General Comments
As scheduled, a representative arrived on-site to perform the below discussed services and we have
the following comments.
"'OPEN HOLE"'
The exposed materials at the base of the excavation for the Preschool building were observed. Al an elevation of approximately
3.5' below footing bearing, the exposed materials were comprised of sandy. silty clays and sands that were generally consistent
with the anticipated conditions as outlined in the project geotechnical report R136017 prepared by GROUND Engineering
Consultants, Inc dated August 23, 2013 and subsequent letter L136017 dated September 30, 2013.
The exposed materials were prepared in accordance with project documents Jim Bickling with New Creation Church was
immediately notified of today's observations.
Fietd Representative: Chris Hutto, CET, reviewed by Carl Henderson, PE
Englewood, Commerce City, Loveland, Granby. Gypsum, Grand Junction, Casper
EROUND
ENGINEERING CONSULTRNTS
Date; May 28, 2015
Client Mr Jim Bickling
New Creation Church
44761 US -6
Glenwood Springs. CO 81601
New Creation Preschool
General Contractor. New Creation Church
Soil Cover Report
Job Number 15-6536
Rep. Notified Jose
As scheduled, a representative visited the project site to perform soil moisture and density testing and/or obtain
samples for laboratory testing. The locations and elevations of each test are approximate. The results reported
represent the material at each test location at the time of testing.
Cum ments or Photos
Outstanding Discrepancies Reported this Date?
Nuclear Gauge Number: 72
No. of Samples Collected: o
Lab Sample Location: NIA
Lab Sample Location: NIA
No. of Pages Attached: 1
Field Representative: Carder Ullom
Density / Moisture
Standard Counts: 2444/743
www groundeng com
Englewood, Commerce City, Loveland, Granby, Gypsum, Grand Junction, Casper
GROUND
ENGINEERING CONSULTANTS
Client. Mr. Jim Bickling
New Creation Church
44761 US -6
Glenwood Springs. CO 81601
New Creation Preschool
Dale May 28, 2015
Report Type Structural Fill
General Contractor' New Creation Church
Earthwork Contractor New Creation Church
Equipment Utilized Excavator. walk behind compactor
Area Represented Structural fill beneath foundation footings
Nuclear Soil Density and Moisture Content
Job Number: 15-6536
Rep wlotried- Jose
Rep Noti=ied. Jose
T .I
1J
Test Location
El. vation
;feet)
Field Wel
Density
(prf)
Field Dry
Density
(pcf)
Field
Moisture
Content
(%)
Proctor
Max Dry
Density
(pcl)
Proctor
Optimum
Moisture
(°%i,}
Comp
action
(%)
pass or
Fail
Sail Type
1
15' South of Northwest Comer
97'
126.4
114 5
10 4
116.1
12 2
98 6
Pass
CL -ML
2
30' South of Northwest Comer
95'
123 0
111.6
10.2
116 1
12.2
96 1
Pass
CL -ML
Specifications Min. 95
Field Technician Carder Ultom
Comments
Max Dry Density and tram
-2 su +2 of Optimum Mosture Content
Standard Proctor O
Modified Proctor O
www.groundeng com
Englewood, Commerce City, Loveland, Granby. Gypsum. Grand Junction, Casper
GROUND
ENGINEERING CONSULTANTS
Dale: May 29, 2015
Client Mr. Jim Sickling
New Creation Church
44761 US -6
Glenwood Springs. CO 81601
New Creation Preschool
General Contractor: New Creation Church
Soil Cover Report
Job Number: 15-6536
Rep. Notified: Jose
As scheduled, a representative visited the project site to perform soil moisture and density testing and/or obtain
samples for laboratory testing. The locations and elevations of each test are approximate. The results reported
represent the material at each test location at the time of testing.
Comments or Photos.
Yes
Outstanding Discrepancies Reported this Date?
Nuclear Gauge Number: 63
No. of Samples Collected: 0
Lab Sample Location: N/A
Lab Sample Location: N/A
No. of Pages Attached: 1
Field Representative: Carder Mom
•.
Density / Moisture
Standard Counts: 2141/705
www.groundeng com
Englewood, Commerce City, Loveland, Granby, Gypsum, Grand Junction, Casper
GROUND
ENGINEERING CONSULTANTS
Client. Mr. Jim Bicklin
New Creation Church
44761 US -6
Gtenwood Springs, CO 81601
New Creation Preschool
Date May 29, 2015
Report Type Structural Fill
General Contractor New Creation Church
Earthwork Contractor New Creation Church
Equipment Utilized Excavator, walk behind compactor
Area Represented Structural fill beneath foundation footings
Nuclear Solt Density and Moisture Content
Job Number 15-6536
Rep Notified Jose
Rep. Wolfed Jose
Test
Na
Test Location
Fievation
ifeet)
Field Wet
Density
(pcf)
Field Dry
Density
(Pcf)
Field
Moisture
Concent
(°'s)
Proctor
Max Dry
Density
(Pct)
Proctor
Optimum
Moisture
{%)
Comp-
action
(%)
Pass or
Fail
Soil Type
3
6' East, 50' South of Northwest
Comer
97'
126 5
113.7
11 3
116.1
12 2
97 9
Pass
CL -ML
4
25' North of Southwest Comer
94'
124 9
112.3
11.2
116.1
12 2
96 7
Pass
CL -ML
,
25' East of Southwest Comer
92'
126 0
113 7
10.8
116.1
12 2
97 9
Pass
CL -ML
6
50' East, 25 North of Southwest
Comer
95'
127.7
114.6
11.4
116.1
12 2
98 7
Pass
CL -ML
Fieri Te
Comments
95 `io Max Dry Density and from
Carder uioni
-2 1c +2 of Optimum Mo'slure Content
Standard Proctor
Modified Proctor O
www.groundeng tom
Englewood. Commerce City, Loveland, Granby, Gypsum, Grand Junction. Casper
EROUND
ENGINEERING CONSULTRNTS
Date: June 1, 2015
Client: Mr. Jim Bickling
New Creation Church
44761 US -6
Glenwood Springs, CO 81601
New Creation Preschool
Genera Contractor: New Creation Church
Soil Cover Report
Job Number 15-6536
Rep. Notified: Jose
As scheduled, a representative visited the project site to perform soil moisture and density testing and/or obtain
samples for laboratory testing. The locations and elevations of each test are approximate. The results reported
represent the material at each test location at the time of testing.
Comments or Photos:
Outstanding Discrepancies Reported this Date? (
Nuclear Gauge Number: 63
No. of Samples Collected: 0
Lab Sample Location: NIA
Lab Sample Location: NIA
No. of Pages Attached: 1
Field Representative: Carder Ultom
Density / Moisture
Standard Counts: 2141/707
www groundeng com
Englewood, Commerce City, Loveland, Granby, Gypsum, Grand Junction, Casper
IIROUND
ENGINEERING CONSULTANTS
New Creation Preschool
Client: Mr. Jim Bickling
New Creation Church
44761 US -6
Glenwood Springs, CO 81601
Date June 1, 2015
Report Type Structural Fill
General Contractor New Creation Church
Earthwork Contractor New Creation Church
Equipment Utilized
Area Represented
Job Number: 15-6536
Rep Notified: Jose
Rep. Notified: Jose
Excavator, walk behind compactor
Building Structural Fi:l
Nuclear Soil Density and Moisture Content
Z ey
NoTest
Location
Elevation
(feet}
Field Wet
Density
(pcf)
Field Dry
Density
(Pcf)
Field
Moisture
Content
(%)
Proctor
Max Dry
Densely
(pcf)
Proctor
Optimum
Moisture
(%)
Comp-
action
(%)
pass or
Fail
Soil Type
.7
55' West of Southeast comer
97'
128.2
116.1
10.4
116.1
12.2
100 0
Pass
CL -ML
8
3' West, 3' North of southeast
comer
94'
127 7
115 9
10.2
116 1
12.2
99 8
Pass
CL -ML
9
70' West, 30' North of southeast
comer
92'
124 3
110.8
12.2
116 1
12 2
95 4
Pass
CL -ML
Specif cations Min 95
Field Technician Carder Ullom
Comments
0/: Max Dry Density and from
-2 trs
+2
of Optimum Moisture Content
Standard Proctor
Modified Proctor fl
www groundeng corn
Englewood, Commerce City, Loveland, Granby, Gypsum, Grand Junction, Casper
EROUND
ENGINEERING CONSULTRNTS
Date- June 2, 2015
Client. Mr Jim Bickling
New Creation Church
44761 US -6
Glenwood Springs, CO 81601
New Creation Preschool
General Contractor. New Creation Church
Soil Cover Report
Job Number: 15-6536
Rep. Notified: Jose
As scheduled, a representative visited the project site to perform soil moisture and density testing and/or obtain
samples for laboratory testing. The locations and elevations of each test are approximate. The results reported
represent the material at each test location at the time of testing.
Comments or Photo
Outstanding Discrepancies Reported this Date?
Nuclear Gauge Number 74
No. of Samples Collected: o
Lab Sample Location- NIA
Lab Sample Location: N/A
No. of Pages Attached: 1
Field Representative. Carder Ullom
Yes
No
Density / Moisture
Standard Counts- 2152/758
www.groundeng com
Englewood, Commerce City, Loveland, Granby, Gypsum, Grand Junction, Casper
AROUND
ENGINEERING CONSULTANTS
Client Mr. Jim a ckling
New Creation Church
44761 US -6
Glenwood Springs, CO 81601
New Creation Preschool
Date: June 2, 2015
Report Type. Structural Fill
General Contractor: New Creation Church
Earthwork Contractor New Creation Church
Equipment Uli 'zed' Excavator, walk behind compactor
Area Represented Structural fill beneath foundation footings
Nuclear Soil Density and Molsture Content
Job Number 15-6536
Rep Notified Jose
p Notified Jose
Test
No
Test Location
Elevation
(feel)
Field Wet
Density
(pcf)
Field Dry
Density
(pct)
Fief
Moisture
Content
(%)
Proctor
Max Dry
Density
(pct)
Proctor
Optimum
Moisture
(%)
Comp-
action
f.°. )
Pass or
Fail
Soil Type
10
55' West, 20' North of Southeast
Comer
97
125.1
113.2
10.5
116.1
12.2
97 5
Pass
CL -ML
11
5' West, 20' South of Northeast
comer
95
122.5
110.4
11.0
116.1
12.2
95.1
Pass
CL -ML
12
20' West. 3, North of Northeast
Comer
96
122 7
111.2
10.3
116.1
12.2
95.8
Pass
CL -ML
Specifications: Miry 95
Field Technician: Carder UMom
Comments
a Max Dry Density and from
•2 to +2 of Op!imum Moisture Content
Standard Proctor Cl
Modified Proctor O
www.groundeng.com
Englewood, Commerce City, Loveland. Granby, Gypsum, Grand Junction. Casper
EROUND
ENGINEERING CONSULTRNTS
Client Mr Jim Sickling
New Creation Church
44761 US -6
Glenwood Springs, CO 81601
New Creation Preschool
Soil Cover Report
Date: June 3, 2015 Job Number: 15-6536
General Contractor: New Creation Church
Rep. Notified: Jose
As scheduled, a representative visited the project site to perform soil moisture and density testing and/or obtain
samples for laboratory testing. The locations and elevations of each test are approximate. The results reported
represent the material at each test location at the time of testing.
Comments or Photos:
Outstanding Discrepancies Reported this Date?
Nuclear Gauge Number: 74
No. of Samples Collected: 0
Lab Sample Location: N/A
Lab Sample Location: NIA
No. of Pages Attached: 1
Field Representative: Carder Ullom
Yes
0
•
Density 1 Moisture
Standard Counts: 2141/750
www groundeng com
Englewood, Commerce City, Loveland, Granby, Gypsum, Grand Junction, Casper
GROUND
ENGINEERING CONSULTRNTS
Date June 3, 2015
Report Type Structural Fill
General Contractor New Creation Church Rep Nolifie•J Jose
Earthwork Contractor New Creation Church Rep Nolifie.1 Jose
Equipment Utilized Excavator and Walk behind compactor
Area Represented Structural fill beneath foundation footings
Nuclear Soil Density and Moisture Content
Client: Mr. Jim Bicking
New Creation Church
44761 US -6
Glenwood Springs, CO 81601
New Creation Preschool
Job Number 15-6536
o Test
Test Lvcatiun
Elevation
(feet)
Field Wel
Density
(pcf)
Field Dry
Density
(pct)
Field
Moisture
Content
(%)
Proctor
Max Dry
Density
(pci)
Proctor
Optimum
Moisture
(%)
Comp-
action
(%)
Pass Fail or
Soil Type
13
60' West o' Northeast Corner
97
120 9
109.3
10.6
116.1
12.2
94 1
Fa:
CL -ML
13 1
60' West of Northeast Comer
(Retest)
97
124 1
112.3
10.5
116.1
12.2
96 7
Pass
CL -ML
14
45' East, 25' South of Northwest
Comer
97
116 7
105.1
11.0
116 1
12 2
90 5
Fai:
CL -ML
14.1
45 East, 25 South of Northwest
Comer (Retest)
97
123 3
111.3
10 8
116 1
12.2
95 9
Pass
CL -ML
Specificat ons Mi:-, 95
Field Technician Carder UI1om
Comments
`.:, Max Dry Density and from
-2 70 +2 of Optimum Moisture Content
Standard Proctor O
Modif ed Proctor O