HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT
BLCO-1-16-4028
Una Development
Temp Office @ Strong PUD Lot 2
Parachute, CO
1) ALL WORK MUST COMPLY WITH THE 2009 IBC AND MANUFACTURERS INSTALLATION
SPECIFICATIONS.
2) ALL WORK MUST COMPLY WITH THE CURRENT PUD GUIDE/RESOLUTION # 2009-08.
3) ACCESSIBILTY REQUIREMENTS PER 2009 IBC, CHAPTER 11 AND ICC/ANSI A117.1-2003.
PARKING, SIGNAGE, ACCESSIBLE ROUTE, AND ENTRY.
4) SEWAGE HOLDING TANK REQUIRES OVER -FILL ALARM AND PUMP -OUT LOG.
5) VERIFY C.D.O.H. FACTORY BUILD LABEL PRIOR TO FINAL/COMPLETION INSPECTION.
6) ELECTRICAL FINAL APPROVAL IS REQUIRED FOR FINAL/COMPLETION INSPECTION.
7) LOCKS, LATCHES AND LANDINGS PER 2009 IBC, SECTION 1008.
8) LIGHT AND VENTILATION PER 2009 IBC, CHAPTER 12.
9) GARFIELD COUNTY FINAL INSPECTION REQUIRED FOR FINAL/COMPLETION INSPECTION.