Loading...
HomeMy WebLinkAboutFoundation Report 08.01.2014F Aug, 2(:14 11: 3AM Huddlestor—Berry TO: COMPA!F•�r, TAX TUM PHONE NUMBER: Huddleston -Berry LalincelEn:S= Toting ue ILC No, 1465 P. FACSIMILE TRANSMITTA[. SHEET 'Mg- 3 FROM: DATE TOTAL NO. or PAGES INCLUDING COVER: SENDER'S REFERENCE NUMBER: YOUR NC NUMBER: .y" 0 URGENT 0 FOR REVIEW 0 PLEASE COMMENT 0 PLEASE REPLY 0 PLEASE RECYCLE NOTES/COMMENTS: A.g. 2014 11:03AM Hudd'eslon—Berry No.`465 Huddleston -Berry Engineering & Tasting, LLC Cheryl Gonzalez 216 West Capital Coprt New Castle, CO 81647 Attention: Ms. Cheryl Gonzalez Subject: Construction Materials Testing and Special Inspections 350 Cedar Hills Road, Silt, CO Grand Junction, Colorado 640 White Avenue Grand Junction, CO 8I50I Phone: 970-255-8005 Fax: 970-255.6818 HuddlestonBerry@bresnan.net www.HBET-Gl.com August 1, 2014 Project No.: 01313-0001 Reference: Geotechnical Investigation and 1SDS Feasibility for 350 Cedar Hills Road, Silt, CO by Huddleston -Berry Engineering and Testing, LLC, dated December 9, 2013, .Report #F 01313-0001 Dear Ms. Gonzalez, A representative of Huddleston -Derry Engineering and Testing, LLC (HBET) observed the open hole and tested the soil compaction for the foundation on June 27, 2014, and July 15, 17, and 2111, 2014. Periodic testing for the subject project is complete and any exceptions have been corrected. The open hole inspection indicated that the subsurface soil conditions on the lot are consistent with the referenced report. Therefore, based upon the recommendations in the referenced reports, results of the open hole inspection, and results of the field density testing, the subgrade is adequate for foundations constnicted in accordance with the Garfield County Mininuan House Foundation Standards using an allowable bearing capacity of 1500 psf. Please find enclosed the soil compaction test results are included as IRW, 1S, 2S, and 3S. 1=IBET appreciates the opportunity to offer services to your project. If you have any questions please call. (970) 255-8005. pectfully ' •mined. ldlesto - t rry Engineering and Testing, LLC ueras ect Manager C.C. Garfield County Building Depannnern: Matt Provost Fax: (970) 384.3470 Aug. 1. 2014 11:03Av Huddleston—Berry No. 1465 Huddleston•I3erry L'r;�rry�nl.L Taua:.LLC Project No.: 01313 a 0001 Project Name: 350 Cedar Hills Road Client Name: Cheryl Gonzalez Installation Contractor: Contractor Representative; Physical Address: REVIEW Observed By: DP Date; 6/27/14 Work Order No: 30931 Authorized By: client Date: 6/27/14 Reviewed By; JDC Date: 6127114 Installation Equipment: Datum: I observed the partial excavation for the west house footing The material at the bottom of the excavation is sand stone. The sandstone observed is very soft and friable HBET recommends removing the soft sandstone to a depth suffiecient to place the full depth of the structural fill indicated in the Geotechnical report General Remarks: Record No. 1 RW