Loading...
HomeMy WebLinkAboutApplication- PermitJob Address «'Sao Nature of Work Use of Building Owner No. 7573 GARFIELD COUNTY BUILDING, SANITATION, and PLANNING DEPARTMENT 109 8th, Street, Suite 303 Glenwood Springs, CO 81601(970) 945-8212 Building Permit Contractor Amount of Permits t2! 7 7 - r 6 Date /9,017. as peet,ik C,Lek be -e.-= '7,71 oZ 7c/ •`fro Clerk yn fit, aa�,� GARFIELD COUNTY BUILDING PERMIT APPLICATION TELEPHONE: (970) 945-8212 • GARFIELD COUNTY (OLENWOOD SPRINOS), COLORADO PERMIT NO. 153 INSPECTION LINE: (970)354-5003 PARCEL/SCHEDULE NO. JOB ADDRESS: f�' a. o C 1 z- 3-1Z) k(--4-:1-. . C-ok.so I LOT NO. yo BLOCK NO. SUBDIVISION/EXEMPTION/1, /I / jl �j'chid 2 „4 J. 1/ ADDRESS 5-75'3 e,e 3,2 d zia's„ l�/5' - - Pid. i /j7.5' 3 CONTRACIUR ADDRESS PH: LIC. NO: 4 ARORMTAINOINEER ADDRESS M(: LIC NO: 5 IQ 1 /S77 /./d,A, )0(431 •z.--- y3S d oa (" NO. OF I o 6 WE OP eOEnwO 7 Dna= wink /dem.., C otirk &d i a w 8 CLASP OF WORK: PrIEW oADDMON M1.YERATION DMOVE DLENOVE 9 GARAGE: maw CARPORT: OOwarZ ODOVBLE 10 .11.111 _ /f_ O DRIVEWAY Mb= N� I' NM IMAGE DEPOSAL DIERI) R18 PLAN VALVAMON OR WOR[: $ �7 6. D D O AMSTED VALTIMION:$ /1/(697,ti, I `r.OSPECIAL CONDITIONS.!DC NOTICE A SEPARATE ELECTRICAL PERMIT IS REQUIRED AND MUST BE ISSUED BY THE STATE OF COLORADO. THIS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUCTION AUTHORIZED IS NOT COMMENCED WITHIN 110 DAYS, OR W CONSTRUCTION OR WORK 1S SUSPENDED OR ABANDONED FOR A PERIOD OF 110 DAYS AT ANY TIME AFTER WORK IS COMMENCED. I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW 71111 SAME TO BE TRUE AND CORRECT. ALL PROVISIONS OF LAWS GOVERNING THIS TYPE OF WORK WILL BE COMPLIED WITH WHETHER SPECIFIED HEREIN OR NOT. THE GRANTING OF A PERMIT DOES NOT PRESUME TO GIVE AUPHDRTIY TO VIOLATE OR CANCEL THE PROVISIONS OF ANY OTHER STATE OR LOCAL LAW REGULATING CONS UCTION OR TIE PERFORMANCE OF CONSTRUCTION. DRt 4 o ././.F/././.F/244013 PLAN CHECK FE.EEE % 7 r/ 77/ 1 ! / PERMIT/ FEB: ,:T / a a 7 ., 3 TOTAL. / i/, rJ ` DATE PERMIT ISSUED: T 7 LP ;GROUP: CONST: TYPE: -. ZONING: SETBACKS: Skeeter. ofOwDar .antrRoWr or .... ,.. ESent aed . ... f• .. notice dom. I ' jJ 4+ ( /11 MANU. HOME: - ISDS NO. $ FEEL J 1 % . ? i . # pep,. Approveldhte .. , . sri to Phi AGREEMENT PERMISSION IS HEREBY GRANTED TO THE APPLICANT AS OWNER, CONTRACTOR AND/OR THL AGENT OF THE CONTRACTOR OR OWNER TO CONSTRUCT THE STRUCTURE AS DETAILED ON PLANS AND SPECIFICATIONS SUBMITTED TO AND REVIEWED BY THE BUILDING DEPARTMENT. 3..31 F 111 CONSIDERATION OF THE ISSUANCE OF THIS PERMIT, THE SIGNER HEREBY AGREES TO COMPLY WITH ALL BUBDING CODES AND LAND USE REGULATIONS ADOPTED BY OARFIEID COUNTY PURSUANT TO AUTHORITY (EVEN LN 30.2E201 CRS AS AMENDED. 1118 SIGNER FURTHER AGREES THAT IF THE ABOVE SAID ORDINANCES ARE NOT FULLY COMPLIED WITH TN THE LOCATION, ERECTION, CONSTRUCTION AND USE OP THE ABOVE DESCRIBED STRUCTURE, THE PERMIT MAY THEN BE REVOKED BY NOTICE FROM 'THE COUNTY AND THAT THEN AND THERE TT SHALL BECOME NULL AND VOID. THE ISSUANCE OF A PERMIT BASED UPON PLANS, SPECIFICATIONS AND OTHER DATA SHALL NOT PREVENT THE BUILDING OFFICIAL FROM THEREAFTER REQUIRING 1118 CORRECTION OF ERRORS IN SAID PLANS, SPECIFICATIONS AND OTHER DATA OR FRO PREVENTING BUILDING OPERATION BEING CARRIED ON THEREUNDER WHEN IN VIOLATION OF TEES CODE OR ANY OTHER ORDINANCE OR REGULATION OF THIS JURISDICTION. 1118 REVIEW OF THE SUBMITTED PLANS AND SPECIFICATIONS AND INSPECTIONS CONDUCTED THEREAFTER DOES NOT CONSTITUTE AN ACCEPTANCE OF ANY RESPONSIBILITIES OR LIABILITIES BY GARFIELD COUNTY FOR ERRORS, OMISSIONS OR DISCREPANCIES. THE RESPONSTBILTI Y FOR THESE ITEMS AND IMPLEMENTATION DURING CONSTRUCTION RESTS SPECIFICALLY WILT THE ARCHITECT, DESKENER, BUILDER AND OWNER. COMMENTS ARE INTENDED TOM CONSERVATIVE IN SUPPORT OF THE OWNERS INTEREST. / /f ORrfo�oo3 1 HEREBY ACKNOWLEDGET[TAT I HAVE READ AND UNDERSTAND THE A(IREEMENT ABOVE. fIPIfITAI.i .S i i 7�! ,�,0t:Jd v„,,c ig..340101 6t, The following items are required by Garfield County for a final inspection: 1. A final Electrical Inspection from the Colorado State Electrical Inspector; 2. Permanent address assigned by Garfield County Building Department posted where readily visible from access road; 3. A finished roof, a lockable house, complete exterior siding, exterior doors and windows installed, a complete kitchen with cabinets, a sink with hot & cold running water, non-absorbent kitchen floor coverings, counter tops and finished walls, ready for stove and refrigerator, all necessary plumbing; 4. A complete bathroom, with wash bowl, tub or shower, toilet stool, hot and cold running water, non-absorbent floors and walls finished and a privacy door; 5. All steps outside or inside over three (3) steps must have handrails, guard rails on balconies or decks over 30" high constructed to all 1994 UBC requirements; 6. Outside grading done to where water will detour away from the building; 7. Exceptions to the outside steps, decks and grading may be made upon the demonstration of extenuating circumstances, i.e. weather, but a Certificate of Occupancy will not be issued until all the required items are completed and a final inspection made. A CERTIFICATE OF OCCUPANCY WILL NOT BE ISSUED UNTILL THE ABOVE ITEMS HAVE BEEN COMPLETED. ****CANNOT OCCUPY OR USE DWELLING UNTIL A CERTIFICATE OF OCCUPANCY (C.O.) IS ISSUED. OCCUPANCY OR USE OF DWELLING WITHOUT A C.O. WILL BE CONSIDERED AN ILLEGAL OCCUPANCY AND MAY BE GROUNDS FOR VACATION PREMISES UNTIL ABOVE CONDITIONS ARE MET. I understand and agree to abide by the above conditions l'or occupancy use and the issuance of a Certificate of Occupancy for the dwelling under building permit # Signa bpcont Date 4 artrol.A—. C.) , , 04/4.4e,e- JOIX.g? f7C476 / Z° _La 1/3 460,00 .408v4ftkaV1P..01X271 gi# OalPreDthie (Jiet 10," _titr t /lc 7 8* 6. 4 d_s_ Ho fa _dede-r-4,v-cof 4,tfa`=:•7,?* -2e-a_ I 7.13%ao ijA27,gt reeem 7 9 7, 7/ 004', / ie 7,47.0.00 ••0.• 15,660.00 + 40)020000 + 110,262.00 + 1,728.00 + 167,670•00 * 1. Is a site plan included that indicates the distance of the proposed building or addition to property lines, other buildings, set back easem nts and utility easements? Yes No cu Not necessary for this project (2) 2. Does the site plan include the location of the 1.S.D.S. (Individual Sewage Disposal System) and the distances to property lines, wells (on subject property and adjacent properties) , streams or water courses? Yes _y_ No Not necessary for this project (2) 3. Does the site plan indicate the location and direction of the County or private road accessing the property? Yes r.i_ No co Not necessary for this project (2) 4. Do the plans include a foundation plan indicating the size, location and spacing of all reinforcing steel in accordance with the uniform building. code or per stamped engineered design? Yes ✓ No a) . Not necessary for this project (2) 5. Do the plans indicate the location and size of ventilation openings for under floor crawl spaces and the clearances required between wood and earth? Yes _Z___ No 0) Not necessary for this project m 6. Do the plans indicate the size an location of ventilation openings for the attic, roof joist spaces and soffits? Yes _,..i/ No w Not necessary for this project (2) 7. Do the plans include design loads as required under the Uniform Building code for roof snow loads, (a minimum of 40 pounds per square foot in Garfield County) floor loads and wind loads? Yes _ .. No (1) Not necessary for this project (2) 8. Does the plan include a building section drawing indicating foundation, wall, floor and roof construction? Yes v No (i) Not necessary for this project c2r 9. Does the building section drawing include size and spacing of floor joists, w 11 studs, ceiling joists, roof rafters or joists or trusses? Yes ... No u) Not necessary for this project (2) 10. Does the building section drawing or other detail include the method of positive connection of all columns and beams? 2 ri Yes 1/ No (1) Not necessary for this project n► 11. Does the plan indicate the height of the building or proposed addition from the highest point of the building or addition measured at mid span bejween the ridge and the eave down to existing grade contours? Yes ...Z..._ No (1) Not necessary for this project 9► 12. Does the plan include any stove or zero clearance fireplace planned for installation including make and model and Colorado Phase II certifications or phase II EPA certification? Yes No ✓ ci Not necessary for this project (2) 13. Does the plan include a masonry fireplace including a fireplace section indicating design to comply with the Uniform Building Code Chapter 37? Yes _ No ✓ (l) Not necessary for this project a► 14. Does the plan include a window schedule or other verification that egress/rescue windows from sleeping rooms and/or basements comply/with the requirements of the Uniform Building Code? Yes _Y_..... No ____0) Not necessary for this project c2► 15. Does the plan include a window schedule or other verification that windo,s provide natural light and ventilation for all habitable rooms? Yes No a) Not necessary for this project 01 16. Do the plans indicate the location of glazing subject to human impact such as glass doors, glazing immediately adjacent to such doors; glazing adjacent to any surface normally used as a walking surface; sliding glass doors; fixed glass panels; shower doors and tub enclosures 'and specify safety glazing for these areas? Yes ✓ No a, Not necessary for this project (2) 17. Is the location of all natural and liquid petroleum gas furnaces, boilers and water heaters indicated on the plan? Yes ✓ No m Not necessary for this project (2) 18. Have two (2) complete sets of constructions drawings been submitted with the _application? Yes _. No (1) Not necessary for this project (2) 19. Have you designed or had this plan designed while considering buildin and other construction code requirements? Yes _ No (3) 3 20. Does the plan accurately indicate what you intend to construct and what will receive a final inspection by the Garfield Building Departrn.ent? Yes ✓✓ No (3) 21. Do you understand that approval for design and/or construction change are required prior to the application of these changes? 'Yes / No (3) 22. Do you understand that the Building Department will Collect a "Plan Review" fee from you at the time of application and that you'will be required to pay the "Permit Fee" as well as any "School impact" or "Septic system " fees required, at the time you pick up your building permit? Yes w_ No (3) 23. Are you aware that you are required to call for all inspections required under the Uniform Building Code including approval on a final inspection prior to receiving a Certificate of Occupancy and occupancy of the building? Yes 1 No (3) 24. Are you aware that the person signing the Permit Application whether the "Owner", "Agent of the Owner", "General Contractor", "Contractor" or otherwise, signing the application is the party responsible for the project jomplying with the Uniform Codes". Yes No (3) 1 hereby acknowledge that 1 have read, understand and answered these questions accurately to the best of my ability. signatur date Phone: 4,75'-/ec7 5" (days); ZZ %"-• 5' '�P (evenings) Project Name: 4/ %' z .eo" LI / 247 ?g Project Address: 0 513-c2 Ce3.2, 4 INSPECTION WILL NOT BE MADE UNLESS 1 THIS CARD IS POSTED ON THE JOB I 24 HOURS NOTICE REQUIRED FOR INSPECTIONS BUILDING PERMIT GARFIELD COUNTY, COLORADO Date Issuedlul"" Zoned Area Permit No V. 15 # AGREEMENT In consideration of the issuance of this permit, the applicant hereby agrees to comply with all laws and regulations related to the zoning, location; construction and erection of the proposed structure for which this permit is granted, and further agrees that if the above said regulations are not fully complied with in the zoning, location, erection and construction of the above described structure, the permit may then be revoked by notice from the County Building Inspector and IMMEDIATELY BECOME NULL AND VOID. Use bOQR‘k r A(20,6 Address Legal Description Owner V ckQ' Contractor Setbacks Front Side Side Rear This Card Must Be Posted So It is Plainly Visible From The Street Until Final Inspection. INSPECTION RECORD Footing 5-_ /0_00 Foundation s -__/s- _ to Underground Plumbing .g , Insulation /0 4_,c1-1 Rough Plumbing r.../ 2 Drywall u-ze- do i Chimney & Vent 1(7/7 Electric Final (by State Inspector) 4.. ...0( Gas Piping _/ 7.� 1, Final S -I $-.01 Electric Rough (By Stat nspector) 'f j ' 'Septic Final Framing ' j'-5{- a, (To include Roof in place and Windows and Doors installed). Notes: ALL LISTED ITEMS MUST BE INSPECTED AND APPROVED BEFORE COVERING - WHETHER INTERIOR OR EXTERIOR, UNDERGROUND OR ABOVE GROUND. 003 THIS PERMIT IS NOT TRANSFERABLE Phone1l11r 109 8th Street County Courthouse Glenwood Springs, Colorado. DO NOT DESTROY THIS CARD APPROVED Dat = 0 By� C IF PLACED OUTSID - CO ER WITH CLEAR PLASTIC