Loading...
HomeMy WebLinkAboutApplication- PermitGarfield County Building & Planning Department 108 8th Street, Suite #401 Glenwood Springs, Co. 81601 Office:970-945-8212 Fax: 970-384-3470 Inspection Line: 970-384-5003 Building Permit No. s■./ --1' Parcel No: Locality: Job Address: Use of Building: 2407-184-22-007 Canyon View Ph1, blk2, Lot 7 45 Aster Court, Parachute Re -roofing f/ slf home Owner : Contractor: Kehm, John & Sharon B & C Construction Fees: Plan Check: Septic: Bldg Permit: S 100.00 Other Fees: Total Fees: $ 400.00 1 Clerk: ti,Vic-r Date: GARFIELD COUNTY BUILDING PERMIT APPLICATION 108 8th Street, Suite 401, Glenwood Springs, Co 81601 Phone: 970-945-82121 Fax: 970-384-3470 / Inspection Line: 970-384-5003 www.garlieId-CounIt•.mill STAFF USE ONLY Special Conditions: I Parcel No: (This information is available at the assessors otTcc 470-945-9134) (1 j i o- -- \ey `ce,, -00--- +�1 2 Job Address: (if an address has not been assigned, C+5 Pc c r. )eFtrilte please provide Cr, Hwy or Street Name & City) or and legal description Mir itil £iN, No: t).2—Subd.l Exemption: CNUttrn tirteuf 3 Lot No: Block 4 Owner: (prom�.3o1wne�r) ,,■�a���,�,��}1y, TI`iIi � V �[ll" •"5 �+'a 5I"FL+I�':*, Mallin r Address:y�`e.�� L "eJ.V� � Ph: pp -itOv�J •r Alt Ph; 5 C tractor. . eq til Mailing Address: qua, W. W ) 16 Ph: 6-61,56)Alt Ph: ' "o+ -L • 6 Architect / Engineer: Mailing Address: Ph: Alt Ph: 7 Sq. �,Fftt. of Building: Sq. Ft. or Acres of Lot: Height: i No. of Floors: 8 Use of Building: fr 9 Describe Work: 10 Class of Work: o New o Alteration o Addition 11 Garage: o Attached o Detached Septic: to ISDS o Community 12 Driveway Permit: Owners valuation of Work: $ Authority. This application for a Building Permit must be signed by leiter of authority, signet by the Owner, most be provided Levi Access. A Building Permit cannot be issued without proof of legal NOTICE the Owner of the property, de cubed above. or an authonzed agent. lithe signature below is not that of the Owner, a separate with this Application. and adequate access to the property for purposes of inspections by the Building Department. Electrical Permit, (2) County ISDS Permit. (3) another permit requited for use on die property identified above, c.g State or Discharge Permit. is not commenced within 180 days ofthe date of issuance and if work is supcndcd or abandoned for a period of 180 CERTIFICATION contained above is true and correct. I understand that the Building Depanmcnt accepts the Application, along with the plans based upon my certification as to accuracy a Building Permit will be issued granting permission to mc, as Owner, to construct the stricture(s) and facilities detailed on and my agents will comply with provisions of any federal, state or local law regulating the work and the Garfield County Building Regulation(s)). I acknowledge that the Building Permit may be suspended or revoked, upon notice from the County, if the location, arc not in compliance with County Regulation(s) or any other applicable law described above, to inspect the work. 1 further acknowledge that the issuance of die Building Permit does not prevent die if any. discovered aflcr issuance; or (2) stopping construction or use of the structure(s) or facility(ies) ifsuch is in violation work by the Building Deportment to nol constitul: an acccranucc of responsibility or liability by die County ofcrrors. omissions compliance with federal, state and local laws and County Regulations rest with me and my authorized agents, including without TIIE NOTICE & CERTIFICATION ABOVE DATE Other Permits. Multiple separate permits may be required (1) State County Highway! Road Access or a State Wastewater Void Permit. A Building Petmit becomes null and void if the work authorized days after commenccrnent 1 hereby certify ilial I have read this Application and that the information and specifications and other data submitted by mc or on my bchalf(submiltals), Assuming completeness of the submittals and approval of this Application, the submittals reviewed by the Building Department. In consideration of the issuance oldie Building Permit, l agree that I Code, ISDS regulations and applicable land use regulations (County construction or use of the structure(s) and facility(ies), described above, I hereby grant permission to the Building Department to enter the property, Building Official from: (1) requiring the correction of errors in the submittals, of County Regulation(s) or any other applicable law. Review of Ellis Application, including submit Ills, and inspeclions of Jia or discrepancies. As the Owner. I acknowledge that responsibility for limit - n my architect designer, engineer and/ or builder 11 . • ' Y AC: WLEDGE THAT 1 HAVE READ AND UNDERSTAND ii, + OWNE' ' SIGNATURE STAFF USE ONLY Special Conditions: I Adjusted Valuation: Plan Check Fee: Permit Fee: Manu home Fee: Mise Fees: ISDS Fee: To al Fees: IA to() Fees Paid: 11M Balance Due: kAorie BP No & Issue Date: ISDS No & Issued Date: 110TV -r---. Setbacks: OCC Group: Const Type: I Zoning: BLDG DEPT:�r� D PLNG DEPT: APPROVAL DATE APPROVAL DATE Q01 bbe.,-1J CANYON VIEW HOMEOWNERS ASSOCIATION July 21, 2008 1 Garfield County Building Department 108 86 Street, Ste. 401 Glenwood Springs, CO 81601 P.O. Box 6006 BAraLEKEr r MESA COLORADO 81636 (970) 285.9740 X019C' Po/d/c iftt5-014 cAzzo Re: Building Permits: 25 Aster Ct., 45 Aster Ct., 267 Limberpine Circle, 45 Poppy Ct., 55 Poppy Ct. & 65 Poppy Ct., Battlement Mesa, CO Dear Sirs: Attached are six building permits for the properties listed above. All of the above properties are homes that were constructed several years ago in Canyon View Village in Battlement Mesa, Colorado. These homes are now in need of new shingles. Canyon View Village is an HOA community. As is common with many HOA communities, the Canyon View Homeowners Association, Inc., is solely responsible for the repair or replacement of the roofs. This is covered in Article VIII, "Exterior Maintenance", Paragraph 1 of the Declaration of Covenants, Conditions, and Restrictions of Canyon View which was filed with the County Clerk on August 25, 1993. This section states, in part: "...the Association shall provide, to the extent and with such frequency as determined by the Executive Board in its discretion from time to time: landscape maintenance on the exterior of the Units (to the extent that such landscaping was installed by or at the direction of the Declarant in its development and construction of the Common Interest Community); exterior maintenance on the structures on each Unit, including paint, repair, replacement and care of roofs, gutters, downspouts, exterior building surfaces, and walks, but excluding exterior doors (except painting), window screens, and windows or other glass surfaces; maintenance, reasonable repair (but not replacement) and servicing of evaporative coolers; and removal of snow and ice on the front walks and sidewalks." These roofs are being replaced at the expense and direction of the Canyon View Homeowners Association Board of Directors and the undersigned, as Association Manager of Canyon View Homeowners Association, is directly in charge of directing this work. As such, I have signed the building permit applications. Sincerely, Keith Lammey Association Manager