Contractor" or otherwise, is the party responsible for the project omplying with the Uniform Building Code? Yes No 30. Are you aware that prior to issuance of a building permit you are required to show proof of a driveway access permit or obtain a statement from the Garfield County Road & Bridge Department s ting one is not necessary? You can contact the Road & Bridge Department at 625-8601. Yes No 31. Do you understand that you will be required to hire a State of Colorado Licensed Electrician and Plumber to erform installations and hookups, unless you as the homeowner are performing the rk? The license number of the person performing the work will be required at time of appli able inspection. Yes ® No 32. Are you aware, that on the front of the Building Permit Application you will need to fill in the Parcel/Sched Number for the lot you are applying for this permit on prior to issuance of a building pe t? Your attention in this is appreciated. Yes \ No 5 I hereby acknowledge that I have read, understand and answered these questions to the best of my ability. signature date Phone: (days); (evenings) Project Name: Project Address: Notes: If you have answered "No" on any of the questions, you may be required to provide this information at the request of the Building Official prior to beginning the plan review process. Delays in issuing the permit are to be expected. Work may not proceed without the issuance of a permit. If it is determined by the Building Official that additional information is necessary to review the application and plans to determine minimum compliance with the adopted codes, the application may be placed behind more recent applications for building permits in the review process and not reviewed until required information has been provided and the application rotates again to first position for review, delay in issuance of the permit or delay in proceeding with construction. bpminreq sroo 6 Designate North Arrow cn ce3 o „. -o-, z O E. 0 z Draw in your house, _ a) 0) E4 V) c5-.)) e, .,.. 0 • = f., 1 B- 0 15 0 u ..,,t.:- t- ..o -0 ›-.. (-1 ,.; ••,...- ... , ..--, '' ..., =I ....r. ....r. "... ,..<, o •••••./.. -..., • -? .. / .,- cd -') 2 % CI) CC . 0 ,. 9 N--.... 'i:-- ----------______________ 1 9 g 0 , "..)„ ..„•;:-Y-----,-' ' - - - - - cx r--. CD 0 ;... • ';`'e -i 1 I t.71 0 r. ti 1 \/ '*•;-},'-- 0) oll i / 713 c a) c..) cat ca r..) c.. 0 ....4 .-a County Road (Note the Road Number and Name)