Loading...
HomeMy WebLinkAboutEngineer's Report on OWTS1 COLORADO RIVER ENGINEERING INCORPORATED Date March 11, 2016 Pastor Mark Bintliff New Creation Church Via email:pastormark@newcreationchurch.org RE: CRE Job 1006 - New Creation Church Preschool - Wastewater System (OWTS) Dear Pastor: Colorado River Engineering, Inc. (CRE) has completed field investigations to examine the construction of the On-site Wastewater Treatment System (OWTS) for the preschool building. This letter shall serve as our approval that that the construction has occurred in substantial conformance with the design guidelines and details as shown in our design drawings and in accordance with county and state regulations. We will prepare an as -built sketch to show the location of the as - constructed facilities and forward it to the County for purposes of completing the permit documentation process. Christopher Manera, P.E. CC via email: Eileen Koch, Jim Bickling CM:cm M:ICREjobfiles11006-NCC PreschoollWord Files12016-03-I 1 Memo OWTS Inspection cert.doc P.O. Brox 1301 • Rine.. CO 81650 • Tel. 970-625-4933