Loading...
HomeMy WebLinkAboutSoils Report 05.28.2015EROUNIJ ENGINEERING CONSULTRNTS Client. Mr Jim Bickling New Creation Church 44761 US -6 Glenwood Springs. CO 81601 New Creation Preschool Job No: 15-6536 Date: May 28, 2015 General Comments As scheduled, a representative arrived on-site to perform the below discussed services and we have the following comments. "'OPEN HOLE"' The exposed materials at the base of the excavation for the Preschool building were observed. Al an elevation of approximately 3.5' below footing bearing, the exposed materials were comprised of sandy. silty clays and sands that were generally consistent with the anticipated conditions as outlined in the project geotechnical report R136017 prepared by GROUND Engineering Consultants, Inc dated August 23, 2013 and subsequent letter L136017 dated September 30, 2013. The exposed materials were prepared in accordance with project documents Jim Bickling with New Creation Church was immediately notified of today's observations. Fietd Representative: Chris Hutto, CET, reviewed by Carl Henderson, PE Englewood, Commerce City, Loveland, Granby. Gypsum, Grand Junction, Casper EROUND ENGINEERING CONSULTRNTS Date; May 28, 2015 Client Mr Jim Bickling New Creation Church 44761 US -6 Glenwood Springs. CO 81601 New Creation Preschool General Contractor. New Creation Church Soil Cover Report Job Number 15-6536 Rep. Notified Jose As scheduled, a representative visited the project site to perform soil moisture and density testing and/or obtain samples for laboratory testing. The locations and elevations of each test are approximate. The results reported represent the material at each test location at the time of testing. Cum ments or Photos Outstanding Discrepancies Reported this Date? Nuclear Gauge Number: 72 No. of Samples Collected: o Lab Sample Location: NIA Lab Sample Location: NIA No. of Pages Attached: 1 Field Representative: Carder Ullom Density / Moisture Standard Counts: 2444/743 www groundeng com Englewood, Commerce City, Loveland, Granby, Gypsum, Grand Junction, Casper GROUND ENGINEERING CONSULTANTS Client. Mr. Jim Bickling New Creation Church 44761 US -6 Glenwood Springs. CO 81601 New Creation Preschool Dale May 28, 2015 Report Type Structural Fill General Contractor' New Creation Church Earthwork Contractor New Creation Church Equipment Utilized Excavator. walk behind compactor Area Represented Structural fill beneath foundation footings Nuclear Soil Density and Moisture Content Job Number: 15-6536 Rep wlotried- Jose Rep Noti=ied. Jose T .I 1J Test Location El. vation ;feet) Field Wel Density (prf) Field Dry Density (pcf) Field Moisture Content (%) Proctor Max Dry Density (pcl) Proctor Optimum Moisture (°%i,} Comp action (%) pass or Fail Sail Type 1 15' South of Northwest Comer 97' 126.4 114 5 10 4 116.1 12 2 98 6 Pass CL -ML 2 30' South of Northwest Comer 95' 123 0 111.6 10.2 116 1 12.2 96 1 Pass CL -ML Specifications Min. 95 Field Technician Carder Ultom Comments Max Dry Density and tram -2 su +2 of Optimum Mosture Content Standard Proctor O Modified Proctor O www.groundeng com Englewood, Commerce City, Loveland, Granby. Gypsum. Grand Junction, Casper GROUND ENGINEERING CONSULTANTS Dale: May 29, 2015 Client Mr. Jim Sickling New Creation Church 44761 US -6 Glenwood Springs. CO 81601 New Creation Preschool General Contractor: New Creation Church Soil Cover Report Job Number: 15-6536 Rep. Notified: Jose As scheduled, a representative visited the project site to perform soil moisture and density testing and/or obtain samples for laboratory testing. The locations and elevations of each test are approximate. The results reported represent the material at each test location at the time of testing. Comments or Photos. Yes Outstanding Discrepancies Reported this Date? Nuclear Gauge Number: 63 No. of Samples Collected: 0 Lab Sample Location: N/A Lab Sample Location: N/A No. of Pages Attached: 1 Field Representative: Carder Mom •. Density / Moisture Standard Counts: 2141/705 www.groundeng com Englewood, Commerce City, Loveland, Granby, Gypsum, Grand Junction, Casper GROUND ENGINEERING CONSULTANTS Client. Mr. Jim Bicklin New Creation Church 44761 US -6 Gtenwood Springs, CO 81601 New Creation Preschool Date May 29, 2015 Report Type Structural Fill General Contractor New Creation Church Earthwork Contractor New Creation Church Equipment Utilized Excavator, walk behind compactor Area Represented Structural fill beneath foundation footings Nuclear Solt Density and Moisture Content Job Number 15-6536 Rep Notified Jose Rep. Wolfed Jose Test Na Test Location Fievation ifeet) Field Wet Density (pcf) Field Dry Density (Pcf) Field Moisture Concent (°'s) Proctor Max Dry Density (Pct) Proctor Optimum Moisture {%) Comp- action (%) Pass or Fail Soil Type 3 6' East, 50' South of Northwest Comer 97' 126 5 113.7 11 3 116.1 12 2 97 9 Pass CL -ML 4 25' North of Southwest Comer 94' 124 9 112.3 11.2 116.1 12 2 96 7 Pass CL -ML , 25' East of Southwest Comer 92' 126 0 113 7 10.8 116.1 12 2 97 9 Pass CL -ML 6 50' East, 25 North of Southwest Comer 95' 127.7 114.6 11.4 116.1 12 2 98 7 Pass CL -ML Fieri Te Comments 95 `io Max Dry Density and from Carder uioni -2 1c +2 of Optimum Mo'slure Content Standard Proctor Modified Proctor O www.groundeng tom Englewood. Commerce City, Loveland, Granby, Gypsum, Grand Junction. Casper EROUND ENGINEERING CONSULTRNTS Date: June 1, 2015 Client: Mr. Jim Bickling New Creation Church 44761 US -6 Glenwood Springs, CO 81601 New Creation Preschool Genera Contractor: New Creation Church Soil Cover Report Job Number 15-6536 Rep. Notified: Jose As scheduled, a representative visited the project site to perform soil moisture and density testing and/or obtain samples for laboratory testing. The locations and elevations of each test are approximate. The results reported represent the material at each test location at the time of testing. Comments or Photos: Outstanding Discrepancies Reported this Date? ( Nuclear Gauge Number: 63 No. of Samples Collected: 0 Lab Sample Location: NIA Lab Sample Location: NIA No. of Pages Attached: 1 Field Representative: Carder Ultom Density / Moisture Standard Counts: 2141/707 www groundeng com Englewood, Commerce City, Loveland, Granby, Gypsum, Grand Junction, Casper IIROUND ENGINEERING CONSULTANTS New Creation Preschool Client: Mr. Jim Bickling New Creation Church 44761 US -6 Glenwood Springs, CO 81601 Date June 1, 2015 Report Type Structural Fill General Contractor New Creation Church Earthwork Contractor New Creation Church Equipment Utilized Area Represented Job Number: 15-6536 Rep Notified: Jose Rep. Notified: Jose Excavator, walk behind compactor Building Structural Fi:l Nuclear Soil Density and Moisture Content Z ey NoTest Location Elevation (feet} Field Wet Density (pcf) Field Dry Density (Pcf) Field Moisture Content (%) Proctor Max Dry Densely (pcf) Proctor Optimum Moisture (%) Comp- action (%) pass or Fail Soil Type .7 55' West of Southeast comer 97' 128.2 116.1 10.4 116.1 12.2 100 0 Pass CL -ML 8 3' West, 3' North of southeast comer 94' 127 7 115 9 10.2 116 1 12.2 99 8 Pass CL -ML 9 70' West, 30' North of southeast comer 92' 124 3 110.8 12.2 116 1 12 2 95 4 Pass CL -ML Specif cations Min 95 Field Technician Carder Ullom Comments 0/: Max Dry Density and from -2 trs +2 of Optimum Moisture Content Standard Proctor Modified Proctor fl www groundeng corn Englewood, Commerce City, Loveland, Granby, Gypsum, Grand Junction, Casper EROUND ENGINEERING CONSULTRNTS Date- June 2, 2015 Client. Mr Jim Bickling New Creation Church 44761 US -6 Glenwood Springs, CO 81601 New Creation Preschool General Contractor. New Creation Church Soil Cover Report Job Number: 15-6536 Rep. Notified: Jose As scheduled, a representative visited the project site to perform soil moisture and density testing and/or obtain samples for laboratory testing. The locations and elevations of each test are approximate. The results reported represent the material at each test location at the time of testing. Comments or Photo Outstanding Discrepancies Reported this Date? Nuclear Gauge Number 74 No. of Samples Collected: o Lab Sample Location- NIA Lab Sample Location: N/A No. of Pages Attached: 1 Field Representative. Carder Ullom Yes No Density / Moisture Standard Counts- 2152/758 www.groundeng com Englewood, Commerce City, Loveland, Granby, Gypsum, Grand Junction, Casper AROUND ENGINEERING CONSULTANTS Client Mr. Jim a ckling New Creation Church 44761 US -6 Glenwood Springs, CO 81601 New Creation Preschool Date: June 2, 2015 Report Type. Structural Fill General Contractor: New Creation Church Earthwork Contractor New Creation Church Equipment Uli 'zed' Excavator, walk behind compactor Area Represented Structural fill beneath foundation footings Nuclear Soil Density and Molsture Content Job Number 15-6536 Rep Notified Jose p Notified Jose Test No Test Location Elevation (feel) Field Wet Density (pcf) Field Dry Density (pct) Fief Moisture Content (%) Proctor Max Dry Density (pct) Proctor Optimum Moisture (%) Comp- action f.°. ) Pass or Fail Soil Type 10 55' West, 20' North of Southeast Comer 97 125.1 113.2 10.5 116.1 12.2 97 5 Pass CL -ML 11 5' West, 20' South of Northeast comer 95 122.5 110.4 11.0 116.1 12.2 95.1 Pass CL -ML 12 20' West. 3, North of Northeast Comer 96 122 7 111.2 10.3 116.1 12.2 95.8 Pass CL -ML Specifications: Miry 95 Field Technician: Carder UMom Comments a Max Dry Density and from •2 to +2 of Op!imum Moisture Content Standard Proctor Cl Modified Proctor O www.groundeng.com Englewood, Commerce City, Loveland. Granby, Gypsum, Grand Junction. Casper EROUND ENGINEERING CONSULTRNTS Client Mr Jim Sickling New Creation Church 44761 US -6 Glenwood Springs, CO 81601 New Creation Preschool Soil Cover Report Date: June 3, 2015 Job Number: 15-6536 General Contractor: New Creation Church Rep. Notified: Jose As scheduled, a representative visited the project site to perform soil moisture and density testing and/or obtain samples for laboratory testing. The locations and elevations of each test are approximate. The results reported represent the material at each test location at the time of testing. Comments or Photos: Outstanding Discrepancies Reported this Date? Nuclear Gauge Number: 74 No. of Samples Collected: 0 Lab Sample Location: N/A Lab Sample Location: NIA No. of Pages Attached: 1 Field Representative: Carder Ullom Yes 0 • Density 1 Moisture Standard Counts: 2141/750 www groundeng com Englewood, Commerce City, Loveland, Granby, Gypsum, Grand Junction, Casper GROUND ENGINEERING CONSULTRNTS Date June 3, 2015 Report Type Structural Fill General Contractor New Creation Church Rep Nolifie•J Jose Earthwork Contractor New Creation Church Rep Nolifie.1 Jose Equipment Utilized Excavator and Walk behind compactor Area Represented Structural fill beneath foundation footings Nuclear Soil Density and Moisture Content Client: Mr. Jim Bicking New Creation Church 44761 US -6 Glenwood Springs, CO 81601 New Creation Preschool Job Number 15-6536 o Test Test Lvcatiun Elevation (feet) Field Wel Density (pcf) Field Dry Density (pct) Field Moisture Content (%) Proctor Max Dry Density (pci) Proctor Optimum Moisture (%) Comp- action (%) Pass Fail or Soil Type 13 60' West o' Northeast Corner 97 120 9 109.3 10.6 116.1 12.2 94 1 Fa: CL -ML 13 1 60' West of Northeast Comer (Retest) 97 124 1 112.3 10.5 116.1 12.2 96 7 Pass CL -ML 14 45' East, 25' South of Northwest Comer 97 116 7 105.1 11.0 116 1 12 2 90 5 Fai: CL -ML 14.1 45 East, 25 South of Northwest Comer (Retest) 97 123 3 111.3 10 8 116 1 12.2 95 9 Pass CL -ML Specificat ons Mi:-, 95 Field Technician Carder UI1om Comments `.:, Max Dry Density and from -2 70 +2 of Optimum Moisture Content Standard Proctor O Modif ed Proctor O www.groundeng.com Eng.ewood.. Commerce City, Loveland, Granby, Gypsum, Grand Junction, Casper