HomeMy WebLinkAbout2.0 BOCC Staff Report 06.21.2004Exhibits for Ruby River Resort SUP Public Hearing held on June 14, 2004
Exhibit Letter
(A to Z)
Exhibit
A
Mail Receipts
B
Proof of Publication
C
Garfield County Zoning Regulations of 1978, as amended
D
Garfield County Comprehensive Plan of 2000
E
Application
F
Staff Memorandum
G
Garfield County Building and Planning, Chief Building Official
H
Garfield County Road & Bridge Department
I
Burning Mountain Fire Protection District
J
Department of the Army, Corps of Engineers
BOCC 6/21/04 JH
PROJECT INFORMATION AND STAFF COMMENTS
REQUEST
APPLICANT
LOCATION
SITE DATA
EXISTING ZONING
ADJACENT ZONING
A request for review of a Special Use Permit for
Resort Designation
Thom and Camille Toler
0361 County Road 311, South of Silt,
approximately 1/4 mile south of 1-70in the NE 1/4
and the SE 1/4 of the SE 1/4 of Section 10, Township
6 South, Range 92 West of the 6th Principle
Meridian.
6.78 Acres
A/I Agricultural/Industrial
A/I Agricultural/Industrial
View: Location of property in relation to the town of Silt
I. RELATIONSHIP TO THE COMPREHENSIVE PLAN
The subject property is located within Study Area 2 in the Comprehensive Plan of 2000. This
Study Area characterizes the area as "Commercial."
1
II. PROPERTY DESCRIPTION AND PROPOSAL
The applicant is requesting resort status for a 6+ acre parcel currently being used as single
family use, an additional dwelling unit (un -permitted) and a storage building used to store
materials for the applicant's business, TOMCA construction, which is un -permitted for a
home occupational use. The Applicant will not be using the main single family dwelling unit
for any use connected with the resort other than administration and bookkeeping.
The property contains meadows and native and landscaped stands of trees, access to the Last
Chance Ditch of the Colorado River, a day use area accessible when the ditch is dry and a
small pond on the southwest corner of the property and is suited for the requested use in that
it is situated near the river for a portion of the proposed use, near the town of Silt, access to
Interstate 70, and trees and low hills providing screening for the proposed use.
The Applicant plans to approach the project in phases to determine what the needs are and
the direction to be taken in order to be successful in the first phase. In the first two years they
will modify the present ADU to be used as a lodge facility, build three additional cabins,
establish a trout pond and fish cleaning facilities, laundry facility, engineered mound septic
system, gazebo for day use for such activities as reunions, weddings, anniversaries etc., and
augmented by the use of portable toilets. All activities and cabins will located in, near and
within existing and proposed dwellings that are arranged into a small resort compound. They
proposal will not adversely affect any scenic views held by the neighboring ranches.
If the project appeared to be successful and funding was available, the next phase of the
project the second and third phases of the proposal would be brought to the Garfield County
Building and Planning Department as they are in the application for long-range informational
purposes and not part of this SUP proposal.
III. REVIEWING AGENCIES AND DEPARTMENTS
a.
b.
c.
d.
e.
f.
g.
h.
Town of Silt
Burning Mtn. Fire District
Colorado Division of Wildlife
US Corps of Engineers
Garfield County Road & Bridge
Garfield County Vegetation (Steve Anthony)
Garfield County Attorney
Garfield County Building Official (B&P Dept.)
IV. STAFF COMMENTS
No Comment
Comment Received
No Comment
Comment Received
Comment Received
No Comment
No Comment
Comment Received
2
a. Zoning: A Resort is interpreted as a special use pursuant to Section 3.01 in the A/I
zone district.
b. Process: The Zoning Resolution of 1978 provides a process by which a Special Use
Permit request is reviewed. In the event this proposal is approved , the applicant realizes
their responsibility to return to the Garfield County Building and Planning Department
and apply for an approval for of the resort for any additional phases as outlined in the
application. The current Special Use Permit process does not provide a process for
amendments to an existing and approved Special Use Permit. Rather a new application
that highlights the current approved use and the addition of new proposed uses for
approval consideration must be submitted at a later date.
c. Roads & Access: The proposed use gains access from County Road 311, south of
Silt, which is hard surfaced with no curves within sight so it is not a blind or hidden
driveway where vehicle can enter the grounds safely. The north entrance is hard surfaced
and serves as a parking area for the ADU and the storage building. The south entrance is
graveled to the primary dwelling unit, day use area and general use parking area. Both
the main access and internal vehicle access areas are adequate for the proposed use with
exception of the day use access road to the day use area and the gazebo during times of
high water (this is discussed below under US Army Corps comments). The main access
County Road 311 is within the Town of Silt and is maintained by the County.
d. Water and Sewer: the units and uses contained in this application will be served by
an individual well, priority date, July 1, 1957, case number W-1161; well permit number
217995 has been issued has a production rate of 0.0198 cfs or approximately 9 gpm. The
single family dwelling unit has an independent water supply which will not augment the
water usage of the elements of this application. The existing water supply for the initial
phase is not adequate to serve the second and third phase of this proposed use.
The existing single family dwelling and the accessory dwelling unit are served by an
engineered and pressurized mound septic system. The proposed addition of three
cottages will utilize a mound system for sewage treatment similar to the existing
approved system. The engineering analysis submitted in the application indicates that the
proposed facilities with the current facilities will not exceed the 2,000 gal per day sewage
demand limit.
If and when the Stillwater Ranch development is completed the applicant intends to gam
a water supply and sewer collection capacity to allow the later phases of the resort.
e. US Army Corps of Engineers: A Section 404 Permit will be needed for the day use
access road crossing of the Colorado River, boat ramps proposed for the second phase (if
it includes fill material) and the development of the trout pond if it involves some
component of dredge or fill material. Please see the attached letter form the Department
of the Army.
f. Building Department:
3
1. All proposed new buildings and any existing buildings in which there is a change
in occupancy classification will require a building permit.
2. Verification of the actual design flow of the project's phase one septic
requirements being under the State requirement of 2000gal/day design flow should be
reviewed. Also, the applicant has included a laundry use for the resort in the first
phase and estimated water source requirements do not show up in the septic
requirements later in the proposal.
3. Any road related signage must comply with the zoning regulations of the county.
g. State and Local Health Standards: State health standards are applicable to the
application, namely the Colorado Department of Health ISDS (septic) setback standards,
which should be verified by an engineer at time of installation, and any permitting as may
be required for the main lodge kitchen.
h. Drainage: The parcel drains to the north and northwest and running centrally through
the property. The property is not known to be subject to any unusual hydrologic or
geologic hazards other than its inclusion within the floodplain. The first floor elevations
have been established according to the Elevation Certification guidelines used by FEMA
for construction in a floodplain. The applicant understands that although non-regulated
there is an inherent risk of building in this area.
i. Fire Protection: the Burning Mountain Fire Protection District has indicated that (1)
fire access roads shall be a minimum of 20' feet wide and (2) the later phases will require
automatic fire suppression systems and therefore adequate water supply must be available.
V. REVIEW STANDARDS
Special Uses are subject to the standards in Section 5.03 of the Zoning Resolution.
A. Section 5.03 Review Standards
1) Utilities adequate to provide water and sanitation service based on accepted
engineering standards and approved by the Board of County Commissioners shall
either be in place or shall be constructed in conjunction with the proposed use;
Staff Response: The applicant has indicated and shown how adequate water can be
provided for the proposed use. The Applicant has also indicated how additional
septic needs will be provided with the exception of the laundry facilities of the resort.
This item has NOT been met.
2) Street improvements adequate to accommodate traffic volume generated by the
proposed use and to provide safe, convenient access to the use shall either be in
place or shall be constructed in conjunction with the proposed use;
4
Staff Response: The Applicant has indicated and shown how access will be obtained
for the proposed use, however they have not demonstrated to the fire protection
district that they have the necessary 20' for emergency service access. This item has
NOT been met.
3) Design of the proposed use is organized to minimize impact on and from adjacent
uses of land through installation of screen fences or landscape materials on the
periphery of the lot and by location of intensively utilized areas, access points,
lighting and signs in such a manner as to protect established neighborhood
character;
Staff Response: The Applicant has shown how the proposed use will not visually
impact adjacent uses by placing additional uses near existing buildings and using
existing vegetative screening. This item has been met.
V. SITE PHOTOGRAPHS
View: NW corner looking NE
lMl(1110I4
View: Looking at west side of main residence
View: At N entrance looking at ADU
View: At N entrance looking at storage building
5
View: from N property line to north at Ditch/Co. River
VI. SUGGESTED FINDINGS
View: Looking at west side of main residence
1. That proper posting and public notice was provided as required for the meeting before
the Board of County Commissioners.
2. That the public hearing before the Board of County Commissioners was extensive and
complete, that all pertinent facts, matters and issues were submitted and that all
interested parties were heard at that meeting.
3. That for the above stated and other reasons, the proposed Special Use Permit is in the
best interest of the health, safety, morals, convenience, order, prosperity and welfare of
the citizens of Garfield County.
4. That the application is in conformance with the Garfield County Zoning Resolution of
1978, as amended.
5. That the application is in conformance with the Garfield County Comprehensive Plan
of 2000.
VII. RECOMMENDATION & CONDITIONS
Staff recommends APPROVAL, with the following conditions of approval:
a. That all representations of the applicant, either within the application or stated at the
hearing before the Board of County Commissioners, shall be considered conditions of
approval.
b. That the applicant obtains all building permits and inspections consistent with the
adopted rules and regulations of Garfield County for all development within the resort
area.
6
c. Prior to the issuance of the Special Use Permit, the Applicant shall submit an engineered
design for a second mound system to the Garfield County Building and Planning
Department and the Colorado Department of Health and Environment. BOCC. As per
Colorado Department of Health ISDS setback standards, an engineer shall verify the
appropriateness at time of installation of any new septic systems and any permitting as
may be required for the main lodge and kitchen.
d. A Section 404 Permit for the day use access road crossing of the Colorado River and the
development of the trout pond shall be obtained if the proposed use involves some
component of dredge or fill material and then shall be presented to the Garfield County
Building and Planning Department prior to the issuance of the Special Use Permit if
necessary.
e. The applicant shall submit an updated report to the Garfield County Building Official
discussing the laundry component use in the first phase and estimated water source
requirements which do not show up in the septic requirements of the application proposal
prior to issuance of the Special Use Permit.
f. The applicant shall utilize the Elevation Certification guidelines used by FEMA for
construction in a floodplain for all dwelling units and construction associated with the
Special Use Permit and provide evidence of this requirement to the Garfield County
Building and Planning Department prior to the issuance of the Special Use Permit.
g.
Fire access roads shall be a minimum of 20' feet wide.
h. If any further expansion of the use be attempted, the applicant shall readdress the
proposal with and obtain the necessary approvals from the Board of County
Commissioners.
i. All exterior lighting shall be the minimum amount necessary and that all exterior lighting
be directed inward, downward and towards the interior of designated cabin sites, except
that provisions may be made to allow for safety lighting that goes beyond the property
boundaries.
J.
"A water test shall be conducted which includes the following items used to determine
physical water supply for SUP' s";
a. That a four (4) hour pump test be performed on the well to be used;
b. A well completion report demonstrating the depth of the well, the characteristics
of the aquifer and the static water level;
c. The results of the four (4) hour pump test indicating the pumping rate in gallons
per minute and information showing drawdown and recharge;
d. A written opinion of the person conducting the well test that this well should be
adequate to supply water to the proposed use on;
e. The water quality be tested by an independent testing laboratory and meet State
guidelines concerning bacteria and nitrates.
7
f. This is to be submitted to the Garfield County Building and Planning Department
prior to issuance of the Special Use Permit
11. Portable toilets shall not be used for the proposed permanent uses of the Resort.
VIII. RECOMMENDED MOTION
"I move to APPROVE the request with the above noted requirements for a Special Use Permit
to allow a Special Use Permit for Resort Designation in the A/I zone at 0361 County Road 311
for Thom and Camille Toler.
8
From: Andy Schwaller
Sent: Monday, May 17, 2004 1:05 PM
To: Jim Hardcastle
Subject: Ruby River Resort
Jim,
The Building Department has the following comments regarding the Toler project.
Page 1 of 1
EXHIBIT
_a_a
1. All proposed new buildings and any existing buildings in which there is a change in occupancy
classification will require a building permit.
2. Verification of the actual design flow of the project's phase one septic requirements being under the State
requirement of 2000gal/day design flow should be reviewed. My limited knowledge of this subject includes
the use of a 1.5 factor multiplied to the average use from Table 1 of the state regulations to arrive at the
design flow. Also, they included a Laundromat in phase one Estimated Water Source Requirements that
does not show up in the septic requirements later in the proposal.
3. Any road related signage must comply with the zoning regulations of the county.
Please call if you have any questions or need additional input.
Yours truly,
Andy Schwaller
Building Official, Garfield County
aschwaller(5garfield-county.com
970.945.8212
crA-v(-e6 /S25,
fi4fi/e9 —
file://H:\JHardcastle\ SUP \Toler%20Ruby\Ruby%20River%20Resort%20Blding%2ORevie... 6/15/2004
GARFIELD COUNTY
Building & Planning Department
Review Agency Form
Date Sent: May 13, 2004
Comments Due: June 7, 2004
Eil3IT
a
i
Name of application: Toler, Thom & Camille -Ruby River Resort
Sent to: Garfield County Road and Bridge Dept.
-----------------------------
Garfield County requests your comment in review of this project. Please notify the
Planning Department in the event you are unable to respond by the deadline. This form
may be used for your response, or you may attach your own additional sheets as
necessary. Written comments may be mailed, e-mailed, or faxed to:
Garfield County Building & Planning
Staff contact: Jim Hardcastle
109 8th Street, Suite 301
Glenwood Springs, CO 81601
Fax: 970-384-3470
Phone: 970-945-8212
General comments: Garfield County Road and Bridge Dept. has no comment on this
application as it is located within the city limits of Silt and is in the Stillwater annexation.
Name of review agency: Garfield County Road and Bridge Dept
By: Jake B. Mall Date June 7, 2004
Revised 3/30/00
Jun -04-04 12:49P
BURNING MOUNTAINS FIRE PROTECTION DISTRIC
Brit C. McLin
Chief
611 Main St.
P.U. Box 2
Silt, CO. 81652
Jim Hardcastle
Re: Ruby River Resort
Jim:
Phone: (970) 876-5738
Fax: (970) 876-2774
E -Mail: chief800@rof.net
4 June 2004
At this time the only comments from Burning Mountains Firc arc as follows:
1) Firc access roads shall be a minimum of 20'widc
2) The proposed later phases will require automatic fire suppression systems and,
therefore, adequate water supply must be available.
BMFPD reserves the opportunity to comment further as the development
progresses. You should be advised that we are currently operating under the 2000
Uniform lire Code.
Yours truly,
Brit C. McLin, Chief
RECEIVED
JUN 0 4 2004
;ARFIELD COUNTY
BUILDING & PLANNING
RECEIVED
JUN 0 9 20( n DEPARTMENT OFTHE ARMY
FA. ARMY ENGINEER DISTRICT, SACRAMENTO
CORPS OF ENGINEERS
GARHELD CO N,.� T 1325 J STREET
BUILDING & PLANNINgACRAMENTO, CALIFORNIA 95814-2922
REPLY TO
ATTENTION OF June 8, 2004
Regulatory Branch (200475257)
Mr. Jim Hardcastle
Garfield County Building and Planning Department
108 8th Street, Suite 201
Glenwood Springs, Colorado 81601
Dear Mr. Hardcastle:
EXHIBIT
ffi
I am responding to your written request for comment on the
Ruby River Resort, special use permit application. The project
site is located south of the Town of Silt, at the Colorado River
within Section 10, Township 6 South, Range 92 West, Garfield
County, Colorado.
In accordance with Section 404 of the Clean Water Act, a
Department of the Army permit is required for any discharge
(including mechanized land clearing) of dredged or fill material
in waters of the United States. Within the context of Section
404, "waters of the United States" are defined as the territorial
seas; perennial and ephemeral streams; lakes, ponds,
impoundments; and wetlands. Federal law requires that any
individual or entity proposing to discharge into waters of the
United States obtain a Department of the Army permit prior to
commencing such work. To aid the applicant, we have enclosed a
list of wetland consultants who routinely perform wetland
delineations and are familiar with the Section 404 permit
process.
My review of this application has identified activities that
would require a Department of the Army permit. The day use
access road crossing of the Colorado River, boat ramps proposed
for the second phase of this project (if they include fill
material) and possibly, the development of the proposed trout
ponds are activities that are likely to involve some component of
dredge or fill material in waters of the U.S.
I have assigned number 200475257 to this project. Please
refer to this number as a Department of the Army permit is
required on this development project as proposed. If you have
any questions, please write to me at this address, telephone 970-
243-1199, extension 15 or email mark.a.gilfillan@usace.army.mil.
Sincerely,
rov/
Mark Gilfill
Biologist, Colorado/Gunnison Basin
Regulatory Office
400 Rood Avenue, Room 142
Grand Junction, Colorado 81501-2563
Enclosure
Copy Furnished
Mr. Mark Bean, Garfield County, 108 8th Street, Suite 201,
Glenwood Springs, Colorado 81601