HomeMy WebLinkAboutApplication- PermitBEST COPY
INSPECTION
MADE
THIS CARD IS POSTED ONTHE UNLESS
24 HOURS NOTICE REQI]IRED FOR INSPECTIONS
BUILDING PERMIT
GARF1ELD COUNTY, COLORADO
Date Issued .`
Zoned Area Permit No.
ffG
AGREEMENT
In consideration of the issuance of this permit, the applicant hereby agrees to comply with;
laws and regulations related to the zoning, location; construction and erection of the propos,
structure for which this permit is granted, and further agrees that if the above said regulatio
are not fully complied with in thezoning, location, erection and construction of the abo
described structure, the permit may thenbe
e revoked by
VOIDe from the County Buildi
Inspector and IMMEDIATELY BECOME
Use
Address or Legal Description
Setbacks Front Side Side Rear
This Card Must Be Posted So It is Plainly Visible From The Street Until Final Inspection.
INSPECTION RECORD
Footing., 7
FoundationUnderground Plumbing .- ii -o, .,)
Rough Plumbing df t4.,)
Chimney & Vent -14.
Insulation
Drywall 151044
Gas Piping a' _ tio
Electric Rough (By State Inspeetur) - - `(
Framing I0: u r �
(To include Roof in place and Windows
and Doors installed).
Electric Final (by Sta Inspector)/) _r;
Final 16-17-bj
Septic Final
Notes:
ALL LISTED ITEMS MUST BE INSPECTED AND APPROVED BEFORE COVERING
WHETHER INTERIOR OR. EXTERIOR, UNDERGROUND OR ABOVE GROUND.
THIS PERMIT IS NOT TRANSFERABLE
Phone 384-5003 109 8th Street County Courthouse Glenwood Springs, Color!
APPDO NOT DESTROY THIS CARD
' .• ED .. ..
Dat
e•.
OF1By
IF PLACED OUTSIDE COVER WITH C1EAR PLASTIC
tej
u
UAD
C
?5J-170
n b
co co .k3
CA a
CJI.‘44:".4 N
•
rzt
d
•
Ji
•
0 -
gr4
P
o
Szt
N
!az'
ga
a
AN
Ng
Ng
�x
QSI
Qg
y Z
Rs
ti
z
4 !I
r,
R
W �
W
7a• ell Cc
a
IF -
0
r
1
1}
0
Cti
1}. 107 •1 U1 �`s
W
Z.
fo-
do
• A7
M
n
ie •' / �4 H
/9.a:/
-c
GARFIELD COUNTY
BUILDING, SANITATION,
and PLANNING DEPARTMENT
109 Stir, Street, Suite 303
Glenwood Springs, CO 81601(970) 945-8212
Job Address Q, ]`in ? -rm i e _ Dp !&, Si L r
Nature of Work Building Permit
No. 8005
Use of Building rn O 0 70 �Y,4&m &r
Contractor 1_� c
Amount of Permits t5Date
.diict, 6/ i
g ,6
Clerk
•GARFIELD COUNTY BUILDING PERMIT APPLICATION
GARFIELD COUNTY (GLENWOOD SPRINGS), COLORADO
LE -PHONE: (970) 945-8212 INSPECTION LINE: (970) 3 84-55043
PERMIT NO. E.5 PARCEL/SCHEDULE NO,
IB ADDRESS: 311 0 TA'jag R I l 1 C nISI u {-� f 5 R ---r i f
SUBDIVISION/EXEMPTION FA, 1p M f_ttel ,
l0
LOT NO. / BLOCKNO.
OWNER
UL. taMMB 40FP-14ti!
cotiI• .AC'ne cove ' s
ARCKITEcTIENGYIIIKE
D,,4fAi de -1444,-C)&44"
see
sq- 1.T. OF BUE O 1/ 5'.7
USE
USBUBD0rG ,P 51OgAiT/4
DESCRIBE WORE:
ADDRrs s 0,34,0 a doeivri c. dE
AM!)RPSS
ADITESS
gq. F[. OF'LOT
AcU47i170/V re,�..oG you5
Class Or wax: orsw
DRNEW.W PERMS'
Cnnrwr
oSINOiE CMOVSLE
DAL-FBA-11ON
CANE&T.
OMOVE olUEN0VE
Pii87‘
-9/c
PA
'Rama//yQ
oeatts.E ODOSOLS
) R7 arra 8EWAGE1DrBPOSAL (SMIC) RS(TE PIAN
%YE PD:
Ur_ NO:
LIC No:
NO. OPFLOORS
VALUATION OF WORMS Apia:MD VAVJA11Or::5
SPECIAL CQNDrr[ONS:
eP3V09-43
NOTICE
. SEPARATE ELECTRICAL PERMIT IS REQUIRED AND MUST BE 1SSUF.I3 BY THE STATE OF
�ULORAE'O.
THIS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUCTION
AUTHORIZED IS NOT COMMENCED WTTHIN 180 DAYS, OR IF CONSTRUCTION OR
WOKK IS SUSPENDED OR ABANDONED FOR A PERIOD OF 180 DAYS AT ANY TIME
AFTER WORK IS COMMRNCED.
I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND
KNOW THE SAME TO BE TRUE AND CORRECT. ALL PROVISIONS OF LAWS
GOVERNING IBIS TYPE OF WORK WILL BE COMPLIED WITH WHETHER SPECIFIED
HEREIN OR NOT THE GRANTING OF A EMIT DOES NOT PRESUME TO GIVE
HORiTY TO OLATE OR CANCEL THE ROV[SIONS OF ANY OTHER STATE OR
LO . T. LAW R GULA S STRU ON OR THE PERF9RMANCE OP
CONS UCfION.
Signa(<ue of Owner/ haeta+ or aathorizcd
asf r04-0
Date
read and nuderstaotl>3olio above.
Building Dort, Ap'xov JIDate
Planning .1. A it?1
PLAN CHECK FEE:YT t}
ft . I t
PERS' TT FEEL W7 2S
- TOTAL FEE: Yr n 8.okDATE PERMTIISSUED:
OCC, GROUP:
R. -3
CONST: TYPE:
U_ A(
ZONING:
SETBACKS:
MANU_ HOME:
ISDS NO.& FEE:
AGREEMENT
ERMISSION IS HEREBY GRANTED TO TIM APPLICANT AS OWNER, CONTRACTOR AND/OR THE AGENT OF THE CONTRACTOR OR OWNER TO CONSTRUCT THE STRUCTURE AS
ETAILED ON PLANS AND SPECIFICATIONS SUBMITTED TO AND REVIEWED BY THE BUILDING -DEPARTMENT.
4 CONSIDERATION OF THE ISSUANCE OF THIS PERMIT, THE SIGNRR HEREBY AGREES TO COMPLY WITH ALL BUILDING CODES AND LAND USE REGULATIONS ADOYI ED BY
ARFIELD COUNTY PURSUANT TO AUTHORITY GIVEN IN 30.28.20] CRS AS AMENDED. THE SIGNER FURTHER AGREES THAT IF THE ABOVE SAID ORDINANCES ARE NOT FOLLY
OMPLIED WITH IN THE LOCATION, ERECTION, CONSTRUCTION AND USE OF THE ABOVE DESCRIBED STRUCTURE, TIM PERMIT MAY THEN BE REVOKED BY NOTICE FROM
HE COUNTY AND THAT THEN AND THERE TT SHALL BECOME NULL AND VOW.
HE ISSUANCE OF A PERMIT BASED UPON PLANS, SPECIFICATIONS AND OTHER DATA SHALL NOT PREVENT THE BUILDING OFFICIAL FROM THEREAFTER REQUIRING THE
ORRECTION OF ERRORS IN .SAID PLANS, SPECIFICATIONS AND OTHER DATA OR FRO PREVENTING BUILDING OPERATION BEING CARRIED ON THEREUNDER WHEN IN
IOLATION OF THIS CODE OR ANY OTHER ORDiNANcE OR REGULATION OF THIS TURISDICTION.
HE REVIEW OF THE SUBMITTED PLANS AND SPECIFICATIONS AND INSPECTIONS CONDI'CTED THEREAFTER DOES NOT CONSTTFUTE AN ACCEPTANCE OF ANY
E SPONSIBILII'ES OR L]ABILTTIES BY GARFIELD COUNTY FOR. ERRORS, OMISSIONS CR DISCREPANCIES. THE RESPONSIBILITY FOR THESE ITEMS AND IMPLEMENTATION
EB NGCONSTRUCTION RESTS SPECIFICALLY WITH THE ARCHITECT, DESIGNER, BUB DERAND OWNER. COMMENTS ARE INTENDED TO BE CONSERVATIVE AND IN SUPPORT
FTSE OWNERS ST.
ierformoo31+ 1 HEREBY ACKNOWLEDGE THAT I HAVE. READ AND UNDERSTAND THE AGREEMENT ABOVE, (THUM
l�1
The following items are required by Garfield County for a final inspection:
1. A final Electrical Inspection from the Colorado State Electrical Inspector;
2. Permanent address assigned by Garfield County Building Department posted where readily
visible from access road;
3. A finished roof, a lockable house, complete exterior siding, exterior doors and windows
installed, a complete kitchen with cabinets, a sink with hot & cold running water, non-absorbent
kitchen floor coverings, counter tops and finished walls, ready for stove and refrigerator, all
necessary plumbing;
4. A complete bathroom, with washbowl, tub or shower, toilet stool, hot and cold running water,
non-absorbent floors and walls finished and a privacy door;
5. All steps outside or inside over three (3) steps must have handrails, guard rails on balconies or
decks over 30" high constructed to all 1994 UBC requiurements;
6. Outside grading done to where water will detour away from the building;
7. Exceptions to the outside steps, decks and grading may be made upon the demonstration of
extenuating circumstances, i.e. weather, but a Certificate of Occupancy will not be issued until
all the required items are completed and a final inspection made.
A CERTIFICATE OF OCCUPANCY WILL NOT BE ISSUED UNTIL ALL THE ABOVE
ITEMS HAVE BEEN COMPLETED.
****CANNOT OCCUPY OR USE DWELLING UNTIL A CERTIFICATE OF OCCUPANCY
(C.O.) IS ISSUED. OCCUPANCY OR USE OF DWELLING WITHOUT A C.D. WILL BE
CONSIDERED AN ILLEGAL OCCUPANCY AND MAY BE GROUNDS FOR VACATING
PREMISES UNTIL ABOVE CONDITIONS ARE MET.
I understand and agree to abide by the above conditions for occupanwd the issuance of a
Certificate of Occupancy for the dwelling under building permit #
CC,'
Signature
bpcont
Date
tore LovEt
03 1‘0,961,06g404,-, 4,
Ho QCs
2,1[S/.c)a
2"l8 62•"=-- 3 rS7C.Dt.)
673 YQ9.0 o
'2 , z
Sof•?f
11_93'.96
January 1, 1999
Plans to be included for a Building Permit, must be on drafting paper at least 18"x24 and drawn to
scale.
Plans must include a floor plan, a concrete footing and foundation plan, elevations all sides with
decks, balcony, steps, hand rails and guard rails, windows and doors, including the finish grade line. A
section showing in detail, from the bottom of the footing to the top of the roof, including re -bar,
anchor bolts, pressure treated plates, floor joists, wall studs and spacing, insulation, sheating, house -
rap, (which is required), siding or any approved building material.
A window schedule. A door schedule.
A floor framing plan, a roof framing plan, roof must be designed to withstand a 40# per ft. up to
7,000 F.O.S. and an 80 M.P.H. wind.
All sheets to be identified by number and indexed. All of the above requirements must be met or your
plans will be returned.
1. Is a site plan eluded that indicates the distances of the proposed building or addition to
property Ii s, other buildings, setback easements and utility easements?
Yes
2. Does the site plan include the location of the I.S.D.S. (Individual Sewage Disposal System)
and the distances to property lines, wells (on subject property and adjacent properties),
streams or }Mater courses?
Yes ,�
3 Does the site plan indicate the location and direction of the County or private road accessing
the property,?
Yes
4. Dothe plans include a foundation plan indicating the size, location and spacing of all
reinforcing steel in accordance with the uniform building code or per stamped engineered
design?
Yes J
S. Do the plans indicate the location and size of ventilation openings for under floor crawl
spaces and the clearances required between wood and earth?
Yes /At
2
6. Do the plans indicate the size and location of ventilation openings for the attic, roofjoist
spaces's and soffits?
Yes AO,
7. Do the plans include design loads as required by Garfield County for roof snow loads, (a
minimum of 40 pounds per square foot up to & including 7,000 feet above sea level), floor
loads and nd loads?
Yes ,f
8. Does the plan include a building section drawing indicating foundation, wall, floor and roof
construction?
Yes
9. Does the building section drawing include size and spacing of floor joists, wall studs, ceiling
joists, roof rajrs or joists or trusses?
Yes
10. Does the building section drawing or other detail include the method ofpositive connection of
all columns aiyd beams?
Yes
11. Does the plan indicate the height of the building or proposed addition from the highest point
of the building or addition measured at mid span between the ridge and the eave down to
existing graadcontours?
Yes
12. Does the plan include any stove or zero clearance fireplace planned for installation including
make and model and Colorado Phase II certifications or phase II EPA certification?
Yes ,/ No
13. Does the plan include a masonry fireplace including a fireplace section indicating design to
comply with the Uniform Building i2'ode Chapter 37?
Yes No ;f
14. Does the plan include a window schedule or other verification that egress/rescue windows
from sleeping rooms andlorbasements comply with the requirements of the Uniform Building
Code?
Yes No
15. Does the plan include a window schedule or other verification that windows provide natural
light and ventilation for all habitable rooms?
Yes ✓ No
3
16. Do the plans indicate the location of glazing subject to human impact such as glass doors,
glazing immediately adjacent to such doors; glazing adjacent to any surface normally used as a
walking surface; sliding glass doors; fixed glass panels; shower doors and tub enclosures and
specify safety g for these areas?
Yes No
17. Is the location of all natural and liquid petroleum gas furnaces, boilers and water heaters
indicated on tl}e plan?
Yes No
18. Do you understand that if you are building on a parcel of land created by the exemption
process or the subdivision process, are building plans in compliance with all plat notes andlor
covenants? /
Yes ,j No
19. Do you understand that if you belong to a homeowners association, it is your responsibility to
obtain written permission from the association, if required by that association, prior to
submitting an application for a building permit? If you do not have written permission from
the association, do you understand that the plan check fee will not be refunded should the
architecturalcommittee deny or reject your building plans?
Yes / No
20. Will this be th only residential structure on the parcel?
Yes No If no -Explain;
21. Have two (2 omplete sets of construction drawings been submitted with the application?
Yes V
22. Do you unders and that the minimum size a home can be on a lot is a 20ft. x 20ft.?
Yes No
21 Have you d signed or had this plan designed while considering building and other
constructs code requirements?
Yes No
24. Does the plan accurately indicate what you intend to construct and what will receive a final
inspection by t Garfield County Building Department?
Yes No
25. Do you understand that approval for design andlor construction changes are required prior to
the applicatio of these changes?
Yes No
4
26. Do you understand that the Building Department will collect a "Plan Review" fee from you at
the time of application and that you will be required to pay the "Permit Fee" as well as any
"School Impact" r "Septic System" fees required, at the time you pick up your building
permit?
Yes No
27. Are you aware that twenty-four (24) hour notice is required for all inspections?
Inspections will be made from Battlement Mesa to West Glenwood in the mornings and
from Glenwood Springs to Carbondale in the afternoon. Morning inspections must be
called in by 12:00 p.m. the day before; afternoon inspections must be called in by 4:00
p.m. the day b fore. Failure to give twenty-four (24) hour notice for inspections will
delay your i pection one (1) day. Inspections are to be called in to 384-5003.
Yes No
28. Are you aware that you are required to call for all inspections required under the Uniform
Building Code including approval on a final inspection prior to receiving a Certificate of
Occupancy and ccupancy of the building?
Yes No
29. Are you aware that the person signing the Permit Applicatiowhether the "Owner", "Agent
of the Owner", "General Contractor", "Contractor" or otherwise, is the party responsible for
the project co plying with the Uniform Building Code?
Yes / No
30. Are you aware that prior to issuance of a building permit you are required to show proofofa
driveway access permit or obtain a statement from the Garfield County Road & Bridge
Department sta 'ng one is not necessary? You can contact the Road & Bridge Department at
625-8601.
Yes No
31. Do you understand that you will be required to hire a State ofColorado Licensed Electrician
and Plumber to perform installations and hookups, unless you as the homeowner are
performing the work? The license number ofthe person performing the work will be required
at time of applicable inspection.
Yes No
32. Are you aware, that on the front of the Building Permit Application you will need to fill in the
Parcel/Schedule Nu er for the lot you are applying for this permit an prior to issuance of a
building permit? ur attention in this is appreciated.
Yes No
5
I hereby acknowledge that 1 have read, understand and answered these questions to the
best gf,rny abilit rte.
GCLSsignature
Phone: 31 O to 3 (days);
Project Name: 440 F= t --1A0 A 7L )2 7cZAJ
Project Address:
Notes:
<zz
date
el(03— 001 k4
(evenings)
IL7�
if you have answered "No" on any of the questions, you may be required to provide this information
at the request of the Building Official prior to beginning the plan review process, Delays in issuing
the permit are to be expected. Work may not proceed without the issuance of a permit. if it is
determined by the Building Official that additional information is necessary to review the application
and plans to determine minimum compliance with the adopted codes, the application may be placed
behind more recent applications for building permits in the review process and not reviewed until
required information has been provided and the application rotates again to first position for review,
delay in issuance of the permit or delay in proceeding with construction.
bpminreq
8f00
6