Loading...
HomeMy WebLinkAboutApplication - PermitI Garfield County Building & Planning Department 108 8th Street, Suite #401 Glenwood Springs, Co. 81601 Office:970·945-8212 Fax: 970-384-3470 Inspection Line: 970-384-5003 Building Permit No. Parcel No: 2395-013-28-246 Locality: Job Address: 0934 River Bend GWS ----------···----·~~~-~--~~~~c~~--------------------- Owner: Bill & Juanita Contractor: Hansen Construction Fees: Plan Check: -~----1,_184.66 Septic: Bldg Permit: $ 1,822.55 RFTA: $ 750.00 -···-------~·-··--.. ~-·--- Total Fees: _!_~,757.21 Clerk: Date: I V\0odeJ *-3\D\-A si""".fl(\::::::; s eFJ r-. 0 GARFIELD COUNTY BUILDING PERMIT APPLICATION -y 't::.><....J I 08 8111 Street, Suite 40 I. Glenwood Springs. Co 8160 I 2 Phone: 970-945-8212 I Fax: 970-384-3470 /Inspection Line: 970-384-5003 \V\VW .gar[teld~county .com Authority. 1l1is application for a Building Pcnnit must be sig,ncd by the I' h property. above. or an authorized agent. lfthc signature below is 1101 that of the Owner. a separate letter of authority. signed by the Owner. must be provided with this Applicmion. Legal Access. A Building Permit !.-'annot be issued without proof of legal and adequate access to the propc11y for ptnvoses of inspections by the Bui!dint; Department OtltCI' Permits. Multiple separate permits may be rcqttircd: ( 1) State Electrical Permit. (2) County !SDS Permit_{:>) another penn it t•equircd for usc on the property identified above. e.g.. Stnte 01 County Highway/ Road Access or a State Wastewater Discharge Perlllit. Void Pel'mit. A Buildi11g Permit becomes null and void if the work authorir-ed is not com111enccd within 180 days of the date of issuance and if work is suspended ol' abando11ed fnr a period of ISO days after cotmnenccment. CERTIFICATION 1 hereby certifY thnt I have read this Application and that the information contained above is true and correct. ! understand that the Building Department accepts the Application. along with the plans and specifications and other data submitted by me or 011 my behalf (submi!tllls). based upon my certification :1s to accurllcy. Assuming completeness oft he submittals and npproval of this ApplicatioH. a Building Permit will be issued granting permission to me. as Owner. to construct the StJ'ucture(s) and facilities dctaikd on the submittals reviewed by the Building Depat1mcnt. In consideration oft he issuance of the Building Permit. I agree that I and my agents will comply with provisions of any federaL swte or !\)Cal law regulating the work and the Gf\l'field County Building Code. lSDS regulations and applicable hmd usc regulations (County Rcgulation(s)). I acklwwledgc that the l~uilding Permit may be suspended or revoked. upon n01icc fi·omthc CO\lllty. if the locntion. construction or \tSC of the structurc(s) lllld facility(ics). described above. nrc not in compliance with Cou111y Rcgulation(s) or any other applicable law, 1 hereby grfllll permission to the Building Dcpllrtment to enter the property. dc,scribcd above. to inspect the work. I fl!rther acknowledge that the issunncc of the Building Permit docs not prcnmt the Building Official fi·om: ( 1) requiring the correction of errors in the submittals. if any. discove1ed after issuance: or (2) stopping. \OonstnJction or usc of the stntcturc(~) or fflci!ity(ies) if such is in violntion of County RCL!tilation(s) or any other applicable lnw. Rc\'iew of this t\pplicntion. including submil!als. ~::':;;;~::;'; by the Building Depanmem do not constitute an acceptance of responsibility or liability by the County ofcrr()rS. omissions or discrcpnncics. As the Owner. I acknowledge h fO' fompli"'" with federal. stntc and local laws and Coumy RcgtJlatioJJS rest with me mtd my autholiv.)d ng<.'llls. inch!ding without limitation my architect designer. n 1 ·and! ! HEREBY ACKNOWLEDGE I STAFF USE ONLY Manu home The following items are required by Garfield County for a final Inspection: 1) A final Electricallnspection from the Colorado State Electricallnspector. 2) Permanent address assigned by Garfield County Building Department and posted at the structure and where readily visible from access road. 3) A finished roof; a lockable building; completed exterior siding; exterior doors and windpws installed; a complete kitchen with cabinets, sink with hot & cold running water, non-absorbent kitchen floor covering, counter tops and finished walls, ready for stove and refrigerator; all necessary plumbing. 4) All bathrooms must be complete, with washbowl, tub or shower, toilet, hot and cold running water, non-absorbent floors, walls finished, and privacy door. 5) Steps over three (3) risers, outside or inside must be must have handrails. Balconies and decks over 30" high must be constructed to alllBC and lRC requirements including guardrails. 6) Outside grading completed so that water slopes away from the building; 7) Exceptions to the outside steps, decks, grading may be made upon the demonstration of extenuating circumstances., i.e. weather. Under such circumstances A Certificate of Occupancy may be issued conditionally. 8) A final inspection sign off by the Garfield County Road & Bridge Department for driveway installation, where applicable; as well as any final sign off by the Fire District, and/or State Agencies where applicable. A CERTIFICATE OF OCCUPANCY (C.O.) WILL NOT BE ISSUED UNTIL ALL THE ABOVE ITEMS HAVE BEEN COMPLETED. A C.O. MAY TAKE UP TO 5 BUSINESS DAYS TO BE PROCESSED AND ISSUED. OWNER CANNOT OCCUPY OR USE DWELLING UNTIL A C.O. IS ISSUED. OCCUPANCY OR USE OF DWELLING WITHOUT A C.O. WILL BE CONSIDERED AN ILLEGAL OCCUPANCY AND MAY BE GROUNDS FOR VACATING PREMISES UNTIL ABOVE CONDITIONS ARE MET. I understand and agree to abide by the above conditions for occupancy, use and the issuance of a C.O. for the building identified in the Building Permit. DATE VALUATION FEE DETERMINATION Applicant Address Date Lar e Subdivision -:;9:;:34~Ri7'v_e_r "'B-en-d"'w=a-y _______ Lot/Block "9.:.;.1c::6::.:.0:..::8'-------------Contractor Finished (Livable Area): Main Upper Lower Other Total Basement: Unfinished Square Feet Valuation Conversion of Unfinished to Finished Total Valuation Garage: Carport: Total Valuation Crawl Space Total Valuation Decks/ Patios Total Covered Open Valuation Type of Construction: Occupancy: Valuation Total Valnation 2080 sq.ft sq.ft sq.ft sq.ft X $74.68 2080 sq.ft 1962 sq.ft X $41.00 sq.ft X $33.68 533 sq.ft X $18.00 sq.ft X $12.00 sq.ft X $9.00 87 sq.ft X $24.00 sq.ftX $12.00 Commercial sf X sf X sf X sf X sf X sf X Iron Bridge 246 155,334.40 80,442.00 9,594.00 0.00 2,088.00 0.00 247,458.40 GARFIELD COUNTY BUILDING AND PLANNING 970-945-8212 MINIMUM APPLICATION REQUIREMENTS For SINGLE FAMILY DWELLING CONSTRUCTION Including NEW CONSTRUCTION ADDITIONS ALTERATIONS And MOVED BUILDINGS In order to understand the scope of the work intended under a permit application and expedite the issuance of a permit it is important that complete information be provided. When reviewing a plan and it's discovered that required information has not been provided by the applicant, this will result in the delay of the permit issuance and in proceeding with building construction. The owner or contractor shall be required to provide this information before the plan review can proceed. Other plans that are in line for review may be given attention before the new information may be reviewed after it has been provided to the Building Department. TWO (2) SETS OF CONSTRUCTION DRAWINGS & TWO (2) SITE PLANS MUST BE SUBMITTEDFOR ALL APPLICATIONS. Please review this document to determine if yon have enough information to design your project and provide adequate information to facilitate a plan review. Also, please consider using a design professional for assistance in your design and a construction professional for construction of your project. Any project with more than ten (10) occupants requires the plans to be sealed by a Colorado Registered Design Professional. To provide for a more understandable plan in order to determine compliance with the building, plumbing and mechanical codes, applicants are requested to review the following checklist prior to and during design. Applicants are required to indicate appropriately and to submit the completed checklist at time of application for a permit. Plans to be included for a Building Permit, must be on drafting paper at least 18"x24" and drawn to scale. Plans must include a floor plan, a concrete footing and foundation plan, elevations all sides with decks, balcony, steps, hand rails and guard rails, windows and doors, including the finish grade line and original grade. A section showing in detail, from the bottom of the footing to the top of the roof, including re-bar, anchor bolts, pressure treated plates, floor joists, wall studs and spacing, insulation, sheeting, house-rap, (which is required), siding or any approved building material. Engineered foundations may be required. A window schedule. A door schedule. A floor framing plan, a roof framing plan, roof must be designed to withstand a 40 pound per square foot up to 7,000 feet in elevation, a 90 M.P.H. wind speed, wind exposure B or C, and a 36 inch frost depth. All sheets to be identified by number and indexed. All of the above requirements must be met or your plans will be returned. All plans submitted must be incompliance with the 2003 IRC. I. Is a site plan included that identifies the location of the proposed structure or addition and distances to the property lines from each corner of the proposed structure(s) prepared by a licensed surveyor and has the surveyors signature and professional stamp on the drawing? Properties with slopes of 30% or greater must be shown on the site plan. (NOTE Section: 106.2) Any site plan for the placement of any portion of a structure within 50 ft. of a property line and not within a previously surveyed building envelope on a subdivision final plat shall be prepared by a licensed sw·veyor and have the surveyor's signature and professional stamp on the drawing. Any structure to be built within a building envelope of a lot shown on a recorded subdivision plat shall include a copy of the building envelope as it is shown on the final plat with the proposed structure located withi+e envelope. Yes 2. Does the site plan also include any other buildings on the property, setback easements and utility easements? Please refer to Section 5.05.03 in the Garfield County Zoning Resolution if the propertyxou ar applying for a building permit on is located on a corner lot. Special setbacks do apply. Yes \ < 3. Does the site plan include when applicable the location of the I.S.D.S. (Individual Sewage Disposal System) and the distances to the property lines, wells (on subject property and adjacent prop*s ), streams or water courses? Yes 4. Does the site plan indicate the location and direction of the County or private road accessing the proper~, Yes;-=- 2 5. Are you aware that prior to submittal of a building permit application you are required to show proof of a legal and adequate access to the site? This may include (but is not limited to) proof of your right to use a private easement/right of way; A County Road and Bridge permit; a Colorado Dept. of Highway Permit, including a Notice to Proceed; a permit from the federal government or any combination. You can contact the Road & Bridge Depat1ment at 625-860 I. See phone book for ~~:~ 6. Do the plans in/tude a foundation plan indicating the size, location and spacing of all reinforcing steel in accord_ap<:e with the IRC or per stamped engineered design? Yes._--f~--- 1 7. Do the plans indicate the location and size of ventilation openings for under floor crawl spaces and the clearances required between wood and earth? Yes 'j-No ____ _ 8. Do the plans indicate the size and location of ventilation openings for the attic, roof joist spaces and soffits? Yes ~ No _____ _ 9. Do the plans include design loads as required by Garfield County for roof snow loads, (a minimum of 40 pounds per square foot up to & including 7,000 feet above sea level), floor loads and wind loads?V Yes._'""~,L--'---- I 0. Does the plan include a building section drawing indicating foundation, wall, floor, and roof construcy? Yes_--;~f--»'---- 11. Does the building section drawing include size and spacing of floor joists, wall studs, ceiling joists, roof ra er or joists or trusses? Yes_+-=---- 12. Does the building section drawing or other detail include the method of positive connection of all columvd beams? Yes~~r-~------ 13. Does the elevation plan indicate the height of the building or proposed addition from the undisturbed grade to the midpoint between the ridge and eave of a gable or shed roof or the top of a ~yoof? (Building height measurement usually not to exceed 25 feet) Yes.-:i~~'------ 14. Does the plan include any stove or zero clearance fireplace planned for installation including make and model and Colorado h se II certifications or phase II EPA certification? Yes No __ ~~---- 3 15. Does the plan include a masonry fireplace including a fireplace section indicating design to comply with the lRC? Yes _____ No_-/-)V ___ _ 7 16. Does the plan include a window schedule or other verification that egress/rescue windows from sleeping rofoi sand/or basements comply with the requirements of the lRC? Yes ---F""-- 17. Does the plan include a window schedule or other verification that windows provide natural light and ventilatio or all habitable rooms? Yes ---t--- 18. Do the plans indicate the location of glazing subject to human impact such as glass doors, glazing immediately adjacent to such doors; glazing adjacent to any surface normally used as a walking surface; sliding glass doors; fixed glass panels; shower doors and tub enclosures and specify safety glazing for these areas? Yes ~ No ___________ _ 19. Is the location of all natural and liquid petroleum gas furnaces, boilers and water heaters indicated on ~=splanf 20. Do you understand that If you are buildmg on a parcel of land created by the exemption process or the subdivision process, are building plans in compliance with all plat notes and/or covenants? Yes ~~---- 21. Do you understand that if you belong to a Homeowners Association (HOA), it is your responsibility to obtain written permission from the association, if required by that association, prior to submitting an application for a building permit? The building permit application will be accepted without it, but you run the risk of the HOA bringing action to enforce the covenants, which can resu It in revocation of permit issued. Additionally, your Plan Review fee is not refundable if the plans have been reviewed by the Building Department prior to any action by the HOA that requires either revoc~i7n or substantial modification of the plans. Yes._-4--1'>------- 22. Will this be th.epnly residential structure on the parcel? Yes ~ No lfno-Explain: ________ _ 7 Yes · 23. Have two (?lete sets of construction drawings been submitted with the application? 24. Do you understand that the minimum dimension a home can be on a lot is 20ft. wide and 201!. long? Yes f 4 25. Have you designed or had this plan designed while considering building and other construction code requirfts? Yes 26. Do your plans comply with all zoning rules and regulations in the County related to your properties zone district? Yes )C 27. Does the plan accurately indicate what you intend to construct and what will receive a final inspection by the Gar 1eld County Building Department? Y es_--'1--~-- 28. Do you understand that approval for design and/or construction changes are required prior to the application of these changes? Yes+-- 29. Do you understand that the Building Department will collect a "Plan Review" fee from you at the time of application submittal and that you will be required to pay the "Permit Fee" as well as any "Road Impact" or "Septic System" fees required, at the time you pick up your building permit? Yes p;_ 30. Are you aware that you must call in for an inspection by 3:30 the business day before the requested inspection in order to receive it the following business day? Inspections will be made from 7:30 a.m. to 3:30 p.m. Monday through Friday. Inspections are to be called in to384-~. Yes~ No _____ _ 31. Are you aware that requesting inspections on work that is not ready or not accessible will result in a $50.00 ~nspection fee? Yes.__,/,___'-___ _ I 32. Are you aware that you are required to call for all inspections required under the IRC including approval on a final inspection prior to receiving a Certificate of Occupancy and occupancy of the building? Yes "jc 33. Are you aware that the Permit Application must be signed by the Owner or a written authority being give~ an Agent and that the party responsible for the project must comply with the IRC? y es._r-1'-c----- 5 34. Do you understand that you will be required to hire a State of Colorado Licensed Electrician and Plumber to perform installations and hookups, unless you as the homeowner are performing the work? The license number of the person performing the work will be required at time of applicable'\n;;pection. Yes----,~~---------/ 35. Are you aware, that on the front of the Building Permit Application you will need to fill in the Parcel/Schedule Number for the lot you are applying for this permit on prior to submittal of a building permit application? Your attention in this is appreciated. Yes ~ 36. Do you know that the local fire district may require you to submit plans for their review of fire safety issues? Yes __ y-A~-----(please check with the building department about this requirement) -/~ 37. Do you understand that if you are planning on doing any excavating or grading to the property prior to issua.pse of a building permit that you will be required to obtain a grading permit? Yes -:7:/-A'-"--- 38. Are you aware that if you will be connecting to a public water and/or sewer system, that the tap fees have to be paid and the connections inspected by the service provider prior to the issuance of a Certificate of Occupancy? Yes "f-c I hereby acknowledge that I have read, understand and answered these questions to the best of my ability. Date Phone:ql D -:::84 -3Cf1~ays); (evenings) Project Name: l---Dt C34lo :::r: ron}o I l~f' ) ~LJD 'Ph ~ Project Address: _______________________________________ _ 6 PLAN REVIEW CHECKLIST Applicant ( gee_ k Date 1-//:>:0:=s£5 Building Au;ineered Foundation ddDriveway Permit ~eyed Site Plan 1:/:l_septic Permit and Setbacks ~- __ Grade/Topography 30% ~kk•tiol PlM I«~~ L;. __ Minimum Application Questionnaire -sUbdivision Plat Notes K.(,_,(yir~partment Review -~-V al"u~attli,on Determination/Fees ~ine Plans/Stamps/Sticker ~onditions ~cation Signed ~eviewer To Sign Application ~1/Schedule No. i:!:JL 40# Snowload Letter-Manf. Hms. ~Report GENERAL NOTES: Planning/Zoning ~erty Line Setbacks f-{Ja._30ft Stream Setbacks li_blood Plain ~eight __ Zoning Sign-off ~Impact Fees ;/~RC Approval __ Grade/Topography 40% ~inglssues ~ivision Plat Notes EXHIBIT A ~+a=tto \JJ 0-i'f-eJ) FREEDOM PRO~ CONSTRUCJ,ION CONTRACT L 1-,2oo1L_ THIS CONSTRUCTION CONTRACT ("Contract") is made and entered into between IRONBRIDGE MOUNTAIN COTTAGES LLC, a Colorado limited liability company ("Contractor"), whose address is 410 Ironbridge Road, Glenwood Springs, Colorado 81601, whose telephone number is (970) 947-4300, and whose facsimile number is (970) 928-8865 and j21=~ . . ("Owner"), whose address is J)p : 1!2 85b,'f2; , whose telephone number is$o.S7'Z-1JZ-;~d whose facsimile number i£1t>. /,f#J-.5""!5~. This Contract is entered into this 2./!0 ctay of ftf/2J k , 200Zf("Effective D?te"),_ This Contract is entered into in connection with and pursuant to Contractor and Owner's Freedom Program Purchase and Sale Agreement dated fr;fi2J,1-e 2-. , 2ooS Terms defined in the Freedom Program Purchase and Sales Agreement and used in this Contract shall hold the same definition in this Contract. The construction of the Residence on the Lot, each as defined in the Freedom Program Purchase and Sale Agreement shall be referred to herein as (the "House"). 1. Contactor' s Scope of Work. Contractor's scope of work shall consist of construction services for the House as set forth below, which collectively shall be referred to herein as the "Work." 2. Plans a. Contractor bas prepared the following drawings, consistent with other homes in the Project, as defined in the Freedom Programflurchase and Sale Agreement, and constructed by Contractor: _L ${Dl 1!. iii. -----(collectively, the "Plans"). 3. Construction Services a Contractor shall procure and pay for all pennits, licenses, approvals and inspections required for the House. b. Contractor shan provide or cause to be provided all labor, materials, equipment and services to construct the House in a workmanlike manner, consistent with homebuilding industry standards in Garfield County, pursuant to the Plans. Contractor shall not be responsible for furnishing or constructing any improvements or perfonning any work unless the same are specifically set forth in the Plans or in this Contract. 4. Owner's Responsibilities a. Owner shall cooperate with Contractor in securing any pennits, licenses, approvals and inspections for the House. b. Upon Contractor's request, Owner shall provide all "Requested Information'' to Contractor in a timely manner, and shall be available to meet with Contractor to approve plans and review the progress of the Work. Requested Information shall include, but not necessarily be limited to: i. proof of financing ii. Design and Architectural Option selections by the associated design selection dates iii. change order requests iv. proof of necessary insurance c. Owner specifically agrees and acknowledges that financing for the House is the sole and exclusive obligation of Owner, and Owner's ability to obtain financing is not a condition precedent to Owner1S obligations set forth in this Contract. Owner represents that Owner is qualified to obtain such financing and/or has available funds in the amount necessary to complete the House. Owner agrees to promptly seek and obtain any and all required financing for the House. Owner agrees to provide Contractor with proof, satisfactory to Contractor, that Owner's financing for the House has been finalized, and agrees that Contractor is not obligated to proceed with construction on the House until such proof is delivered to Contractor and the Closing of the Lot has occurred. Form Date: 1/l/08 15 OF 23 d. Owner agrees not to let or enter into any other contracts in connection with the House or the Lot without the prior written approval of Contractor. Owner acknowledges and agrees that entering into any contract or permitting any other contractor onto the Lot may impede the Contractor's ability to manage the cost of the House and timely complete performance of the Work as contemplated herein. Violation of this provision, shall, in addition to any other remedies set forth herein, penn it Contractor to exercise its termination rights as specified herein. e. Within three (3) days after substantial completion of the Work, Owner shall notifY all utility suppliers that Owner is responsible for utility expenses from and after the date of substantial completion. 5. Time a. Without limiting 'the foregoing, Owner agrees -to provide al1 Requested Information to ContraCtor fo-start construction within three (3) months of the date on which the Closing ofthe Lot occurs. Should Owner delay commencement construction beyond said three (3) months, Owner shall pay Contractor the sum ofFive Thousand Dollars ($5,000.00) per month, allocated for fractional portions of months ("Extension Fee"). The parties hereby agree that Contractor's actual damages for such Owner delay cannot be calculated now with certainty, and that Liquidated P.amages are a_reason~ble estimate thereof. b. Provided that Owner has complied with all of its obligations hereunder, including but not limited to timely payment of all sums due to Contractor, and Owner has secured financing for the House and delivered satisfactory proof thereof to Contractor, and Closing of the Lot has occurred, Contractor shall commence construction at the House Site within sixty (60) days after the issuance of a building permit in the Owner's name, as evidenced by accurate installation ofthe foundation forms (the "Commencement Date"). c. Substantial Completion of the House shall occur within ten (10) months after the Commencement Date (the "Completion Date"). The Completion Date may be extended on account of: i. labor disputes; ii. fire or other damage to the House; including interior damage; iii. material or labor shortages; iv. transportation delays; v. governmental action; vi. unusual weather conditions; vii. change orders or delays caused by Owner; viii. the failure of Owner to provide information and/or approvals in a timely manner; or ix. any other causes which are beyond Contractor's control or which may otherwise justifY the delay; and x. Force Majeure events. d. Without limiting the foregoing, Owner agrees to provide all required information to Contractor to substantially complete construction by the Completion Date. Should either party delay Substantial Completion of the House beyond the Completion Date, the delaying party shall pay the other party the sum of Five Thousand Dollars ($5,000.00) per month, allocated for fractional portions of months as an Extension Fee. The parties hereby agree that actual damages for such delays cannot be calculated now with certainty, and that these Liquidated Damages are a reasonable estimate thereof. 6. Ownership of Plans. Owner agrees and acknowledges that the Plans, and any amendments or revisions thereto, are and shall remain the sole and exclusive property of Contractor, and Owner agrees not to sell, transfer, assign, use, copy or share the same with any person or entity without the prior and express written consent of Contractor, which may be withheld in Contractor's sole discretion. 7. Contract Price. er shall pay Contractor the s~u~m~o~f'fit[f4t{;~~~~~~~@~~~~~~~~~~~~q,_~~ "7--~----:-c:-:---.,...-->, Dollars($ ~._;QI..OO) ("Contract Price") or performance of a. ork, which amount shall be paid in accor ce with the payment provisions set forth in this Contract. b. Owner acknowledges that upon the execution of any change orders during the course of construction, the Contract Price may increase, and in such event Owner shall pay to Contractor such increase upon execution of the change order, and prior to Contractor's perfonnance of any work in connection with the change order. 8. Payment Procedure. a. Owner shall make, or cause Owner's lender to make, progress payments for the Work in accordance with the schedule attached hereto as Exhibit A-1 ("Draw Schedule") or at any intermediate point based on the percentage of completion ofwv;k at that time i.:kotificd by inspection. Prvgress payments shall be de!ivercd to Contractor wit!iin Form Date: 1/l/08 16 OF 23 five (5) days after Owner's receipt of Contractor's request for payment, which requests for payment shall include a blanket lien waiver statement relating to all parties who provided labor and/or materials applicable to the previous request for payment. b. In the event that at any time the amount of Owner's loan available for distribution is less than the amount of the Contract Price remaining to be paid, Owner shall deposit the difference into a construction control account and execute a customary construction control agreement with respect to the holding and distribution of said sum prior to Contractor's obligation to commence or continue construction at the House Site. Owner shaH be responsible for the payment of any fees in connection with the construction control. c. Within ten (10) days after substantial completion of the Work, Owner shall pay all remaining amounts due under this Contract. d. All monies not paid when due as provided herein shall bear interest at the rate of eighteen percent (18%) per annum. e. In the event any installment is not paid when due, Contractor may exercise any remedy set forth in this Contract or exercise any other legal and/or equitable rights which may be necessary or appropriate to enforce this Contract. 9. Changes in the Work a. Buyer understands, acknowledges and agrees that the Contract Price includes only the items set forth in the document attached hereto as Exhibit B ("Features List"). These are referred to herein as ("Standard Selections"). b. Additions, upgrades, and/or optional items which are made available to Owner shall be selected, contracted and paid for in a separate contract with Contractor or by Change Order. c. Contractor may offer pre-designed and priced options for each Residence to Owner. i. Options which change the architectural design of the Residence, such as an additional garage bay, are referred to as architectural options {'1Architectural Options"). ii. Options which change the materials and colors of the Residence, such as carpet type and/or color, are referred to as design options ("Design Options"). m. Together these are often referred to as ("Options'). d. Changes to the Work that are not a pre-designed and priced Architectural Option or Design Options are referred to as change orders ("Change Orders"). i. All change orders shall specifY the following: I. the change in the Work, 2. the adjustment to the Contract Price, if applicable, and 3. the adjustment to the Completion Date, if applicable. e. Changes in the Work can only occur by purchasing an Architectural Option, purchasing a Design Option or by written Change Order prepared and approved by Contractor. f. Options will be offered to the Owner, provided the following conditions have been adhered to: i. Options must be selected in a timely manner. Each Option is assigned one of three dates which are referred to as Design Selection I ("DS I'), Design Selection 2 ("DS2") and Design Selection 3 ("DS3"). DS I is seven (7) days after closing, DS2 is forty five ( 45) days after closing and DS3 is ninety (90) days after closing. ii. Should Owner fail to select Options on or before the applicable design selection date, Seller shall have the right to either stop work, install the standard selection or deny the Option. iii. Options and Change Orders shall be selected subsequent to the execution of this Agreement. Payment in the amount of!OO% of the price of each Option or Change Order shall be due when each Option or Change Order is ordered. g. ALL PAYMENTS FOR DESIGN OPTIONS ARE NON-REFUNDABLE TO OWNER h. All Option purchases and change orders shall be executed by both the Owner and the Contractor and paid for by Owner, prior to the commencement of the work set forth therein. i. In the event that any increase in the cost of construction arises because of a change in applicable governmental regulations taking effect after the date of this Contract~ such revision or condition shall be the basis for a change order and Contractor shall receive appropriate compensation for making such change. 10. Possession and Use of the Lot. Upon the Closing of the Lot, Owner is deemed to have conveyed to Contractor an absolute and exclusive right to possess and use the Lot. Owner shall not enter the Lot unless accompanied by an authorized representative of Contractor. Owner shall not instruct, direct or otherwise contact Contractor's laborers, subcontractors or consultants. Contractor shall permit access to the Lot by inspectors of Owner's lender. Contractor shall return possession of the Lot to Owner at the time that all payments and obligations required ofthe Owner have been fully paid and perfonned by the Owner. If possession of the House and Lot is taken by the Owner before Owner's obligations set forth in this Contract are fully performed and without the prior written consent of Contractor, Owner shall be deemed to have uccepted the \Vcrk ~ corr:.p!ete and satisfactoi)\ in compliance of all of Contractor's obligations hereunder. Form Date: 1/1/08 17 OF 23 II. Walk Through. a. Upon notice from Contractor to Owner, Owner and Contractor shall schedule a walk-through of Owner's home and shall compile a list of any items which are materially not in accordance with approved plans and specifications, or do not materially conform to Garfield County standards. Contractor shall repair, replace or otherwise remedy the items within a reasonable time after Substantial Completion. b. Notwithstanding the fact that additional work may be required to correct the items, if the House has reached Substantial Completion, then no funds shall be withheld from Contractor for these items. c. After Substantial Completion, the Limited Seller's Warranty included in the Freedom Program Purchase and Sale Agreernent shall apply. 12. No Assignment. This Contract shall not be assigned by Owner or Contractor to any other party except after the prior written consent of Owner or Contractor, which consent may be reserved in Owner's or Contractor's sole discretion. lf Owner or Contractor assigns any of Owner's or Contractor's rights under this Contract to any other party in violation of this provision, said assignment shall be void and of no effect, and Owner shall be in default hereunder. Notwithstanding the foregoing, Contractor consents to a collateral assignment of this Contract to Owner's lender pursuant to Owner's agreement with its lender. 13. Insurance. a. Owner shall procure and maintain during the term ofthis Contract the following policies of insurance: i. Course of Construction insurance in the amount of the Contract Price; ii. Homeowner's insurance, and a fire and extended risk insurance policy, covering the House and Lot, in an amount not less than the Purchase Price, together with insurance covering loss or damage to Owner's personal property, and Owner's personal liability for injuries which may be sustained within the Property; and m. Comprehensive General Liability insurance in the amount of$1,000,000. b. Contractor shall maintain during the term of this Contract: i. Workers compensation insurance, as required by law. 14. Termination of the Contract upon Termination of the Freedom Plan Purchase and Sale Agreement. This Contract shall be deemed terminated upon the termination of the Freedom Plan Purchase and Sale Agreement for any reason. In such event, unless the cause of such termination is the default of Contractor as sel1er under the Freedom Plan Purchase and Sale Agreement, Contractor shall be entitled to retain all other amount( s) previously paid to Contractor or otherwise due to Contractor under this Contract. 15. Contractor's Right to Stop Work and Terminate Contract. In addition to all other remedies set forth in this Contract, in the event that any payment is not made in full within five (5) days after such payment is due, or Owner fails to perform any of its duties under this Contract within ten (10) days after written notice from Contractor, Contractor may stop the Work until payment is made or Owner fulfills its duties. Should the Work be stopped for a period of fifteen (IS) days or more upon Owner's failure to make a progress payment or as a result of any other act, omission or neglect of the Owner, then Contractor may, upon providing written notice to Owner, terminate this Contract. Upon such termination, the Contractor may recover from the Owner payment for all work completed and for any loss sustained by the Contractor for materials, equipment, tools, or machinery to the extent of actual loss thereon, plus an amount equal to the Contractor's anticipated profit under this Contract, plus interest on the foregoing amounts at the rate of eighteen percent ( 18%) per annum. 16. Alternative Dispute Resolution. Owner and Contractor agree to be bound by the alternative dispute resolution procedures set forth in the Declaration. Any and all claims, disputes and controversies arising between Owner and Contractor, whether before or after Closing, relating to this Contract or its subject matter, including, but not limited to, any alleged construction defect, shall be submitted to final and binding arbitration. 17. Notices. All notices required by this Contract shall be in writing and shall be given by any of the following means to the below listed addresses or fax numbers: a. certified or registered mail, postage prepaid, return receipt requested, in which case notice shall be deemed delivered three (3) business days after the postmark date; b. recognized co~merclu1 overnight courier, in vvhich case notice shall be deemed delivered one (1) business day after Fonn Date: 1/1/08 18 OF 23 receipt for delivery by tbe courier; c. electronic mail transmission with confirmed receipt, d. telecopy transmittal ("fax 11 ), in which case notice shaH be deemed delivered upon fax confirmation of transmission to the intended party; or e. personal delivery, in which case the notice shaH be effective when received. f. Notice shall be given to Contractor to: 410 Iron bridge Dr. Glenwood Springs, CO, 8160 I g. Notice shall e given to wner to: /...W ~-?.2.0~512.· ~'2.4 to. C!--5ao-':>31~ ?8"" l -:fAy.-52.0 ~ G90-'3&65' h. Notice of change of address shall be delivered by written notice in the manner described in this section. Rejection ·or other refusal to accept a notice or the inability to deliver a notice because of changed address of which no notice was given shall be deemed to constitute receipt of the notice sent. 18. Contractor's Limited Warranty. Contractor shall provide a one-year limited warranty on the house as provided for in the Freedom Program Purchase and Sales Agreement. 19. Contractor's Disclaimers. Contractor makes no representation or warranty, and shall in no event be responsible for the following: a. Hazardous materials (as defined by applicable law) in the House or on the Lot; b. Homeowner's association assessments and/or property taxes applicable to the Lot; c. Owner's financing of the Work; d. Any work or materials not supplied or installed by Contractor pursuant to this Contract; or e. All of the ma!:ters described in tbe disclosures and disclaimers set forth in tbe Freedom Plan Purchase and Sale Agreement, which disclosures and disclaimers are fully incorporated herein by this reference. 20. General Provisions. a. This Contract shall be governed by the Jaws of the State of Colorado. Jurisdiction and venue for any action concerning this Contract shall be in Garfield County, Colorado. b. In the event of any litigation or other proceedings between the parties concerning this Contract, the prevailing party shall be entitled to the payment by the nonprevailing party of all of its reasonable attorneys' fees, court costs, and litigation expenses. c. This Contract constitutes the entire agreement between the parties and any prior understandings, agreements or representations of any kind whatsoever preceding tbe date of tbis Contract shall not be binding upon either party except to tbe extent that they are specifically incorporated into this Contract. d. This Contract shall be binding upon and inure to the benefit of the parties hereto and to their respective heirs, representatives, successors and permitted assignees. This Contract is intended for the exclusive benefit of Owner and Contractor and is not intended and shall not be interpreted as conferring any benefit on any third party. e. This Contract and any amendments to this Contract may be executed in any number of counterparts, each of which shall be deemed an original and all taken together shall constitute one and the same agreement. Fax copies of this Contract and any amendments to this Contract and fax signatures thereon shall have the same force, effect, and legal status of originals. f. If any provision of this Contract is or shall become invalid or unenforceable, the remaining provisions of this Contract shall not be affected. g. Time is ofthe essence in each and every tenn and provision of this Contract. All references to days herein shall be deemed to refer to calendar days unless otherwise specified. In the event that the final date for performance of any act required by this Contract falls on a Saturday, Sunday, or legal holiday, such act may be performed on the next day which is not a Saturday, Sunday, or legal holiday. h. The waiver of a breach of any provision in this Contract shall not be construed as a waiver of any other breach of the same or other provision of this Contract, including the time of performance of any provision. i. Owner understands that this Contract is a legally binding contract. Owner represents and warrants that Owner has read the terms and conditions of this Contract, and has bad a full and fair opportunity to consult with legal counsel of Owner1S own choosing conceming this Contract. Fonn Date: 1/1/08 19 OF 23 CONTRACTOR: OWNER: IRONBRIDGE MOUNTAIN COTTAGES LLC, Fonn Date: l/1/08 20 OF 23 Fonn Date: l/1/08 EXH1BITA-1 (Draw Schedule insert) 21 OF 23 1/14/08 EXHIBIT A-1 DRAW SCHEDULE lronbridge Homes, LLC lronbridge Mountain Cottages, LLC Iron bridge Aspen Collection, LLC Plan No: 3101 Foundation: Crawi Space Description Permits, Engineering, Survey Sitework Foundation Framing Roofing Plumbing Electrical HVAC Windows, Doors, Trim Insulation Exterior Finishes Painting Drywall Flooring Tile Cabinets Appliances Landscaping (if applicable), Driveways, Sitework General Conditions Total Cost Contractor Fee Total Contractor Cost and Fee "B" Elevation Option Cost "C" Elevation Option Cost % Cost 5% $ 13,185 4% $ 10,548 7% $ 18,459 20% $ 52,741 5% $ 13,185 5% $ 13,185 3% $ 7,911 4% $ 10,548 7% $ 18,459 1% $ 2,637 5% $ 13,185 6% $ 15,822 4% $ 10,548 3% $ 7,911 2% $ 5,274 2% $ 5,274 1% $ 2,637 7% $ 18,459 2% $ 5,274 93% $ 245,244 7% $ 18,459 100% $ 263,703 $ 3,000 $ 18,000 EXHIBITB (Features List insert) Fonn Date: J/J/08 220F 23 GOLP CLUB AND MO~l"'JN COMMVNITY SOPRISSERIES IRONBRIDGE HOMES LLC January 7, 2008 ENERGY PERFORMANCE FEATURES • Fully Engineered Air and Water Infiltration Package by Building Science Corporation o Double Paned LowE glass o IC Rated Recessed Cans with Air Barriers o Air Infiltration Protected Electrical Outlets o Fully Wrapped and Sealed Window Openings o Weather Stripping on Exterior Doors o Air Barrier Weather Stripping at Foundation o Insulated Foundation walls o Under Slab or Crawlspace Vapor Barriers • 92% Efficient Furnace o .62 Energy Rated High Efficiency Water Heater • Conditioned Crawlspaces or Basements o Insulated Exterior Doors and Garage Door o Outside Fresh Air Exchanger WINDOWS & DOORS o Lifetime Warranty E-Star Rated Windows o Guaranteed Never to Chalk or Yellow o Double-Paned Low-E Glass o 8-ft. Thermatru Fiberglass Insulated Entry Door with Side Lite ELECTRICAL o Phone/Data/TV Ports in Kitchen, Great Room and Master Bedroom o Photo Cell Automatic Exterior Sconces • Decorative Brush Nickel Fixtures in Kitchen, Dining Room, Bathrooms and Walk-in Closets • Switched Outlets in Great Room and Bedrooms o Recessed Can Lights in Kitchens and Hallways I of2 HEATING & VENTILATION • Engineered and Balanced by Building Science Corooration • High Efficiency Furnace: o Carrier Comfort 92 Furnace o Direct Sealed Combustion uses I 00% Outside Air o 92% AFUE Heating Efficiency o 5-Year Furnace Warranty o 20-Year Heat Exchanger Warranty o Digital, Programmable Thermostat o High Efficiency 48 Gal. Hot Water Heater: o Department of Energy-Energy Miser Certified -Meeting NAECA Testing o Six Year Warranty o Exhaust Fans: E-Star Rated Whisper Fans, Vented to Exterior • Power Vented Active Radon Mitigation System APPLIANCES o Slide in Gas GE Range on 3101 & 3202 o Range Exhaust Hood on 3101 & 3202 o Built-in GE Dishwasher-All Plans o GE Profile Cooktop on 3203 & 3204 o GE Built-In Oven/ Microwave on 3203 & 3204 INTERIOR FINISHES AND FLOORING o Hand Textured Painted Walls o Rounded Drywall Comers • 9-ft. Ceilings • Vaulted Entry & Great Room Ceilings (selected plans) • 10-ft. Coffered Ceilings in Master Bedrooms • Vinyl Flooring at Kitchens, Bathrooms and Mudrooms • Plush or Frieze Carpeting with a% inch Pad. • Ceramic Tiled Tub Deck in Master Bath • Full Height Fiberglass Shower and Tub Enclosures GOLF CLUB AND M:OUN1i\1N COMMUNn·y SOPRIS SERIES IRONBRIDGE HOMES LLC January 7, 2008 INTERIOR DOORS, TRIM, & CABINETS • Interior Doors: Sante Fe Scyle Hollow Core • Closets: Stained Rods and Painted Shelves • Painted Baseboards and Door Casings • Painted Extended Window Sills and Aprons • F onnica & Wilsonart Laminate Countertops • Cabinets: Hickory -Pioneer by Aristokraft 30" Uppers in Kitchen Raised Panel Doors Raised Panel Drawer Fronts 36" High Vanicy's Adjustable Shelves Raised Bar Countertop GARAGE DOORS • Insulated Door with Exterior Cladding • Garage Door Opener PLUMBING FIXTURES & SHOWER ENCLOSURES • Master Bath: Soaker Tub • Pedestal Sink in Powder Rooms • Decorative Coordinating ProFlo Fixtures • Jcemaker: Line to Refrigerator • Mirrors: Over all Vanicy Cabinets EXTERIOR • Asphalt Driveway with Concrete Walk to Front Entry • In-Ground Drainage System ROOFING • 40-Year Asphalt Shingles • Prefinished Gutters and Downspouts, all Eaves. THE TOTAL NUMBER, DESIGN, LAYOUT AND LOCATION OF LOTS, LANDSCAPING, LAKES, RESIDENCES AND UNIT MIX AND THE LOCATION, DESIGN AND LAYOUT OF RECREATIONAL FACILITIES MAY BE CHANGED DUE TO A NUMBER OF CIRCUMSTANCES, INCLUDING GOVERNMENTAL REQUIREMENTS, MARKET DEMAND AND COST CONSTRAINTS. THERE IS NO ASSURANCE THAT THE FUTURE IMPROVEMENTS AND FACILITIES DESCRJBED WILL BE CONSTRUCTED. DIMENSIONS AND RESIDENCE SIZE ARE APPROXIMATE IN NATURE AND ARE NOT INTENDED FOR FINAL REFERENCE AS PLANS ARE NOT TO SCALE. LB ROSE RANCH LLC, AND IRONBRIDGE HOMES LLC RESERVE THE RIGHT TO MAKE MODIFICATIONS IN LOT AND RESIDENCE PRJCES AND MAKE MODIFICATIONS IN MATERIALS AND SPECIFICATIONS AT ANY TIME WITHOUT PRJ OR NOTICE. OWNERSHIP OF A RESIDENCE OR LOT DOES NOT INCLUDE CLUB MEMBERSHIP OR RJGHTS IN THE COUNTRY CLUB FACILITIES. 2 of2 EXHIBITB-1 PROJECT DOCUMENTS ACKNOWLEDGEMENT The Purchaser, as witnessed by the signature(s) below, acknowledges that as specified in the Purchase and Sale Agreement, paragraph 5(A), Title Policy, will receive all recorded documents that relate to the Property from the Title Company within ten days from mutual execution of the Contract. Said documents are referred to as all Schedule B-2 exception documents as listed in the Commitment to Provide a Title Insurance Policy. Said Documents are provided on a computer disc, however the Buyer may request from the Title Company printed copies of any or all documents provided on the disc. As referenced in Paragraph 5(E) and 5(F), Project Documents and !POA, ofthe Purchase and Sale Agreement, there are additional documents relating to the Property which are considered to be unrecorded documents that relate to the Title of the Property. These documents are provided by the Seller and the IPOA through the website of the community which is accessible at www.ironbridgeclub.com by Jogging into the site under member's login by using the password 2345. By signing below, the Purchaser acknowledges the ability to review and the receipt of said documents through the website listed above during the Title Review Period. ·Purchaser may request printed copies of said documents in the event that they are unable to access the documents through the website. ///· /" ~ ~~./,--<._ Purchaser ~ ~:&~~ chaser .t..f-::J -{) g Date February 4, 2007 Fonn Date: 1/1/08 23 OF 23 ~d>tech HEPWORTH-PAWLAK GEOTECHNICAL SUBSOIL STUDY Hepworth-Pawlak OeNechnical, Inc. 5020 Counr.y Road I 54 Glenwood Springs, Colorado 81601 Phone 970-945-1988 Fax' 970-945-8454 email: hpgeo@hpgeotech.com FOR FOUNDATION DESIGN PROPOSED RESIDENCE r;;:LOT•24!\' RIVER BEND WAY f2<:,>):::<' ;-;\ -~'-----.<--:·---·~? IRONBRIDGE SOPRIS LOTS PHASE 2 GARFIELD COUNTY, COLORADO JOB NO. 107 0486 SEPTEMBER 28, 2007 PREPARED FOR: IRONBRIDGE HOMES, LLC ATTN: TEREASA BAKER 410 IRONBRIDGE DRIVE GLENWOOD SPRINGS, COLORADO 81601 Parker 303-841-7119 • Colorado Springs 719-633-5562 • Silverthorne 970-468-1989 TABLE OF CONTENTS PURPOSE AND SCOPE OF STUDY ........................................................................ -1 - PROPOSED CONSTRUCTION ................................................................................. -1- SITE CONDITIONS ................................................................................................... -2- GEOLOGY ................................................................................................................. -2 - FIELD EXPLORATION ............................................................................................ -3- SUBSURFACE CONDITIONS .................................................................................. -3- FOUNDATION BEARING CONDITIONS ............................................................... -4- DESIGN RECOMMENDATIONS ............................................................................. -4- FOUNDATIONS .................................................................................................... -4 - FOUNDATION AND RETAINING WALLS ......................................................... -5- FLOOR SLABS ...................................................................................................... -6 - UNDERDRAIN SYSTEM ...................................................................................... -7 - SURFACE DRAINAGE ......................................................................................... -8- LIMITATIONS .......................................................................................................... -8- FIGURE 1-LOCATION OF EXPLORATORY BORING FIGURE 2-LOG OF EXPLORATORY BORING FIGURE 3 -LEGEND AND NOTES FIGURE 4-SWELL-CONSOLIDATION TEST RESULTS TABLE 1 -SUMMARY OF LABORATORY TEST RESULTS PURPOSE AND SCOPE OF STUDY This report presents the results of a subsoil study for a proposed residence to be located on Lot 246, River Bend Way, Ironbridge Sopris Lots Phase 2, Garfield County, Colorado. The project site is shown on Figure I. The purpose of the study was to develop recommendations for the foundation design. The study was conducted in accordance with our agreement for geotechnical engineering services to Ironbridge Homes, LLC dated June 22, 2007. We previously perfOrmed a preliminary geotechnical study for this area ofthe Phase 2 subdivision development and presented our findings in a report dated May 31, 2005, Job No. 105 115-4. We also performed observation and testing of compaction during the infrastructure and lot grading construction and presented those fmdings in daily reports under Job No. 1 06 0367. An exploratory bating was drilled on the lot to obtain information on the subsurface conditions. Samples of the subsoils obtained during the field exploration were tested in the laboratory to determine their classification, compressibility or swell and other engineering characteristics. The results of the field exploration and laboratory testing were analyzed to develop recommendations for foundation types, depths and allowable pressures for the proposed building foundation. This report sun1marizes the data obtained during this study and presents our conclusions, design recommendations and other geotechnical engineering considerations based on the proposed construction and the subsurface conditions encountered. PROPOSED CONSTRUCTION The proposed residence will be a 2-story, wood frame structure above a crawlspace. The garage floor will be slab-on-grade. Grading for the structure is assumed to be relatively minor with cut depths between about 2 to 4 feet. We assume relatively light foundation loadings, typical of the proposed type of construction. Job No. 107 0486 -2- Ifbuilding loadings, location or grading plans change significantly from those described above, we should be notified to re-evaluate the recommendations contained in this report. SITE CONDITIONS The lot is located on the downhill, eastern side of River Bend Way just to the north of the Mountain Cottages part of Phase 2. The underground utilities to the lot and the roadway construction are complete. Minor over lot grading during subdivision development consists of shallow fills. The 17'h Hole of the golf course borders the east side of the lot. The ground surface is relatively flat and slopes gently down to the east. Vegetation consists of sparse grass and weeds. GEOLOGY The geologic conditions were described in our previous report conducted for planning and preliminary design of the overall subdivision development dated October 29, 1997, Job No. 197 327. The surficial soils on the lot mainly consist of sandy silt debris fan deposits overlying gravel terrace alluvium ofthe Roaring Fork River. The alluvium is predominantly a clast-supported deposit of rounded gravel, cobbles and boulders up to about 3 feet in size in a silty sand matrix that was encountered to depths of about 25 to 30 feet below ground surface in the area of Lot 246. The underlying bedrock consists of the Eagle Valley Evaporite which contains gypsum and is generally associated with scattered sinkhole development in the Roaring Fork River valley. An apparent sinkhole was observed along the south side of River Bend Way and River Bank Way intersection about 500 feet north of Lot 246. The sinkhole was excavated, backfilled and grouted during construction of the roadway. Voids have not been encountered in borings drilled into the bedrock near Lot 246 and the potential for subsidence due to dissolution of the evaporite throughout the service life ofthe residence, in our opinion, is low, but the owners of the lot should be aware of the sinkhole potential and the risk of future subsidence. Job No. 107 0486 ~tech -3- FIELD EXPLORATION The field exploration for the project was conducted on July 20, 2007. An exploratory boring was drilled at the location shown on Figure 1 to evaluate the subsurface conditions. The boring was advanced with 4-inch diameter continuous flight augers powered bY a truck-mounted CME-55 drill rig. The boring was Jogged by a representative of Hepworth-Pawlak Geotechnica~ Inc. Samples of the subsoils were taken with a 2 inch I.D. spoon sampler. The sampler was driven into the subsoils at various depths with blows from a 140 pound hammer falling 30 inches. This test is similar to the standard penetration test described by ASTM Method D-1586. The penetration resistance values are an indication ofthe relative density or consistency of the subsoils. Depths at which the samples were taken and the penetration resistance values are shown on the Log ofExploratory Boring, Figure 2. The samples were returned to our laboratory for review by the project engineer and testing. SUBSURFACE CONDITIONS A graphic log of the subsoil profile encountered in the boring is shown on Figure 2. The subsoils consist of about 2Y2 feet of compacted, sand, silt and gravel mixed fill and 13 feet of stif~ sandy silt and clay (debris fan deposits) overlying dense, slightly silty sandy gravel, cobbles and boulders (terrace alluvium) at a depth of 15Y2 feet down to the drilled depth of 17 feet. Drilling in the dense terrace alluvium with auger equipment was difficult due to the cobbles and boulders and drilling refusal was encountered in the deposit. The existing fill material was placed during the subdivision development and monitored during construction for compaction by Hepworth-Pawlak Geotechnical. Laboratory testing performed on samples obtained from the boring included natural moisture content and density and finer than sand size gradation analyses. Results of swell-consolidation testing performed on a relatively undisturbed drive sample of the silt and clay soil, presented on Figure 4, indicate low compressibility under existing low moisture condition and light loading and a low collapse potential (settlement under Job No. 107 0486 OOf>tech -4- constant load) when wetted. The sample showed moderate compressibility under additional loading after wetting. No free water was encountered in the boring at the time drilling and the subsoils were slightly moist. FOUNDATION BEARING CONDITIONS The upper silt and clay (debris fan) soils typically have low bearing capacity and low to moderate settlement potential under loading when wetted. Foundations that extend down to the dense terrace alluvium would have moderate bearing capacity and low settlement risk. Spread fuotings placed on the natural soils or compacted fill are recommended for building support with some potential for differential settlement, mainly if the debris fan soils are wetted. DESIGN RECOMMENDATIONS FOUNDATIONS Considering the subsurface conditions encountered in the exploratory boring and the nature of the proposed construction, we recommend the building be founded with spread footings bearing on the natural subsoils or compacted structural fill. The design and construction criteria presented below should be observed for a spread footing foundation system. I) Footings placed on the undisturbed natural soils or compacted fill should be designed for an allowable bearing pressure of I ,000 psf Based on experience, we expect initial settlement offootings designed and constrncted as discussed in this section will be about 1 inch or less. Additional differential settlement on the order of I to 2 inches could occur if the debris tim soils are wetted. Job No. 107 0486 -5- 2) The footings should have a minimum width of20 inches for continuous walls and 2 feet for isolated pads. 3) Exterior footings and fuotings beneath unheated areas should be provided with adequate soil cover above their bearing elevation for frost protection. Placement of foundations at least 36 inches below exterior grade is typically used in this area. 4) Continuous foundation walls should be reinforced top and bottom to span local anomalies such as by assuming an unsupported length of at least 12 feet. Foundation walls acting as retaining structures should also be designed to resist lateral earth pressures as discussed in the "Foundation and Retaining Walls" section of this report. 5) Any vegetation and loose disturbed soils should be removed and the fuoting bearing level extended down to the firm natural soils or compacted fill. The exposed soils in footing areas should then be moistened and compacted. 6) A representative ofthe geotechnical engineer should observe all footing excavations prior to concrete placement to evaluate bearing conditions. FOUNDATION AND RETAINING WALLS Foundation walls and retaining structures which are laterally supported and can be expected to undergo only a slight amount of deflection should be designed for a lateral earth pressure computed on the basis of an equivalent fluid unit weight of at least 55 pcf for backfill consisting ofthe on-site soils. Cantilevered retaining structures which are separate from the residence and can be expected to deflect sufficiently to mobilize the full active earth pressure condition should be designed fur a lateral earth pressure computed on the basis of an equivalent fluid unit weight of at least 45 pcffor backfill consisting of the on-site soils. All fOundation and retaining structures should be designed for appropriate hydrostatic and surcharge pressures such as adjacent footings, traffic, construction materials and equipment. The pressures recommended above assume drained conditions behind the Job No. 107 0486 ~tech -6- walls and a horizontal backfill surface. The buildup of water behind a wall or an upward sloping backfill surface will increase the lateral pressure imposed on a foundation wall or retaining structure. An underdrain should be provided to prevent hydrostatic pressure buildup behind walls. Backfill should be placed in uniform lifts and compacted to at least 90% of the maximum standard Proctor density at a moisture content near optimum. Backfill in pavement and walkway areas should be compacted to at least 95% of the maximum standard Proctor density. Care should be taken not to overcompact the backfill or use large equipment near the wall, since this could cause excessive lateral pressure on the wall. Some settlement of deep foundation wall backfill should be expected, even if the material is placed correctly, and could result in distress to facilities constructed on the backfill. The lateral resistance of foundation or retaining wall footings will be a combination of the sliding resistance of the footing on the foundation materials and passive earth pressure against the side of the footing. Resistance to sliding at the bottoms of the footings can be calculated based on a coefficient of friction of0.35 for footings placed on fine-grained soils and 0.50 for footings placed on gravel soils. Passive pressure of compacted backfill against the sides of the footings can be calculated using an equivalent fluid unit weight of 300 pcf. The coefficient of friction and passive pressure values recommended above assume ultimate soil strength. Suitable factors of safety should be included in the design to limit the strain which will occur at the ultimate strength, pruticularly in the case of passive resistance. Fill placed against the sides of the footings to resist lateral loads should be compacted to at least 95% of the maximum standard Proctor density at a moisture content near optimum. FLOOR SLABS The natural on-site soils and compacted fill are suitable to support lightly loaded slab-on- grade construction. The upper silt soils have variable settlement potential when wetted under load and there could be some post-construction slab movement if the subgrade soils become wet. To reduce the effects of some differential movement, floor slabs should be separated fi·om all bearing walls and columns with expansion joints which allow Job No, 107 0486 - 7 - unrestrained vertical movement. Floor slab control joints sbould be used to reduce damage due to shrinkage cracking. The requirements for joint spacing and slab reinforcement should be established by the designer based on experience and the intended slab use. A minimum 4 inch layer of free-draining gravel should be placed beneath basement level slabs to facilitate drainage. This material should consist of minus 2-inch aggregate with at least 50% retained on the No. 4 sieve and less than 2% passing the No. 200 sieve. All fill materials for support of floor slabs should be compacted to at least 95% of maximum standard Proctor density at a moisture content near optimum. Required fill can consist ofthe on-site soils devoid of vegetation, topsoil and oversized rock. UNDERDRAIN SYSTEM Although free water was not encountered during our exploration, it has been our experience in the area that local perched groundwater can develop during times of heavy precipitation or seasonal runoff. Frozen ground during spring runoff can create a perched condition. We recommend below-grade construction, such as retaining walls and basement areas, be protected from wetting and hydrostatic pressure buildup by an underdrain system An underdrain should not be provided around shallow foundations (3 feet deep or less) and slab-on-grade garage areas. The drains should consist of drainpipe placed in the bottom ofthe wall backfill surrounded above the invert level with free-draining granular material. The drain should be placed at each level of excavation and at least 1 foot below lowest adjacent finish grade and sloped at a minimum 1% to a suitable gravity outlet or sump and pump. Free- draining granular material used in the underdrain system should contain less than 2% passing the No. 200 sieve, less than 50% passing the No. 4 sieve and have a maximum size of2 inches. The drain gravel backfill should be at least 1 Y, feet deep. In silt bearing soil areas, an impervious membrane, such as a 30 mil PVC liner, should be placed in a trough shape below the drain gravel and attached to the foundation wall with mastic to prevent wetting of the bearing soils. Job No. 107 0486 ~tech -8- SURFACE DRAINAGE The following drainage precautions should be observed during construction and maintained at all times after the building has been completed: 1) Inundation of the foundation excavations and underslab areas should be avoided during construction. 2) Exterior backfill should be adjusted to near optimum moisture and compacted to at least 95% of the maximum standard Proctor density in pavement and slab areas and to at least 90% of the maximum standard Proctor density in landscape areas. 3) The ground surface surrounding the exterior of the building should be sloped to drain away from the foundation in all directions. We recommend a minimum slope of 12 inches in the first 1 0 feet in unpaved areas and a minimum slope of3 inches in the first 10 feet in paved areas. Free-draining wall backfill should be capped with about 2 feet ofthe on- site, frne grained soils to reduce surface water infiltration. 4) Roof downspouts and drains should discharge well beyond the limits of all backfill. 5) Landscaping which requires regular heavy irrigation, such as sod, should be located at least 1 0 feet from foundation walls. LIMITATIONS This study has been conducted in accordance with generally accepted geotechnical engineering principles and practices in this area at this time. We make no warranty either express or implied. The conclusions and recommendations submitted in this report are based upon the data obtained from the exploratory boring drilled at the location indicated on Figure 1, the proposed type of construction and our experience in the area. Our services do not include determining the presence, prevention or possibility of mold or other biological contaminants (MOBC) developing in the future. If the client is concerned about MOBC, then a professional in this special field of practice should be consulted. Our frndings include interpolation and extrapolation of the subsurface conditions identified at the exploratory boring and variations in the subsurface conditions Job No. 107 0486 ~tech -9- may not become evident until excavation is performed. If conditions encountered during construction appear different from those described in this report, we should be notified so that re-evaluation of the recommendations may be made. This report has been prepared for the exclusive use by our client for design purposes. We are not responsible for technical interpretations by others of our infl:mnation. As the project evolves, we should provide continued consultation and field services during construction to review and monitor the implementation of our recommendations, and to verifY that the recommendations have been appropriately interpreted. Significant design changes may require additional analysis or modifications to the recommendations presented herein. We recommend on-site observation of excavations and foundation bearing strata and testing of structural fill by a representative of the geotechnical engineer. Respectfully Submitted, HEPWORTH-PAWLAK GEOTECHNICAL, INC. Reviewed by: Daniel E. Hardin, P.E. SLP!ksw cc: Fuhnnaun Engineering-Jamie Andreassen (jandreassen@fuhnnannengineering.com) Job No. 107 0486 ......_ )f) _,_ --APPROXIMATE SCALE 1!1 = 201 17th HOLE GOLF COURSE -- r-------------------l I I I I I I I I I I I I I I I I BORING 1 I I I I • I I I I I I I I LOT247 I I LOT 245 I LOT246 I I I I I I I I I L-------------------~ -- RIVER BEND WAY 107 0486 ~ch LOCATION OF EXPLORATORY BORING Figure 1 Hepworth-Pawlak Geotechnical 0 5 Q) Q) LL 10 .<;; ~ 0 15 20 107 0486 BORING1 LOT246 9/12 13/12 WC=9.6 DD=106 -200=62 11/12 WC=4.8 DD=96 8/6,10/2 NOTE: Explanation of symbols is shown on Figure 3. LOG OF EXPLORATORY BORING ~ He orth-Powlok Geotechntcal 0 5 8l 10 lL ~ Q) 0 15 20 Figure 2 LEGEND: FILL; mixed clay, silt and sand with gravel and scattered cobbles, medium dense, slightly moist, brown. SILT AND CLAY (ML-CL); sandy, stiff, slightly moist, light brown, slightly calcareous. GRAVEL AND COBBLES (GM-GP); slightly silty, sandy, probable boulders, dense, slightly moist, brown, rounded rock. 9/12 T NOTES: Relatively undisturbed drive sample; 2-inch I. D. California liner sample. Drive sample blow count; indicates that 9 blows of a 140 pound hammer falling 30 inches were required to drive the California sampler 12 inches. Practical drilling refusal. 1. The exploratory boring was drilled on July 20, 2007 with a 4-inch diameter continuous flight power auger. 2. The exploratory boring location was measured approximately by pacing from features shown on the site plan provided. 3. The exploratory boring elevation was not measured and the log is drawn to depth. 4. The exploratory boring location should be considered accurate only to the degree implied by the method used. 5. The lines between materials shown on the exploratory boring log represent the approximate boundaries between material types and transitions may be gradual. 6. No free water was encountered in the boring at the time of drilling. Fluctuation in water level may occur with time. 7. Laboratory Testing Results: WC = Water Content (%) DO = Dry Density (pcf) -200 = Percent passing No. 200 sieve 107 0486 c~ HEPWORTH•f>AWLAK GE:OTECHNICAl. LEGEND AND NOTES Figure 3 Moisture Content = 4.8 percent Dry Density = 96 pel Sample of: Sandy Silt and Clay From: Boring 1 at 10 Feet, Lot 246 0 -r-r--1 !----" Compression ~ v upon wetting 2 * " 3 0 "iil ""' w ~ E 4 0 '\ 0 5 !'\. 6 \ 1\ 7 0.1 1.0 10 100 APPLIED PRESSURE-ksf 107 0486 ~ Heoworth-Powlak Geotechnical SWELL-CONSOLIDATION TEST RESULTS Figure 4 HEPWORTH-PAWLAK GEOTECHNICAL, INC. TABLE 1 Job No. 107 0486 SUMMARY OF LABORATORY TEST RESULTS Lot 246 ~ SAMPLE LOCATION NATURAL NATURAL GRADATION PERCENT ATTERBERG LIMITS UNCONFINED I MOISTURE DRY GRAVEL SAND PASSING LIQUID PLASTIC COMPRESSIVE SOIL OR BORING DEPTH CONTENT DENSITY NO. 200 LIMIT INDEX STRENGTH BEDROCK TYPE (%) (%) SIEVE (It) (%) (pcfl l%1 (%) IPS F) 1 5 9.6 106 62 Sandy silty & clay 10 ! 4.8 96 Sandy silt & clay I I I ' ! I I l Inspection Report COLORADO STATE ELECTRICAL BOARD INSPECTION REPORT I CORRECTION NOTICE Page 1 of 1 Data Received; 09-JUL-09 Permit Number: 659624 Contractor/HomeOwner: Address: Type of Inspection: Action; Comments or corrections: No building permit card available Inspectors Name: Robert Fuller Phone Number: 970-947-8902 WALKER ELECTRIC 934 River Bend Final Accepted Date: 09-JUL-09 COLORADO STATE ELECTRICAL BOARD DEPARTMENT OF REGULATORY AGENCIES 1580 Logan St. Suite 550 Denver, Colorado 80203-1941 Phone: (303) 894-2985 https://www .dora.state.co. us/pls/real/Ep _ Web_Inspection_GUI.Process_Page 7/10/2009 ::: ~/l:a••d S9888260L6l:0 l LL6lS290L6 lJ3l3 ~3~l~M:WOJJ 6£:01 5002-£1-lnt:=: COUNTY OF GARFIELD -BUILDING DEPARTMENT CORRECTION NOTICE. 108 8th St., Suite 401 Glenwood Springs, Colorado Phone (970) 945-8212 Job located at C?T.:> f' £/ Y/e: /( ;3/E:d P Permit No. 1/1 CJ g AllfJ /ZJ P£ca&1uz/e: ?if~ 57110~ 5 itt ttJ P1/ s .s tNG--I< I ;r;;-WALL . A 7 /7C Acc~..s.s ? ?c:u for Re-lnspection 0 $50.00 Re-lnspection Fee must be paid prior to Re-lnspection You are hereby notified that the above correction must be inspected before covering. When correction(s) have been made, call for inspection at 970-384-5003. Date "3'-Z...t; 20 d:P 7' Building Inspector ---";~~::,.,~"""~;"::'~'::::J.,___I?c-4~'!,:~~::Z~~~~ ~,__,___ __ Phone (970) 945-8212 COUNTY OF GARFIELD -BUILDING DEPARTMENT CORRECTION NOTICE 1 08 8th St., Suite 401 Glenwood Springs, Colorado Phone(970)945~212 Job located at --=OC42'-":3"""'-L-f=_· _____,_£/~0"-''£~/(-"<------",Z!.=-.:..::£.==-M~fZ"--­ Permit No. /// ?J IS ' I have this day inspected this structure and these premises and found the following corrections needed: J>AT!l EAN J?tteT /bt,t_,;e: P 6?/r:: do 1 .§1(/lcd"E:.r:s. ?can for Re-Inspection 0 $50.00 Re-Inspection Fee must be paid prior to Re-lnspection You are hereby notified that the above correction must be inspected before covering. When correction(s) have been made, call for inspection at 970-384-5003. Date f-4 20 8 ?' Building Inspector __ _,.,C2"7"'-"'~'-"""'-"'-c.-"--?(__-'-~"'"~=·=--~"'---"'-'---- Phone (970) 945-8212 ~ No. 1110& Assessor's Parcel No. 2395-013-28-246 -,'} Date 9/16/2008 BUILDING PERMIT CARD Job Address 0934 River Bend Way, GWS ( lronbridge PUD Ph2 flg2, Lot 246) Owner Large, Bill & Juanita Address P.O.Box 436, AZ Phone# ---- Contractor Hansen Construction Address 410 lronbride dr, gws Phone # 384-3990 Setbacks: Front Rear RH LH Zoning ____ _ s/f on unf bsmt w/attached garage & cov pati INSPECTIONS Soils Test Weatherproofing-=-:-:::---,.---::;;;-:--,--- Footing ?-:Jo ~og 'UF(;k, 0/c.~ Mechanical 3-"Z& -o<t ,tCA/. Foundation /cz-G-o9;1'?¥ Electrical Rough (State) '3 -z....r-o? Grout .,q Electrical Final (State) _________ _ Underground .Plumbing ./t?-'Z& ·-t-7 3';?'tyl _ Fina! _7-L<·(?o/ /Checklist Coml2]eted?~ Rough Plumbmg :Y-cc>-tJ9 @.f. Cert1f1cate Occupancy # ~fl"":p:>:::::-o.:::>-::;_:-:::--=-:::::---- Framing tf-2_;-o9 ~ Date I 'S~.l~L -=t---:sO-o9 Insulation 2f-!D071 .lf1'7"il Septic System # __,C'-:,..,; (~:5'-'VV\'-'-'-'\"""IV\'--'------- Roofing Date -------------g~sw;i1~in'f1~? J?eV. Other ~.)'f\~~~\}X\\1 :'-,\)'t)"fti~\AAr,· NOTES (continue on back) BUILDING PERMIT GARFIELD COUNTY, COLORADO INSPECTION WILL NOT BE MADE UNLESS THIS CARD IS POSTED ON THE JOB lbt-aY.b Date Issued -~ft.L..l• I._,\I~·Q8o.q,,~-________ Permit No. _\._\.._\_,_QB""-\oL--------- AGREEMENT In consideration of the issuance of the permit, the applicant hereby agrees to comply with all laws and regulations related to the zoning, location; construction and erection of the proposed structured for which this permit is granted, and further agrees that if the above said regulations are not fully complied with in the zoning, location, erection and construction of the above described structure, the permit may then be revoked by notice from the County Building department and IMMEDIATELY BECOME NULL AND VOID. Contractor • This Card Must Be Posted So It Is Plainly Visible From The Street Until Final Inspection INSPECTION RECORD Footing ~~ --·-·. l Driveway ~ 9-.3o .og <2/!"efl<. o~ Foundation I Grouting Insulation j' fd.,t,-m. ~ Ho-bq ~ Underground Plumbing /f?-ZO-Cl g J""?U. Drywall '1-15"0?~ Rough Plumbing ::;-zo-o?"?'~ Electric Final (by State inspector) (Prior to Final) Rough Mechanical 3 -<""-c'T" ~ Septic Final Gas Piping 3-z.::>-or 7'('?<-::"' FINAL 7 -I")-O'f~&;;;z{-/ Electric Rough (by State Inspect~ (You Must Cal! For Finallmpection) ot-/}F 3jz-s-"i Notes {Prior to Framing) Framing '!-7-07 f'm!-+ ~~~ (to include Roof in place & Windows & Doors installed & Firestopping in place) APPROVED Date THIS PERMIT IS NOT TRANSFERABLE For Inspection Call970~384-5003 Office 970-945-8212 108 8th Street, Suite 401 Glenwood Springs, Colorado 81601 DO NOT DESTROY THIS CARD q. \lo·Qfb sy "F. lntmr.un!hw""M.u?'5QO_ PROTECT PER~ WEAT~~...,_._,_,_,_ (DO NOT LAMINATE) Parcel Detail Page I of 4 Garfield County Assessor/Treasurer Parcel Detail Information Assessor/Treasurer Property Search I Assessor Subset Query I Assessor Sales Search Clerk & Recorder Reception Search Basic Building Characteristics I Tax Information Parcel Detail I Value Detail I Sales Detail I Residential/Commercial Improvement Detail Land Detail I Photographs I Mill Levy Revenues Detail ~ Account Parcel 2007 Mill Number Number Levy a I 090 II R043439 l/23950 1328246/l 64.976 Owner Name and Mailing Address ILARGE, WILLIAM F & JUANITA jP 0 BOX436 jCORT ARO, AZ 85652 Assessor's Parcel Description (Not to be used as a legal description) jSECT,TWN,RNG:l-7-89 SUB:IRONBRIDGE jPUD, PHASE II, FILING 1, 2 & 3 jLOT:246 PRE:R041489 BK:l596 PG:871 jBK:l565 PG:600 BK:l560 PG:438 jBK:l560 PG:431 BK:l057 PG:0745 jBK:l028 PG:768 BK:l028 PG:597 http://www. garcoact. com/ assessor /parcel.asp ?Parce IN umber=23 9 50 13 28246 I I I I I I I I I I 8/12/2008 Parcel Detail Page 2 of 4 IBK:1006 PG:743 RECPT:752404 I IRECPT:752403 BK:1822 PG:287 I jRECPT:702424 BK: 1822 PG:283 I jRECPT:702422 BK: 1822 PG:250 I IRECPT:702421 BK: 1782 PG:269 I IRECPT:694479 BK:1782 PG:264 I IRECPT:694478 BK:1747 PG:1 I IRECPT:686745 BK:1218 PG:738 I jRECPT:572583 BK:1218 PG:715 I jRECPT:572582 BK:1217 PG:266 I jRECPT:572131 BK:1206 PG:852 I IRECPT:569200 BK:1206 PG:780 I IRECPT:569199 BK:1206 PG:768 I IRE CPT: 569197 BK: 1206 PG:734 I IRECPT:569195 BK:1206 PG:662 I IRECPT:569194 BK:1206 PG:637 I IRECPT:569192 BK:1206 PG:629 I IRECPT:569191 BK:1206 PG:574 I jRECPT:569190 BK:1063 PG:0578 I jBK:1063 PG:0571 I Location Physical 1934 RIVER BEND WAY GLENWOOD SPRINGS! Address: 1!Subdivision: !IIRONBRIDGE PUD, PHASE II, FILING 1, 2 & I IILand Acres: llo j Land Sq Ft: !19,646 I I Section II Township II Range I I 1 II 7 II 89 I http:/ I www. garcoact. com/assessor /parcel. asp ?Parce IN umber=23 9 50 13 28246 8/12/2008 Parcel Detail Page 3 of4 2008 Property Tax Valuation Information II Actual Value II Assessed Value I I Land: jj 1 01,300\l 29,380\ \Improvements: jj oil oj I Total: II 101 ,3ooll 29,3801 Additional Value Detail Most Recent Sale Sale Date: l\7111/2008 Sale Price: J/325,300 Additional Sales Detail Basic Building Characteristics Number of Residential !o I Buildings: Number of Comm/Ind !o I Buildings: No Building Records Found Tax Information I Tax Year II Transaction Type II Amount ) I 2007 II Tax Payment: Second Half Jl ($808.30)1 I 2007 II Tax Payment: First Half II ($8o8.3o)l I 2007 II Tax Amount II $1,616.6ol I 2006 II Tax Payment: Second Half II ($95.12)) I 2006 II Tax Payment: First Half II ($95.12)1 I 2006 II Tax Amount II $190.241 http://www. garcoact. com/ assessor/parcel.asp ?ParcelN umber=23 9 50 13 2 82 46 8/12/2008 IRONBRIDGE CLUB LOT PLOT 246, PLAN BLOCK 3 so9·05'11 "E 59.54' S05.31 '07"E LOT 247 _____________ _J (!) Ol ~ ~ 2-CAR 1 ~ ~ ':.t GARAGE ~ ""' TOS=74.3' ·.'Q'. j-... ,....: v. .11 .. •• I)_ v. : "'~ iq .~ -CONC .. · .· DRIV~ .. -~ .. " MODEL 3101A FF=5977.0' TOF=5975.6' I 9,646 ~ I oJ '<( 80.0' FULL BASEMENT 3:1 :: I ..--I 01 ~ I N1 I") I • I N1 CX)I (f) I L--------------- ;: N-0-7-.2-7"""':'_5_9"!":"'" w---+-·oz-=-+. -9-o-:Go·------~-)---------1 . I ~~-I '6' . 'Iii' •... ~ 'Q' •.• '>: .q. LEGEND 86.9 = ELEVATION PER GRADING PLAN 89.4 = DESIGN ELEVATION APPROX. . EDGE ROAD RIVER BEND WAY (60' R.O. W.) Jdl~JPJD--.~ COMMENTS: . 1. MODEL 3201 DRAWN FROM FOUNDATION PLANS DATED 04/07/06 2.ARCHITECTURAL PLANS DATED 04/07/06 SCALE: 1 "=20' 3.GRADING BASED ON HCE GRADING PLAN DATED 04/27/06 JOB NUMBER: --'71'---0=0-"-6-'-'-.0-0-- 4. SUBDIVISION: IRONBRIDGE P.U.D.-PHASE 2-FIL. 3 ADDRESS: 934 RIVER BEND WAY MINIMUM SETBACKS: FRONT: 1 0' REAR: 15' FINISHED GRADE: 5975.6 BUILDING/BUILDING ...J....>.L__ NOTE: LOT: 246 BLOCK: =-"'3'=--_ CITY /COUNTY: /GARFIELD SIDE: ~ CORNER: N I A TYPE OF HOUSE: 2 STORY ' 1. BUILDING IMPROVEMENTS SHOv.t.l ON THIS PLOT PLAN ARE CONCEPTUAL FOR THE SOLE PURPOSE OF OBTAINING A BUILDING PERMIT. REFER TO APPROVED ARCHITECTURAL PLANS FOR CONSTRUCTION OF BUILDING IMPROVEMENTS. 2. THE DRAINAGE PATTERNS SHOv.t.l ON THIS PLOT PLAN AR~ CONCEPTUAL, MODIFICATION MAY BE REQUIRED BY EXISTING CONDITIONS TO PROVIDE POSITIVE DRAINAGE OF THE FINISHED SITE. DRAWN BY:~M~D=M~----------­ REV: --------------------------------- REV: ---------------------------------REV: __________________________ __ DATE: 08120108 ~ , DATE: ___ _ DATE: ___ _ DATE: ___ _ ~ JT·R JENGIINEEWNG A Subsidiary of Westrian 6020 Greenwcxx:l Plaza Blvd. • Englewcxx:l, CO 80111 303-740-9393 • Fax: 303-721-9019 • wwwjrengineering.com