Loading...
HomeMy WebLinkAbout5.0 ISDS System>e GRAPHIC SCALE 10 Ib p ( Of Fin ) 1 Inch . 20 I:L as a SPECTION PORT (TIP.) 68' 185' 0" GENERAL LOCATION PERCOLATION TESTS AEy ITS OF EXCAVATDN AND SELECT BACKFIN USE 44 INFLMATOR CHAMBERS IN 4 ROWS OF 11. LOCATION OF TRENCHES MAY BE AMSTED AS LONG AS A TOTAL OF 662 SQ. FT. OF AREA IS PROMDED. LOCATION OF TRD1CHES MUST MEET ALL mum SETBACK REQUWEMENTS. THE SYS1D1 SHALL BE PLUMBED FOR EQUAL DISTRIBUTION. INE CHAMBERS IN EACH TRENCH SHALL BE INSTALLED AT LEVEL GRADE, THE BOTTOM ELEVATION OF EACH TRENCH MAY VARY TO ACHIEVE A MAXIMUM DEPTH OF 36 INCHES TO THE 9011011 SURFACE BELOW THE PROPOSED GRADE. 8100 FROM PROPOSED WELL STRIBUTION UNES MP.) -0I519I9U110N BOX W/ DISTRIBUTION UNE RISERS AND AOCESS RISER TO SURFACE TION LITE 1600 GAL SEPTIC TANK W EFFLUENT FILTER 34' SEWAGE UN- ` FROM HOUSE RESIDENC� i•T10-WAY CLEANOUTS WELL. i 6,,81 ACRS S. 4" DISTRIBUTION GRAVITY UNE FROM SEPTIC TANK DISTRIBUTION BOX UD AT GROUND SURFACE PERFORATED RISER INVERT IN HIGH POINT 4" SOLID PVC GRAVITY DISTRIBUTION LATERALS (TYP.) TO ABSORPTION TRENCHES FLOW SPLITTER BOX N.T.S. 14'-2' G5) <3-) TWO WAY CLEAN OUT PROPOSED GRADE EXISTING GRADE EFFLUENT FILTER OUTLET TEE �I UNE DISTRIBUTION UNES AT MINIMUM 1% SLOPE EFFLUENT DRAIN UNE AT MINIMUM 2% SLOPE SEPTIC TANK UENT DISCHARGE UNE AT MINIMUM 1X SLOPE DISTRIBUTION BOX KITH RISER CROSS SECTION SLOPE DETA, N.T.S. ISDS SYSTEM NOTES 1. ADD A TWO-WAY CLEAN OUT ON THE SERVICE LINE FROM THE DWELLINGS. 2. ALL MATERIALS AND INSTALLATION SHALL CONFORM TO GARFIELD COUNTY INDIVIDUAL SEWAGE DISPOSAL SYSTEM (ISDS) REGULATIONS. 3. ALL SEWER LINES TO BE SDR -35 OF SCHEDULE 40 P.V.C. PIPE UNLESS NOTED OTHERWISE. 4. THE CONTRACTOR SHALL ENSURE ALL SEWER LINES AND SEPTIC TANKS ARE WATERTIGHT. ANY POTENTIAL PLUMBING LEAKS SHALL BE REPAIRED TO AVOID EXCESSIVE WATER ENTERING THE SEPTIC SYSTEM. 5. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO CONTACT ALL UTILITY COMPANIES FOR FIELD LOCATIONS OF UTTUTIES PRIOR TO CONSTRUCTION AND EXCAVATION. 6. THE ABSORPTION TRENCHES MUST BE MARKED AND PROTECTED TO PREVENT DAMAGE FROM VEHICULAR AND LIVESTOCK TRAFFIC. 7. THE TANK SHALL BE INSTALLED LEVEL ON COMPACTED EARTH. INSTALL WATERTIGHT RISERS AS NECESSARY TO BRING ALL REQUIRED ACCESS POINTS TO WITHIN 8 INCHES OF THE FINISHED SURFACE GRADE. INSTALL AND OUTLETINSPECTED AND MAINTAINEDEFR MTTHE TANK RIS RSSAND ACCESSTO BELUDS. AN EFFLUENT FILTER SHALL BE INSTALLED IN THE OUTLET TEE OF THE SEPTIC TANK. THE EFFLUENT FILTER SHALL BE CLEANED WHEN THE TANK IS PUMPED OR AS NECCESSARY. INSTALL A SUITABLE EXTENSION ON THE FILTER WITH A HANDLE TO BE WITHIN 8" BELOW THE ACCESS LID. 8. THE ENTIRE ABSORPTION TRENCH SURFACE MUST BE SODDED OR RE -VEGETATED WITH GROUND COVER. 9. THE ABSORPTION TRENCH SURFACES MUST BE CROWNED TO DIVERT SURFACE DRAINAGE AWAY FROM THE TRENCHES. 10. THE DIMENSIONS SHOWN ON THE PLAN INDICATE MINIMUM AREA AND SEPARATION DISTANCES FOR THE TRENCHES. 11. EACH TRENCH SHALL BE LEVEL AND CONNECTED FOR EQUAL DISTRIBUTION. THE MAXIMUM DEPTH OF ANY TRENCH SHALL NOT EXCEED 36". 12. THE MINIMUM COVER OVER THE TOP OF THE ABSORPTION TRENCH SHALL BE 12 INCHES NOT TO EXCEED 36 INCHES. 13. THE TRENCH CHAMBERS WILL BE BACKFILLED WITH EXCAVATED MATERIAL VOID OF ROCKS, THE BACKFILL MATERIAL SHALL NOT EXCEED 2 1/2" DIAMETER AND SHALL BE PLACED TO ATLEAST 6 INCHES ABOVE THE TOP OF THE CHAMBERS. THE TOP OF THE PLACED BACKFILL SHALL BE COVERED WITH A LAYER OF FILTER FABRIC. A MINIMUM 4" DEPTH OF TOP SOIL IS TO BE PLACED ABOVE THE BACKFILL TO THE SURFACE. THE TRENCH BOTTOM SHALL BE SCARIFIED IF SMEARING OCCURS. 14. VERTICAL INSPECTION PORTS SHALL BE INSTALLED FROM THE CENTER PRE MARKED HOLE ON THE TOP OF EACH END CHAMBER. (TYP. END OF EACH ROW) A SPLASH PLATE SHALL BE INSTALLED ON THE TRENCH BOTTOM BELOW EACH TRENCH INLET TO PREVENT SCOURING. 15. ALL INSTALLATION OF TRENCH CHAMBERS SHALL BE IN CONFORMANCE WITH THE MANUFACTURES INSTALLATION INSTRUCTIONS. NOTE: EACH RUN OF CHAMBERS MUST BE LEVEL. INLET AND END CAP TO BE USED ON EACH END CHAMBER. INSTALL 4" PVC INSPECTION PORT W/ CAP ON EACH END CHAMBER IN EACH TRENCH. MAINTAIN 6' OF UNDISTURBED SOIL BETWEEN TRENCHES. THE TRENCH BOTTOM ELEVATION OF ADJACENT TRENCHES MAY VARY. CROWN FIELD TRENCH TO DIVERT SURFACE WATER REVEGATATION TOPSOIL LAYER PERVIOUS MEMEBRANE LAYER FILTER FABRIC OR STRAW SCREENED BACKFILL LAYER v NATURAL ONSITE SOILS FREE OF GRAVEL AND ROCKS IN ...Jvvv4 EXCESS OF 2 1/2" DIAMETER .117gra. ail__._.m n.,a. gar �� r...,_._.r... 3' MIN I - 8' MIN n"I erlieSkiit$ STADARD CAPACITY INFILTRATOR CHAMBER (TYP.) SCARIFY/TILL BOTTOM SURFACE T A DEPTH OF 3" AND RAKE LEVEL \W �//j\ A 12' - 24" MIN. MAX. UNDISTURBED SOIL INFILTRATOR CROSS SECTION DET, NTS GENERAL NOTES: 1. THE ISDS SYSTEM AS SHOWN ON THE PLAN AND THE DETAILS WERE DESIGNED BY SOPRIS ENGINEERING. THE HOUSE, DRIVEWAY AND OTHER SITE CONDITIONS WERE PROVIDED BY THE OWNER. SOPRIS ENGINEERING, LLC. PML CONSULTANTS 502 MAIN STREET, SUITE A3 DES. YTN CK. FILE N0. m sltE-Isosowo 8/18/01 6AR66W6A11, 66 @1133 21076 _ (970) 704-0311 DR. PER DATE 6/16/01 21076,01 N0. DATE REVISION BY GREG & DIANNE PARK PROPERTY 1213 COUNTY ROAD 112, GARFIELD COUNTY PARK ISDS SYSTEM INDIVIDUAL SEWAGE DISPOSAL SYSTEM SITE PLAN AND SYSTEM DETAILS SHEET 1 OF 1