Loading...
HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT BLC0-1-16-4029 Garfield County Alteration/ Addition @ R & B Facilities Rifle & Glenwood Springs, CO 1) ALL WORK MUST COMPLY WITH THE 2009 IBC, IMC, IPC, IFGC , IECC, IFC, NFPA 52 , AND THE MANUFACTURERS INSTALLATION SPECIFICATIONS . 2) LOCAL FIRE DISTRICT SHALL INSPECT FIRE EXTINGUISHERS, ALARMS, AND OTHER PERTINENT IFC REQUIREMENTS . FIRE DISTRICT FINAL APPROVAL REPORT IS REQUIRED FOR FINAL/COMPLETION INSPECTION . 3) ENGINEER ON RECORD SHALL INSPECT All EXTERIOR CONSTRUCTION RELATED TO INFRASTRUCTURE/CIVIL IMPROVEMENTS. A FINAL APPROVAL REPORT IS REQUIRED FOR CERTIFICATE OF OCCUPANCY. 4) OPEN -HOLE SOILS REPORT IS REQUIRED AT FOOTING INSPECTION, 2500 PSF . S) All HIGH STRENGTH BOLTING AND FIELD WELDING REQUIRES SPECIAL INSPECTOR . APPROVAL REPORT IS REQUIRED AT FRAMING INSPECTION. 6) FINAL IECC COMPLIANCE REPORT REQUIRED FOR FINAL MECHANICAL INSPECTION. 7) BUILDING COMMISSIONING IS REQUIRED FOR ALL ELECTRICAL, PLUMBING, HVAC, SPECIFICALLY THE CARBON MONOXIDE , NATURAL GAS DETECTION , ALARM , AND FAN SYSTEMS . PROVIDE BUILDING MAINTENANCE PERSONNEL WITH TRAINING AND A PERIODIC TESTING SCHEDULE REGARDING THE DETECTION, ALARM AND FAN SYSTEMS . 8) ACCESSIBILTY REQUIREMENTS PER 2009 IBC, CHAPTER 11 AND ICC/ANSI Al17.1-2003. 9) ELECTRICAL ROUGH APPROVAL IS REQUIRED PRIOR TO FRAME INSPECTION . 10) ELECTRICAL FINAL APPROVAL IS REQUIRED FOR FINAL/COMPLETION INSPECTION .