Loading...
HomeMy WebLinkAboutApplication-PermitI Garfield County Building & Planning Department 108 8th Street, Suite #401 Glenwood Springs, Co. 81601 Office:970·945·8212 Fax: 970·384-3470 Inspection Line: 970·384-5003 Building Permit No. 11131 Parcel No: 2393-071-01-004 ---··· ------ Locality: Van Rand lot4 Job Address: 133 Marand Rd. GWS ---~· Use of Building: --~ __ _:.:reLpla9e metal roo!_& insulations, repair roof purli.:.:.n _____ _ Owner: Contractor: Bellar --- Fees: Plan Check: $ 604.99 Septic: ··-~"~"··---- Bldg Permit: 930.72 Other Fees: Total Fees: $ 1,535.71 Clerk: jthompson_ Date: 10/10/2008 ---·--I 2 3 4 5 6 7 8 9 10 11 !2 Garage: GARFIELD COUNTY BUILDING PERMIT APPLICATION !08 8"' Stree~ Suite 401, Glenwood Springs, Co 81601 Phone: 970-945-8212/ Fax: 970-384-3470 I Inspection Line: 970-384-5003 www.garfield~county.com oNew Iteration o Addition Septic: o Detached o!SDS Driveway Penni!: et i Stl Owners valuation of Work: NOTICE Authority. This application for a Building Permit must be signed by the Owner of the property, described above, or an authorized agent. If the signature below is not that of the Owner, a separate letter ofautbority, signed by the Owner, must be provided with this Application. Legal Ac~§.. A Building Permit cannot be issued without proofoflegal and adequate access to the property for purposes of inspections by the Building Department Other Permits. Multiple separate permits may be required: (I) State Electrical Permit, {2) County ISDS Permit, (3} another permit required for use on the property identified above, e.g. State or County Highway/ Road Access or a State Wastewater Discharge Permit. Void Permit. A Buijding Permit becomes null and void if the work authorized is not commenced within 180 days of the date of issuance and if work is suspended or abandoned for a period of 180 days after commencement. CERTIFICATION I hereby certifY that I have read this Application and that the information contained above is true and correct. I understand that the Building Department accepts the Application, along with the plans and specifications and other data submitted by me or on my bebalf(submlttals), based upon my certification as to accuracy. Assuming completeness of the submittals and approval of this Application, a Building Permit will be issued granting pennission to me, as Owner, to construct the structure(s) and facilities detailed on the submittals reviewed by the Building Department. In consideration of the issuance of the Building Permit, I agree that I and my agents will comply with provisions of any federal, state or local Jaw regulating the work and the Garfield County Building Code, ISDS regulations and applicable land use regulations (C01.mty Regulation(s)). I acknowledge that the Building Permit may be suspended or revoked, upon notice from the County, if the location, construction or use of the structure(s) and facility{ies), described above, are not in compliance with County Regulation(s) or any other applicable law. I hereby grant pennission to the Building Department to enter the property, described above, to inspect the work. I further acknowledge that the issuance of the Building Permit does not prevent the Building Official from: (l) requiring the correction of errors in ·the submittals, if any, discovered after issuance; or (2} stopping construction or use of the structure(s) or facility(jes) if such is in violation ofCoootyRegulation(s) or any other applicable law. Review of this Application, including submittals, and inspections of the work by the Building Department do Dot constitute an acceptance of responsibility or liability by the County of errors, omlssions or discrepancies. As the Owner, I acknowledge that responsibility for compliance with federal, state and local laws and County Regulations rest with me and my authorized agents, including without limitation my architect designer, engineer and/ or builder. I HEREBY ACKNOWLEDGE THAT I HAVE READ AND UNDERSTAND THE NOTICE & CERTIFICATION ABOVE: -q DATE STAFF USE ONLY Special Conditions: Adjusted Valuation: Permit Fee: Manu home Fee: Mise Fees: ~en£) crt;o_-rco !SDS No & Issued Date: ISDS Fee: BP No & Issue Date: J \ l3 I Seth~ ''\ f OCC Group: Cons! Type: L\\' ,\(\ Zoning: The following items are required by Garfield County for a final Inspection: 1) A final Electrical Inspection from the Colorado State Electrical Inspector. 2) Permanent address assigned by Garfield county Building Department and posted at the structure and where readily visible from access road. 3) A finished roof; a lockable building; completed exterior siding; exterior doors and windows installed; a complete kitchen with cabinets, sink with hot & cold running water, non-absorbent kitchen floor covering, counter tops and finished walls, ready for stove and refrigerator; all necessary plumbing. 4) All bathrooms must be complete, with washbowl, tub or shower, toilet, hot and cold running water, non-absorbent floors, walls finished, and privacy door. 5) Steps over three (3) risers, outside or inside must be must have handrails. Balconies and decks over 30" high must be constructed to all IBC and IRC requirements including guardrails. 6) Outside grading completed so that water slopes away from the building; 7) Exceptions to the outside steps, decks, grading may be made upon the demonstration of extenuating circumstances., i.e. weather. Under such circumstances A Certificate of Occupancy may be issued conditionally. 8) A final inspection sign off by the Garfield County Road & Bridge Department for driveway installation, where applicable; as well as any final sign off by the Fire District, and/or State Agencies where applicable. A CERTIFICATE OF OCCUPANCY (C.O.) WILL NOT BE ISSUED UNTIL ALL THE ABOVE ITEMS HAVE BEEN COMPLETED. A C.O. MAY TAKE UP TO 5 BUSINESS DAYS TO BE PROCESSED AND ISSUED. OWNER CANNOT OCCUPY OR USE DWELLING UNTIL A C.O. IS ISSUED. OCCUPANCY OR USE OF DWELLING WITHOUT A C.O. WILL BE CONSIDERED AN ILLEGAL OCCUPANCY AND MAY BE GROUNDS FOR VACATING PREMISES UNTIL ABOVE CONDITIONS ARE MET. I understand and agree to abide by the above conditions for occupancy, use and the issuance of a C.O. for the building identified in the Building Permit. RS SIGNATURE DATE Bapplicationdecember2007 GARFIELD COUNTY BUILDING AND PLANNING 970-945-8212 MINIMUM APPLICATION REQUIREMENTS FOR CONSTRUCTION OF COMMERCIAL OR MULTI-FAMILY RESIDENTIAL BUILDINGS Including NEW CONSTRUCTION ADDITIONS ALTERATIONS And MOVED BUILDINGS In order to understand the scope of the work intended under a permit application and expedite the issuance of a permit it is important that comple~e information be provided. When reviewing a plan and it's discovered that required information has not been provided by the applicant, this will result in the delay of the permit issuance and in proceeding with building construction. The owner or contractor shall be required to provide this information before the plan review can proceed. Other plans that are in line for review may be given attention before the new information may be reviewed after it has been provided to the Building Department. Please review this document to determine if you have enough information to design your project and provide adequate information to facilitate a plan review. Also, please consider using a design professional for assistance in your design and a construction professional for construction of your project. Any project with more than ten (10) occupants requires the plans to be sealed by a Colorado Registered Design Professional. To provide for a more understandable plan and in order to determine compliance with the building, plumbing and mechanical codes, applicants are requested to review the following checklist prior to and during design. Plans to be included for a Building Permit must be on draft paper at least 18"x 24"" and drawn to scale. Plans must include a floor plan, a concrete footing and foundation plan, elevations all sides with decks, balcony steps, hand rails and guard rails, windows and doors, including the finish grade and original grade 1 line. A section showing in detail, from the bottom of the footing to the top of the roof, including re-bar, anchor bolts, pressure treated plates, floor joists, wall studs and spacing, insulation, sheeting, house-rap, (which is required), siding or any approved building material. Engineered foundations may be required. Check with the Building Department. A window schedule. A door schedule. A floor framing plan, a roofing framing plan, roof must be designed to withstand a 40 pound per square foot up to 7,000 feet in elevation, a 90 M.P.H. windspeed, wind exposure B or C, and a 36 inch frost depth. All sheets need to be identified by number and indexed. All of the above requirements must be met or your plans will be returned. All plans submitted must be incompliance with the 2003 IBC, IPC, IMC, IFGC, and IFC. Applicants are required to indicate appropriately and to submit completed checklist at time of application for a permit: 1. Is a site plan included that identifies the location of the proposed structure, additions or other buildings, setback easements, and utility easements showing distances to the property lines from each comer of the proposed structure prepared by a licensed surveyor and has the surveyors signature and professional stamp on the drawing? Slopes of 30% or more on properties must be show on site plan. (NOTE: Section 106.2) Any site plan for the placement of any portion of a structure within 50 ft. of a property line and not within a previously surveyed building envelope on a subdivision final plat shall be prepared by a licensed surveyor and have the surveyors signature and professional stamp on the drawing. Any structure to be built within a building envelope of a lot shown on a recorded subdivision plat, shall include a copy of the building envelope as it is shown on the final plat with the ~tur~:ated within the envelope. 2. Does the site plan when applicable include the location of the I.S.D.S. (Individual Sewage Disposal System) and distances to the property lines, wells (on subject property and adjacent properties), streams or water courses? This information must be certified by a .licensed surveyor with their signature and professional stamp on the design. Yes Not necessary for this project Y- 3. Does the site plan indicate the location and direction of the State, County or private road accessing the ~? N~ 4. Is the I.S.D.S. (Individual Sewage Disposal System) designed, stamped and signed by a Colorado Registered Engineer? Yes . Not necessary for this project 'f... 2 5. Are the plans submitted for application review construction drawings and not drawings that are stamped or marked identifying them as "Not for construction, for permit issuance only", "Approval drawings only", "For permit issuance only" or similar language? Yes Not necessary for this project X 6. Do the plans include a foundation plan indicating the size, location and spacing of all reinforcing steel in accordance with the building code or per stamped engineered design? Yes __ Not necessary for this project-il- 7. If the building is a pre-engineered structure, is there a stamped, signed engineered foundation plan for this building? Yes __ Not necessary for this project.,x:__ 8. Do the plans indicate the location and size of ventilation openings for under floor crawl spaces and the clearances required between wood and earth? Yes __ Not necessary for project-X__ 9. Do the plans indicate the size and location of the ventilation openings for the attic, roof joist spaces and soffits? Yes __ Not necessary for this project__b_ 10. Do the plans include design loads as required under the IBC or IRC for roof snow loads, (a minimum of 40 pounds per square foot in Garfield County)? Yes~ Not necessary for this project __ 11. Do the plans include design loads as required for floor loads under the IBC or IRC? Yes __ Not necessary for this project~ 12. Does the plan include a building section drawing indicating foundation, wall, floor, and roof construction? Yes __ Not necessary for this project~ 13. Is the wind speed and exposure design included in the plan? Yes __ Not necessary for this projectL 14. Does the building section drawing include size and spacing of floor joists, wall studs, ceiling joists, roof rafters or joists or trusses? Yes __ Not necessary for this project_L 3 15. Does the building section drawing or other detail include the method of positive connection of all columns and beams? Yes __ Not necessary for this projectJ:.__ 16. Does the elevation plan indicate the height of the building or proposed addition from the undisturbed grade to the midpoint between the ridge and eave of a gable or shed roof or the top of a flat roof? (Check applicable zone district for building height maximum) Yes __ Not necessary for this project_1.,__ 17. Does the plan include any stove or zero clearance fireplace planned for installation including make and model and Colorado Phase II certifications or Phase II EPA certification? Yes __ Not necessary for this project_L_ 18. Does the plan include a masonry fireplace including a fireplace section indicating design to comply with the IBC or IRC? Yes __ Not necessary for this project~ 19. Does the plan include a window schedule or other verification that egress/rescue windows from sleeping rooms and/or basements comply with the requirements of the IBC or IRC? Yes __ Not necessary for this project+- 20. Does the plan include a window schedule or other verification that windows provide natural light and ventilation for all habitable rooms? Yes __ Not necessary for this project~ 21. Do the plans indicate the location of glazing subject to human impact such as glass doors, glazing immediately adjacent to such doors; glazing adjacent to any surface normally used as a walking surface; sliding glass doors; fixed glass panels; shower doors and tub enclosures and specify safety glazing for these areas? Yes __ Not necessary for this projectl:::._ 22. Do the plans include a complete design for all mechanical..~ystems planned for installation in this building? Yes __ No Not necessary for this project. __ ]"_ 4 23. Have all areas in the building been accurately identified for the intended use? (Occupancy as identified in the IBC Chapter 3) Yes __ Not necessary for this project_'/.~- 24. Does the plan indicate the quantity, form, use and storage of any hazardous materials that may be in use in this building? Yes __ Not necessary for this project~ 25. Is the location of all natural and liquid petroleum gas furnaces, boilers and water heaters indicated on the plan? Yes __ Not necessary for this project__b_ 26. Do the plans indicate the location and dimension of restroom facilities and if more than four employees and both sexes are employed, facilities for both sexes? Yes __ Not necessary for this project _:;f..._- 27. Do the plans indicate that restrooms and access to the building are handicapped accessible? Yes __ Not necessary for this project~ 28. Have two (2) complete sets of construction drawings been submitted with the application? Yes 29. Have you designed or had this plan designed while considering building and other construction code requirements? Yes.Y,.._ 30. Does the plan accurately indicate what you intend to construct and what will receive a final inspection by the Garfield County Building Department? Yes_)L_ 31. Do your plans comply with all zoning rules and regulations in the County related to your zone district? For comer lots see supplemental section 5.05.03 in the Garfield County Zoning Resolution for setbacks. Yes __ _ 32. Do you understand that approval for design and/or construction changes are required prior to the imple,ntation of these changes? Yes 5 33. Do you understand that the Building Department will collect a "Plan Review" fee from you at the time of application and that you will be required to pay the "Permit" fee as well as any "Septic System" or "Road Impact" fees required, at the time you pick up your building permit? Yes 'X. 34. Are you aware that you are required to call for all inspections required under the IBC including approval on a final inspection prior to receiving a Certificate of Occupancy and occupancy of the building? Yes~ 35. Are you aware that the Permit Application must be signed by the Owner or a written authority be given for an Agent and that the party responsible for the project must comply with the Uniform Codes? Yes--4- 36. Are you aware that you must call in for an inspection by 3:30 the business day before the requested inspection in order to receive it the following business day? Inspections will be made between 7:30a.m. and 3:30p.m. Monday through Friday. Inspections are to be called in to 384-5003. Yes~ 3 7. Are you aware that requesting inspections on work that is not ready or not accessible will result in a $50.00 re-inspection fee? Yes_k 38. Are you aware that prior to submittal of a building permit application you are required to show proof of a legal and adequate access to the site? This may include (but is not limited to) proof of your right to use a private easement/right of way; a County Road and Bridge permit; a Colorado Dept. of Highway Permit including aN otice to Proceed; a permit from the federal government or any combination. You can contact the Road & Bridge Department at 625-8601. See Phone book for other agencies Yes~ 39. Do you understand that you will be required to hire a State of Colorado Licensed Electrician and Plumber to perform installations and hookups? The license number will be required at time of inspection. Yes 'f- 40. Are you aware, that on the front of the building permit application you will need to fill in the Parcel/ Schedule Number for the lot you are applying for this permit on prior to submittal of the building permtpplication? Your attention in this is appreciated. Yes 41. Do you know that the local fire district may require you to submit plans for their review of fire safety issues? YesL (Please check with the building department about this requirement) 6 42. Do you understand that if you are planning on doing any excavating or grading to the property prior to issuance of a building permit that you will be required to obtain a grading permit? Yes__ No: necessary for this project~ 43. Did an Architect seal the plans for your commercial project? State Law requires any commercial project with occupancy of more than 10 persons as per Section 1004 of the IBC to prepare the plans and specifications for the project. Yes L Not Necessary for this project ____ _ I hereby acknowledge that I have read, understand, and answered these. questions to the best of my ability. ( lf7-&>) Phone: 3{21.-'lZ£7 (days); -;::.....'*""'., ..; to Date Project Name: .:Pve>f~ ~!' \.,. ... ..,_\ A~Z>b.o~ ProjectAddress: 1'?3 Mare>..nJ gJ ' Note: (evenings) On any of these questions you may be required to provide this information. If required information is not supplied, delays in issuing the permit are to be expected. Work may not proceed without the issuance of the permit. *If you have answered "Not necessary for this project" on any of the questions and it is determined by the Building Official that the information is necessary to review the application and plans to determine minimum compliance with the adopted codes, please expect the following: A. The application may be placed behind more recent applications for building permits in the review process and not reviewed until required information has been provided and the application rotates again to first position for review. B. Delay in issuance of the permit. C. Delay in proceeding with construction. BpcommDec2007 7 GARFIELD COUNTY BUILDING REQUIREMENTS Codes: 2003 IRC, IBC, IFGC, IMC, IPC, Setbacks: Check subdivisions and zone district for setback requirements. Snowload (measured at tbe roof): 40PSF up to 7000ft. elevation. 50PSF 7001 to 8000ft. Seismic design category: B 75PSF 8001 to 9000ft. JOOPSF 9001 to JOOOOft. Weathering probability for concrete: Severe Termite infestation probability: None to slight Wind speed: 90mph Decay probability: None to slight Wind Exposure: B or C (see section R301.2.1.4) Frost Depth: 36in. to 8000ft. elevation. 42in. 8001 and above. Winter Design Temperature: Minus 2 to 7000ft.; minus 16 over 7000ft. elevation. Air Freezing Index: 2500deg F-days to 7000ft.; over 7000ft. to be determined by Building Official. Ice shield under-layment required. Mean Annual temp.: Variable Insulation: Maximum glazing U factor: 0.50 Minimum R-Values: • Ceilings/roofs R values are: R-30 stick built structures. R-38log construction and steel rafter construction. • Walls R values are R-19 wood frame; R-19 cavity R-3 sheathing steel studs. • Floors R-values are R-19. • Basement wall R-values are R-IO beTow · grade, R-19 above grade. • Slab perimeter R-value and deptb is R- 10/36in. • Crawl space wall R-values are R-IO·below grade and R-19 above grade lf floors over crawl spaces are not insulated, tbe crawl space walls must be insulated. Basement wall must be insulated to frost deptb. Common walls garage to bouse must have R -19 insulation. Common ceilinglfloor garage to house must have R-19. Take precautions to protect plumbing in tbese areas. N 11131 o. ________________ __ Assessor's Parcel No. 2393-071-01-004 Date ___ 1_01_1_01_20_0_8_ BUILDING PERMIT CARD Job Address __ ,..::13::..:3::...:M=ar:.:a:.:.:n.=d..:..R:::d::... =--' G=W~S=--·....:V:..:a::..n:....:R-=a::n:.:d:....:P_:.a::..rk::!,:....:L:..:o..:..t ....:.4 _______________ _ Owner _____ M_&_M_E_n_te_r'"'-p_ri_se_s...:..,_L_L_C ___ Address __ 13_3_M_a_r_an_d_R_d_. ______ Phone # 970-379-2872 Contractor Belfor Address 50633 Hwy 6&24 unit B Phone # 970-945-7105 Setbacks: Front ______ Rear _______ RH ________ LH Zoning 970-3664757 replace metal roof & insulations, repair roof purlin Soils Test----------- Footing------------ Foundation __________ _ Grout _____________ __ Underground Plumbing ______ _ Rough Plumbing ---------Framing ___________ __ Insulation------------Roofing ___________ _ Drywall ------------- ~s Piping _.,._--::::----------:;;"?7'7--"t-rf<~-/;/Sf? ~l>·-o7 ~ INSPECTIONS ,;#/1(/Z_ ~3' 0 ~ 0/6 CJ NOTES Weatherproofing ____________ _ Mechanical ____________ _ Electrical Rough (State)---------- Electrical Final (State) d-) Final7~.3o -c.>"l' /Checklist Completed? ~ Certificate Occupancy # I Date ___________ __ Septic System # ____________ _ Date -------------Final _____________ _ Other _______________ _ !.(tz.v;tJ MAN> ;::;;£c:P C/11 f. L , MA /1.1 ~-<hC ::;ro::.> ·-fbY -r.:3C:.-7 ~~ o? jXsm;oC 3o5--:5.33 ,-6-&o 7' /AV;£" _£,dd. 1 (continue on back) BUILDING PERMIT GARFIELD COUNTY, COLORADO INSPECTION \/1/ILL NOT BE MADE UNLESS THIS CARD IS POSTED ON THE JOB Date Issued \ Q ' \ Q_·-'0""-'f>""----------Permit No. \ \\~..__1 ---- AGREEMENT In consideration of the issuance of the permit, the applicant hereby agrees to comply with all laws and regulations related to the zoning, location; construction and erection of the proposed structured for which this permit is granted, and further a.grees that if the above said regulations are not fully complied with in the zoning, location, erection and constructiOn of the above described structure, the permit may then be revoked by notice from the County Building department and IMMEDIATELY BECOME NULL AND VOID. use_2eplO!e MeW rnaf~insulo±ioo_~~o Address or Legal Description \ ~ Marard f2.d 1 · 6 WS Owner Contractor_Be{"-'"""'-'-fou..-.C._ ________ _ Building PermitType_~ .. .,·_.oJ""""------------------------ This Card Must Be Posted So It Is Plainly Visible From The Street Until Final Inspection INSPECTION RECORD Footing Driveway Foundation I Grouting Insulation Underground Plumbing Drywall Rough Plumbing !Electric Final (by S'i:ate Inspector) OFPic.f.. ~n-7·'1 v-- a,.,., 'J ~ ' (PriortoFinal) hf..4h._ Dl( dJ--:2? -0 7 /j/~ Rough Mechanical Septic Final ~ Gas Piping FINAL -1-:JO Electric Rough (by State lnspect:t (You Must Call For Final Inspection) (p,;onohom;~f u: r,j, ;z... or Notes Framing (to include Roof in place & Windows & Doors Installed & Firestopping in place) THIS PERMIT IS NOT TRANSFERABLE For Inspection Call970-384-5003 Office 970·945-8212 108 8th Street, Suite 401 Glenwood Springs, Colorado 81601 DO NOT DESTROY THIS CARD FAY ENGINEERING CORP. Mr. Kevin Mansfield BELFOR 5085 Kalamath Street Denver, Colorado 80221 SUBJECT: REFERENCE: Dear Mr. Mansfield: 5201 E. 48TH AVE. I DENVER CO 80216 I 303-333-5209 July 27. 2009 Structural Fire Repair Professional Auto Body 0133 Marand Road Glenwood Springs. Colorado Our File No: 08-210 Attached photographs appear to show purl in reinforcements as called for in our September 18, 2008 letter. l f there are questions or if we can be of any ftJrthcr assistance, please call. cc Mr. Jim Elhardt BELFOR J i m.c I hard tliV us. be I for. co 111 -"~--------------~ Sincerely, www.filyengJrH-:ering com I infof-·'ilayenginec!lng.com I fAX 303-329 .. 0687 V ~L~~ z) ~'Dtl>\L 16 ~P--v ~ 2-oQ.:s :p-Jk. R, ~ ~-~ FAY ENGINEERING CORP. Mr. Kevin Mansfield BELFOR 5085 Kalamath Street Denver, Colorado 80221 SUBJECT: REFERENCE: Dear Mr. Mansfield: 5201 E. 48TH AVE. I DENVER, CO 80216 I 303-333-5209 September 18,2008 Structural Fire Repair Professional Auto Body 0133 Marand Road Glenwood Springs, Colorado Our File No: 08-210 APPROVEU SUBJECT TO NOTED .ICXCEPTIONS & lNSPECTY~ GARFIELD COUNTY ~UlLDING DEPAJF~EN: Ate /cH:h?ll By~ FIELD COPY -- 140 INSPECTION WiT~ 'i ~ I'UIMS OM llfi'l: . "Afl<" ()I Pursuant to your request, we visited the subject site on September 15, 2008 in order to evaluate the extent and nature of structural fire damage and to make structural recommendations for repair. The fire occurred at a furnace damaging one Z-purlin, adjacent roof decking and the roofing system. The following structural repair is recommended: 1. Remove the entire roof decking system and underlying insulation down to existing purlins. 2. Provide smoke and water damage remediation (specified by others). 3. Reinforce ( 1) purlin located in the second bay from the south end of the building and adjacent to the west side of the furnace. Reinforcing to be composed of an 8CS 1.625 x 071 x 25' -0" (Fy=55 ksi) each side attached with two rows of staggered #12 self tapping screw spaced at 24" centers each side. Reinforcements to extend 30" beyond girder supports each end. Provide welded steel bearing plates between reinforcements and girders each side each end. 4. Replacement roof decking to be 26 gage Butlerib II (3-span minimum continuous) with accessories as provided by manufacturer. Fasten to existing purlins with #12 self-tapping screws spaced at 12" centers. Fasten side seams with #12 self-tapping screws spaced at 24" centers. All screws to be provided with formed steel washers and bonded sealing washers as supplied with the roof decking by tbe manufacturer. www.fayengineering.com I info®fayengineering.com I FAX 303-329-0687 Mr. Kevin Mansfield BELFOR 5085 Kalamath Street Denver, Colorado 80221 08-210 Page 2 5. Install roof penetration boots and flashings, perimeter flashings and gutters and apply waterproofing roof membrane system similar to the original (specified by others). cc 6. Install R-38 fiberglass batt insulation at the underside of the roof decking between existing perlins (not sandwiched between roof deck and purlins). Provide plastic enclosure and wire/strap support system similar to the original (specified by others). If there are questions or if we can be of any further assistance, please call. Sincerely, Mr. Jim Elhardt BELFOR Jim.elhardt@us.belfor.com Parcel Detail Page 1 of4 Garfield County Assessor/Treasurer Parcel Detail Information Asses_sor/Treasurer .PrQJ2ef1Y-Search I A!>l>essor SubsetQuery: I Assesl)or Saks SearcJ1 Clerk & Recorder Reception S.earch Par.cel Detail I Yalue D.l:ltail I Sales Detail I Re.sidentiaVColll!llercial.Jmnrovement P~:tail Land Detail I Photogranhs I Mill Ley;r_Reve!1lles Detajl I Tax Area II Account Number II Parcel Number II 2007 Mill Levy I I 011 II R111281 II 239307101004 II 60.843 I Owner Name and Mailing Address jM&M ENTERPRISES, LLC. \133 MARAND RD \GLENWOOD SPGS, CO 81601-9325 Assessor's Parcel Description (Not to be used as a legal description) \SECT,TWN,RNG:7-7-88 SUB:VAN RAND jP ARK LOT:4 BK:0519 PG:0667 IRECPT:738055 BK:1760 PG:993 jRECPT:689782 BK:1672 PG:370 \RECPT:670749 BK:1672 PG:368 jRECPT:670748 BK:0851 PG:0549 Location I I I I I I Physical Address: \1133 MARAND RD GLENWOOD SPRINGS\ I Subdivision: \IV AN RAND PARK I I Land Acres: \lo I Land S9 Ft: \\52,708 I I Section II Township II Range I 7 II 7 II 88 I http:/ /www.garcoact.com/ assessor/parcel.asp ?ParcelN umber=23 93 071 0 1 004 10/9/2008 Parcel Detail Page 2 of4 2008 Property Tax Valuation Information II Actual Value II Assessed Value I I Land: II 448,020\l 129,930\ I Imerovements: II 214,16011 62,1101 I Total: II 662,180\1 192,040\ · Most Recent Sale Sale Date: \13/2112005 Sale Price: 1!812,500 Additional S<tles Detail Basic Building Characteristics Number of Residential 0 Buildings: Number of Commllnd 1 Buildings: I Commercial/Industrial Building Occurrence 1 Characteristics I I WAREHOUSE: jj9,014 I I TOTAL HEATED AREA: Ito I IISPEC.PURPOSE- ABSTRACT CODE: _IMPROVEMENTS I I ARCHITECTURAL STYLE: IIWAREHOUSE I I EXTERIOR WALL: IIPREFAB MIL I I ROOF COVER: IIPRO PANEL I I ROOF STRUCTURE: i!STEEL FRAM I I INTERIOR WALL: IIDRYWALL I INTERIOR WALL: jjMINIMUM I FLOOR: IIASPH TILE I FLOOR: IIcoN oN GRD I HEATING FUEL: IiGAS I HEATING TYPE: IIUNIT HEATR I STORIES: IISTORIES 1.0 " http://www. garcoact.corn/ assessor/parcel.asp?ParcelN urnber=23 93 071 01 004 10/9/2008 Parcel Detail Page 3 of 4 BATHS: 112 ROOMS: 14 UNITS: II BEDROOMS: I 0 YEAR BUlL T: 111979 I Additional Residentiill/{;omn1er£ial Improvement D~tail Tax Information I Tax Year II Transaction Type II Amount I 2007 II Tax Payment: Second Half II ($5,842.14)1 2007 II Tax Payment: First Half II ($5,842.14)1 2007 II Tax Amount II $11,684.281 2006 II Tax Payment: Second Half II ($5,496.28)1 2006 II Tax Payment: First Half II ($5,496.28)1 2006 II Tax Amount II $1 0,992.561 2005 II Tax Payment: Second Half II ($5,520.14)1 2005 II Tax Payment: First Half II ($5,520.14)1 2005 II Tax Amount II $11,040.281 2004 II Tax Payment: Second Half II ($4,728.19)1 2004 II Tax Payment: First Half II ($4, 728.19)1 2004 II Tax Amount II $9,456.381 2003 II Tax Payment: Second Half II ($3,975.05)1 2003 II Tax Payment: First Half II ($3,975.05)1 2003 II Tax Amount II $7,950.101 2002 II Tax Payment: Second Half II ($3,418.62)1 2002 II Tax Payment: First Half II ($3,418.62)1 I 2002 II Tax Amount II $6,837.241 I 2001 II Tax Payment: Second Half II ($3,437.57)1 I 2001 II Tax Payment: First Half II ($3,437.57)1 I 2001 II Tax Amount II $6,875.141 2000 II Tax Payment: Second Half II ($3,616.35)1 2000 II Tax Payment: First Half II ($3,616.35)1 2000 II Tax Amount II $7,232.701 1999 II Tax Payment: Second Half II ($3,567.21 )I I 1999 II Tax Payment: First Half II ($3,567 .21 )I I 1999 II Tax Amount II $7,134.421 http://www. garcoact.com/ assessor/parcel.asp ?ParcelN umber=23 93071 0 1 004 10/9/2008