Loading...
HomeMy WebLinkAboutOWTS Installation Inspection Report 03.15.2016640 White Avenue, Unit B Grand Junction, Colorado 81501 Huddleston -Berry Phone: 970-255-8005 Engineering & Testing„ LLC Fax: 970-255-6818 Info@ huddlestonbetry.com March 15, 2016 Project#01313-0001 Cheryl Gonzalez 246 West Capital Court New Castle, Colorado 81647 Subject: OWTS Installation Inspection 350 Cedar Hills Road Silt, Colorado Reference: ISDS Design, 350 Cedar Hills Road, Silt, Colorado by Huddleston -Berry Engineering & Testing, LLC for Cheryl Gonzalez, January 21, 2014. Dear Mrs. Gonzalez, In accordance with Garfield County and State of Colorado regulations, Huddleston -Berry Engineering & Testing, LLC (HBET) conducted inspection of the installed Onsite Wastewater Treatment System (OWTS) at 350 Cedar Hills Road in Silt, Colorado. As indicated in the referenced report, HBET completed engineering design of the system. Based upon our inspection, HBET certifies that the OWTS was constructed in accordance with the design. It is important to note that HBET observed that Infiltrator ARC 36 chambers were used in lieu of the Quick 4 Standard chambers outlined in the design drawings. However, the infiltrative surface area was consistent with the design. Please contact us if you have any questions or comments regarding the contents of this letter. Respectfully Submitted: Huddleston -Berry Engineering and Testing, LLC Michael A. Berry, P.E. Vice President of Engineering Cc: Garfield County Health Department Scale: 1" = 20' Project # 01313-0001 Date: 03/15/16 By: MAB Huddleston -Berry Engineering & Testing LLC 640 Whitc Avcnuc, Unil R Grand Junction. CO 81501 350 CEDAR HILLS ROAD AS -BUILT SITE PLAN