Loading...
HomeMy WebLinkAboutApplication - PermitI Garfield County Building & Planning Department 108 8th Stree t, Suite #401 Glenwood Springs, Co. 81601 Office :970-945-8212 Fax: 970-384-3470 Inspection Line : 970-384-5003 Building Permit No. _ulo~--- Parcel No: 2171-332-00 -019 Locality: Job Address: 4289 CR 215 Parach ute Use of Building: 8' perimeter security fence ----------------~--------~~------------------ Owner: Williams Production RMT Co. Contractor: Owner Fees: Plan Check : $ 260.88 Septic : Bldg Pe rmit: $ 401.3 5 Other Fees : Total Fees: $ 662.23 Clerk : ~D0)\or Date: _g -ts-at I l 2 3 4 GARFIELD COUNTY BUILDING PERM IT APPLICA TlON 108 8'h Street, Suite 401, Glenwood Springs, Co 81601 Phone: 970-945-8212 I fax: 970-3 84-3470 I Inspection Line: 970-384-5003 www. gartie ld-cou nty .com Parcel No: (this infonnation is a vailable at the assessors office 970-945-91 34) 2171-332-00-019 Job Address: (if an address has not been assigned, pl ease provide Cr, Hwy or Street Name & C ity) or and legal description 4289 County Road 2 15 Parachute, CO 81635 Lot No: Block No: Subd./ Exemption: Owner: (proper~ owner) Mailitel Address: Ph: Williams Pro uction RMT Co. 4289 R215 Parachute, CO 81635 970-263-27 43 AltPh; 5 Contractor: Mailitel Addres s: P h: X Ylll AltPh: Williams Production RMT CO. 4289 R215 Parachute, CO 81635 970~62 ~5 350 6 Architect I Engineer: Maili ng Address : Ph: AltPh: NA 7 Sq. Ft. of Building: S~ Ft. or Acres of Lot: H e ight: No. of Floors: 0 13 3.33 acre parcel NA NA 8 Usc of Building: NA 9 Describe Work: Installation of a 1,235 feet long x 8' high perimeter secu rity fen ce lO C lass of Work: ICINcw o A lte ration o Addition ll Garage: Septic: o Attac hed 0 Detached o iSDS o Community 12 Driveway Permit: Owners valuation of Work: $ 26,000.00 NOTICE Authoriry. This application for a Building Pem1it must be signed by the 0\\ner of th e property. described above, or an au th orized agent. If the signature below is not that of the Owner, a separate letter of a uthority, signed by the Owne r, must be provided with thi s Applicati on. Legal Access. A Bui lding Pe nn it catmot be issued without proof of legal and adequate access to the prope rty fo r purposes of inspecti ons by the Building Departm en t. Other Permits. Multiple separate pennits may be required : (I) State Electrical Penni!. (2) County ISDS Penni I. (3) another p ennit required for usc on the property id entified abo,·c, e.g. State or Co unty Highway/ Road Access or a State Wastewater Di scharge Pennit . Void Permit. A Build ing Permit becomes null and void if the work authorized is not commenced within )80 days of the date of iss uance and i f work is suspended or abandoned fo r a period of 180 days after commencement. CERTIFICATION I hereby c ertify that I ha ve read this Appli cation and that the information contained above is tnoe and co rrec t. I understand that th e Buildin g Departme nt acce pts the Application, along with the plans and specifications and o ther data submitted by me o r on my behalf (submittals), based upon my certification ns to accuracy. Assuming completeness of the submittals and approval of this Application, a Building Permit will be is sued granting pe nni ss ion to me , as Owner. to constmct th e stmc ntre(s) and fac ilities detailed on th e submittals reviewed by the Building Departme nt. In consid erati on of the iss uance of th e Bui ld ing Pcm1it , I agree that I and my agents will comply with provisio ns of any fede ral , state or local law regulating the work and the Gariield Co unty Building Code, ISDS regu lations and appl icable land use regulation s (County Reg ulation(s)). I acknowledge that the Building Pennit may be suspe nd ed or revo ked, upon notice from the County, if th e location, constntction o r use of the s tmctu rc(s) and fa cility(ics), described above. are not in compliance with County Rcgulation(s) or any othe r applicable law. I hereb y grant pcnnission to the Building Department to ente r th e property, described above, to in spect the work. I furth er ac knowledge that the issuance of th e Building Permit docs not prevent the Bu ilding Ofticial from: (I) requ iring th e correction of en-ors in the sub mittal s, if any . discovered after issuan ce; or (2 ) stop pi ng constmction or use of the stmcturc(s) or facilit y(ies) if s uch is in violation of County Regul arion (s) or any other applicable law. Review of thi s Application, including submittals. and in spections oft he work by the Building Depa rtme nt do not constitut e an acceptance of res ponsibility or liability by the County of errors, omissions or discrepancies. As the Owner, I acknowledge that responsibility for compli ance with federal. s tate and local laws and County Regulati ons rest wi th me and my authorized agents. including without limitation my architect designer. engin eer an cV or builder. I HEREBY ACKNOWLEDGE THAT I HAVE READ AND UNDERSTAND THE NOTICE & CERTIFICATION ABOVE: ~~\)l~~ -\\~~ 8/18/08 -Please contact Phil at 970-625-5350 when permit is ready' OWNERS SIGNATURE~ DATE STAFF USE ONLY C..t( C? Adjusted Valuation: Plan Check Fee: Permit Fee: Manu home Fee: Mise Fees: )G,c. ~~ ISDS No & I ssu ed Date: Setbacks: OCC G •·oup: DATE The following items are required by Garfield County for a final Inspection: I) A final Electrical Inspection from the Colorado State Electrical Inspector. 2) Permanent address assigned by Garfield County Building Department and posted at the structure and where readily visible from access road. 3) A finished roof; a lockable building; completed exterior siding; exterior doors and windows installed; a complete kitchen with cabinets, sink with hot & cold running water, non-absorbent kitchen floor covering, counter tops and finished walls, ready for stove and refrigerator; all necessmy plumbing. 4) All bathrooms must be complete, with washbowl, tub or shower, toilet, hot and cold running water, non-absorbent floors, walls finished, and privacy door. 5) Steps over three (3) risers, outside or inside must be must have handrails. Balconies and decks over 30" high must be constructed to all IBC and IRC requirements including guardrails. 6) Outside grading completed so that water slopes away from the building; 7) Exceptions to the outside steps, decks, grading may be made upon the demonstration of extenuating circumstances., i.e. weather. Under such circumstances A Certificate of Occupancy may be issued conditionally. 8) A final inspection sign off by the Garfield County Road & Bridge Department for driveway installation, where applicable; as well as any final sign off by the Fire District, and/or State Agencies where applicable. A CERTIFICATE OF OCCUPANCY (C.O.) WILL NOT BE ISSUED UNTIL ALL THE ABOVE ITEMS HAVE BEEN COMPLETED. A C.O. MAY TAKE UP TO 5 BUSINESS DAYS TO BE PROCESSED AND ISSUED. OWNER CANNOT OCCUPY OR USE DWELLING UNTIL A C.O. IS ISSUED. OCCUPANCY OR USE OF DWELLING WITHOUT A C.O. WILL BE CONSIDERED AN ILLEGAL OCCUPANCY AND MAY BE GROUNDS FOR VACATING PREMISES UNTIL ABOVE CONDITIONS ARE MET. I understand and agree to abide by the above conditions for occupancy, use and the issuance of a C.O. for the building identified in the Building Permit. ~\)\~~-~\~ OWNERS IGNATURE Bapplicationdeccmber2007 8/18/08 DATE GARFIELD COUNTY BUILDING AND PLANNING 970-945-8212 MINIMUM APPLICATION REQUIREMENTS FOR CONSTRUCTION OF COMMERCIAL OR MULTI-FAMILY RESIDENTIAL BUILDINGS Including NEW CONSTRUCTION ADDITIONS ALTERATIONS And MOVED BUILDINGS In order to understand the scope of the work intended under a permit application and expedite the issuance of a permit it is important that complete information be provided. When reviewing a plan and it's discovered that required information has not been provided by the applicant, this will result in the delay of the permit issuance and in proceeding with building construction. The owner or contractor shall be required to provide this information before the plan review can proceed. Other plans that are in line for review may be given attention before the new information may be reviewed after it has been provided to the Building Department. Please review this document to determine if you have enough information to design your project and provide adequate information to facilitate a plan review. Also, please consider using a design professional for assistance in your design and a construction professional for construction of your project. Any project with more than ten (10) occupants requires the plans to be sealed by a Colorado Registered Design Professional. To provide for a more understandable plan and in order to determine compliance with the building, plumbing and mechanical codes, applicants are requested to review the following checklist prior to and during design. Plans to be included for a Building Permit must be on draft paper at least 18"x 24"" and drawn to scale. Plans must include a floor plan, a concrete footing and foundation plan, elevations all sides with decks, balcony steps, hand rails and guard rails, windows and doors, including the finish grade and original grade line. A section showing in detail, from the bottom of the footing to the top of the roof, including re-bar, anchor bolts, pressure treated plates, floor joists, wall studs and spacing, insulation, sheeting, house-rap, (which is required), siding or any approved building material. Engineered foundations may be required. Check with the Building Department. A window schedule. A door schedule. A floor framing plan, a roofing framing plan, roof must be designed to withstand a 40 pound per square foot up to 7,000 feet in elevation, a 90 M.P.H. windspeed, wind exposure B or C, and a 36 inch frost depth. All sheets need to be identified by number and indexed. All of the above requirements must be met or your plans will be returned. All plans submitted must be incompliance with the 2003 IBC, !PC, IMC, IFGC, and IFC. Applicants are required to indicate appropriately and to submit completed checklist at time of application for a permit: I. Is a site plan included that identifies the location of the proposed structure, additions or other buildings, setback easements, and utility easements showing distances to the property lines from each comer of the proposed structure prepared by a licensed surveyor and has the surveyors signature and professional stamp on the drawing? Slopes of 30% or more on properties must be show on site plan. (NOTE: Section 106.2) Any site plan for the placement of any pmtion of a structure within 50 ft. of a property line and not within a previously surveyed building envelope on a subdivision final plat shall be prepared by a licensed surveyor and have the surveyors signature and professional stamp on the drawing. Any structure to be built within a building envelope of a lot shown on a recorded subdivision plat, shall include a copy of the building envelope as it is shown on the final plat with the propos¢ structure located within the envelope. Yes..J ---'---- 2. Does the site plan when applicable include the location of the I.S.D.S. (Individual Sewage Disposal System) and distances to the property lines, wells (on subject prope1ty and adjacent properties), streams or water courses? This information must be certified by a licensed surveyor with their signature and professional stamp on the design. j Yes Not necessary for this project __ _ 3. Does the site plan indicate the location and direction of the State, County or private road accessing the propel? Yes 4. Is the I.S.D.S. (Individual Sewage Disposal System) designed, stamped and signed by a Colorado Registered Engineer? . Yes Not necessary for this project.~J~- 2 5. Are the plans submitted for application review construction drawings and not drawings that are stamped or marked identifying them as "Not for construction, for permit issuance only", "Approval drawings only", "For permit issuance only" or similar language? Yes , ( Not necessary for this project __ _ 6. Do the plans include a foundation plan indicating the size, location and spacing of all reinforcing steel in accordance with the building code or per stamped engineered design? Yes __ Not necessary for this projec~ 7. If the building is a pre-engineered structure, is there a stamped, signed engineered foundation plan for this building? Yes c h" . J Not necessary 10r t 1s proJect __ 8. Do the plans indicate the location and size of ventilation openings for under floor crawl spaces and the clearances required between wood and :!h? Yes __ Not necessary for project 9. Do the plans indicate the size and location of the ventilation openings for the attic, roof joist spaces and soffits? Yes __ Not necessary for this projec~ l 0. Do the plans include design loads as required under the IBC or IRC for roof snow loads, (a minimum of 40 pounds per square foot in Garfield County::/ Yes __ Not necessary for this project 11. Do the plans include design loads as required for floor loads under the IBC or IRC? Yes __ Not necessary for this project-J- 12. Does the plan include a building section drawing jndicating foundation, wall, floor, and roof construction? Yes __ Not necessary for this project_v_ 13. Is the wind speed and exposure design included in the plan? Yes __ Not necessary for this project___J_ 14. Does the building section drawing include size and spacing of floor joists, wall studs, ceiling joists, roof rafters or joists or trusses? J Yes ___ Not necessary for this project __ 3 15. Does the building section drawing or other detail include the method of positive connection of all columns and beams? J Yes __ Not necessary for this project __ 16. Does the elevation plan indicate the height of the building or proposed addition from the undisturbed grade to the midpoint between the ridge and eave of a gable or shed roof or the top of a flat roof? (Check applicable zone district for building ,height maximum) Yes __ Not necessary for this project_J_ 17. Does the plan include any stove or zero clearance fireplace planned for installation including make and model and Colorado Phase II certifications or Phase II EPA certification? Yes __ Not necessary for this project_j__ 18. Does the plan include a masonry fireplace including a fireplace section indicating design to comply with the IBC or IRC? Yes __ Not necessary for this project_L 19. Does the plan include a window schedule or other verification that egress/rescue windows from sleeping rooms and/or basements comply with the requirements of the IBC or IRC? Yes __ Not necessary for this projectj~ 20. Does the plan include a window schedule or other verification that windows provide natural light and ventilation for all habitable rooms? J Yes __ Not necessary for this project __ 21. Do the plans indicate the location of glazing subject to human impact such as glass doors, glazing immediately adjacent to such doors; glazing adjacent to any surface normally used as a walking surface; sliding glass doors; fixed glass panels; shower doors and tub enclosures and specify safety glazing for these areas? . Yes __ Not necessaty for this project_j__ 22. Do the plans include a complete design for all mechanical systems planned for installation in this building? Yes __ No Not necessaty for this project j .__,__ 4 23. Have all areas in the building been accurately identified for the intended use? (Occupancy as identified in the IBC Chapter 3) J Yes __ Not necessary for this project. __ _ 24. Does the plan indicate the quantity, form, use and storage of any hazardous materials that may be in use in this building? Yes __ Not necessary for this project_{_ 25. Is the location of all natural and liquid petroleum gas furnaces, boilers and water heaters indicated on the ~~ . Yes __ Not necessary for this project__l__ 26. Do the plans indicate the location and dimension of restroom facilities and if more than four employees and both sexes are employed, facilities for bot~/exes? Yes __ Not necessary for this project 27. Do the plans indicate that restrooms and access to the building are handicapped accessible? Yes ___ Not necessary for this project_j___ 28. Have twJ (2) complete sets of construction drawings been submitted with the application? Yes 29. Have you designed or had this plan designed while considering building and other construction code requ:rments? Yes 30. Does the plan accurately indicate what you intend to construct and what will receive a final inspection by the Gyfield County Building Department? Yes 31. Do your plans comply with all zoning rules and regulations in the County related to your zone district? For comer lots see supplemental section 5.05.03 in the Garfield County Zoning Resolution for setbacks. Yes_J__ 32. Do you understand that approval for design and/or constmction changes are required prior to the implementation of these changes? Yes...J....._ 5 33. Do you understand that the Building Depa1tment will collect a "Plan Review" fee from you at the time of application and that you will be required to pay the "Permit" fee as well as any "Septic System" or "Road,lmpact" fees required, at the time you pick up your building permit? Yes J 34. Are you aware that you are required to call for all inspections required under the IBC including approval on a finJnspection prior to receiving a Certificate of Occupancy and occupancy of the building? Yes 35. Are you aware that the Permit Application must be signed by the Owner or a written authority be given for an A.JJent and that the party responsible for the project must comply with the Uniform Codes? Yes 36. Are you aware that you must call in for an inspection by 3:30 the business day before the requested inspection in order to receive it the following business day? Inspections will be made between 7:30 a.ll). and 3:30 p.m. Monday through Friday. Inspections are to be called in to 384-5003. Yes ..J 3 7. Are you aware that requesting inspections on work that is not ready or not accessible will result in a $50.00 re-inspection fee? Yes_J__ 38. Are you aware that prior to submittal of a building permit application you are required to show proof of a legal and adequate access to the site? This may include (but is not limited to) proof of your right to use a private easement/right of way; a County Road and Bridge permit; a Colorado Dept. of Highway Permit including a Notice to Proceed; a permit fi·om the federal government or any combination. You can coptact the Road & Bridge Department at 625-860 I. See Phone book for other agencies Yes J 39. Do you understand that you will be required to hire a State of Colorado Licensed Electrician and Plumber to perform iftet~l~tions and hookups? The license number will be required at time of inspection. Yes IJ\j t\ 40. Are you aware, that on the front of the building permit application you will need to fill in the Parcell Schedule Number for the lot you are applying for this permit on prior to submittal of the building permJ application? Your attention in this is appreciated. Yes 41. Do you know that the local fire district may require you to submit plans for their review of fire safety issues? J Yes __ (Please check with the building department about this requirement) 6 42. Do you understand that if you are planning on doing any excavating or grading to the property prior to issuan9e of a building permit that you will be required to obtain a grading pe1mit? Yes ~J__ Not necessary for this project __ 43. Did an Architect seal the plans for your commercial project? State Law requires any commercial project with occupancy of more than I 0 persons as per Section I 004 of the IBC to prepare the plans and specifications for the project. / Yes Not Necessary for this project _ ____., ... ,_ __ _ I hereby acknowledge that I have read, understand, and answered these questions to the best of my ability. Phone:970-625-5350 (days); _________ (evenings) Project Name: Williams PCGP-NGL Storage Perimeter Fence Project Address:4289 County Road 215 Parachute, CO 81635 Note: On any of these questions you may be required to provide this information. If required information is not supplied, delays in issuing the permit are to be expected. Work may not proceed without the issuance of the permit. *If you have answered "Not necessary for this project" on any of the questions and it is determined by the Building Official that the information is necessmy to review the application and plans to determine minimum compliance with the adopted codes, please expect the following: A. The application may be placed behind more recent applications for building permits in the review process and not reviewed until required information has been provided and the application rotates again to first position for review. B. Delay in issuance of the permit. C. Delay in proceeding with construction. BpcommDec2007 7 November 4, 2005 Mr. Mark Bean Director Garfield County Building and Planning Department 108 Slh Street, Suite 201 Glenwood Springs, CO 81601 Dear Mr. Bean, EXPLORATION &: PRODtJCnON IOS8CRI2JS P. 0. Box 370 Puxln,.,, CO 8t63S.0370 '170/:JB'>-9377 970/28).9S73 fax By this letter Williams Production RMT Co. authorizes PVCMI-Land Planning Division to represent us in any and all matters related to the special use permit application known as Williams Production RMT Co.-Parachute Creek Gas Plant Expansion Phase 3. This includes the preparation and submission of documents associated with the land use . application and representation of this application before the applicable appointed and elected boards. Sincerely, ~-C.~ Mr. Steve Soychak Williams Production RMT Co. 1111 WJI\'~N~HIU~I,N! ,1-tn':W~~!i«,IIUII IIIII Recept1on#: 732470 09/06/2007 01:19:00 PM Jean Alberico 1 of 3 Reo Fee:$0.00 Doo Fee:0.00 GARFIELD COUNTY CO ADMINISTRATIVE PERMIT for Williams Field Services Co., LLC [Parachute Greasewood Express Pipeline] In accordance with and pursuant to Section 9.07 of the Garfield County Zoning Resolution of 1978, as amended, and Resolution No. 2005 -53 of the Board of County Commissioners of Garfield County, State of Colorado, the Director of the Building and Planning Department hereby authorizes, by Administrative Permit, the following activity: The construction of a 7.2 mile, 6-inch and 8-inch natural gas pipeline and the Parachute Natural Gas Liquids Facility located approximately 3.8 miles northwest of the Town of Parachute, Colorado. The Administrative Permit is issued subject to the conditions set forth in Exhibit A (attached hereto), and shall be valid only during compliance with such conditions and other applicable provisions of the Garfield County Zoning Resolution, Subdivision Regulations, Building Code, and other regulations of the Board of County Commissioners of Garfield County, Colorado. BUILDING AND PLANNING DEPARTMENT, GARFIELD COUNTY, COLORADO Director EXHIBIT A ADMINISTRATIVE PERMIT 1. Any equipment used in construction or operation of a pipeline must comply with the Colorado Oil and Gas Conservation Commission Rules and Regulations, Section 802, Noise Abatement. Additionally, all power sources used in pipeline operations sball have electric motors or muffled internal combustion engines. 2. . Pipeline operations shall be located in a manner to minimize their visual impact and disturbance of the land surface. Facilities sball be painted in a uniform, non- contrasting, non-reflective color, to blend with the adjacent landscape. Right-of-way sball be located in existing disturbed areas unless safety or visual concerns or other adverse surface impacts clearly dictate otherwise. 3. All access and oversize or overweight vehicle permits shall be obtained from the County Road & Bridge Department prior to beginning operation. Any new roads or intensified driveway accesses created as a result of the pipeline construction, intended to be permanent for maintenance and repair operations sball be placed behind a locked gate or other barriers preventing use by recreational vehicles. Any gates or barriers need to be consistent with the surface owner's preferences. 4. All vehicles working within Garfield County Right of Ways will be licensed and registered in the State of Colorado. All vehicles hauling equipment and materials for the pipeline construction will abide by Garfield County Road & Bridge Departments oversize/ overweight regulations. All vehicles requiring an oversize/ overweight permit will send a letter showing proof that they can operate under a known bond holder on file with Garfield County Road & Bridge Department before a permit will be issued. 5. Any proposed waste disposal or treatment facilities shall comply with all requirements of the County Individual Sewage Disposal System Regulations. 6. The Applicant shall provide the County with a revegetation security for fee lands in the amount of $185,000 for 74 acres disturbed prior to issuance of the pipeline permit. Additionally, the Applicant shall submit the original tags from each seed bag. The seed mix in the Plan sball match the seed mix used in the field. Seed mix containing yellow sweet clover (Melilotus offcinalis) or annual yellow sweetclover (M. indicus) sball not be used. The amount of seed specified to be planted in the Plan sball match the quantity of seed used in the field. The security sball be held by Garfield County until vegetation has been successfully reestablished according to the Reclamation Standards in the Garfield County Weed Management Plan. It is the responsibility of the applicant to contact the County, upon successful revegetation establishment, to request an inspection for security release consideration. 7. The Applicant shall remove all Tamarisk or Russiao-Olive within 100 feet of the construction right-of-way. 8. The Applicant shall power wash all off-road major construction equipment (graders, dozers, etc) used in areas of mapped noxious weeds before leaving off site. A designated washing station should be established to rernove seeds, soil, and vegetative matter. 9. The Applicant shall provide construction details of boring the pipeline beneath creeks or drainage ways. 10. The Applicant shall provide the County with a digital alignrnent of the pipeline once constructed in a format readable to the County. 11. In no case shall an operator engage in activities which irnpact Federal or State threatened and endangered species. 12. Ait contaminant emissions shall be in compliance with the applicable perrnit and control provisions of the Colorado Ait Quality Control Program. Title 25, Resolution 7, C.R.S. 13. All operations shall comply with all applicable Federal and State Public Health and Environment, Noise, and Ait and Water Quality Control standards. 14. Any proposed waste disposal or treatment facilities shall comply with all requirements of the County Individual Sewage Disposal System Regulations. 15. Should an abandoned pipeline be removed, it will be subject to the original revegetation and weed management requirements in the original application. Jim Wilson From: Sent: To: Cc: Subject: Attachments: Jim, Phil Vaughan [phil@pvcmi.com] Tuesday, May 12, 2009 9:05AM Jim Wilson 'Fiore, Tom (E&P)' Fence Permits 1 0760 and 11104 GarcoRes2006-19WilliamsPCGP-Ph3SpeciaiUsePermit.pdf; Parachute Greasewood Express Pipeline-Garfield County Admin Permit-Signed and Recorded.pdf Thanks for taking time to speak yesterday. As we discussed, each of the fence locations were reviewed by the Grand Valley Fire Protection District in their reviews of the respective land use applications. Permit 10760 fence location was approved via the Special Use Permit for the Parachute Creek Gas Plant-Phase 3. This SUP number is 2006-19 and is attached for your files. Permit 11104 fence location for the NGL storage area was approved via the Pipeline Administrative Permit for the Parachute Greasewood Express Pipeline. This administrative permit is attached for your files. Thanks again for your assistance and please contact me with questions. Sincerely, Phil Vaughan Phil Vaughan Construction Management, Inc. 1038 County Road 323 Rifle, CO 81650 970-625-5350 1 N 11104 0. --------------------Assessor's Parcel No. 2171-332-00-019 Date 9/15/2008 BUILDING PERMIT CARD Job Address ____ _:4:.::2:::8::.9.:C:.:.R.:.:2=.1.:..:5:.c,..:.P-=a.:..:ra:..:c:.:.h:.:uc::te=----------------------------'--------------------- Owner __________ W_i_ll--'ia_m_s __ P_ro_d_u_c_ti_o_n_R_M_T _____ Address 4289 CR 215, Parachute Phone # 625-5350-Phil Contractor owner Address Phone # ________ __ Setbacks: Front __________ Rear __________ RH __________ LH~--------Zoning ________ __ 8' perimeter security fence Soils Test------------------------ Footing ------------------------- Foundation ______________________ _ Grout ________________________ ___ Underground Plumbing ____________ __ Rough PI umbi ng ----------------- Framing ________________________ _ Insulation ------------------------ Roofing ------------------------- Drywall------------------------ Gas Piping ----------------------- INSPECTIONS NOTES Weatherproofing----------------------- Mechanical __________________________ _ Electrical Rough (State)------------------- E I ectri Q.§l Final (State l-----------------=__,-.,---.,., Finai.5=/Z"-o/ /ChecklistCqmpleted? 9'«/ Certificate Occupancy# _.=VV.L/,..1&.__ __________ _ Date-------=,...-----------------Septic System # ----------------------- Date ------------------------- Final ________________________ _ Other ____________________________ _ (continue on back)