HomeMy WebLinkAboutLand Use Change Permit. 1111 W}~Jtvltfr~ 1'11'.i'. ~~I ~f~l r.i~ ~ICllYJ. ITil-1
Receptiontt: 852464
OB/i2/2014 t2:52:32 P~ Jean Alberico 1 or 6 Rec Foe:S0.00 Dec Fee:0.00 GRRFIE\.O COUNTY CO
LAND USE CHANGE PERMIT
for
A Parcel of Land Located Approximately % Mile Southwest of Battlement Mesa
in 'Section 24, Township 7 South, Range 96 West of the 6"' P.M. and Legally
Described in Exhibit •A" with the Project Ama Described in Exhibit "B"
(Assessors Parcel No. 2409-244-00-124)
In accordance with and pursuant to provisions of the Garfield County Land Use and
Development Code, as amended, and Resolution No. 2014. -=tl_ of the Board of
County Commissioners of Garfield County, State of Colorado, the following activity is
hereby authorized by Land Use Change Pennlt:
A Small Injection Well Facility known as the Ursa Speakman A Injection Well as
shown on the Site Plan Attached as Exhibit "B"
(LIPA -7835)
This Land Use Change Pennit -Administrative Review is issued subject to the
conditions contained in Resolution No. 2014.~ and set forth in Exhibit "C" and shall
be valid only during compliance with such conditions and other applicable provisions of
the Garfield County Land Use and Development Code, as amended, Building Code,
and other regulations of the Board of County Commissioners of Garfield County,
Colorado. ·
Date
ATIEST:
-IOI Mf.irM~r.?! H~ !'ii I\\ ~:~w,j~.r,, ~:; M"":11 iW. 11111
ReceptionM: 852464
08/12/20t4 t2:52:32 P" Jean Albarlco 2 of 5 Rec Fee,so.oo Doo Fee:D.00 GARFlE\.D COUNTY CO
Exhibit A
(Legal Description)
Setfion:24 Townsi19: 7 Range: 98 SEC 24 NWSEN NESE', TIMT
PORTION OFTHENESWLYING S.. OF THEOO. RD~EXCEPT A
·tR OF lAND CON't. 16.70 AC +/-AS tee IN 8NDY LINE ADJ
PLAT REC #759&7 & NFDAVfr REC #]59298 & Q<D REC#
769'lS6..
1111 rN~JfJrt~D.,~ t't'l\LIW ~l 11WhNt"" M'/1Wil Iv}, 11111
Reception~: 852464 0911212014 12:52:32 PM Je~n Alb•rlco 3 of 5 Reo Fee:SO 00 Doc Fee:0.00 GARFIELD COUNTY CO
Site Plan Spealcman A Pad
Tba NW1f4 orna. SBt/4. 'IboNBl/4 orni. smM
A A P1rion Of the NBl/40fliDSWIJ4 0
1 Of Section 24, Towmlalp 1 Sollth, Range 96 Weat,
0£1hc 6th Principal Meriden,
Caunty Of Garfield, &W9 Of Colanda
Not to
Scale
Exhibit B
(Project Site Plan)
,.:
_,.. ...
! !I l!!!I 1
.~!'Ila
1111 W)f',dlltt.,',H)j r.¥~,ni,1~~fit"t!IJV,~ll~) liy), 11111
Recept.lontl: 852464
08/12/2014 12:52 :32 Pl1 Joan Rlberlca 4 of 5 Rec Fee :S0 .00 Doc Fee:D .00 GARFIELD COUNTY CO
Exhibit C
(page 1 of2)
I. That all representations made by the Applicant in the application shall be conditions of
approval unless specifically altered by the conditions of approval of the Board.
2. That the Ursa Speakman A Injection Well shall be operated in accordance with all
applicable Federal, State and local regulations governing the operation of this type of
facility.
3. Prior to issuance of the Land Use Change Permit, the Applicant shall provide updated
drainage information and/or designs adequate to address the referral comments from the
County's Consulting Engineer, Chris Hale.
4. Prior to issuance of the Land Use Change Permit, the Applicant shall provide an
u~ted site plan including designation of truck circulation areas within the well pad to
be used for truck delivery traffic. The site plan shall also address circulation patterns to
be implemented when active drilling and placement of a drill rig on the well pad
occurs.
5. Prior to issuance of the Land Use Change Permit, the Applicant shall provide an
updated dust control plan for the site and access roads with more specifics on the timing
of watering and application of dust suppressing chemicals. The plan shall include the
well pad area surrounding the injection well facilities.
6. The facility shall maintain compliance with CDPHE Storm Water Management
Permits, Drainage end Grading Plans, and Reclamation and Erosion Control Plans for
the site.
7. The Applicant shall maintain all required COGCC permits and forms for the facility
and shall comply with all conditions or requirements of said pennits and forms.
8. The facility shall maintain compliance with COGCC Noise Standards/Regulations and
the facility shall be required to utili7.e an electric pump as represented. If future
compliance issues are identified, the Applicant shall provide noise mitigation in order
to achieve compliance along with a technical evaluation by a qualified professional to
confirm compliance.
9. The Applicant shall comply with all SPCC Plan provisions and shall keep the plan
current and updated for any changes to the facility.
111111Jr .. m1~1'f1~.iw~. Ml·.~.~rJ~Pl.~\l"J~l ~~ti 11111
Reception#: 852464
081121201~ 12:52:32 PM Jean Alberico
5 or 5 Rec Fee:S0.00 Doc Fee:0.00 GARFIELD COCJllTY CO
Exhibit C
(page2of2}
10. As represented in the Application, the facility shall have only tennpore.ry lighting for
unscheduled night time maintenance. All lighting shall comply with Section 7-304,
Lighting Standards, with all lighting to be directed inward and doward toward the
interior of the site. Facilities and storage tanks shell be painted a non-glare neutral
color to lessen any visual impacts.
11. The Emergency Response Plan shall be updated to include a section on response to and
prevention of field or wild land fires. Separation between the injection well pad
facilities and native vegetation at the perimeter of the site shall be maintained.
12. The Applicant shall maintain all required CDPHE permits for the facility including any
applicable air quality APEN pennits.
13. The Applicant shall comply with the referral comments from Colorado Parks and
Wildlife (CPW), including compliance with the Battlement Mesa Wildlife Mitigation
Plan. Said plan and agreement between Ursa Operating Company and CPW includes a
limitation on trucking to between the hours of 10:00 a.m. and 3 :00 p.m., when and
where possible, compliance with COGCC Noise Regulations and use of bear proof
trash containers for all food related trash.
14. The Applicant shall comply with the access representations and Traffic Report
including limiting trucking to the designated haul mute and the limitation to a
maximum of 20 daily water truck deliveries to the facility. The haul route is defined by
the two maps in the Applicant's Traffic Study. The access map (I-70 to Speakman Pad)
and the haul route map (Speakman Pad to Watson and Monument Ridge Pads) shall be
considered the haul mute. The daily trucking limitation may be calculated based on a
weekly average to account for minor operational variations. Trucking of water to the
site shall utilize watertight tanks and shall comply with all COGCC or COOT
requirements for hauling of production water.
15. The Applicant and property owner shall provide the County with a plan for minor re-
grading and re-seeding of disturbed portions of the Speakman property outside of the
Injection Well facility. Said plan, including timing for completion, shall be subject to
approval by the County Vegetation Manager.