Loading...
HomeMy WebLinkAboutApplication-PermitI Garfield County Building & Planning Department 108 8th Street, Suite #401 Glenwood Springs, Co. 81601 Office:970·945-8212 Fax: 970·384-3470 Inspection Line: 970·384-5003 Building Permit No. Parcel No: -··--·--·-·--=23:_:_95=-·Q_13-_29-_26_0 --~------·-" Locality: lronbridge PUD Ph.2, Lot 260 Job Address: 0131 River Vista GWS -------------·--- Owner: -···-----·--·---L=-e""-n.derman, Carolx_n ------·-· Contractor: Hansen Cons!. Fees: Plan Check: 795.18 Septic: Bldg Permit: RFTA: 750.00 Total Fees: .!. __ 2,768.~ Date: I ~~ ~\ l~~~t:.r') \(\/\ \ \ ~ '\D \ f"..... GARFIELD COUNTY BUILDING PERMIT APPLICATION l f \ (!)(J€...--t l_} I 08 8111 Street, Suite 40 I. Glenwood Springs, Co 8160 I Phone: 970-945-8212 I fax: 970-384-3470 I Inspection Line: 970-384-5003 \V\V\\'.garfiekl~county .com : (this information is available at the assessors office 970-945-9134) Jl.!!~illt• This application for a Building Permit must be signed by the Owner of the property. described above. or an authorized agent. If the signalltrc below is not that of the Owner. A separate letter of authority, signed by the Owner. must be provided with this Application. Legal Access. A Building Permit cannot be issued without proof of legal and adequate ncccss to the propc11y for ptnl)oscs of inspections by the Building Depm·tmcnt. Other Permits. Multiple separate permits may be required: ( 1) State Electrical Permit (2) County !SDS Pennit, (3) another penn it required for usc on the propeny identified above. e.g. State or County Highway/ Road Access o1· a State Wastewater Discharge Pen11iL Void Permit. A Building Permit becomes null and void if the work authorized is not commenced within 180 days of the date of issuance and if work is suspended or abandoned for a period {)f !80 days after COilllllencemcnt. CERTIFICATION I hereby certify that! have read this Applicmion and that the information contained above is true and con·cct. ltmderstand that the Building Department accepts the Application. along with the plans and spccificatiOilS mal other data submitted by me or on my behalf(submittals). based upon my certification as to accuracy. Assuming completeness of the submittals and approval of this Application. a Building Pennit will be issued gra!lling permission to me. as Owner, to construct the strucwre{s) and facilities detailed on the submittals reviewed by the Building Department. In consideration of the issuance of the Building Permit, I agree that 1 and my agents will comply with provisions of any federal. state or local law regulating the work and the Garfield County Buildint~ ~"r't:t>do. lSDS regulations and applicable land use regulations (County Regulation(s)). I acknowledge that the Building Permit may be suspended or revoked. upon notice fi·om the County. if the location. ~~~~~i,t' :::·~~;i"~o~'::,u1se of the structure(s) and facility(ies). described above. are not in compliance with County Rcgulation(s) or any other applicable law. 1 1 to the Building Department to enter the prope11y. described above, to inspect the work. I further acknowledge that the issuance of d1e Building Permit does not p11.'vent the ·1 n 1 fronl: ( 1) requiring the cotrection of errors i11 the submittals. if any. discovered after issuance: or (2) stopping constmction or use of the structure(s) or facility(ies) if such is in violation of County Regulation(s) or any other applicable law. Review of this Application. including submittals. and inspections of the work by the Building Depa11lllcnt do not coi\Stitute an acceptance of responsibility or liability by the County of cnors. omissions or discrepancies. As the Owner. 1 acknowledge that · for compliance with federal. state and local laws a11d County Regulations rest with me and my authorized agents. includill!;! withDut limitation my architect and/ or 1 HEREBY ! THE NOTICE & CERTIFICATION ABOVE: STAFF USE ONLY . ~,~-.. ,.~,~ .. ,,~ ' /. . :. : ''"'''"'' · i':$'1\~£~~~ ¢'1~4ii,i(J,~¥;',1J ~ 1~· ;C L-oc-1 llj};i#ti~~ ;Putt"Jf/&t!'H/ /ZC!ftl!re'cl f;r ;:IP~..f/ C. 0. Adjusted Valuation: Plan Check Fee: Permit Fee: ~5" Manu home Fee: Mise Fees: I LJo 865. fjJ, 195 lb IZ z 7, 750 (JP R.F<A ISOS Fee: Total Fees: Fees Paid: ;·97Z~' it BP No & Issue Date: ISDS No & Issued Date: z, 7b8. 9-791. z:t._ II IOU2fJ Setbacks: OCC G1·oup: Const Type: Zoning: ;.>,' / /'-1, I 15, 0 1M l.f 5-(f. IRe PIA.D BLI>G DEPT: z_;b £~~4-J?d_;;A.r #~ APPROVAL • 'oATE APPROVAL DAlE The following items are required by Garfield County for a final Inspection: 1) A final Electricallnspection from the Colorado State Electricallnspector. 2) Permanent address assigned by Garfield County Building Department and posted at the structure and where readily visible from access road. 3) A finished roof; a lockable building; completed exterior siding; exterior doors and windows installed; a complete kitchen with cabinets, sink with hot & cold running water, non-absorbent kitchen floor covering, counter tops and finished walls, ready for stove and refrigerator; all necessary plumbing. 4) All bathrooms must be complete, with washbowl, tub or shower, toilet, hot and cold running water, non-absorbent floors, walls finished, and privacy door. 5) Steps over three (3) risers, outside or inside must be must have handrails. Balconies and decks over 30" high must be constructed to all IBC and IRC requirements including guardrails. 6) Outside grading completed so that water slopes away from the building; 7) Exceptions to the outside steps, decks, grading may be made upon the demonstration of extenuating circumstances., i.e. weather. Under such circumstances A Certificate of Occupancy may be issued conditionally. 8) A final inspection sign off by the Garfield County Road & Bridge Depa11ment for driveway installation, where applicable; as well as any final sign off by the Fire District, and/or State Agencies where applicable. A CERTIFICATE OF OCCUPANCY (C.O.) WILL NOT BE ISSUED UNTIL ALL THE ABOVE ITEMS HAVE BEEN COMPLETED. A C.O. MAY TAKE UP TO 5 BUSINESS DAYS TO BE PROCESSED AND ISSUED. OWNER CANNOT OCCUPY OR USE DWELLING UNTIL A C.O. IS ISSUED. OCCUPANCY OR USE OF DWELLING WITHOUT A C.O. WILL BE CONSIDERED AN ILLEGAL OCCUPANCY AND MAY BE GROUNDS FOR VACATING PREMISES UNTIL ABOVE CONDITIONS ARE MET. I understand and agree to abide by the above conditions for occupancy, use and the issuance of a C.O. for the building identified in the Building Permit. '· BaPpl icationdecember2007 VALUATION FEE DETERMINATION Applicant Address Date _,c7a,ro,lyns.:L:::e:::;n::;d;::enn=a:,:n=::-------Subdivision -:0-:13:':1'::R:-:'::iv7er'-V=is.::ta"-, :::;G..;.W:..:S;;_ ______ Lot/Block ..;.7~/3:.::0:..:12::.:;0:.::0.::.8 ___________ Contractor Finished (Livable Area): Main Upper Lower Other Total Basement: Unfinished Square Feet Valuation Conversion of Unfinished to Finished Total Valuation Garage: Valuation Crawl Space Valuation Decks/ Patios Valuation Covered Open Type of Construction: Occupancy: Valuation Total Valuation 1694 sf sf sf sf X $74.68 1694 sf sf X $41.00 sf X $33.68 555 sf X $18.00 sf X $9.00 182 sf X $24.00 sf X $12.00 Commercial sf X sf X sf X sf X sf X sf X lronbridge PUD 2 Lot260 Hansen Construction 126,507.92 0.00 9,990.00 0.00 4,368.00 0.00 140,865.92 GARFIELD COUNTY BUILDING AND PLANNING 970-945-8212 MINIMUM APPLICATION REQUIREMENTS For SINGLE FAMILY DWELLING CONSTRUCTION Including NEW CONSTRUCTION ADDITIONS ALTERATIONS And MOVED BUILDINGS In order to understand the scope of the work intended under a permit application and expedite the issuance of a permit it is important that complete information be provided. When reviewing a plan and it's discovered that required information has not been provided by the applicant, this will result in the delay of the permit issuance and in proceeding with building construction. The owner or contractor shall be required to provide this information before the plan review can proceed. Other plans that are in line for review may be given attention before the new information may be reviewed after it has been provided to the Building Department. TWO (2) SETS OF CONSTRUCTION DRAWINGS & TWO (2) SITE PLANS MUST BE SUBMITTEDFOR ALL AJ>PLICATIONS. Please review this document to determine if you have enough information to design your project and provide adequate information to facilitate a plan review. Also, please consider using a design professional for assistance in your design and a construction professional for construction of your project. Any project with more than ten (10) occupants requires the plans to be sealed by a Colorado Registered Design Professional. To provide for a more understandable plan in order to determine compliance with the building, plumbing and mechanical codes, applicants are requested to review the following checklist prior to and during design. Applicants are required to indicate appropriately and to submit the completed checklist at time of application for a permit. Plans to be included for a Building Permit, must be on drafting paper at least l8"x24" and drawn to scale. Plans must include a floor plan, a concrete footing and foundation plan, elevations all sides with decks, balcony, steps, hand rails and guard rails, windows and doors, including the finish grade line and original grade. A section showing in detail, from the bottom of the footing to the top of the roof, including re-bar, anchor bolts, pressure treated plates, floor joists, wall studs and spacing, insulation, sheeting, house-rap, (which is required), siding or any approved building material. Engineered foundations may be required. A window schedule. A door schedule. A floor framing plan, a roof framing plan, roof must be designed to withstand a 40 pound per square foot up to 7,000 feet in elevation, a 90 M.P.H. wind speed, wind exposure B or C, and a 36 inch frost depth. All sheets to be identified by number and indexed. All of the above requirements must be met or your plans will be returned. All plans submitted must be incompliance with the 2003 IRC. I. Is a site plan included that identifies the location of the proposed structure or addition and distances to the property lines from each corner of the proposed structure(s) prepared by a licensed surveyor and has the surveyors signature and professional stamp on the drawing? Properties with slopes of 30% or greater must be shown on the site plan. (NOTE Section: 106.2) Any site plan for the placement of any portion of a structure within 50 ft. of a property line and not within a previously surveyed building envelope on a subdivision final plat shall be prepared by a licensed surveyor and have the surveyor's signature and professional stamp on the drawing. Any structure to be built within a building envelope of a lot shown on a recorded subdivision plat shall include a copy of the building envelope as it is shown on the tina! plat with the proposed structure located within~ envelope. Yes 2. Does the site plan also include any other buildings on the property, setback easements and utility easements? Please refer to Section 5.05.03 in the Garfield County Zoning Resolution if the property you are applying for a building permit on is located on a corner lot. Special setbacks do apply. Yes )c 7 3. Does the site plan include when applicable the location of the I.S.D.S. (Individual Sewage Disposal System) and the distances to the property lines, wells (on subject property and adjacent properties), streams or water courses? Yes )( 7 4. Does the site plan indicate the location and direction of the County or private road accessing the property? Yes )< I 2 5. Are you aware that prior to submittal of a building permit application you are required to show proof of a legal and adequate access to the site? This may include (but is not limited to) proof of your right to use a private easement/right of way; A County Road and Bridge permit; a Colorado Dept. of Highway Permit, including a Notice to Proceed; a permit from the federal government or any combination. You can contact the Road & Bridge Department at 625-860 I. See phone book for other agencies Yes)( 7 6. Do the plans include a foundation plan indicating the size, location and spacing of all reinforcing steel in accordance with the IRC or per stamped engineered design? Yes )( / 7. Do the plans indicate the location and size of ventilation openings for under floor crawl spaces and the clearances required between wood and earth? Yes_K No ____ _ 8. Do the plans indicate the size and location of ventilation openings for the attic, roof joist spaces and soffits? Yes )( No ----- 9. Do the plans include design loads as required by Garfield County for roof snow loads, (a minimum of 40 pounds per square foot up to & including 7,000 feet above sea level), floor loads and wind loads? I/ Y es_~,c'f--c__ __ _ I 0. Does the plan include a building section drawing indicating foundation, wall, floor, and roof construction? Yes )C I II. Does the building section drawing include size and spacing of floor joists, wall studs, ceiling joists, roof rafters or joists or trusses? Yes _ __,:..>... ___ _ 12. Does the building section drawing or other detail include the method of positive connection of all columns and beams? Yes_-}'------ 13. Does the elevation plan indicate the height of the building or proposed addition from the undisturbed grade to the midpoint between the ridge and eave of a gable or shed roof or the top of a flat roof? (Building height measurement usually not to exceed 25 feet) Yes )(: ' 14. Does the plan include any stove or zero clearance fireplace planned for installation including make and model and Colorado Phase II certifications or phase II EPA certification? Yes k No._ --/k"-----' -I 3 15. Does the plan include a masonry fireplace including a fireplace section indicating design to comply with the IRC? Yes ______ No __ L)C ____ _ 16. Does the plan include a window schedule or other verification that egress/rescue windows from sleepinJCrooms and/or basements comply with the requirements of the IRC? Yes --f-"---- 17. Does the plan include a window schedule or other verification that windows provide natural light and ventilation for all habitable rooms? Yes "f. 18. Do the plans indicate the location of glazing subject to human impact such as glass doors, glazing immediately adjacent to such doors; glazing adjacent to any surface normally used as a walking surface; sliding glass doors; fixed glass panels; shower doors and tub enclosures and specify safety glazing for these areas? Yes /( No ______ _ 19. Is the location of all natural and liquid petroleum gas furnaces, boilers and water heaters indicated on the plan? Yes X I 20. Do you understand that if you are building on a parcel ofland created by the exemption process or the subdivision process, are building plans in compliance with all plat notes and/or covenants? Yes K I 21. Do you understand that if you belong to a Homeowners Association (HOA), it is your responsibility to obtain written permission from the association, if required by that association, prior to submitting an application for a building permit? The building permit application will be accepted without it, but you run the risk of the HOA bringing action to enforce the covenants, which can result in revocation of permit issued. Additionally, your Plan Review fee is not refundable if the plans have been reviewed by the Building Department prior to any action by the HOA that requires either revocation or substantial modification of the plans. Yes Y: I 22. Will this be the only residential structure on the parcel? Yes )C No Ifno-Explain: ______ _ 23. Have two (2) complete sets of construction drawings been submitted with the application? Yes X 24. Do you understand that the minimum dimension a home can be on a lot is 20ft. wide and 20ft. long? Yes X: I 4 25. Have you designed or had this plan designed while considering building and other construction code requirenl{~? Yes _ _.,A=-- 26. Do your plans comply with all zoning rules and regulations in the County related to your properties zone district? Yes )<: 27. Does the plan accurately indicate what you intend to construct and what will receive a final inspection by the Garfield County Building Department? Yes )<' 28. Do you understand that approval for design and/or construction changes are required prior to the application of these changes? Yes )c 29. Do you understand that the Building Department will collect a "Plan Review" fee from you at the time of application submittal and that you will be required to pay the "Permit Fee" as well as any "Road Impact" or "Septic System" fees required. at the time you pick up your building permit? Yes_:j,~-- 30. Are you aware that you must call in for an inspection by 3:30 the business day before the requested inspection in order to receive it the following business day? Inspections will be made from 7:30 a.m. to 3:30 p.m. Mouday through Friday. Inspections are to be called in to384~03. Yes ,~ No _____ _ 31. Are you aware that requesting inspections on work that is not ready or not accessible will result in a $50.00 re-inspection fee? Yes (C 32. Are you aware that you are required to call for all inspections required under the IRC including approval on a final inspection prior to receiving a Certificate of Occupancy and occupancy of the buildin* Yes. _ _,_('v ___ _ 33. Are you aware that the Permit Application must be signed by the Owner or a written authority being given for an Agent and that the party responsible for the project must comply with the IRC? Yes_{(__ 5 34. Do you understand that you will be required to hire a State of Colorado Licensed Electrician and Plumber to perform installations and hookups, unless you as the homeowner are performing the work? The license number of the person performing the work will be required at time of applicable inspection. Yes X 35. Are you aware, that on the front of the Building Permit Application you will need to fill in the Parcel/Schedule Number for the lot you are applying for this permit on prior to submittal of a buildin~fermit application? Your attention in this is appreciated. Yes____p:. 36. Do you know that the local fire district may require you to submit plans for their review of fire safety issues? Yes X (please check with the building department about this requirement) 37. Do you understand that if you are planning on doing any excavating or grading to the property prior to issuance of a building permit that you will be required to obtain a grading permit? Yes k:" ' 38. Are you aware that if you will be connecting to a public water and/or sewer system, that the tap fees have to be paid and the connections inspected by the service provider prior to the issuance of a Certificate of Occupancy? Yes )c I hereby acknowledge that I have read, understand and answered these questions to the best of my ability. Date Phone: 3<64--::f\CiD (days); (evenings) ProjectName: :Lri)obr_i~e ]?0t Yb d / .[)f@td) Project Address: ('"":) \?;\ BtJ e.l \.(\ .:siQ) ~S 6 Notes: If any required information is missing delays in issuing the permit are to be expected. Work may not proceed without the issuance of a permit. If it is determined by the Building Official that additional information is necessary to review the application and plans to determine minimum compliance with the adopted codes, the application may be placed behind more recent applications for building permits in the review process and not reviewed until required information has been provided and the application rotates again to first position for review, delay in issuance of the permit or delay in proceeding with construction. BpminreqDec2007 7 PLAN REVIEW CHECKLIST Applicant Let1JJ! ,( r illlA711 Date 1 /3o I tJ 8 ' I Building /Engineered Foundation r-J/ A Driveway Permit Lsurveyed Site Plan N /A Septic Permit and Setbacks / Grade/Topography 30% V Attach Residential Plan Review List -- ~Minimum Application Questionnaire / Subdivision Plat Notes tV j A Fire Department Review / Valuation Determination/Fees ~Red Line Plans/Stamps/Sticker / Attach Conditions -- ../ . Application Signed J Plan Reviewer To Sign Application / Parcel/Schedule No. rJ j!r 40# Snowload Letter-Manf. Hms. V Soils Report GENERAL NOTES: Planning/Zoning ~ Property Line Setbacks Afjl1 30ft Stream Setbacks tvjfi Flood Plain / Building Height / Zoning Sign-off /.ftJ!JJ. Road Impact Fees J HOA/DRC Approval J Grade/Topography 40% ../' Planning Issues V'subdivision Plat Notes EXHIBIT A THE ASPEN COLLECTION FREEDOM PROGRAM/(.::Q~STRUCeiON······.·.C .. o ... ·.JI<TRACT 7 VV'l0f~3Q200 .. · ... ' THIS CONSTRUCTION CONTRACT ("Contract") is made and entered into between IRONBRJDGE ASPEN COLLECTION LLC, a Colorado limited liability company ("Contractor'), whose address is 410 Jronbridge Road, Glenwood Sprin s, Colorado 81601, whose telep one number is (970) 945-4300, and whose facsimile number is (970) 928-8865, and ~~~~~~~~~~~~~~~~~~~][~~==== ("Owner"), whose address is ~ , whose telephone number is'tb-J..cJ5· ~and whose facsimile number is This Contract is entered into this 3 0 day of fflar:ch , 200f2 ("Effective DateH). This Contract is entered into in connection with and pursuant to Contractor and Owner's Freedom Program Purchase and Sale Agreement dated XY).a@ 30 , 200.6_. Terms defined in the Freedom Program Purchase and Sales Agreement and used in this Contract shall hold the same definitiOn in this Contract. The construction of the Residence on the Lot, each as defined in the Freedom Program Purchase and Sale Agreement shall be referred to herein as (the "House"). 1. Contactor's Scope of Work. Contractor's scope of work shall consist of construction services for the House as set forth below, which collectively shaH be referred to herein as the "Work." 2. Plans a. Contractor has prepared the following drawings, consistent with other homes in the Project, as defined in the Freedom Program Purchase and Sale Agreement, and constructed by Contractor: i. It 01 D · ii. iii. _____ (colleetive!y, the "Plans"). 3. Construction Services a. Contractor shall procure and pay for all permits, licenses, approvals and inspections required for the House. b. Contractor shall provide or cause to be provided all labor, materials, equipment and services to construct the House in a workmanlike manner, consistent with homebuilding industry standards in Garfield County, pursuant to the Plans. Contractor shall not be responsible for furnishing or constructing any improvements or performing any work unless the same are specifically set forth in the Plans or in this Contract. 4. Owner's Responsibilities a. Owner shall cooperate with Contractor in securing any permits, licenses, approvals and inspections for the House. b. Upon Contractor's request, Owner shall provide aU «Requested lnfonnation" to Contractor in a timely manner, and shall be available to meet with Contractor to approve plans and review the progress of the Work. Requested Infonnation shall include, but not necessarily be limited to: i. proof of financing ii. Design and Architectural Option selections by the associated design selection dates iii. change order requests iv. proof of necessary insurance c. Owner specifically agrees and acknowledges that financing for the House is the sole and exclusive obligation of Owner, and Owner's ability to obtain financing is not a condition precedent to Owner's obligations set forth in this Contract. Owner represents that Owner is qualified to obtain such financing and/or has available funds in the amount necessary to complete the House. Owner agrees to promptly seek and obtain any and all required finanCing for the House. Owner agrees to provide Contractor with proof, satisfactory to Contractor, that Owner's financing for the House has been finalized, and agrees that Contractor is not obligated to proceed with construction on the House until such proof is delivered to Contractor and the Closing of the Lot has occurred. F'om1 Date: 2!15/08 15 OF 23 d. Owner agrees not to let or enter into any other contracts in connection with the House or the Lot without the prior written approval of Contractor. Owner acknowledges and agrees that entering into any contract or pennitting any other contractor onto the Lot may impede the Contractor's ability to manage the cost of the House and timely complete performance of the Work as contemplated herein. Violation of this provision, shaJlj jn addition to any other remedies set forth hereint pennit Contractor to exercise its termination rights as .specified herein. e. Within three {3) days after substantial completion of the Work, Owner shall notify all utility suppliers that Owner is responsible for utility expenses from and after the date of substantial completion. 5. Time a. Without limiting the foregoing, Owner agrees to provide aU Requested Infom1ation to Contractor to start construction within three (3) months of the date on which the Closing of the Lot occurs. Should Owner delay commencement construction beyond said three {3) monthst Owner shall pay Contractor the sum of Five Thousand Dollars ($5,000.00) per month, allocated for fractional portions of months ("Extension Fee"). The parties hereby agree that Contractor's actual damages for such Owner delay cannot be calculated now with certainty, and that Liquidated Damages are a reasonable estimate thereof. b. Provided that Owner has complied with all of its obligations hereunder, including but not limited to timely payment of all sums due to Contractor, and Owner has secured financing for the House and delivered satisfactory proof thereof to Contractor, and Closing of the Lot has occun·ed, Contractor shaH commence construction at the House Site within sixty (60) days after the issuance of a building pem1it in the Owner's name, as evidenced by accurate installation of the foundation forms (the "Commencement Date"). c. Substantial Completion of the House shall occur within ten (1 0) months after the Commencement Date (the "Completion Date"). The Completion Date may be extended on account of: i. labor disputes; ii. fire or other damage to the House, including interior damage; iii. material or labor shortages; iv. transportation delays; v, governmental action; vi. unusual weather conditions; vii, change orders or delays caused by Owner; viii. the failure of Owner to provide information and/or approvals in a 6mely manner; or ix. any other causes which are beyond Contractor's control or which may othenvise justify the delay; and x. Force Majeure events. d. Without limiting the foregoing, Owner agrees to provide all required infonnation to Contractor to substantially complete construction by the Completion Date. Should either party delay Substantial Completion of the House beyond the Completion Date, the delaying party shall pay the other party the sum of Five Thousand Dollars ($5,000.00) per month, allocated for fractional portions of months as an Extension Fee. The parties hereby agree that actual damages for such delays cannot be calculated now with certainty, and that these Liquidated Damages are a reasonable estimate thereof. 6. Ownership of Plans. Owner agrees and acknowledges that the Plans, and any amendments or revisions thereto, are and shall remain the sole and exclusive property of Contractor, and Owner agrees not to sell, transfer, assign, use, copy or share the same with any person or entity without the prior and express written consent of Contractor, which may be withheld in Contractor's sole discretion. 7. a. .;>l.f.-)'ll!..Ll!&!::!:la:rl'lfl:.~-,-c:~!.QlL_ Dollars ($2tl.Q., "03.00) ("Contract Price') for performance of the Work, which amount shall be paid in accordance with the payment provisions set forth in this Contracl b. Owner acknowledges that upon the execution of any change orders during the course of construction, the Contract Price may increase, and in such event Owner shall pay to Contractor such increase upon execution of the change order, and prior to Contractor's perfonnance of any work in connection with the change order. 8. Payment Procedure. a. Owner shall make, or cause Owner's lender to make, progress payments for the Work in accordance with the schedule attached hereto as Exhibit A-1 ("Draw Schedule") or at any intermediate point based on the percentage of completion of work at that time identified by inspection. Progress payments shall be delivered to Contractor within Form Date: UlS/08 16 OF 23 five (5) days after Owner's receipt of Contractor's request for payment, which requests for payment shall include a blanket lien waiver statement relating to all parties who provided labor andior materials applicable to the previous request for payment. b. In the event that at any time the amount of Owner's Joan available for distribution is less than the amount of the Contract Price remaining to be paid, Owner shall deposit the difference into a construction control account and execute a customary construction control agreement with respect to the holding and distribution of said sum prior to Contractor's obligation to commence or continue construction at the House Site. Owner shall be responsible for the payment of any fees in connection with the construction control. c. Within ten ( 1 0) days after substantial completion of the Work, Owner shall pay aU remaining amounts due under this Contract. d. All monies not paid when due as provided herein shall bear interest at the rate of eighteen percent (18%) per annum . . e. In the event any installment is not paid when due, Contractor may exercise any remedy set fOrth in this Contract or exercise any other legal and/or equitable rights which may be necessary or appropriate to enforce this Contract. 9. Changes in the Work a. Buyer understands, acknowledges and agrees that the Contract Price includes only the items set forth in the document attached hereto as Exhibit B ("Features List"). These are referred to herein as ("Standard Selections''). b. Additions, upgrades, and/or optional items which are made available to Owner shall be selected, contracted and paid for in a separate contract with Contractor or by Change Order. c. Contractor may offer pre-designed and priced options for each Residence to Owner. i. Options which change the architectural design of the Residence~ such as an additional garage bay, are referred to as architectural options ("Architectural Options"). ii. Options which change the materials and colors of the Residence, such as carpet type and/or color, are referred to as design options ("Design Options"). m. Together these are often referred to as ("Options'). d. Changes to the Work that are not a pre-designed and priced Architectural Option or Design Options are referred to a.;; change orders ("Change Orders"). i. All change orders shall specify the following: 1. the change in the Work, 2. the adjushnent to the Contract Ptice, if applicable, and 3. the adjustment to the Completion Date, if applicable. e. Changes in the Work can only occur by purchasing an Architectural Option, purchasing a Design Option or by written Change Order prepared and approved by Contractor. f. Options will be offered to the Owner, provided the following conditions have been adhered to: i. Options must be selected in a timely manner. Each Option is assigned one of three dates which are referred to as Design Selection I ("DS 1 "), Design Selection 2 ("DS2") and Design Selection 3 ("DS3"). DS I is seven (7) days after closing, DS2 is forty five (45) days after closing and DS3 is ninety (90) days after closing. ii. Should Owner fail to select Options on or before the applicable design selection date, Seller shall have the right to either stop work, install the standard selection or deny the Option. iii. Options and Change Orders shall be selected subsequent to the execution of this Agreement. Payment in the amount of 100% of the price of each Option or Change Order shall be due when each Option or Change Order is ordered. g. ALL PAYMENTS FOR OPTIONS AND CHANGE ORDERS ARE NON-REFUNDABLE TO OWNER h. All Option purchases and Change Orders shall be executed by both the Owner and the Contractor and paid for by Owner, prior to the commencement of the work set forth therein. i. In the event that any increase in the cost of construction arises because of a change in applicable governmental regulations taking effect after the date of this Contract, such revision or condition shall be the basis for a Change Order and Contractor shall receive appropriate compensation for making such change. 10. Possession and Use of the Lot. Upon the Closing of the Lot, Owner is deemed to have conveyed to Contractor an absolute and exclusive right to possess and use the Lot. Owner shall not enter the Lot unless accompanied by an authorized representative of Contractor. Owner shall not instruct, direct or otherwise contact Contractor's laborers, subcontractors or consultants. Contractor shall pem1it access to the Lot by inspectors of Owner's lender. Contractor shall return possession of the Lot to Owner at the time that all payments and obligations required of the Owner have been fully paid and perfonned by the Owner. If possession of the House and Lot is taken by the Owner before Owner's obligations set forth in this Contract are fully performed and without the prior written consent of Contractor, Owner shall be deemed to have accepted the Work as complete and satisfactory, in compliance of all of Contractor's obligations hereunder. FQnn Date: 2/JS/08 170F23 11. Walk Through. a. Upon notice from Contractor to Owner, Owner and Contractor $hall schedule a walk-through of Owner's home and shall compile a list of any items which arc materially not in accordance with approved plans and specifications, or do not materially conform to Garfield County standards. Contractor shall repair, replace or otherwise remedy the items within a reasonable time after Substantial Completion. b. Notwithstanding the fact that additional work may be required to correct the items, if the House has reached Substantial Completion, then no funds shall be withheld from Contractor for these items. c. After Substantial Completion, the Limited Seller's Warranty included in the Freedom Program Purchase and Sale Agreement shall apply. 12. No Assignment This Contract shall not be assigned by Owner or Contractor to any other party except after the prior written consent of Owner or Contractor~ which consent may be reserved in Owner's or Contractor's sole discretion. If Owner or Contractor assigns any of Owner's or Contractor's rights under this COntract to any other party in violation of this provision) said assignment shall be void and of no effect, and Owner shall be in default hereunder. Notwithstanding the foregoing~ Contractor consents to a collateral assignment of this Contract to Owner's lender pursuant to Owner's agreement with its lender. 13. Insurance. a. Owner shall procure and maintain during the tenn of this Contract the following policies of insurance: i. Course of Construction insurance in the amount of the Contract Price; H. Homeowner's insurance, and a fire and extended risk insurance policy, covering the House and Lot, in an amount not less than the Purchase Price, together with insurance covering loss or damage to Owner's personal property, and Owner's personal liability for injuries which may be sustained within the Property; and m. Comprehensive General Liability insurance in the amount of$1,000,000. b. Contractor shall maintain during the term of this Contract i. Workers compensation insurance, as required by law. 14. Termination of the Contract upon Termination of the Freedom Plan Purchase and Sale Agreement. This Contract shall be deemed tenninated upon the termination of the Freedom Pian Purchase and SaJe Agreement for any reason. In such event, unless the cause of such termination is the default of Contractor as seller under the Freedom Plan Purchase and Sale Agreement, Contractor shall be entitled to retain all other amount(s) previously paid to Contractor or othefV,.Iise due to Contractor under this Contract. 15. Contractor's Right to Stop Work and Terminate Contract. In addition to all other remedies set forth in this Contract, in the event that any payment is not made in full within five (5) days after such payment is due, or Owner fails to perform any of its duties under this Contract within ten (1 0) days after written notice from Contractor, Contractor may stop the Work untH payment .is made or Owner fulfills its duties. Should the Work be stopped for a period of fifteen (15) days or more upon Owner's failure to make a progress payment or as a result of any other act~ omission or neglect of the Owner, then Contractor may, upon providing written notice to Owner, tenninate this Contract. Upon such termination, the Contractor may recover from the Owner payment for all work completed and for any loss sustained by the Contractor for materials, equipment, tools, or machinery to the extent of actual loss thereon, plus an amount equal to the Contractor's anticipated profit under this Contract, plus interest on the foregoing amounts at the rate of eighteen percent (18%) per annum. 16. Alternative Dispute Resolution. Owner and Contractor agree to be bound by the a1temative dispute resolution procedures set forth in the Declaration. Any and all claims, disputes and controversies arising between Owner and Contractor, whether before or after Closing, relating to this Contract or its subject matter, including, but not limited to, any alleged construction defect, shall be submitted to final and binding arbitration. 17. Notices. All notices required by this Contract shaH be in writing and shall be given by any of the following means to the below listed addresses or fax numbers: a. certified or registered mail, postage prepaid, return receipt requested, in which case notice shall be deemed delivered three (3) business days after the postmark date; b. recognized commercial overnight courier, in which case notice shall be deemed delivered one (1) business day after Form Date: 21!.5/08 !8 OF 23 receipt for delivery by the courier; c. electronic mail transmission with confinned receipt, d. telecopy transmit1al ("fax"), in which case notice shall be deemed delivered upon fax confinnation of transmission to the intended party; or e. f. personal delivery, in which case the notice shaH be effective when received. Notice shall be given to Contractor to: 41 0 lronbridge Dr. Glenwood Springs, CO 8160 l g. Notice shaiJd'e iv{J/f (},"Jtr to: !flJ .~ ~~IL~~J!""' Sbl,IV h. Notice of change of address shall be delivered by written notice in the manner described in this section. Rejection or other refusal to accept a notice or the inability to deliver a notice because of changed address of which no notice was given shall be deemed to constitute receipt of the notice sent. 18. Contractor's Limited Warranty. Contractor shall provide a one-year limited warranty on the house as provided for in the Freedom Program Purchase and Sales Agreement 19. Contractor's Disclaimers. Contractor makes no representation or warranty, and shall in no event be responsible for the following: a. Hazardous materials (as defined by applicable law) in the House or on the Lot; b. Homeowner's association assessments and/or property taxes applicable to the Lot; c. Owner's financing of the Work; d. Any work or materials not supplied or installed by Contractor pursuant to this Contract; or e. All of the matters described in the disclosures and disclaimers set forth in the Freedom Plan Purchase and Sale Agreement, which disclosures and disclaimers are fuUy incorporated herein by this reference. 20. General Provisions. a. This Contract shall be governed by the laws of the State of Colorado. Jurisdiction and venue for any action concerning this Contract shan be in Garfield County, Colorado. b. In the event of any litigation or other proceedings between the parties concerning this Contract, the prevailing party shall be entitled to the payment by the nonprevailing party of all of its reasonable attorneys' fees, court costs, and litigation expenses. c. This Contract constitutes the entire agreement between the parties and any prior understandings, agreements or representations of any kind whatsoever preceding the date of this Contract shall not be binding upon either party except to the extent that they are specifically incorporated into this Contract. d. This Contract shall be binding upon and inure to the benefit of the parties hereto and to their respective heirs, representatives, successors and permitted assignees. This Contract is intended for the exclusive benefit of Owner and Contractor and is not intended and shall not be interpreted as conferring any benefit on any third party. e. This Contract and any amendments to this Contract may be executed in any number of counterparts, each of which shall be deemed an original and all taken together shall constitute one and the same agreement. Fax copies of this Contract and any amendments to this Contract and fax signatures thereon shall have the same force, effect, and legal status of originals. f. If any provision of this Contract is or shall become invalid or unenforceable, the remaining provisions of this Contract shall not be affected. g. Time is of the essence in each and every term and provision of this Contract. All references to days herein shall be deemed to refer to calendar days unless otherwise specified. In the event that the final date for performance of any act required by this Contract falls on a Saturday, Sunday, or legal holiday, such act may be perfonncd on the next day which is not a Saturday, Sunday, or legal holiday. h. The waiver of a breach of any provision in this Contract shall not be construed as a waiver of any other breach of the same or other provision of this Contract, including the time of performance of any provision. i. Ov.rner understands that this Contract is a legally binding contract. Owner represents and warrants that Owner has read the tem1s and conditions of this Contract, and has had a full and fair opportunity to consult with legal counsel of Owner's own choosing concerning this Contract. Fonn Date: 2115108 190F 23 EXECUTED to be effective as of the date of the date first written above. CONTRACTOR: OWNER: IRONBRIDGE ASPEN COLLECTION LLC, Fonn Date: 2115/08 200F23 Form Date: 2115108 EXHIBIT A-1 (Draw Schedule insert) 21 OF 23 EXHIBIT A-1 DRAW SCHEDULE lronbridge Aspen Collection, LLC February 14, 2008 P!an No: 1<'~ '"" f"'\ IVIU Foundation: Post Tension Slab on Grade Description % Cost Permits, Engineering, Survey 5% $ 12,030 Sitework 4% $ 9,624 Foundation 7% $ 16,842 Framing 20% $ 48,.121 Roofing 5% $ 12,030 Plumbing 5% $ 12,030 Electrical 3% $ 7,218 HVAC 4% $ 9,624 Windows, Doors, Trim 7% $ 16,842 Insulation 1% $ 2,406 Exterior Finishes 5% $ 12,030 Painting 6% $ 14,436 Drywall 4% $ 9,624 Flooring 3% $ 7,218 Tile 2% $ 4,812 Cabinets 2% $ 4,812 Appliances 1% $ 2,406 Landscaping (if applicable), Driveways, Sitework 7% $ 16,842 General Conditions 2% $ 4,812 Total Cost 93% $ 223,760 Contractor Fee 7% $ 16,842 Total Contractor Cost and Fee 100% $ 240,603 / EXHIBITB (Features List insert) Form Date: 2/15103 22 OF 23 GOLF CLLIB AND MOUN"JAJN COMMUNIT1:'" IRON BRIDGE ASPEN COLLECTION LLC February 7, 2008 ENERGY PERFORMANCE FEATURES • Fully-engineered Air and Water Infiltration Package o Double~paned Low-E Glass o Air Infiltration-protected Electrical Outlets o Fully-wrapped and Sealed Window Openings o Weather Strippjng on Exterior Doors o Air Barrier Weather Stripping at Foundation o Under-slab Vapor Barriers • High-efficiency Furnace • High-efficiency 48 Gallon Hot Water Heater • Insulated Exterior Doors and Garage Door • Outside Fresh Air Exchanger ROOFING • 40-year Asphalt Shingles • Pre-finished Gutters and Downspouts WINDOWS & DOORS • Lifetime Warranty Energy Star-rated Windows • Double-paned Low-E Glass • Thennatru Fiberglass Insulated Entry Door ELECTRICAL • Phone/Data/TV Ports in Kitchen, Great Room and Master Bedroom • Photo Cell Automatic Exterior Sconces • Decorative Fixtures at Kitchen, Dining, Bathrooms, Walk-in Closets • Switched Outlets in Great Room and Bedrooms • Recessed Can Lights in Kitchen & Hallways J of2 HEATING & VENTILATION • Exhaust Fans: Energy Star-rated Whisper Fans, Vented to Exterior • Power-vented Active Radon Mitigation System • Heated Garage GARAGE DOORS • Insulated Door • Pre-wired Garage Door Opener Outlet APPLIANCES • GE Gas Range • Range Exhaust Hood • Built-in GE Dishwasher INTERIOR FINISHES AND FLOORING • Hand~textured Painted Walls • Square DrywaU Comers • 9~ft. Ceilings • I O-ft. Coffered Ceiling in Master Bedroom • Vinyl Flooring at Kitchens, Bathrooms and Mudrooms • Carpeting in aU Bedrooms and Great Room • Ceramic Tile Tub Deck in Master Bath • Full-height Fiberglass Shower and Tub Enclosures GOLF CLU$ AND MOON JAJN COMMtJN11·y IRONBRlDGE ASPEN COLLECTION LLC February 7, 2008 INTERIOR DOORS, TRIM & CABINETS • Interior Doors: Sante Fe Style Hollow Core e Closets: Stained Rods and Painted Shelves • Painted Baseboards and Door Casings • Painted Extended Window Sills and Aprons • Laminate Countertops • Cabinets: Hickory o 30" Uppers at Kitchen o Raised Panel Style Doors o 36" High Vanities o Adjustable Shelves o Raised Bar Countertop PLUMBING FIXTURES & SHOWER ENCLOSURES • Soaker Tub in Master Bath • Pedestal Sink in Powder Rooms • Icemaker-Hne to Refrigerator • Mirror over ail Vanity Cabinets EXTERIOR • Asphalt Driveway with Concrete Walk and Covered Front Porches • Jn~ground Drainage System • Landscaping, liTigation and Drainage • Stucco, Stone & Rough~Sawn Wood Finishes THE TOTAL NUMBER, DESIGN, LAYOUT AND LOCATION OF LOTS, LANDSCAPING, LAKES, RESIDENCES AND UNIT MIX AND THE LOCATION, DESIGN AND LAYOUT OF RECREATIONAL FACILITIES MAY BE CHANGED DUE TO A NUMBER OF CIRCUMSTANCES, INCLUDING GOVERNMENTAL REQUIREMENTS, MARKET DEMAND AND COST CONSTRAINTS. THERE IS NO ASSURANCE THAT THE FUTURE IMPROVEMENTS AND FACILITIES DESCRJBED WILL BE CONSTRUCTED. DIMENSIONS AND RESIDENCE SIZE ARE APPROXIMATE IN NATURE AND ARE NOT INTENDED FOR FINAL REFERENCE AS PLANS ARE NOT TO SCALE. LB ROSE RANCH LLC, IRONBRIDGE HOMES LLC, IRONBRIDGE MOUNTAIN COTTAGES LLC AND IRONBRJDGE ASPEN COLLECTION LLC RESERVE THE RlGHT TO MAKE MODIFICATIONS IN LOT AND RESIDENCE PRJCES AND MAKE MODIFICATIONS IN MATERIALS AND SPECIFICATIONS AT ANY TIME WITHOUT PRIOR NOTICE. OWNERSHIP OF A RESIDENCE OR LOT DOES NOT INCLUDE CLUB MEMBERSHIP OR RIGHTS IN THE COUNTRY CLUB F ACIL!TIES. 2 of2 EXHIBITB-1 PROJECT DOCUMENTS ACKNOWLEDGEMENT The Purchaser, as witnessed by the signature(s) below, acknowledges that as specified in the Purchase and Sale Agreement, Paragraph 5(A), Title Policy, will receive all recorded documents that relate to the Property from the Title Company within ten days from mutual execution of the Contract. Said documents are referred to as aU Schedule B~2 exception documents as listed in the Commitment to Provide a Title Insurance Policy. Said Documents are provided on a computer disc, however the Buyer may request from the Title Company printed copies of any or all documents provided on the disc. As referenced in Paragraph 5(E) and 5(F), "Project Documents" and "The Aspen Collection Association'\ of the Purchase and Sale Agrcement 1 there are additional documents relating to the Property which are considered to be unrecorded documents that relate to the Title of the Property. These docwnents are provided by the Seller and the IPONTACA through the website of the community which is accessible at www.ironbridgeclub.com by logging into the site under member's login by using the password 2345. By signing below, the Purchaser acknowledges the ability to review and the receipt of said documents through the website listed above during the Title Review Period. Purchaser may request printed copies of said documents in the event that they are unable to access the documents through the website. ~4-y<. ...3 -..f3t::> -0 9 Purchaser Date Purchaser Date January 1, 2008 F<mn Date: 2fl :S/08 23 OF 23 October 14, 2008 Ironbridge Golf Club & Sporting Commimity 410 lronbridge Drive Glenwood Springs; CO 81601 Attn: Mike Woelkc RE: Trencf\ Beam and Steel Observation including Ufer Rod 0131 River Vista Lot 260 Iron bridge Subdivision Garfield County,' Colorado Dear Mike: ·--·-+--·--------;---. 1205 S. PJ..?.,m RIVER l).RJVE, SUITE 200· I i DENVER, Cq_LORADO 8922~: r r OmcE(303) 715·9885 1 • p,.X'(3o3) 715;9890 i i: ! : . .'. i: i' ! : Per your request, we visited the subject site on October 9, 2008 to observe the construction o~lhe trench beams. of the post-tensioned slab-on-grade. The dimensions, geometry, and required optioq•> have notibeen verified at this time. The contractor assumes responsibility for the accuracy of all building dimtmsions, l(l~ations on lot, foundation elevations, and the slab step layout. 1 ! ! The trench bea1r depth, width, and required steel placement appeared to be in gene~al confor~ance with . approved construction ·documents. Also, we'observed the required l-inch polystyrel)e foam (~xtruded) insulation· was placed in the trenches at the exterior of the building footprint per plan and is teJ)!porarily jtp the trench walL j . • i. . We also observed that an Ufer rod was placed at the time of the wall steel installati<m. No oth;~r items were observed at this time. ; · Please call ifyqu have.any questions. Sincerely, '"ri~"J:-'""N'~· = Jeffrey R. Goben, PTl # 9160622 JRG:jma Attachments file ! I i' i I , i: ' i; i; i i. ; ' i: ! : N 11068 o. ----------~~~---Assessor's Parcel No. Date 8/19/2008 BUILDING PERMIT CARD Job Address __ ..;:0_::.:13::..1:....R~iv..::e;_r V..:...:.::•s=ta::.__:G::..W:.:..::S_.:.f_:.:lr:..::o~n~b:..:.ri.::dgiLe::...:...P.::U:::.D...:.P...:.h:.:. . .::2z..:, L::.:o:..:t:..::2:::6.::.0 ________________ _ Owner ____ _::_Le:..:n.:..:d::..:e..:..rm=an:.:.''-C:..:a:.:.r..:..o:.t.ly.:..:n _____ Address 3510 Hollow Ct. GJ 8150Phone # ____ _ Contractor Hansen Const. Address 410 lronbridge Dr. GWSPhone # 970-384-3990 Setbacks: Front Rear ______ RH _____ LH _____ Zoning _____ _ s/f on found w/ att. gar. & cov. patio INSPECTIONS Soils Test Weatherproofing L f r Footing Mechanical 2--lp-c:tf 6fnA. I~ Foundation Electrical Rough (State) ____ I _____ _ Grout Electrical Final (State) __________ _ Underground Plum -"-~==="---'"---''---'gt'--;_t<.; -~Final S::-il,6-a9 /CheckliSJ-Comgleted?_· __ _ Rough Plumbing Certificate Occupancy# _..(j.JL-{L..,Ol._3:.1---.1''7------ Framing -t> Date------------- Insulation :3-3-09 S?..' Septic System# ____________ _ Roofing · / · Date-------------- Drywall 3--?-dl~ Finai _________ --'---- Gas Piping A 'JPOd[IQ'Hi. Other --------------- NOTES loc.A110N ON LoT, A-MENDMENT (2.EG\'D r~ "FINAL C...O. (continue on back) BUILDING PERMIT rzGD GARFIELD COUNTY, COLORADO 1 . tJ~ INSPECTION WILL NOT BE MADE UNLESS ~ THIS CARD IS POSTED ON THE JOB Date Issued _ __,~...,_ .. _,{,_Cf.:..:CfO..=-"""'------Permit No. jj_Q.3{o8"'-"'"'-------- AGREEMENT In consideration of the issuance of the permit, the applicant hereby agrees to comply with all laws and regulations related to the zoning, location; construction and erection of the proposed structured for which this permit is granted, and further agrees that if the above said regulations are not fully complied with in the zoning, location, erection and construction of the above described structure, the permit may then be revoked by notice from the County Building department and IMMEDIATELY BECOME NULL AND VOID. useS }.f 00 'fu\mdo.-Hon W/tA+ttld1e_d ~ ~covered dec.K. Address or Legal Description 0\ 3\ R.i.Y..er \f \ S.fn Cl W S owner 1 fndermoo 1 C'W\yn Building PermitType~S.\den±i ... tA'-"-'\~-------------______ _ contractor -~Sen Coos.t. This Card Must Be Posted So It Is Plainly Visible From The Street Until Final Inspection INSPECTION RECORD I Footing ·-~·--···"-< --·-----····---·· ... ~--'""·-~···· I D.riveway -----------------------· --·· ~" .:Z:z::. L [ ;Y#; Foundation I Grouting , Insulation 3-3-0 '1 {(V< .i!7;C.L.. .rr - Undergroundl'lumbing "Cj _ -z? _ o :r· :;?0_ Drywall 3-Cf-o'l ~ Rough Plumbing Electric Final (by State Inspector) ~ ~-l.r01 V1Jv (Prior to Final) Rough Mechanical 0¥ Septic Final ll/14 "A.\, -o '1 Gas Piping J-(t voq FINAb ::5 -;).6~o9' ;:/P~~~c;;;;g:--,GW/ Electric Rough (by State Inspector) f (You Must Call For Final Inspection) It-tf 7 h ~~~ Notes (Prior to Framing) 0 Framing ;).· ;,& ·o"f . 'f1Jtlfi...._ (to include Roof In place & Windows & Doors installed & Firestopping in place) THIS PERMIT IS NOT TRANSFERABlE For Inspection Call970-384-5003 Office 970·945-8212 108 8th Street, Suite 401 Glenwood Springs, Colorado 81601 DO NOT DESTROY THIS CARD APPROVED Q.lf:fl: -1"'-Q_ Date ___ ~_u~ PROTECTP~~fewman~ (DO NOT LAMINATE) Parcel Detail Page I of 4 Garfield County Assessor/Treasurer Parcel Detail Information Assessor/Treasurer Property Search I Assessor Subset Query I Assessor Sales Search Clerk & Recorder Reception Search Basic Building Characteristics I Tax Information Parcel Detail I Value Detail I Sales Detail I Residential/Commercial Improvement Detail Land Detail I Photographs I Mill Levy Revenues Detail ~ Account Parcel 2007 Mill Number Number Levy a I 090 II R043476 1!239501329260 11 64.976 Owner Name and Mailing Address )LENDERMAN, CAROLYN LOVE j351 0 HOLLOW CT jGRAND JUNCTION, CO 81506 Assessor's Parcel Description (Not to be used as a legal description) jSECT,TWN,RNG: 1-7-89 SUB:IRONBRIDGE IPUD, PHASE II, FILING 1, 2 & 3 ILOT:260 PRE:R041508 BK:l596 PG:871 riBK:1565 PG:600 BK:1560 PG:438 IBK:1560 PG:431 BK:1057 PG:0745 IBK: 1028 PG:768 BK: 1028 PG:597 II http://www. garcoact.com/ assessor/parcel.asp ?Parce!N umber=23 9 50 13 2 9260 I I I I I I I I I I 7/3/2008 Parcel Detail Page 2 of4 IBK:1006 PG:743 RECPT:750267 I IRECPT:750266 BK: 1822 PG:287 I IRECPT:702424 BK: 1822 PG:283 I IRECPT:702422 BK:1822 PG:250 I IRECPT:702421 BK: 1782 PG:269 I \RECPT:694479 BK: 1782 PG:264 I IRECPT:6944 78 BK: 17 4 7 PO: 1 I IRECPT:686745 BK:1218 PG:738 I \RECPT:572583 BK:1218 PG:715 I \RECPT:572582 BK: 1217 PG:266 I IRECPT:572131 BK: 1206 PG:852 I IRECPT:569200 BK:1206 PG:780 I IRECPT:569199 BK:1206 PG:768 I IRECPT:569197 BK:1206 PG:734 I IRECPT:569195 BK:1206 PG:662 I IRECPT:569194 BK:l206 PG:637 I IRE CPT: 569192 BK: 1206 PG:629 I IRECPT:569191 BK:1206 PG:574 I IRECPT:569190 BK:1063 PG:0578 I jBK:1063 PG:0571 I Location Physical 1131 RIVER VISTA GLENWOOD SPRINGS! Address: Subdivision: IRONBRIDGE PUD, PHASE II, FILING 1, 2& \Land Acres: lo \Land Sq Ft: 114,009 I I Section II Township II Range I I 1 II 7 II 89 I http://www .garcoact.com/assessor/parcel.asp?ParcelN umber=23950 13 29260 7/3/2008 Parcel Detail Page 3 of4 2008 Property Tax Valuation Information II Actual Value II Assessed Value I I Land: II 82,510jj 23,930j !Improvements: II oil ol I Total: II 82,51011 23,9301 Additional Value Detail Most Recent Sale Sale Date: l/614/2008 Sale Price: 11288,400 Additional Sales Detail Basic Building Characteristics Number of Residential jo I Buildings: Number of Comm/lnd jo I Buildings: No Building Records Found Tax Information I Tax Year II Transaction Type II Amount j I 2007 II Tax Payment: Second Half II ($640.66)1 I 2007 II Tax Payment: First Half 11 ($640.66)1 I 2007 II Tax Amount II $1,281.321 I 2006 II Tax Payment: Second Half II ($54.46)1 I 2006 II Tax Payment: First Half II ($54.46)1 I 2006 II Tax Amount II $108.921 http://www .garcoact.com/assessor/parcel. asp ?ParcelN umber=23 95013 29260 7/3/2008 <:>~cbtech HEPWORTH-PAWLAK GEOTECHNICAL, Hepworth· Pawlak Geotechnical1 Inc 5020 County Road 154 Glenwood Springs, Colorado 81601 Phone' 970-945-7988 fax, 970-945-8454 email: hpgeo@hpgeotech.com OP;C/Ce COj?j' A~.~ I \u_-\~~N ~\\~~ PRELTIWINARYGEOTEC~CALSTUDY PROPOSED IRONBRIDGE VILLAS JRONBRIDGE DRIVE GARFIELD COUNTY, COLORADO JOB NO. 105115-6 SEPTEMBER 14, 2005 PREPARED FOR: L.B. ROSE RANCH, LLC ATTN: AARON BEVINGTON 410 IRONBRIDGE DRIVE GLENWOOD SPRINGS, COLORADO 81601 Parker 303-841-7119 • Colorado Springs 719-633-5562 • Silverthorne 970-468-1989 TABLE OF CONTENTS PURPOSE AND SCOPE OF STIJDY ............................................................................ -1- PROPOSED CONSTRUCTION ..................................................................................... -1 - SITE CONDITIONS ....................................................................................................... -2- FIELD EXPLORATION ...................................................................... : .......................... -2- SUBSURFACE COJ\'DITIONS ................................................................................ , ..... -3- ENGINEERING ANALYSIS ......................................................................................... -4- DESIGN RECOMMENDATIONS ................................................................................. -5- FOUNDATIONS ........................... : ............................................................................. -5- FOUNDATION AND RETAINING WALLS ............................................................ -6- FLOOR SLABS .......................................................................................................... -8 - UNDERDRAIN SYSTEM .................................... : ..................................................... -8 - SITE GRADING ......................................................................................................... -9- SURFACE DRAINAGE ................................................................. : ................ , ........ -10- PAVEMENT SECTION ............................................................................................ -11- LIMITATIONS ................................................................................................ , ............ -11 - FIGURES 1 AND 2-LOCATION OF EXPLORATORY BORINGS FIGURES 3 THROUGH 8-LOGS OF EXPLORATORY BORINGS FIGURE 9-LEGEND AND NOTES FIGURES 10 THROUGH 16-SWELL-CONSOLIDATION TEST RESULTS FIGURES 17 AND 18-GRADATION TEST RESULTS TABLE 1-SUMMARY OF LABORATORY TEST RESULTS PURPOSE AND SCOPE OF STUDY Tbis report presents the results of a preliminary geotechnical study for the proposed Ironbridge Villas to be located along lronbridge Drive, Garfield County, Colorado. The project site is shown on Figures 1 and 2. The purpose of the study was to develop recommendations for the foundation and grading designs. The study was conducted in accordance with our agreement for professional engineering services to L.B. Rose Ranch, LLC dated June 30, 2005. We previously conducted geotechnical studies for planning and . preliminary design of the Rose Ranch Development (now known as lronbridge) and presented our findings in reports dated October 29, 1997 and September 10, 1998, Job No.197 327. A field exploration program consisting of exploratory borings was conducted to obtain information on the subsurface conditions within the depth of expected foundation loading. The potential for future ground subsidence due to deeper geologic conditions was to be evaluated by others. Samples of the subsoils obi:ained during the field exploration were tested in the laboratory to determine their classification and other engineering characteristics. The results of the field exploration and laboratory testing were analyzed to develop recommendations for foundation types, depths and allowable pressures for the proposed building foundation and for the subdivision grading. This report sun:u:narizes the data obtained during this study and presents our conclusions, design reco=endations and other geotechnical engineering considerations based on the proposed construction and the subsurface conditions encountered. PROPOSED CONSTRUCTION The proposed Villas development is located in the central part of Ironbridge near the main · club and other common facilities and will consist of tightly spaced, single family residences in two development areas as shown on Figures 1 and 2. The access roads and drives will connect to the existing and proposed Ironbridge Drive. The residences will be 2 story, wood frame structures constructed typically 8 to 10 feet apart. Ground floors will Job No. !05 !15-6 -2- be structural above crawlspace in the residences and slab-on-grade in the garages. The entire development area will be elevated typically up to about 15 feet. The fill sections will grade into the existing Ironbridge Drive, the golf course 18th Hole and the Robertson Ditch. The fill material will be obtained on the project site, likely from <be Phase 2 development. The Robertson Ditch will remain open but be improved by lining to reduce leakage. After the subdivision grading, the excavation for the individual residences will be relatively minor. We assume the residences will be relatively lightly loaded, typical of the proposed type of construction. If building loadings, location or development plans change significantly from those described above, we should be notified to re-evaluate the recormnendations contained in this report. SITE CONDITIONS The Villas development is located downhill to the east and south of the existing pro shop and other cormnons area, see Figures 1 and 2. The north Villas site was mainly vacant and covered with field grass and weeds. The south Villas site is partly disturbed and covered with grass and weeds with miscellaneous fill piles. The ground surface slope is about 5 to 7% with 20 feet of elevation difference across the north Villas site, and about 6 to 8% with 30 feet of elevation difference across the south Villas site. The entire project site is covered with debris fan deposits that generally iocrease io depth with iocrease in ground surface elevation to the west Bedrock of the Eagle Valley Evaporite outcrops to the west of County Road 109 io the golf course fairway and the steep valley side. FIELD EXPLORATION The field exploration for the project was conducted between July 6 and 8, 2005. Twenty~ five exploratory borings were drilled at the locations shown on Figures 1 and 2 to evaluate the subsurface conditions. The boriogs were advanced with 4 inch diameter continuous flight auger powered by a truck-mollllted CME-55 drill rig. The boriogs were logged by a representative of Hepworth-Pawlak Geoteclmical, Inc .. lobNo.IOSl!S-6 Samples of the subsoils were taken withal% inch and 2 inch I.D. spoon samplers. The samplers were driven into the subsoils at various depths with blows from a 140 pound hammer falling 30 inches. This test is similar to the standard penetration test described by ASTM Method D-1586. The penetration resistance values are an indication of the relative density or consistency of the subsoils and hardness of the bedrock. Depths at which the samples were taken and the penetration resistance values are shown on the Logs of Exploratory Borings, Figures 3 through 8. The samples were returned to our laboratory for review by the project engineer and testing. SUBSURFACE CONDITIONS Graphic logs of the subsurface conditions encountered at the site are shown on Figures 3 through 8. The subsoils, below a thin topsoil root zane, consist of a variable depth of stratified silt, sand and gravel debris fan deposits overlying dense, river gravel alluvium. About 3 to 4 feet of existing fill was encountered above the natural soils in. Borings 5, 6, 7 . -' ' ,, ... -" . . . ' . and 15, located just east of the Robertson Ditch. The debris fan soils were typically encountered between depths of7 to 19 feet in the north parcel and between depths of 16 to 32 feet in the south parcel. In Borings 6 through 9 and 15 at the north parcel, the debris fan soils were deeper than the adjacent area to the north, with depths of22 to 38 feet before the gravel alluvium was encountered. Siltstone and gypsum bedxock of the Eagle Valley Evaporite was encountered below the gravel alluvium at a dep1h of 42 feet in Boring 6. The bedrock quality appeared poor to fair and included gypsum, but did not appear to be a void or cavity. Drilling in the dense gravel alluvium with auger equipment was difficult due to 1he cobbles and boulders and practical drilling refusal was typically encountered in the deposit. Laboratory testing performed on samples obtained from the borings included natural moisture content and density, liquid and plastic limits and gradation analyses. Results of swell-consolidation testing, presented on Figures 10 through 16, indicate the debris fan soils are typically hydrocompressive and moderately to highly compressible under load after wetting. Some of the clay soils showed a low expansion potential when wetted but JobNo.l05!!5-6. -4- the resulting heave potential is not expected to be significant compared to the collapse potential. Results of gradation analyses perfonned on small diameter drive samples (minus 1 'h inch :fraction) of the debris fan soils are shown on Figures 17 and 18. The laboratory testing is summarized in Table 1. Free water was typically not encountered in the borings and the subsoils were relatively dry. In Borings 6 through 9 and 15, the subsoils became moist with depth and free water was encountered at depths between 26 and 3 6 feet in Borings 6 and 15. ENGINEERING ANALYSIS Development of the Villas project as proposed should be feasible based on geotechnical conditions. The upper 7 to 38 feet of soils encountered in the borings consist of debris fan deposits that tend to collapse (settle under constant load) when wetted. The amount of settlement will depend on the depth of the compressible soils and the wetted depth below the foundation. The settlement potential and risk of excessive building distress can be reduced by compaction of the soils to a certain depth below the foundation bearing level and by heavily reinforcing the foundation to resist differential settlements. The compaction should also e&iend to below driveway and utility areas. The soil compaction can consist ofihe structural fill proposed to elevate the project site but relatively deep structural fills will also have some potential for long term settlement. Proper grading and compaction as presented below in Site Grading will help reduce the settlement risks. In areas underlain by less than 10 to 15 feet of debris fan soils, maiuly 1he northern part of the north parcel, additional compaction below the building foundation should not. be needed. A heavily reinforced mat foundation designed for large differential settlements or a deep foundation that extends down to the underlying, dense river gravel alluvium could also be used to reduce 1he settlement risk. Eagle Valley Evaporite that underlies the project area is known to be associated vvith · sinkholes and localized grollild subsidence in the Roaring Fork River valley. A sinkhole opened in the parking lot of the Pro Shop to the northwest of the project site in January 2005 and other irregular bedrock conditions have been identified in the affordable JobNo.105115-6 -5- housing site to the west of the Villas north parcel. Indications of ground subsidence were not observed in the Villas development area that could indicate a risk of future ground subsidence but the variable depth of debris fan soils in Borings 6 through 9 and 15 in the north parcel could be the result of past subsidence. In om· opinion, the risk of future ground subsidence in the Villas project area is low and similar to other areas of the Roaring Fork River valley where there have not been indications of ground subsidence. We understand that the potential for future ground subsidence in the project area is being evaluated by others. The southern part of the northern parcel should be further evaluated for potential sinkhole development considering the variable subsurface profJ.le encountered in that area Recommendations for preliminary design of the proposed development are presented below. When the building plans have been developed, we should review the information for compliance with our recommendations. DESIGN RECOMMENDATIONS FOUNDATIONS Considering the subsurface conditions encountered in the exploratory borings and the nature of the proposed construction, we recommend the buildings be founded with spread footings bearing on at least 5 feet of compacted on-site debris fan soils or compacted structural fill. The feasibility of footings placed on the natural soils in the north parcel where the debris fan soils are less than about 10 to 15 feet deep should be evaluated prior to construction. If a mat foundation or deep foundation system is considered for building support, we should be contacted for additional recommendations. The design and construction criteria presented below should be observed for a spread footing foU1ldation system. 1) Footings placed on at least 5 feet of compacted fill in deeper debris fan areas or on natural soils where there is less than 10 to 15 feet of the natural debris fan soils should be designed for an allowable bearing pressure of Job No. 105115·6 -6- 1,500 psf. Based on experience, we expect initial settlement of footings designed and constructed as discussed in this section will be about J inch or less. Additional differential settlement between about 1 to 2 inches could occnr in deeper :fill areas or if the nndisturbed debris fan soils are wetted. 2) The footings should have a minimum width of20 inches for continuous walls and 2 feet for isolated pads. 3) Exterior footings and footings "beneath unheated areas should be provided with adequate soil c.over above their bearing elevation for frost protection. Placement offonndations at least 36 inches below exterior grade is 1ypically used in this area. 4) The fonndation should be constructed in a "box-like" configuration rather than with isolated footings. The fonndation walls should be heavily reinforced top and bottom to span local anomalies such as by assuming an unsupported length of at least 14 feet. Foundation walls acting as retaining structures should also be designed to resist lateral earth pressures as discussed in the "Fonndation and Retaining Walls" section of this report. 5) The topsoil, existing undocumented fill and any loose or disturbed soils should be removed. The soils should be subexcavated as needed to provide at least 5 feet of structural fill below the footing bearing level compacted to at least 98% of the maximum standard Proctor density within 2 percentage points of optimum moisture content. Where footings are placed on the natural soils, the exposed soils in footing area should be moistened and compacted. 6) A representative of the geotechnical engineer should evaluate the compaction of the fill materials and obselVe all footing excavations prior to concrete placement for bearing conditions. FOUNDATION AND RETAJNING WALLS Foundation walls and retaining structures which are laterally supported and can be expected to undergo only a slight amount of deflection should be designed for a lateral lob No. !05 115-6 -7- earth pressure computed on the basis of an equivalent fluid unit weight of at least 55 pcf for backfill consisting of the on-site fme-grained soils. Cantilevered retaining structures which are separate from the buildings and can be expected to deflect sufficiently to mobilize the full active earth pressure condition should be designed for a lateral earth pressure computed on the basis of an equivalent fluid unit weight of at least 45 pcffor backfill consisting of the on-site fine-grained soils. All foundation and retaining structures should be designed for appropriate hydrostatic and surcharge pressures such as adjacent footings, traffic, construction materials and equipment. The pressures recommended above assume drained conditions behind the walls and a horizontal back:fill surface. The buildup of water behind a wall or an upward sloping backfill surface Vldll increase the lateral pressure imposed on a foundation wall or retaining structure. An underdrain should be provided to prevent hydrostatic pressure buildup behind walls. Site walls with a maximum backslope of 2 horizontal to 1 vertical should be designed for an active earth pressure of at least 60 pcf equivalent fluid unit weight. Backfill should be placed in uniform lifts and compacted to at least 90% of the maximum standard Proctor density at a moisture content near optimum. Backfill in pavement and walkway areas should be compacted to at least 95% of the maximum standard Proctor density. Care should be taken not to overcompact the backfill or use large equipment near the wall, since this could cause excessive lateral pressure on the walL Some settlement of deep foundation wall backfill should be expected, even if the material is placed correctly, and could result in distress to facilities constructed on the backfill. The lateral resistance of foundation or retaining wall footings will be a combination of the sliding resistance of the footing on the foundation materials and passive earth pressure against the side of the footing. Resistance to sliding at the bottoms of the footings can be calculated based on a coefficient of friction of 0.35. Passive pressure of compacted backfill against the sides of the footings can be calculated using an equivalent fluid unit weight of 300 pcf. The coefficient of friction and ·passive pressure values recommended above assume ultimate soil strength. Suitable factors of safety should be included in the lob No. 105115-6 ' ' -8- design to limit the strain which will occur at the ultimate strength, particularly in the case of passive resistance. Fill placed against the sides of the footings to resist lateral loads should be compacted to at least 95% of the maximum standard Proctor density at a moisture content near optimum. FLOOR SLABS The natural on-site soils, exclusive of topsoil, and compacted structural fill can be used to support lightly loaded slab-on-grade construction. The natural soils are compressible when wetted and there could be some post-construction settlement To reduce the effects of some differential movement, nonstructural floor slabs should be separated from all bearing walls and columns with expansion joints which allow uurestrained vertical movement. Floor slab control joints should be used to reduce damage due to shrinkage cracking. The requirements for joint spacing and slab reinforcement should be established by the designer based on experience and the intended slab use. A minimum 4 inch layer of free-draining gravel should be placed beneath basement level slabs to facilitate drainage. This material should consist of minus 2 inch aggregate with at least 50% retained on the No.4 sieve and less than 2% passing the No. 200 sieve. All fill materials for support of floor slabs above footing bearing level should be compacted to at least 95% of maximum standard Proctor density at a moisture content near optimum. Required fill can consist of the on-site soils devoid of vegetation, topsoil and oversized rock. UNDERDRAIN SYSTEM Although free water was typically not encountered during our exploration, it has been our experience in the area that local perched groundwater can develop during times of heavy precipitation or seasonal runoff. Frozen ground during spring runoff can create a perched condition. We recommend below-grade construction, such as retaining walls and basement areas, be protected from wetting and hydrostatic pressure buildup by an Job No. !OS 115-6 -9- underdrain system .. A.n underdrain should not be provided around crawlspace and slab-on- grade areas. If installed, the drains should consist of drainpipe placed in the bottom of the wall backfill surrounded above the invert level with free-drafuing granular material. The drain should be placed at each level of excavation and at least 1 foot below lowest adjacent finish grade and sloped at a minimum 1% to a suitable gravity outlet. Free-draini11.g granular material used in the underdrain system should contain less than 2% passing the No. 200 sieve, less than 50% passing the No. 4 sieve and have a maximum size of 2 inches. The drain gravel backfill should be at least 1 Yz feet deep. An impervious membrane, such as a 20 roil PVC liner, should be placed beneath the drain gravel in a trough shape and attached to the foundation wall with mastic to prevent wetting of the bearing soils. SITE GRADJNG Extensive grading of the Villas area is proposed as part of the development plan. In addition, removal and replacement of the debris fan soils compacted is recommended in shallow fill areas to reduce the risk of excessive differential settlements and building distress. The structural fill should extend to at least 8 feet below design surface grade and to at least 2 feet below the water and sewer pipe invert levels. In addition, the water and sewer pipe joints should be mechanically restrained to reduce the· risk of joint separation in the event of excessive settlement. Excavation and compaction below footing bearing level may not be needed where the debris fan soils are less than 10 to 15 feet thick The structoral fl.ll materials below footing bearing level should be compacted to at least 98% of the maximum standard Proctor density within 2 percentage points of optimum moisture content. Prior to fill placement, the sub grade should be carefully prepared by removing the existing fill, all vegetation and topsoil and compacting to at least 95% of the maximum standard Proctor density at near optimum moisture content. The fill should be benched into slopes that exceed 20% grade. Based on our experience with the Phase 1 development, shrinkage of the debris fan soils due to compaction is expected to be about 15%to 20%. Job No. 105!15-6 -10- Permanent UJJXetained cut and fill slopes should be graded at 2 horizontal to 1 vertical or flatter and protected against erosion by revegetation or other means. This office should review site grading plans for the project prior to construction. SURF ACE DRAINAGE Precautions to prevent wetting of the bearing soils such as proper backfill construction, positive backfill slopes, restricting landscape irrigation and use of roof gutters need to be taken to help limit settlement and building distress. The following drainage precautions should be observed during construction and maintained at all times after each residences have been completed: 1) inundation of the foundation excavations and underslab areas should be avoided during construction. 2) Exterior backfill should be adjusted to near optimum moisture and compacted to at least 95% of the maximum standard Proctor density in pavement and slab areas and to at least 90% of the maximum standard Proctor density in landscape areas. 3) The ground surface surrounding the exterior of the building should be sloped to drain away from the foundation in all directions. The slope should be at least 6 inches in the first 5 feet in unpaved areas and at least 3 inches in the first 10 feet in paved areas. Drain gravel of retaining walls should be capped with at least 2 feet of the on-site soils to reduce surface water infiltration. 4) Roof gutters should be provided with downspouts that discharge beyond the limits of the foundation wall backflll. 5) Landscaping which requires regular heavy irrigation, such as sod, should be located at least 5 feet from foundation walls. Consideration should be given to use of xeriscape to reduce the potential for wetting of soils below the building caused by irrigation. lob No. !OS 115-6 -11 - PAVEMENT SECTION The upper soils encountered at the site consist of low plasticity sand, silt and clay that are considered a poor support of pavement sections. A Hveem stabilometer 'R' value of 15 was assumed for the native soils and required imported soils. The traffic loadings for the Villas development have not been provided but are assumed to be relatively light for the service traffic loading condition, after the construction phase. Based on these conditions, a preliminary pavement section consisting of 3 inches of asphalt on 8 inches of CDOT Class 6 base course for the main drives and 3 inches of asphalt on 6 inches of CDOT Class 6 base course for automobile only parking is recommended. We can review the pavement section design when the roadway subgrade has been graded and the traffic loadings have been determined. LIMITATIONS This study has been conducted in accordance with generally accepted geotechnical engineering principles and practices in this area at this time. We make no warranty either express or implied. The conclusions and recommendations submitted in this report are based upon the data obtained from the exploratory borings drilled at the locations indicated on Figures 1 and 2, the proposed type of construction and our experience in the area. Our services do not include determining the presence, prevention or possibility of mold or other biological contaminants (MOBC) developing in the future. If the client is concerned about MOBC, then a professional in this special :field of practice should be consulted. Our :findings include interpolation and extrapolation of the subsurface conditions ideuti:fied at the exploratory borings and variations in the subsurface conditions may not become evident until excavation is perfonned. If conditions encountered during construction appear different from those described in this report, we should be noti:fied so that re-evaluation of the recommendations may be made. Th.is report has been prepared for the exclusive use by our client for design purposes. We are not responsible for technical interpretations by others of our information. As the project evolves, we should provide continued consultation and field services during JobNo.I05115-6 -12- construction to review and monitor the implementation of our recommendations, and to verify that the recommendations have been appropriately intelJlreted. Significant design changes may require additional analysis or modifications to the recommendations presented herein. We recommend on-site observation of excavations and foundation bearing strata and testing of structural f!ll on a regular basis by a representative of the geotechnical engineer. Respectfully Submitted, HEPWORTH-PAWLAK GEOTECHNICAL, INC. Steven 1. Pawlak, P.E. Reviewed by: Daniel E. Hardin, P .E. . SLP/ksw cc: Blgh Country Engineering-Attn: Scott Gregory S.K. Peightal Engineers-Attn: Jack Albright lob No. !OS !15-6 \ ! 105115-6 LOCATION OF EXPLORATORY BORINGS VILLAS NORTH PARCEL Figure 1 105115-6 ~ HEPWoR'Jl+PAWl.A.lt GEOTECHNICAL LOCATION OF EXPLORATORY BORINGS VILLAS SOUTH PARCEL Figure 2 0 5 10 1i) ()) ,u.. )l:, l5_ "' 0 15 20 25 105115-6 BORING 1 ELEV.= 5952' 20/12 WC=4.5 DD=106 20/6,30/4 BORING2 ELEV.= 5950' 20/12 WC=6.2 DD=93 -200=65 25/4,10/0 BORJNG3 ELEV. = 5944' 24/12 WC=5.1 DD=94 Note: Explanation oi symbols is shown on Figure 9. BORING4 ELEV. = 5946' 25/12 WC=7.1 DD=104 -200=63 LL=28 P1=11 20/6.40/6 T ~ LOGS OF EXPLORATORY BORINGS He worth-Powlak Geotectmh:::a\ 0 5 10 1i) ()) lL ' a 15 ()) 0 20 25 Figure 3 ELEV. = 5950' 16/12 WC=9.3 10 00=100 ·200=54 15 20 1il Q) U- '' !.C /Q. Q) 0 25 105115-6 ELEV.= 5953' 15/12 12/12 WC=10.3 -200=50 10/12 -WC=18.2 00=106 -200=73 BORING7 ELEV.= 5954' 7/12 14/12 WC=16.3 00=108 -200=62 32/12 7/12 WC=17.7 DD=107 -200=74 29/12 WC~4.0 DD=107 30112 7/12 WC=6.6 DD=117 -200=44 12/12 '1il tf :S Q_ <D 0 50/2 Note: Explanation of symbols is shown on Figure 9. LOGS OF EXPLORATORY BORINGS Figure 4 0 5 10 1il ,f ) ' ,,:; a. Q) 0 15 20 25 105115-6 BORING9 ELEV. = 5942' 24/12 18/12 28/12 10/12 WC=11.4 DD=104 BORING10 ELEV.= 5938' 18/12 wc~4.o DD=96 10/12 60/12 BORING 11 ELEV.= 5943' 9/12 11/12 WC=15.5 DD=109 -200=76 7/12 3/6,15/6 Note: Explanation of symbols is shown on Figure 9. BORING 12 ELEV. = 5938' 33/12 wc~s.1 DD=117 43/12 14/12 ~ LOGS OF EXPLORATORY BORINGS He worth-Powlok Geotechnleol 0 5 10 ~ ' -a (]) 15 0 20 25 Figure 5 0 5 10 15 -Q) If 20 ' ~ Q) 0 25 30 35 40 105115-6 BORING 13 ELEV. = 5944' 22/12 T BORING 14 ELEV.= 5937' 28/12 WC=8.5 DD=109 -200=91 LL=31 Pl=13 20/6,30/3 BORING 15 ELEV.= 5950' 15/i2 WC=14.3 DD=112 9/12 WC=14.5 -200=71 10/i2 WC=14.4 DD=112 +4=17 -200=58 24/12 32/12 Note: Explanation of symbols is shown on Figure 9. BORING 16 ELEV.= 5968' 15/6,35/5 47/12 33/12 WC=3.2 +4=34 -200=42 18/12 ~ LOGS OF EXPLORATORY BORINGS HEPWOR11+P'AWl.A.K GEO'JECH.NICAJ... 5 G) 20 ,f ~ Q) 0 25 Figure 6 0 5 10 15 a; "' lJ.. £i .o. .~ 20 25 30 35 105115-6 BORING 17 ELEV. = 5963' 52/12 34/12 WC=5.9 DD=115 23/12 50/3 BORING 18 ELEV. = 5968' 38/12 40/12 WC=3.6 DD=104 -200=58 42/12 WC=3.6 DD=109 45/12 BORING 19 ELEV.= 5962' 13/12 30/12 WC=1.7 DD=120 +4=38 -200=26 Note: Explanation of symbols is shown on Figure 9. BORING20 ELEV. = 5967' 18/6,25/3 WC=1.9 DD=103 -200=36 55/12 ~ LOGS OF EXPLORATORY BORINGS H worth-Pawlak Geoteclmlcol 15 a; tE ' £i 0. "' 20 0 Figure 7 il u.. ' £ '0. Ia> 'Cl 5 10 15 20 25 30 BORING21 ELEV. = 5976' 52/12 15/12 43/12 WC=3.3 DD=108 15/12 BORING 22 BORING 23 BORING 24 ELEV.= 5957' ELEV.= 5985' ELEV.= 5985' 21/12 WC=3.3 +4=38 -200=23 30/$,25/3 28/12 40/12 WC=3.4 00=109 52/12 WC=1.3 -200=27 57/12 39/12 20/12 WC=2.6 -200=46 Note: Explanation of symbols is shown on Figure 9. BORING25 ELEV.= 5990' 20/6,30/3 27/12 WC=4.6 10 DD=105 -200=62 30/12 WC=4.1 15 00=112 -200=64 50/6,10/0 20 25 30 1D (j) l1,. ' .<: 15. (j) Cl 105115-6 ~ LOGS OF EXPLORATORY BORINGS Figure 8 HEPWOR'll+PAWLAK GEO'ffiCII.NlCAL LEGEND: 39/12 0,2 T NOTES: FILL; silty sandy gravel, loose to medium dense, slightly moist, brown. TOPSOIL; root zone, sandy silt, slightly moist, brown. SILT AND CLAY (ML-CL); slightly sandy to sandy, scattered gravel, some sandy clay, stiff to very stiff, slightly moist, very moist with depth at Borings 6, 7 and 15, mixed brown, slightly calcareous and porous, low plasticity. SAND AND SILT (SM-ML); scattered gravel to gravelly, loose to medium dense, slightly moist, light brown. SAND AND GRAVEL (SM-GM); silty, some sandy silt layers, medium dense, brown, subangular to rounded rock. GRAVEL, COBBLES AND BOULDERS (GM-GP); slightly silty, dense, typically moist, wet at Borings 4 and 15, brown, rounded rock. SILTSTONE AND GYPSUM; medium hard to hard, moist, gray and white. Eagle Valley Evaporite. Relatively undisturbed drive sample; 2-inch I.D. California liner sample. Drive sample; standard penetration test (SPl), 1 3/8 inch I. D. split spoon sample, ASTM D-1586. Drive sample blow count; indicates that 39 blows of a 140 pound hammer falling 30 inches were required to drive the California or SPT sampler 12 inches. Free water level in boring and number of days following drilling measurement was taken. Depth at which boring had caved when checked on July 8 , 2005. Practical drilling refusal. Where shown above bottom of log, indicates that multiple attempts were made to advance the boring. 1. Exploratory borings were drilled on July 6, 7 and 8, 2005 with 4-inch diameter continuous flight power auger. 2. Locations ol exploratory borings were measured approximately by pacing from features shown on the site plan provided. 3. Elevations of exploratory borings were obtained by interpolation between contours shown on the site plan provided. 4. The exploratory boring locations and elevations should be considered accurate only to the degree implied by the method used. 5. The lines between materials shown on the exploratory boring logs represent the approximate boundaries between material types and transitions may be gradual. 6. Water level readings shown on the logs were made at the time and under the conditions indicated. Fluctuations in water level may occur with time. Groundwater was only encountered in Borings 6 and 15. 7. Laboratory Testing Results: WC = Water Content (%) DD = Dry Denslly (pet) +4 = Percent retained on the No.4 sieve 105115-6 H& -Geutech HePWorth-P<lwlok Geotec:hnlc:ol -200 = Percent passing No. 200 sieve LL = Liquid Limit (%) PI = Plasticity Index (%) LEGEND AND NOTES Figure 9 ' Moisture Content = 4.5 perc ent Dry Densiiy = 106 pcf Sample of: Sandy Silt and Clay From: Boring 1 at 4 Feet 0 ~ '--. c 1 0 -Compression 'iii ~ "' upon ~ ""' wetting Q. 2 E ·', 0 0 3 i 0.1 1.0 10 100 APPLIW PRESSURE-ksf 105115-6 ~ SWELL-CONSOLIDATION TEST RESULTS Figure 10 Hei>Worth-Pow!ok Geoted1nlcal Moisture Content = 5.1 perc ent 0 Dry Density = 94 pcf Sample of: Sandy Silt -'--.... . From: Boring 3 at 4 Feet 1 2 3 """'" Compression upon 4 wetting 5 6 * \ c ·~ 7 "' <D Q. : E ) 0 8 0 9 10 \._ 11 \ \ ( 12 13 \ 14 1\ 15 0.1 1.0 10 100 APPLIED PRESSURE-ksf 105115-6 ~ SWELL-CONSOLIDATION TEST RESULTS Figure 11 HeDWorth-Powlak Geoteohnlcol ., Moisture Content = 4.0 perc ent 0 Dry Density = 107 pci -Sample of: Very Silty Sand --r--~'--r--From: Boring 8 at 4 Feet 1 2 Compression * uoon c 3 ~ wetting ·i ~ "' a E 4 0 "\ 0 5 \ 6 1\ 7 0.1 1.0 10 100 APPLIED PRESSURE • ksf ., Moisture Content ~ 11.4 perc ent Dry Density = 104 pel Sample of: Sandy Silt From: Boring 9 at 19 Feet 0 -1--~'--r-- 1ft 1 c ~ Compression 0 upon ·u; wetting "' 2 ~ ""' E 0 " 0 3 "> 4 0.1 1.0 10 100 APPLIED PRESSURE -ksf 105115-6 ~ech SWELL-CONSOLIDATION TEST RESULTS Figure 12 HePWorth Powlak Geotmnteol 0 ----Moisture Content -4.0 perc ent "'"' Dry Density = 96 pet 1 Sample of: Sandy Silt From: Boring 10 at 4 Feet 2 r-!"--1-- <f. 3 Compression c 0 "" upon ·c;; wetting "' 4 ~ '\ Q_ E 0 0 5 \ 6 \ 7 1\ 8 0.1 1.0 10 100 APPLIED PRESSURE-ksf \ Moisture Content = 6.1 peree nt Dry Density = 117 pel * Sample of: Sandy Silty Clay c From: Boring 12 at 4 Feet .Q 1 i --f--..--, ' 0 c: "'\ r--, ?--, 0 ·a; "' 1 1£ a. Ex pans on E 0 upon 0 wetting 2 0.1 1.0 APPLIED PRESSURE-ksf 10 100 105115-6 ~ SWELL-CONSOLIDATION TEST RESULTS Figure 13 HepWorth-Pawlak Geotechnlc:ol Moisture Content ~ 8.5 perc ent Dry Density = 109 pcf Sample of: Slightly Sandy Silty Clay From: Boring 14 at 4 Feet 2 If. c: ·~ 1 )......__ c: "' (tl "' D.. ' .Jj ~ ' 0 c: ·~ ') 0 I"~ ·u; "' 1 !!! D.. ji::Xpansl 11 E 0 upon 0 wetting 2 0.1 1.0 APPLIED PRESSURE • ksf 10 100 Moisture Content = 5.9 perce nt Dry Density ~ 115 pel Sample of: Sandy Silty Clay From: Boring 17 at 9 Feet 0 If. c: -~ 1 ffi ~ D.. .Jj !'-.... ' 0 --c: Expansion I" 0 upon f'\ ·u; "' wetting !!! 1 D.. E 0 0 2 j 0.1 1.0 10 100 APPLIED PRESSURE -ksl 105115-6 ~ SWELL-CONSOLIDATION TEST RESULTS Figure 14 HePWOtrm-PAWI..AK GE~HN.ICAL. \ Moisture Content = 3. 6 percent Dry Density = 109 pel Sample of: Sandy Silt and Clay From: Boring 18 at 14 Feet 0 'if!. ~ <:" _; 1 c: ""' No movement 0 ·u; " upon "' 1£ 2 wetting D.. '\ E 0 () 3 0.1 1.0 10 100 APPLIED PRESSURE· ksf \ j Moisture Content = 3.3 percent Dry Density = 108 pet Sample of: Sandy Silt and Clay From: Boring 21 at 14 Feet 0 Compression * -!---I-" v upon 1 wetting c ~ 0 ·u; "' i£ 2 D.. '-., E ~ 0 () 3 " ': 0.1 1.0 10 100 APPLIED PRESSURE -ksf 105115-6 ~ SWELL-CONSOLIDATION TEST RESULTS Figure 15 HeoWorth-Pawlok Geotechnical Moisture Content = 3.4 perce nt Dry Density = 109 pet Sample of: Sandy Silt and Clay From: Boring 22 at 19 Feet * 0 r--r-t'--r-, c: --.. 0 ~ 'iii 1 "' i!' ...... [', No movement Q. E upon 0 wetting () 2 0.1 1.0 10 100 APPLIED PRESSURE -ksf ! Moisture Content = 4.6 percent Dry Density = 105 pcf Sample of: Sandy Silt and Clay From: Boring 25 at 9 Feet * 0 c: ~ ·~ 1---. [ 1 ~ ~ E [', 0 () 2 No' movement upon wetting 0.1 1.0 10 100 APPLIED PRESSURE-ksf 105115-6 ~ HEPWOR'n+PAWLAK GIZO'TECHNICAL SWELL-CONSOLIDATION TEST RESULTS Figure 16 HYDROMETER ANALYSIS SIEVE ANALYSIS TIME READINGS U.S. STANDARD SERIES CLEAR SQUARE OPENINGS 24HR. THR #200 #100 #50 #30 #16 #8 #4 3/8" 3/4' 1 1/Z' 3" 5"6' 8' 0 @ 20 z 30 ~ a: 40 !z 50 w ~ 60 70 80 90 100 001 .oos .em .019 .o:37 .074 .1 50 .300 .aoo 1.~a 2.u 4.75 s.s uw 1s.o ns 76.2 15?. 203 fil z ~ 0:. !z w 0 0:. w "- I" DIAMETER OF PARTICLES IN MILLIMETERS CLAYT0$1ll l'lt>.E ~gUM ICOAAS€ I ccam.es GRAVEL 17% SAND 25 % SILT AND CLAY 58 % LIQUID LIMIT % PLASTICITY INDEX % SAMPLE OF: Sandy Gravelly Silt FROM: Boring 15 at 14 Feet HYOROMffiR ANALY IS SIEVE ANALYSIS 24!i.\ll 7HR TIME READINGS U.S. STANDARD SERIES 45 IN. 'l5MIN. 1'." liN HIIN. #:m #100 #YJ #30 # 16 #8 #4 CLEAR SQUARE OPENINGS /2 3/8' 3/4' 1 1 • 3' 5"6' 0 10 20 40 ~ 50 50 70 80 90 B' 100 " " 100 90 80 (!) 70 z 60 ~ f- 50 m 0 40 ffi 0. 30 20 10 0 .001 .002 .005 .009 .019 .037 .074 .150 .300 .600 1.18 2.36 4.75 9.~2.519.0 37.5 76.2 12'j52 203 GRAVEL 34% LIQUID LIMIT 105115-6 DIAMETER OF PARTICLES IN MILLIMETERS ~~~~ SAND 24 % SILT AND CLAY 42 % % PLASTICITY INDEX % GRADATION TEST RESULTS Figure 17 Z fil I_ HYDROMETER ANALYSIS 1 .. ! TIME READINGS I 241-li'l. 7HR 45 MIN. 15 MIN. 60MINj9M!N.4 MIN. 1 MIN. #200 0 10 20 30 ffi a: 40 ~ 50 if 60 ~ 70 80 90 100 SIEVEANALYSIS ./ U.S. STANDARD SERIES I CLEAR SQUARE OPENINGS _I • >00 " (!) 70 z 05 (f) "' ct f- 50 iD if "'w (L " 0 .005 .009 .019 JJ37 .074 .15{) .300 ,6()0 1,1$ z.ss 4.75 R5 tZ.S 19.0 37.5 16.2 152 ro3 '" 0 w z ffi a: f-z w u a: w (L DIAMETER OF PARTICLES IN MILLIMETERS CIAYTOSlLi '"" SIND MrotVM !coARse I F!Nf I ~ I COBBLES GRAVEL 38% SAND 36 % SILT AND CLAY 26 % LIQUID LIMIT % PLASTICITY INDEX % SAMPLE OF: Silty Sand and Gravel FROM: Boring 19 at 9 Feet I HYDROMETER ANALYSIS SIEVE ANALYSIS R 7 HR TIME READINGS I IN. 15 MIN. 60MIN19MIN.4MIN. 1 MIN. #200 ~ 0 U.S. STANDARD SERIES I CLEAR SQUARE OPENINGS #100 #50 #30 #16 #8 #4 3/8" 3/4' 1 1/2" 3" 5"6" 10 20 30 40 50 60 70 80 90 100 I 90 BO (!) 70 z 60~ f- 50~ 40 ffi 0.. 30 20 10 0 .001 .002 .005 .009 .019 .037 ,074 .150 .300 .600 1.18 2.36 4.75 9.512.519.0 37.5 76.2 12't52 203 DIAMETER OF PARTICLES IN MILLIMETERS GRAVEL 38% LIQUID LIMIT % SAMPLE OF: Silty Sand and Gravel SAND 39 % SILT AND CLAY 23 % PLASTICITY INDEX % FROM: Borina 22 at 4 Feet 105115-6 GRADATION TEST RESULTS Figure 18 HEPWORTH-PAWLAK GEOTECHNICAL, INC. TABLE 1 Job No. 105 115-6 SUMMARY OF LABORATORY TEST RESULTS '!ge 0 p 1 f 3 SAMPLE LOCATION NATURAL NATURAL GRADATION PERCENT ATTERBERG LIMITS UNCONANED MOISTURE DRY GRAVEL SAND PASSING LIQUID PLASTIC COMPRESSIVE SOIL OR BORINGS DEPTH CONTENT DENS flY NO. 200 LIMIT INDEX STRENGTH BEDROCK TYPE (%) (%) SIEVE (!t) (%) (pcf) (%) (%) (PSF) 1 4 4.5 106 Sandy silty and clay 2 4 6.2 93 85 Sandy clayey silt 3 4 5.1 94 Sandy silt 4 4 7.1 104 83 28 11 Sandy silty clay 5 81h 9.3 100 54 Silt and sand with gravel 6 14 10.3. 50 Very silty sand and gravel 24 18.2 106 73 Sandy silt 7 9 16.3 108 62 Sandy silt 24 17.7 107 74 Sandy silt 8 4 4.0 107 Very silty sand 14 6.6 117 44 Very silty sand HEPWORTH-PAWLAK GEOTECHNICAL, INC. TABLE 1 Job No. 105 115-6 SUMMARY OF LABORATORY TEST RESULTS age 0 p 2 f 3 SAMPLE LOCATION NATURAL NATURAL GRADATION PERCENT ATTERBERG UMITS UNCONFINED MOISTURE DRY GRAVEL SAND PASSING LIQUID PlASTIC COMPRESSIVE SOIL OR BORINGS DEPTH CONTENT DENSITY NO. 200 LIMIT INDEX STRENGTH BEDROCK IYPE (%) (%) SIEVE (ft) (%) (pcf) (o/o)_ _1"1<>)_ (!'SF) 9 19 11.4 104 Sandy silt 10 4 4.0 96 Sandy silt 11 9 15.5 109 76 Sandy clayey silt 12 4 6.1 117 Sandy silty clay 14 4 8.5 109 91 31 13 Slightly sandy silty clay 15 4 14.3 112 Sandy silty clay 10 .14.5 71 Sandy silty clay 14 14.4 112 17 25 58 Sandy gravelly silt 16 14 3.2 34 24 42 Silty sand and gravel 17 9 5.9 115 Sandy silty clay -------. HEPWORTH-PAWLAK GEOTECHNICAL, INC. TABLE 1 Job No. 105 115-6 SUMMARY OF LABORATORY TEST RESULTS ~e 0 p 3 f3 SAMPLE LOCATION NATURAL NATURAL GRADATION PERCENT ATTERBERG UMITS UNCONFINED MOISTURE DRY · GRAVR SAND PASSING UQUID PLASTIC COMPRESSIVE SOIL OR BORINGS DEPTH CONTENT DENSITY NO. 200 LIMIT INDEX SlRENGTH BEDROCK lYPE (%) (%) SIEVE (It) ('lo) (pet)_ ('lo) ('lo) (PSF) 18 9 3.6 104 58 Sandy silt with gravel 14 3.6 109 Sandy silty and clay 19 9 1.7 120 38 36 . 26 Silty sand and gravel 20 4 L9 103 36 Silty sand and gravel 21 14 3.3 108 Sandy silt and clay 22 4 3.3 38 39 23 . Silty sand and gravel 19 3.4 109 Sandy silt and clay Silty sand and gravel 23 4 1.3 27 Silty sand and gravel 24 9 2.6 46 Very silty sand with gravel 25 9 4.6 105 62 Sandy silt and clay 14 4.1 112 64 Sandy silty and clay