HomeMy WebLinkAboutApplicationGarfield Comity
Community Development Depa$i
108 8th Street, Suite 401
Glenwood Springs, CO 81601
(970) 945-8212
www.garfield-countv.com
BUILDING PERMIT
APPLICATION
TYPE OF CONSTRUCTION
Property Owner: R B /.i(j i F S . .1 nl (, Phone: (4:7-70), -1- s- S-rJ
-
❑ Commercial/Multi-Family
0
Demolition
❑ Manufactured Home (Single or Multi -Level)
cis— 5-c-5-0
Z. -
Mailing Address: Pro . 3e)X 1q s i E2 GL/5' i
M' Residential (SF, Duplex or Townhome)
0
Reroof
INVOLVED PARTIES
Property Owner: R B /.i(j i F S . .1 nl (, Phone: (4:7-70), -1- s- S-rJ
Mailing Address: P. 0 ./ i t--px (' ', 7 %W9 , COL g / 6,0
Contractor: R 13 go n 1,----5-- / f At ('
Phone:
(9
(q 7t ) q
cis— 5-c-5-0
Z. -
Mailing Address: Pro . 3e)X 1q s i E2 GL/5' i
9 ( (,(3
Architect:
Architect: j U k' ) i? 41 /- i ( M C)
Phone:
( 77/0) '7
9 —146 7()
9 1 Ai 7
Mailing Address: P, (i, /3 Ox 7 // /-_::.7/A., (A5'Te
F_ , CO,
Engineer: . ( ► / /1: . s A. -hone:
(U1)
'3 1 0
9,84i 0 3 i G
Mailing Address: Z 3 C.
, I J 1) fl (/k S T,
4 (,c./�i (0 A l
r
Manufactured Home Installer:
Mailing Address:
Phone:
( )
PROJECT NAME AND LOCATION
Describe Work: i '
'lkt\.l—
-
Job Address: 1 ✓! °:c -fir A ad 7- ppt c I.77 IQiii d- (- . T/. ; CO.
Assessor's Parcel Number:.i
Owner's Valuation
Sq. Ft. of Building:
/
'Z j Z��� � 3 Sub. �I L�� A�G� 1� � lot T Block
of Work: $
26/ 6
c7 `
1 Z' G o CI) Property
Size (Sq. Ft. or Acres):
# of Floors: 2
/ i
,
41 Height: 2. 0
-
Class of Work:
JILNew
0 Alteration
• Addition
0 Repair
0 Move/Relocation
Garage:
fKAttached
•
Detached
Septic:
• OWTS
) Community
Type of Heat:
0 Natural
Gas • Propane
jliE Electric
0 Other
Driveway Permit:
AltExempt
•
Permit #:
01
NOTICE
Authority. This application fora Building Permit must be signed by the Owner of the property, described above, or
an authorized agent. If the signature below is not that of the Owner, a separate letter of authority, signed by the
Owner, must be provided with this Application.
Legal Access. A Building Permit cannot be issued w:thout proof of legal and adequate access to the property for
purposes of inspections by the Building Division.
Other Permits. Mutt:p;e separate permits may be required: (1) State Electrical Permit, (2) County OWTS Permit,
(3) another permit required for use on the property identified above, e.g. State or County Highway/ Road Access or
a State Wastewater Discharge Permit.
Void Permit. A Building Permit becomes null and void if the work authorized is not commenced within 180 days of
. the date of issuance and if work is suspended or abandoned for a period of 180 days after commencement.
CERTIFICATION
1 hereby certify that I have read this Application and that the information contained above is true and correct. I
understand that the Building Divis on accepts the Application, along with the plans and specifications and other
data submitted by me or on my behalf (submittals), based upon my certification as to accuracy. Assuming
completeness of the submittals and approval of this Application, a Building Permit will be issued granting
permission to me, as Owner, to construct the structure(s) and facilities detailed on the submittals reviewed by the
Building Division. In consideration of the issuance of the Building Permit, I agree that I and my agents will comply
with provisions of any federal, state or local law regulating the work and the Garfield County Building Code, OWTS
regulations and applicable land use regulations (County RegulaVon(s)). I acknowledge that the Building Permit
may be suspended or revoked, upon notice from the County, if the location, construction or use of the structure(s)
and facility(ies), described above, are not in compliance with County Regulation(s) or any other applicable law.
I hereby grant permission to the Building Division to enter the property, described above, to inspect the work. I
further acknowledge that the issuance of the Building Permit does not prevent the Building Official from: (1)
requiring the correction of errors in the submittals, if any, d°scovered after issuance; or (2) stopping construction
or use of the structure(s) or facility(ies) if such is in v"olation of County Regulation(s) or any other applicable law.
Review of th;s Application, including submittals, and inspections of the work by the Building Division do not
constitute an acceptance of responsib°lity or liability by the County of errors, omissions or discrepancies. As the
Owner, I acknowledge that responsibility for compliance with federal, state and local laws and County Regulations
rest with me and my authorized agents, including without limitation my architect designer, engineer and/ or
builder.
I hereby acknowledge that I have read and understand the Notice and Certification above, as well as,
have provided the required informati which is correct_aq accurate to the best of my knowledge.
17: VP
Property Owner Print and sign
OPPTCIAi O E,OiS ty,
Special Conditions:
Vaa /9 (zo/i
D
Adjusted Valuation:
/4?, 99o. iso
Total Fees:
2037.0/
Plan Check Fee:
$oz. ¢G
Permit Fee:
i2- 3 ¢.5.,C
Manu home Fee:
Setbacks:
Z5 -_,/o
Fees Paid. Balance Due:
OCC Group:
Const
BP No:
Misc Fees:
OWTS No:
ype: Zoning:
BUILDING / PLANNING DIVISION :
Signed Approval
331�b
Date
` �S i8 0/./
7a,Q /i
pp69 [D
Garfield County
Community Development Department
108 8th Street, Suite 401
Glenwood Springs, CO 81601
(970) 945-8212
www.garfield-county.com
SINGLE FAMILY OR DUPLEX;
BUILDING PERMIT
APPLICATION CHECKLIST
SINGLE FAMILY OR DUPLEX BUILDING PERMIT APPLICATION CHECKLIST
In order to understand the scope of work intended and to expedite the issuance of a permit, it is
important that complete information be provided. Please review this document to determine if you have
adequate information to design your project and to facilitate a plan review.
APPLICATION FORM: Please make sure the following information is provided on the application.
• Parcel number obtained from the County Assessor's Office.
• Job address (assigned physical address)
• Legal Description: lot, block, filing, subdivision or tract, section, township and range.
• Owners name, mailing address, phone, fax or cell.
• Contactors name, mailing address, phone, fax, or cell.
• Architect/Engineer's name, mailing address, phone, fax or cell.
• Building size, height, number of stories and lot size.
• Use of building (Residential).
• Class of Work (New, Addition, Alteration, Repair, Demo, Move/ Relocation).
• Detailed description of work.
• Type of heating (natural gas, propane, electric, other).
• Sewer system (Community or OWTS), also see other items below.
• Garage (Attached or Detached).
• Driveway permit (please see other items below).
• Valuation (labor and materials), see attached worksheet.
OTHER ITEMS:
• If you anticipate obtaining a water -tap from the City of Rifle, please provide a letter indicating that
the City will provide water service. Required to submit building permit application.
• OWTS requires a septic permit application to be submitted with the building permit application.
• A separate electrical permit must be obtained from the State of Colorado Electrical Board.
• At the time of building permit submittal, you are required to show proof of legal and adequate
access to the site. This may include proof of right to use a private easement, County Road &
Bridge permit, or Colorado Department of Highway permit, including a Notice to Proceed. The
County Road & Bridge Department can be reached at 970-625-8601.
• If you anticipate excavating or grading prior to issuance of a building permit, you will be required
to obtain a separate grading permit.
• if you belong to a Homeowners Association (HOA), it is your responsibility to obtain written
approval, if required.
• Provide copies of any Resolutions and/or Land Use Permits associated with this property.
• Additional Dwelling Units may require Administrative Review.
• Minimum dwelling dimension is 20 ft wide x 20 feet long.
• A Colorado State Licensed Electrician and Plumber must perform installation and hook-ups,
unless the homeowner is performing the work.
and/or plans for compliance, the application may be placed on hold until the required information is
provided. Work may not proceed without the issuance of a permit.
The Building Division will collect a Plan Review fee at time of application submittal. The permit fee, as
well as, any Septic or Road Impact fees will be collected when the permit is issued.
The permit application must be signed by the owner or by person having written authority from the owner
to act as their representative.
Building cannot be occupied until a Certificate of Occupancy (CO) is issued. Using the building without a
CO will be considered an illegal occupancy and may be grounds for vacating the premises. (Final/CO
inspection requirements will be attached to your approved field set of plans.)
I hereby acknowledge I have read, understand and will abide by the requirements of this
checklist.
Property Owner Print n
Date
(/Q /G
Garfield County
Community Development Department
108 8th Street, Suite 401
Glenwood Springs, CO 81601
(970) 945-8212
www.earfield-countv.com
Applicant:
Job location:
Sub-Lot/Block:
BUILDING PERMIT
FEE ESTIMATE
WORKSHEET
RB Homes, Inc
131 Riverboat Dr. New Castle
Riverbend Lot # 9
Fill ONLY in the yellow areas
Type of Space Square Feet Value
per sq. ft.
Finished Living Space
(N/fl Pr Manufactured Homes)
Unfinished Basement
Crawl Space
Garage
Covered Patio/Deck
Uncovered Patio/Deck
Misc:
Misc:
Misc:
Total Valuation
Manufactured Home Set -Up
Single level ($400.00)
Multi -Level ($600.00)
Total Set -Up Fee
1710
754
143
sq ft X
sq.ft X
sq ft X
sq ft X
$74.68
$41.00
$9.00
$18.00
sq ft X $24.00 $0.00
sq ft X $12.00 $1,716.00
sq ft }( .— �... _... $0.00 $0.00
sq ft X _ $0.00 $0.00
sq ft X
$142,990.80
Valuation
$127,702.80
$0.00
$0.00
$13,572.00
Valuation
$0.00
Septic
Permit ($123.00)
Percolation ($150.00)
Total Septic Fee
Valuation
$0.00
Total fees
This section will be determined by Garfield County.
Plan Review Fee
Building Permit Fee
Pay separately with Cavia or Check only (Road impact fees )- Other
Due at time of Application Submittal $0.00
Due at time of Permit Pick -Up $0.00
$0.00
Garfield Caun;y
Min / Zonin Rev a Che est
Permit Number:
Building
Engineered Foundation
Driveway Permit
Surveyed Site Plan
Septic Permit and Setbacks
Grade/ Topography 30%
/ Attach Residential Plan Review List
Subdivision Plat Notes
N/A Fire Department Review
Valuation Determination/ Fees
Red Line Plans/ Stamps/ Sticker
N//
P/A
Attach Condtions
Application Signed
Plan Reviewer to Sign Application
Parcel/ Schedule No.
401'# Snowload tetter-- Manu. Homes
Soils Report
Planning/ Zonin&
Property Line Setbacks
30 ft. Stream Setbacks
Flood Plain
Building Height
Zoning Sign -Off
N//1
Road Impact Fees
/ Grade/ Topography 40;0
Planning Issues
Subdivision Plat
General Comments: