Loading...
HomeMy WebLinkAbout1.0 Applicationo/ Land Use Summary 'a IO . PA2 15,ooo s.F. 20 7'7 - o PA3 9,ooo s.F. 34 11.2 PA4 DuPlcx 3E 8 PA5 15,OOO S.F. 59 26.2 PA6 9,OOO S.F. lE 6.8 PA7 DuPlcx 29 5'4 PAS 15,OOO S.F. 18 7.1 PA9 2O,OOO S.F. 74 40.8 SUBTOTAL: 2. ROADS 3t4G 149.1 ACRES 33.9o/o o/o OF TOTAL SWTOTAL:14.7 ACRES 33% o/o OF TOTAL3. OPEN SPACE Floatcrs'Park Fishing Park Activc Rccrcation Parks Ooco Spacc (Gcncral) 6.3 1.1 5.0 124.9 SUBTOTAL: 4. GOIF COURSE 139.3 ACRES 31.6% o/o OF TOTAL SUBTOTAL: TOTAL ACREAGE GROSS DENSITY RESIDENTIAL DATA PLANNING AREA O.8O DU/AC 1373 440.4 31.2% 100.0% MIN. LOT SIZE PA1,PA9 PA2,PA5,PA8 PA3,PA6 20,000 s.F. 1s,000 s.F. 9,000 s.F. 138 97 52 67 76.7 41.0 1E.0 13.4PA 4, PA 7 Duplcx 3t4eTOTAL 149.1 ACRESI-TNITS Land LJse Summary SKETCH PLAN LINITS ACRES O/O OF TOTAI .{P' 2O,OOO Sq.Ft. ptin.) 1s,oo0 Sq.Ft. (Min.) 9,000 Sq.Ft. (Min.) Duplex Lots 125 88 47 60 64.5 36.5 12.7 E.6 SUBTOTAL: 2. ROADS 320 - 122.3 ACRES 27.8o/o o/o OF TOTAI SWTOTAL: 3. OPEN SPACE 24.1 ACRES t.4% o/o OF TOTAI Floatcrs' Park Fishing Park Activc Rccrcation Parks Undcvclopcd Opcn Spacc 6.3 3.1 5.0 142.3 SUBTOTAL: 4. GOLF COURSE 1t6.7 ACRES 3t.6% o/o OF TOTAI SUBTOTAL: TOTAL ACREAGE GRO.'S DENSITY RESIDENTIAL DATA PI.ANNING AREA 0.73 DU/AC 137,3 440.4 31.2% 100.0% MIN. LOT SIZE PA1 PA2 PA3 PA4 PA5 PA6 PA7 PAE PA9 20,000 s.F. 15,000 s.F. 9,000 s.F. Duplcx 15,000 s.F. 9,000 s.F. Duplcx 15,000 s.F. 20,000 s.F. 58 18 3l 14 54 16 26 16 67 30.9 7.5 7.6 4.5 23.0 5.1 4.1 6.0 33.6 TOTAL 122.3 1. RESIDENTIAL TINITS ACRES Sketch Plan General Notes: 1. The Sketch Plan has been designed to preserve certain elements of the natural character of the property including the visually open character of the site along with the dominant wildlife corridors. 2. Open Space is provided for passive and active recreation, including parks, trails, community spaces and water features. 3. A community water system will be provided for all lots. Individual water wells are not allowed. 4. Building and fencing controls will be provided throughout the community. 5. The Private Open Space Easements provide additional pedestrian access throughout the project. 6. All lots and parcels created by the subdivision are provided with access to a public right of way, in conformance with the Colorado State Highway Access Code and applicable County Regulations. 7. Water features may be created within the open space and Private Open Space Easements. 8. Adjustments to streets, lot lines, Private Open Space Easements and open space may occur during preliminary platting. 9. Roads have been aligned to be sensitive to the topography and to minimize visual impact. Road layouts may be adjusted during preliminary platting. 10. Proposed golf boundaries may be relocated or modified during final golf course engineering. 1 l. Within the golf clubhouse area, no structures shall be constructed over the Rocky Mountain Gas Easement or the Public Service Easement. These areas shall be either parking or open, landscaped areas. 12. The water source will be an on-site, community water system with a water storage facility located west of County Road 109. 13. All parcels will be connected to the Aspen Glen Water and Sanitation District system for sewage disposal. 14. Potential radiation hazards should be monitor€d once homes have been constructed. 15. , Parking spaces accessed off of an intemal community road have been provided for the fishing park located along the Roaring Fork River. 16. A Private Open Space Easement shall be located in all areas of any lot that infringes in the wetland or floodplain. No structures or other improvements shall be located in these areas.. 17. The anticipated source of Natural Gas - K.N. Energy; Sewer - Aspen Glen Metro District; Water - internal; Telephone - U.S. West; Electric - Holy Cross Electric Association. 18. Fencing detail shall be provided at Final Plat. The overall fencing design intent shall be to maintain a sense of openess within the community. Both open style and privacy fencing may be allowed. 2. PUD General Notes: 1. 3. 4. 5. 6. 15. 16. The PUD plan has been designed to preserve certain elements of the natural character of the property, including the visually open character of the site along with dominant wildlife corridors. Open Space is provided for passive and active recreation, including trails, parks, water features, and community spaces. A community water system will be provided for all lots. Individual water wells are not allowed. Building and fencing controls will be provided throughout the community. The Private Open Space Easements will provide additional pedestrian access throughout the project. All lots and parcels created by the subdivision will be provided with access to a public right of way, in conformance with the Colorado State Highway Access Code and applicable County regulations. Water features may be created within the Open Space and Private Open Space Easements. Adjustments to streets, lot lines, Private Open Space Easements and common open space may occrrr during preliminary platting. Roads have been aligned to be sensitive to the topography and to minimize visual impact. Road layouts may be adjusted during preliminary platting. The water source will be an on-site, community water system with a water storage facility located west of County Road 109. All parcels will be connected to the Aspen Glen Water and Sanitation District system for sewage disposal. A Private Open Space Easement shall be located in all areas of any residential lot that infringe in the wetlands or floodplain. No structures or other improvements shall be located in these areas. The anticipated source of Natural Gas- K.N. Energy; Sewer-Aspen Glen Metropolitan District; Water-internal; Telephone-U.S. West; Electric-Holy Cross Electric Association. Revisions or adjustments may be made between Sketch Plan and Preliminary Plat, provided that approved parcel acreages and dwelling unit maximums are not exceeded; in accordance with County regulations, no revisions to design may be made between Preliminary and Final Plats. Trail locations are illustrated on the Rose Ranch Sketch Plan. Fencing detail shall be provided at Final Plat. The overall fencing design intent shall be to maintain a sense of openess within the community. Both open style and privacy fencing may be allowed. Landscaping/signage detail shall be provided at Final Plat. 7. 8. 9. 11. 10. t2. 13. 14. 17. Surface HydrologY AnalYsis MaP Wildlife Wetland Delineation, Endangered Species and Cultural Resources RePort Views 4.Planned Unit Development Proposal A. B. C. D. E. General Planned Unit DeveloPment Plan Land Use SummarY - PUD Planned Unit Development Plan General Notes Open Space 1. Floaters' Park 2. Fishing Park 3. fuver Overlooks 4. Active Recreation Parks 5. Open Space (General) Golf Course Open Space Plan - PUD Vehicular and Pedestrian Access and Circulation Trails Plan - PUD Residential Use Utility Services 1. Overview 2. Water 3. Sewage Disposal 4. Other Utilities 5. StatementsConcerningUtilities Water Resources RePort Drainage Report Preliminary Traffic StudY Rose Ranch Street Cross-Sections L. M. N. o. Zoning D istrict Regulations Applicability Land Use Summary for PUD Zoning District Regulations K. L. M. N. F. G. H. I. J. K. 5. A. B. C. D.Zoning Districts 1. 2. 4. 5. 20,000 Square Foot Residential Zone District 15,000 Square Foot Residential Zone District 9,000 Square Foot Residential Zone District Duplex Residential Zone District Open Space Zone District a. Floaters'Park b. Fishing Park c. Active Recreation Parks d. Open Space (General) Golf Course6. Sketch Plan A. B. C. Sketch Plan Land Use Summary - Sketch Plan Sketch Plan General Notes Development Phasing Phasing Concept Phasing Plan (Proposed) Summary of Impacts and Mitigations Evidence that Design Considers Natural Environment Impacts on Lakes, Streams and Topography Provisions for Natural Hazards Potential Radiation Hazards Evidence that All Lots Have Access to a Public Righrof-Way Wildlife Affordable Housing Schools Conformance to Garfield County Comprehensive Plan - Study Area I General Public Participation Housing Transportation Recreation and Open Space A. B. C. D. E. 7. A. B. C. D. E. F. G. H. K. L. M. N. Surface HydrologY AnalYsis MaP Wildlife Wetland Delineation, Endangered Species and Cultural Resources RePort Views Planned Unit Development Proposal A. B. C. D. E. General Planned Unit Development Plan Land Use Summary - PUD Planned Unit Development Plan General Notes Open Space 1. Floaters' Park 2. Fishing Park 3. River Overlooks 4. Active Recreation Parks 5. Open Space (General) Golf Course Open Space Plan - PUD Vehicular and Pedestrian Access and Circulation Trails Plan - PUD Residential Use Utility Services 1. Overview 2. Water 3. Sewage Disposal 4. Other Utilities 5. StatementsConcerningUtilities Water Resources Report ' Drainage Report Preliminary Traffi c Study Rose Ranch Street Cross-Sections F. G. H. I. J. K. L, M. N. o. Zoning District Regulations A. Applicability B. Land Use Summary for PUD C. Zoning District Regulations 5. D. Zoning Districts 6. Sketch Plan 20,000 Square Foot Residential Zone District 15,000 Square Foot Residential Zone District 9,000 Square Foot Residential Zone District Duplex Residential Zone District Open Space Zone District a. Floaters'Park b. Fishing Park c. Active Recreation Parks d. Open Space (General) Golf Course Sketch Plan Land Use Summary - Sketch plan Sketch Plan General Notes Development Phasing A. Phasing Concept B. Phasing Plan (Proposed) Summary of Impacts and Mitigations Evidence that Design Considers Natural Environment Impacts on Lakes, Streams and Topography . Provisions for Natural Hazards Potential Radiation Hazards Evidence that All Lots Have Access to a public Right-of-way _ Wildlife . Affordable Housing Schools 9.conformance to Garfield county Comprehensive plan - study Area I l. 2. J. 4. 5. 6. A. B. C. 7. 8. A. B. C. D. E. F. G. H. A. B. C. D. E. General Public Participation Housing Transportation Recreation and Open Space A.General Introduction - Document This document serves as the official request for the Rose Ranch PUD and Sketch plan. It has been prepared and organized in confornance with Garfield County requirements for both zoning (PUD) and subdivision (Sketch Plan) requests. Because zoning must precede any subdivision, general background information related to the PUD requesi precedes the more detailed Sketch Plan. Because the PUD is the more general tool for establishing land use and density and the Sketch Plan is more detailed and specific, graphics and tabular information have been fumished to reflect both requests. This document reflects the thorough analysis and planning effort that has been employed in the creation of the Rose Ranch PUD and Sketch Plan. A multi-disciplinary team was assembled in this effort---planners, engineers, environmental specialisti---to analyze both existing conditions of the site as well as impacts and possible mitigation. Results of their research and conclusions are presented herein, both in full report and summary format. General Introduction - Rose Ranch Rose Ranch, located west of the Roaring Fork River approximat ely 2.5 miles south of Glenwood Springs, is proposed as a mixed use, resideniial / golf community. When fullydeveloped, the 440 acre ranch will accommodate public golf and a maximum of 354 homes on varying sized lots. Perhaps the most dominant feature of this development, however, is the extensive open space network. Although the Garfield County Comprehensive Plan designates the site for a density of up to 2 dwelling units per acre, this proposal is for a resideniial density less than half that allowed. In this way, larger amounts of open space, both developed and undeveloped, will be possible. The open space network---in addition to the golf course---includes several unique features. For example, a riverside park is proposed to accommodate .o--.r.iul rafting ventures from nearby Glenwood Springs. A fishing park will be created along the Roaring Fork fuver, serving not just the residents olRose Ranch, but adjaceni subdivisions as well. Periodic overlooks are proposed along the river, while corridors ofnatural open space will separate individual clusters of residential units. Trails willprovide pedestrian access both in the developed residential areas and the undeveloped open space area west of County Road 109. Between the recreational golf course, parks, overlooks and natural spaces, over 620/o of the site will remain open. The natural beauty of the site and its environs was paramount in the planning of RoseRanch' The presence of the Roaring Fork River *i it, riparian habitat; views to off-siteMount Sopris; impressive stands of both deciduous and coniferous vegetation; themeandering Robertson Ditch; and interesting and varying topography all contributed to B. the careful planning of the golf course, open space and proposed residential uses. Areasof environmental sensitivity, including fltodpiains, wetlana, una wildlife habitat, havebeen identified and protected by mean-s of avoidance and private open Space Easements. An extensive citizen participation process, including meetings with adjacent individualowners and homeowner groups, was used to assurefand use compatibility. In thisprocess' several existing off-site issues related to drainage and access weie identified and,where possible, solutions are proposed to address these Jor..-r. combined with theintent to allow adjacent subdivision residents and property o*r.r, access to the RoseRanch open space network, the resulting plan propor., a lommunity which will both fitinto its surroundings and be a good neijhbo. within the county. H A. Applicabitiry To carry out the purposes and provisions of the Garfield county ZoningRegulations, asamended' the Rose Ranch Planned Unit Deveiir.*, (puD) Zone District is divided intothe ro,owi- ;lJr;'ffi :ffi -^.**,,, Zone District 15,000 Square Foot (Minimum) Residential Zone District 9,000 Square Foot (Minimum) Residential Zone District Duplex Residential Zone District Open Space Zone District Golf Course Additionally' the PUD plan identifies nine (9) distinct planning Areas (pA,s) in whichresidential developmeni -uy occur-. Totaling r+q.i u.r"r, the iesidential developmentwill be confined to.approxim ately 34Yoof thI ri,". rr," remainder of the site isdesignated for roadway s (3.3yo),"open space 1u .eirl-orGolf cours e (3r .2%). The landuse summary below delineates the overall lani use urrd derrrity proposed for the RoseRanch pUD bv pranning Area and open st;;;;;;*. by amenity type. H C. D. Zoning District Regulations The following subsections describe theproposed zoning districts for the Rose Ranch.once zoned to PUD, it is intended that Preliminary plans and Final plats will besubmiued for the individual Planning Areas. rn"r" ptun, and plats will be in substantial ;::}ffice with the land ". .on..pt presenred heiein and with development standards currently zoned A/R/RD within Garfield County, it is intended that the uses and rightsassociated with the A/R/RD zone district will continu" *iii the site. However, as anypropertv within the Rose Ranch is subdivided, as ";i;;r.;l by the recording with theclerk and Recorder of Garfieta county of any finar, ;rr*, approved subdivision prat foranv such portion of the property, *, i*:,:-"r.;;h;'r;d porrion of the properry forany additional uses permittla u/ trr. e,,ivno r"rid;f"il automaticaly terminate, and ,H?Ji:i:l;'oo'n; shall be ,;; on,, ", the peiniuea ur., specificauy described in Zoning Districts t. Intent: Permitted Uses: Minimum lot size: Maximum building height: Minimum Iot width: Minimum lot depth: Front Rear Side Side/comer 20,000 Square Foot Residential ZoneDistrict Individual lot ownership with single family detachedresidential structures single-family residentiar units; non-habitable accessorybuildings and structures; homeom..i public and privatetg:9r, Private Open Space Ea..rr"ntg open space; trails;utility and drainage easements 20,000 square feet 35' 80', measured at front building line r 50, 30' 20' j3, ,r %heightof principal building, whichever is greater H Building to Private open Space Easement: 0" provided standard lot setbacks are met Parking: A minimum of 4 off street parking spaces must be provided for eachprimary residential structure; thisiequire..r,,ouy be satisfied by eitherthe garage or driveway. - -) Other: ) Intent: Permitted Uses: Minimum lot size: Minimum lot width: Minimum lot depth: Maximum building height: 35, Minimum primary building setbacks: Individual lot ownership with single family detachedresidential structures Single-family residential units; non-habitabre accessorybuildings and structures; home offices; public and privateroads; Private Open Space Easementg'open space; trails 15,000 square feet 80', measured at front building Iine 120, Building envelopes may be established that are more restrictive than thoseestablished by standard setbacks. These may be ttre resutt of either privateopen Space Easements or other naturar constraints on a rot. Ail buildingenvelopes shall be finalize( at time of subdivision. r s,ooo sq uare .rr+ ffi:H}l' Front Rear 30' 20' 3i5lr""*". j3, O. %heightof principat buitding, whichever is greater Building to private open space Easement 0,, provided standard lot setbacks are met Parking: Other: A minimum of 4 off street parking spaces must be providedfor.el! primary structure;itris re[uirement may besatisfied by either the garage ", d;;;;;y. Building enveropes may be established that are morerestrictive than those established by stanaara setbacks. 3. Intent: Permitted Uses: Minimum lot size: Minimum lot width: Minimum Iot depth: 90, Maximum building height: 35, Minimum primary building setbacks: These may be the result of either private Open Space Easements or other natural constraints on a lot. AIIbuilding envelopes shalr be finalized at time of subdivision. 91000 Square Foot Residential ZoneDistrict Individual lot ownership with single family detachedresidential structures single-family residentiar units; non-habitable accessorybuildings and structures; home office; public and privateroads; Private Open Space Easements; open space; trails 9,000 square feet 75', measured at front building line Front Rear 25' 20' IO' l5' Side Side/corner Building to Private open space Easement: 0,, provided standard lot setbacks are met Parking: Other: A minimum of 4 0ff street parking spaces must be provided foreach primary structure; this requilment may be satisfied by eitherthe garage or driveway. -'. vELru.vs u. Building envelopes may be estabrished that are more restrictivethan those estabrished by standard setbacks. These may be theresult of either private open space Easements or other naturalconstraints on a lot. A, building enveropes shail be finarized attime of subdivision. 4. Intent: Duplex Residentia I Zone District Individual lot ownership with two_family attachedresidential structures 35' Permitted Uses: Minimum lot size: Duplex Single Family Detached Minimum (double) lot Minimum lot depth: Maximum building height: Minimum setbacks: Front Rear Side/non-adjoining Side/comer Parking: Other: 5- Open Intent: Space ZoneDistrict a. Floaters, park Intent: Permitted Uses: 20' l5' 10' l5' A minimum of 4 off street parking spaces must be providedfor.elch primary structure; tti,,.[uir.ment may besatisfied by either the garage o, arir"*uy. Building enveropes may be estabrished that are morerestrictive than those established by standard setbacks.These may be the result of either prirut. Open SpaceEasements or other natural constraints on a lot. AIIbuilding envelopes sha, be finatized atli-" of ,rbdivision. s ingle-family residential units ; two-family residentiar units ;non-habitable accessory buildings and structures; homeoffrce; public and private roads;-private Open Sp;;;Easements; open space; trails 8,000 squiue feet (2 units/double lot) 9,000 width: 75', measured at front building line 90, To provide a hierarchy.of privately owned open space, bothdeveloped and undeveloped. To provide a stopping point for commercial raftingoperations Toilet facilities; picnic/seating facilities; trails; open H space Maximum structure height: I0, Minimum setback from river: 20, other: ownership and maintenance w,l be under thecontrol of the HOA; ,fiA.iiiii"s wiil be non_illuminated b. Fishing park Intent: Permiued Uses: Permitted Uses: Maximum structure height: 20, Other: Maximum structure height: Structures prohibited Minimum setback from river: Structures prohibited other: ownership and maintenance will be under thecontrol of the IOa, parking will be providedon anadjacent pur.:I, withiccesJprovided'Uy r.*, "f .pedestrian trail c. Active Recreation parks Intent: To provide a non-commercial, bankside area forlicensed fishing for residents of Rose Ranch andadjacent subdivisions Fishing; passive recreation; open space; trails To.provide an opportunity for non_illuminated active recreational activities for residents of RoseRangh and adjacent subdivisions o, i.rigated, multi-use fields. Active recreation including but not limited tovolleyball, horseshoes; trails; op", ,pu."; picnicfacilities Ownership and maintenance will be under thecontrol of the HOA; access to the upper facility willbe provided by means of a pedestrian/vehicular connection; access to the lower facility will be off Golf Cours e ZoneDistrict Intent: Permitted Uses: To provide open, generally undeveloped areas forvisual relief buffering and wildlife corridors Trails; pedestrian linkages; overlooks; community water system storage facilities 35', restricted to water system storage facility It is anticipated that one community water system storage facility will be built in the upper valiey, west of County Road 109. This faciiity will be non_detectable from County Road 109 and accessible bymeans of a maintenance access path that also servesthe Active Recreation parks. To. provide a high quality, golfing experience andgolf related amenities. Recreational golf course; maintenance and acc.essory buildings; driving range; golf relatedactivities; clubhouse including Uut rit limited to proshop, restaurant, lounge; parking; community greenhouse; community facilities d. Intent: Permiued Uses: Maximum structure height: Other: County Road 109 Open Space (General) be finalized during be parcelized / platted for 6. Maximum building height: Minimum building setbacks: ' To County Road 109 To any adjacent residential use 40, 2S', 25', Other:Golf course acreage will platting; golf course may ownership purposes H A. B. Evidence that Design considers Naturar Environment In an effort to protect the natural environment of the site, several steps have been taken.A thorough site anarysis investigated soils, ,rop"r, JJrrug", u.*"tation, views andaccess' A separate wetlands and wildlife study a"iir""i.a on-site wetlands associatedwith the Roaring Fork River, Robertson Ditch, naturar drainages and an existing pond.These areas will be protected by means of either op"n ,pu." designation or private openSpace Easements' A blue heron rookery was fieldsurueyed as part of the site analysisand has been protected from impacts ui **r oiop* ,pu.. buffering. An existing pondlocated within the golf course conidor will u. "xpanaeJ*d i-p.oued, while the creationof new ponds will extend and improve wildlife trauitat. An on-site tree inventory wasconducted to identifr significant stands for preservation.- A proposed I 10, buffer locatedat the south end of the deveropment, between Rose Ranch and reiler springs, wiilprovide separation between the communities and an addiiional wildlife corridoropportunity' No automobile access will be allowed*-*.r, west of county Road 109.Finally' corridors of natural open space have been left untouched between residentialclusters to separate uses and prorije visual relief. Impacts on Lakes, Streams and Topography Impacts to the on-site and off-site lakes, streams and topography shall be minimized. Anon-site pond located in the northem central portion of t[.;roperty (east of county Road109) shall be retained, enlarged una "nt *""d u, u "ir""iJra gorf course feature. Themajor drainageway:rir::r.irg th. p.op"rty from west to east (county Road I09 to theRoaring Fork River) shall be-retuin"alap.ouia. a.uinugl from the upper valley area,across county Road 109, through the property and to the river. This drainage shall beincorporated into the,golf courJ" unJJp"n space areas as naturar features when possibre.All drainage runoff shall be convey.al" the river using county standards. Runoff fromthe golf course w,r be part of the cour,y,, review of grading, drainage and erosioncontrol documents submitted.prior to golf course .onr"*.rion; all appropriate Federal,State and local environmental standarJs will be met in this effort The Robertson Ditch. an ij:'$:'il1#fffi:r#averses ,i. 'i,", w,r be improved and maintained, enhancing for Natural Hazards There are two areas of potential natural hazards identified within this property: (l) debrist'low and (2) flooding.ToT tr,. noJrg Fork River. aiL"no.ts have been made withinthis submittal to provide !1the ,ur"ty?rruture residen,, orrni, community as rerated tothese potential hazards' All residentia lot, t ur" u""n ll'g*a to allow for debris flow totraverse the site from west to east and into the river througf the central portion of the site.AII residential lots have also been car.fully designeJi" r"-.o" all building areas withineach lot out of the 1o0-year floodprain. some rol, tu". proorr.a ownership within the C. Provisions - D. E. F. 100-year floodplain, but any areas within must be contained within a private Open within the Private Open Space Easement. the 100-year floodplain that are located on a lot Space Easement. No structures are allowed Potential Radiation Hazards to Site Radiation hazards information is provided in the Phase I Environmental Site Assessment(MTI GEo) located in section III of this document. Ril requirements for preliminary Plan application concerning radiation determination forthis property shall be providedwith that subdivision application. Evidence that Ail Lots Have Access to a pubric Right-of-way All lots located within the proposed Rose Ranch subdivision have access to county Road109' There are three streets that access onto cR 109 and connect internally within thecommunity' All necessary access permits for these proposed access streets shall beobtained once County standards are met. Wildlife various open space-areas are proposed throughout the Rose Ranch site to allow both east-west and north-south wildlife movement corridors. The Roaring Fork River shall providea significant north-south travel corridor and a proposea tlo, buffer located at the southend of the development, between Rose Ranch and Teller Springs, will provide separationbetween the communities and an additional east-wes, *ilarir. movement corridoropportunity. Both physical and visual separation shall be implemented as buffe r zonemitigationbetween the blue heron took"ry (located east of the Roaring Fork River) and the proposedRose Ranch subdivision' - The iiver provides a natural physical barrier, while additionalopen space is also located between the west edge of the riuer and the residential Iotslocated in the immediate vicinity. The area west of cR 109 has been retained, primarily, as open space and golf coursecorridor' This area will also include an active .".r"uiion area (3.5 acres) and a ridgelinetrail -- all of which are low impact uses adjacent to the wildrife. An educational component shall be included in the homeowners, association structurethat addresses the general and specific aspects of humans and their pets living in closeproximity with wildlife' This information shall be assembled during the subdivisionprocess. - G. H. The covenants, conditions and Restrictions for Rose Ranch provide restrictions relatingto domestic dogs within the subdivision and the relationship to wildlife. Refer to the wetlands delineation, Endangered species and cultural Resources Report(Professional wetrands consurting,Inc.) in section III of this document. Affordable Housing In recognition of the county's goar of expanding its affordable housing stock, theapplicant has volunteered to contribute sioo p..".*r*."a home for the county,saffordable housing programs. This voluntary contribution could be used by the countyHousing Authority to further its goals---incl;did i*a-".qrirition or rent subsidies. Schools Due to the peripheral location of the Rose Ranch subdivision in comparison to theoptimum school site locations within the county, no s"hool sites are proposed within theproperty boundaries Jh". applicant proposes payment of cash-in-lieu of land to theCounty to meet the school sit" p.ovision requirements. H HEPWORTH - PAWLAK GEOTECHNICAL, INC. October 29,1997 The Rose Ranch Limited Partnership Roaring Fork Investments, LLC, General Partner Attn: Ron Heggemeier, Manager 1955 East Main Street Parker, Colorado 80134-7374 Subject: Job No. 197 327 t Report Transmittal, Preliminary Geotechnical study, Rose Ranch Development, County Road 109, Garfield County, Colorado. Dear Mr. Heggemeier: As requested, we have conducted a geotechnical snrdy for the proposed development. The property is suitabl. fr.. the proposed development based on geologic and ger.rtechnical conditions. There are several geologic conditions which ieed to be considered in project planning and design. The more severe constraints are associatedwith alluvial fan flooding and the potential for sinkholes. Subsurface conditions encountered in the exploratory borings drilled throughout the general proposed building.area typically consist of fine grained soils overlfing densegravel alluvium at depths between 2 to 42 feet. Groundwater was typically not encountered in the borings and the soils range from moist ro very -oist ir irrigated fields to sii_ehtly moist in higher rron-irrigaie,J areas. Spread footings placed on the natural subsoils should be suitable for support of lightly loaded buildings typical of residences. There could be potentiat for poii construction settlement where footings bear on hydrocompressive or soft soils. Subgrade stabilization of wet soils could be needed to provide a suitable surface for building androadway construction. The report which follows describes our investigation, summarizes our findings, and presents our recommendations suitable for planning and preliminary design. It is important that we provide consultation during design, and field seruices d'uring construction to review and monitor the implementation of the geotechnical recommendations. If you have any questions regarding this report, please ccntact us. Sincerely, HEPWORTH - PAWLAK GEOTECHNICAL, INC.**l//^A Steven L. Pawlak, P.E. and by: Ralph G. Mock Engineering Geologist SLP/ro TABLE OF CONTENTS PURPOSE AND SCOPE OF STUDY PROPOSED DEVELOPMENT SITE CONDITIONS 1 1 2 2 3 3 4 5 5 6 6 7 7 8 8 9 11 12 t2 t2 12 13 13 T4 t4 i4 15 15 15 L7 REGIONAL GEOLOGIC SETTING PROJECT AREA GEOLOGY EAGLE VALLEY EVAPORITE AND FORMATION COLLUVIUM . ALLUVIAL FANS NORTHEAST DRY PARK GULCH ALLUVIUM RIVER ALLUVT.IM LOESS SINKHOLES FIELD EXPLORATION SUBSURFACE CONDITIONS GEOLOGIC SITE ASSESSMENT ALLUVIAL FAN FLOODING SINKI{CLES REGIONAL EVAJOzuTE DEFORMATION RIVER TERRACE ESCARPMENT SETBACKS CONSTRUCTION RET ATED SLOPE INSTABILITY EARTHQUAKES PRELIMINARY DESIGN RECOMMENDATIONS FOUNDATIONS FLOOR SLABS UNDERDRAIN SYSTEM SITE GRADING SURFACE DRAINAGE PAVET,{ENT SUBGRADE LIMITATIONS REFERENCES FIGURE 1 - LOCATION OF EXPLORATORY BORINGS FIGURE 2 - 4 - LOGS OF EXPLORATORY BORINGS FIGURE 5 - LEGEND AND NOTES FIGURE 6 - 10 - SWELL-CONSOLIDATION TEST RESULTS FIGURE LT & 12 - GRADATION TEST RESULTS FIGURE 13 & 14 - HVEEM STABILOMETER TEST RESULTS TABLE I - SIIMMARY OF LABORATORY TEST RESULTS H-P GEoTECH 'f; PI.IRPOSE AND SCOPE OF STUDY This report presents the results of a preliminary geotechnical study for the proposed Rose Ranch Development, County Road 109, Garfield County, Colorado. The project site is shown on Fig. 1. The purpose of the study was to evaluate the geologic and subsurface conditions and their potential impacts on the project. The study was conducted in accordance with our proposal for geotechnical engineering services to High Country Engineering, dated May 2, lgg7. A field exploration program consisting of a reconnaissance and exploratory borings was conducted to obtain information on the site and subsurface conditions. Samples of the subsoils obtained during the field exploration were tested in the laboratory to determine their classification, compressibilit-v or swell, and other engineering characteristics. The results of the field exploration and laboratory testing were analyzed to develop recofiImendations for project planning and preliminary design. This report summarizes the data obtained during this study and presents our conclusions and recommendaiions based on the prcposed development and subsurface conditions encountered. PROPOSED DEVELOPMENT Rose Ranch Development will be a 440.4 acre residential and golf course development in Garfield County. The September26,1997 Sketch plan shows 320 residential dwelling units on 122.3 acres in the eastern part of the property befween County Road 109 and the Roaring Fork River (see Fig. 1) The residential rJevelopment will consistof 260 single family lots and 60 duplex lots. The golf course will cover 137.3 acres and will be located in two areas. One is along County Road 109 between the residential area and the steep bluffs which form the western valley side. The second golf course area is along Northeast Dry Park Gulch to the west of the steep bluffs. The remaining 180.8 acres will be open space and roads. Ir{ost of the steep terrain in the western part of the property will be undeveloped open space. Water will be supplied by an on-site, community water system w'ith on-site storage facility. The development will be connected to the Aspen Glen Sanitation District system for sewage disposal. H-P Grorecu -2- SITE CONDITIONS The Rose Ranch Development is located on the western side of the Roaring Fork River valley about five miles south of Glenwood Springs. The property covers parts of Sections I and 12, T. 7 S., R. 89 w. The terrain on the property is varied, see Fig.1. Moderately to gently sloping ground is present along the Roaring Fork valley floor in the eastern part of the property. Slopes in this area usually do not exceed l0o/o to the east of County Road 109. To the west of County Road 109 the valley floor abruptly transitions to a steep bluff along the rvestem valiey side. Slopes on the bluff are usually steeper than 60o/a. To the west of the bluff, the property extends into Northeast Dry park Gulch valley that is a tributary to the main Roaring Fork valley. Slopes on the property in the Northeast Dry Park Gulch area are usually in the range of llyo to 4oyo. Except for the Roaring Fork River, streams on the property are ephemeral and only have surface flow following periods of intense thunder storm precipitation or heavy sriowpack melt. Most of the ephemeral streams have small (less than 3 acres) drainage basins that are restricted to the east facing bluff side. These small ephemeral steams have built small, coalescing alluvial fans and aprons along the lower bluff side. Northeast Dry Park Gulch is also ephemeral but it has a relatively large drainage basin that covers about 980 acres. Northeast Dry Park Gulch has built a iarge alluvial fan in the northern part of the property. Most of the eastem part of the property is an active ranch with irrigated hay fields and pastures that are located downslope of the irrigation ditch, see Fig. l. The western part of the property is undevelopeci range land. Vegetation outside of the irrigated areas is rnostly sege anC other br':sh ..*riih some sca.tlered juniper trees. An abandoned railroad grade crosses through the eastern part of the property. In places, relatively large fill embankments are present along the railroad grade and irrigation ditch. Residential developments are located on adjoining properties to the northwest and south. REGIONAL GEOLOGIC SETTING The project site is in the Roaring Fork River valley to the south of Glenwood Springs. In this area the valley trends along the crest of the Cattle Creek Anticline H.P GEoTECH -3 - (Kirkham and Others,1996). The anticline is a second-order, regional structure befween the first-order Grand Hogback Monocline to the southwest and the White River Uplift to the northeast. These regional structural features developed as a result of compressional stresses during the Laramide Orogeny about 40 to 70 million years ago. In additional to Laramide compressional stresses the Cattle Creek Anticline is also believed to be associated with ground deformations related to evaporite diapirism, hydration expansion, and dissolution in the Eagle Valley Evaporite which forms the core of the anticline. The evaporite deformation in the region is younger than the 3.0 to 22.4 million year old basalt flows present in the uplands to the east and west of the Roaring Fork Valley (Kirkham and Widmann, 1997). The evaporite deformation has affected Pleistocene (10,000 to 1.8 million year old) deposits and landforms and possibly Holocene (less than 10,000 year olC) deposits and landforms in the region. Along the axis of the Cattle Creek anticline it appears that the Late Pleistocene and older river terraces have been tilted away from the river in places (Kirkham and Others, 1996). PROJECT AREA GEOLOGY Our interpretation of the geologic conditions in the project area is shown on Fig. 1. Formation rock in the area is the Eagle Valley Evaporite and Eagle Valley Formation. The rock is usually covered by surficial soil deposits that consist of colluvium. ailuvial fans, river alluvium and loess. Major faults are not known to be present in the project area (Iweto and Others, 1978, and Kirkham and Others,1996). The principle geologic fbatures in the project area are described below. EAGLE VALLEY EVAPORITE AND FORMATION Prominent outcrops of the Eagle Valley Evaporite (Pee) are present along the bluffs to the west of County Road 109. Elsewhere the formation rock is usually covered by surficial soil deposits and outcrops are limited. To the west, the Eagle Valley Evaporite grades into the Eagle Valley Formation (Pe) along the limb of the Grand Hogback Monocline. These two formations were deposited during the Middle Pennsylvanian (about 300 million years ago) in the interior of the Eagle Basin. The Eagle .h- H.P GEoTECH -4- Valley Formation is the transitional interval between the Eagle Valley Evaporite and the red-beds of the Maroon Formation. Eagle Valley Evaporite: The Eagle Valley Evaporite (Pee) is made up of gray and tan, gypsum, anhydrite, and halite with interbedded siltstone, claystone, shale, and dolomite. The gypsum, anhydrite and halite are soluble in fresh water. The siltstone, claystone, and shale varies from cemented and hard to non-cemented but firm. The dolomite is cemented and hard. The bedding structure at most places is convoluted because of flow deformation in the plastic gypsum, anhydrite, and halite. Joints are commonly present in the cemented beds. The gypsum, anhydrite, and halite are massive because of their plasticity and do not contain joints. Subsurface voids and related sinkholes are sometimes present in areas underlain by the Eagle Valley Evaporite throughout western Colorado because of the solubility of the gypsum, anhydrite and halite. Ehgle Valley Formation: The Eagle Valley Formation (Pe) is made up of reddish- brown, gray, and reddish-gray siltstone, shale, claystone, fine-grainecl sandstone, carbonate rock, and local lenses of gypsum. The rock varies from non-cemented but firm to cemented and hard. Joints are common in the cemented beds. Subsurface voids and related sinkholes are sometimes present in areas underlain by the Eagle Valley Formation because of the solubility of the local gypsum lenses. CCLLWIUM Colluvium (Qc) usually covers the formation rock on the hillsides and other upland areas. The coiluvium is a poorly stratified deposit of angular rock fragments from gravel to boulder size in a soil matrix. The soil matrix varies from a silty and ciayey sand to sandy silt and clay. The rock fragments are usually supported by the soil matrix with little fragment to fragment contact. The soil matrix typically exhibits a collapse potential when wetted. The depth of the colluvium is expected to vary from less than I foot to over 10 feet in places. H H-P GEoTEcH -5- ALLWIAL FANS Alluvial fans (Qaf-1 and Qaf-2) form an alluvial apron along the base of the bluff in the eastern part of the project area. A large alluvial fan (Qaf-l) is present at the mouth of Northeast Dry Park Gulch. The slope of the Northeast Dry Park Gulch fan is about 8o/o near the fan head and decreases to about 4o/o along the lower parts of the fan. Small basin alluvial fans (Qaf-2) have developed at the mouths of the numerous small drainage basins on the bluff to the north and south of the Northeast Dry Park Gulch fan. In their lower parts these small basin alluvial fans coalesce to form the a continuous alluvial apron. Near the fan head the small basin alluvial fans have slopes between 30yo and 4Oyo. In most places the slope along the lower part of the alluvial apron is about 4o/o. Fan channels are poorly defined and there are several abandoned channels on all ofthe fans. The alluvial fans result from sediment deposition associated with debris floods and viscous debris flows caused by unusually intense thunderstorm precipitation or unusually heavy snowpack melt. Parts of the alluvial fans have covered all but the ybungest river terrace (Qt-1). This indicates that the fans at the site are geologically young and are probably still active geomorphic features. Studies of similar fans to the south in the Carbondale area suggest debris flow recurrence intervals between 100 and 340 years (Kirkham and Widmarn,1997). Tl"re alluvial fans consist of both matrix supported and clast supported deposits. The matrix supported deposits consist of angular to rounded gravel, cobbles and boulders. Boulders from I to 2 feet are common in the upper parts of the fans. The soil matrix varies from a silty and clayey sand to sandy silt and clay. In contrast, the clast supported deposits consist of a sandy silt with angular to rounded, gravel, cobbles and occasional bculders. The explcratory borings show that the fan deposits are relatively deep in their upper and middle parts. The fan deposits at Boring 2 were 42 feet deep, and the fan deposits at Borings 4, 8 and 9 are over 31 feet deep. The natural relatively dry fan deposits typically exhibit a collapse potential when wetted. NORTHEAST DRY PARK GULCH ALLWIUM The channel floor of Northeast Dry Park Gulch and its larger tributaries are underlain by alluvium (Qadp-l). Older alluvium (Qadp-2) is also present in places in the Northeast Dry Park drainage. The older alluvium consists of fans and stream channel , - H-P Georecs -6- deposits. The Northeast Dry Park Gulch alluvium (Qadp-l and Qadp-2) consists of matrix and clast supported deposits similar to the alluvial fan deposits previously described. The only development proposed in this area is the golf course and exploratory borings were not located in this area. RIVER ALLWIUM Alluvium (aar0 deposited by the Roaring Fork fuver is present along the modern river channel and as five terraces (Qrl through Qt-5) adjacent to the channel. All of the terraces except the lowest terrace (Qt-1) appear to project below the alluvial fans on the western valley side. Terrace levels Qt-3, Qt-4 and Qr5 probably correlate with the Pinedale glacial period and the alluvium is outwash that was probably deposited between 12,000 to 35,000 years ago (Kirkha-m and Others, 1996). The lower terraces et-l and et- 2 are younger than 12,000 years. Flood plain studies show that the Qt-l terrace and part of the Qt-2 terrace are below the 100-year flood plain of the Roaring Fork River (High Country Engineerin g, 1997). The Roaring Fork alluviu-m is predominantly a clast-supported deposit of rounded gravel, cobbles and boulders in a sand and silty sand matrix. Some lenses of sandy silt and clay are locally present in the alluvium. The gravel, cobbles and boulders are a variety of durable, unweathered rock types from the upper river drainage basin. Boulders typically vary from 1 foot to 3 feet. Practical auger refusal was encountered at relatively shallow penetration depths in the alluvium. Auger borings could not be drilled deeper than about 2 to 7 feet in the river gravel alluvium. i.,OESS The exploratory borings show that the soil profile at most boring sites have a surface iayer of loess. The loess is a wind deposited sandy clay and silt. At the boring sites the loess was from 1.5 to 15 feet thick. The loess is not always present at the surface and it is not possible to evaluate its thickness from surface observations. Because of this, the loess is not sh<-,nn on the geologic map, Fig. L However, loess should be expected in many areas at the surface of the fans and river terraces. H-P Grorecu -7 - SINKHOLES Sinkholes are known to be locally present in the Roaring Fork and Crystal River valleys south of Glenwood Springs in areas underlain by the Eagle Valley Evaporite and Eagle Valley Formation. Several large ground surface depressions that may be sinkholes were observed in the field, on the topographic map, and on the aerial photographs, see Fig. 1. In addition, smaller circular patterns were noted on the aerial photographs that may also be associated with small sinkholes. The larger possible sinkholes vary from 20 to 200 feet in diameter and have maximum depth of I to l0 feet. Most, but not all, of the possible sinkholes are located within 500 feet of the Roaring Fork River and in areas which have been flood irrigated. The sinkholes in the region appear to result from the roof collapse of subsurface voids in the shallow formation rock or by piping and caving of the surficial soils into voids in the formation rock in areas where rock is relatively deep. In places to the south of the project area, sinkholes have developed in the terrace deposits where the terrace deposits are up to about 100 feet thick. FIELD EXPLORATION The field exploration for the project was conducted on luly 2,3 and B, lg9l. Twelve exploratory borings were drilled at the locations shown on Fig. 1 to evaluate the subsurface conditions. The borings were advanced with 4 inch diameter continuous flight auger powered by a truck-mounted Longyear BK-51HD drill rig. The borings were logged by a representative of Hepworth-pawlak Geotechnical, Inc. Samples of the subsoils were taken with l3le inch and 2 inch I.D. spoon samplers. The samplers were driven into the subsoils at .,,arious depths with blows from a 140 pound hammer falling 30 inches, This test is similar to the standard penetration test described by ASTM Method D-1586. The penetration resistance values are an indication of the relative density or consistency of the subsoils. Depths at which the samples were taken and the penetration resistance values are shown on the Logs of Exploratory Borings, Figs. 2, 3 and 4. The samples were returned to our laboratory for review by the project engineer and testing. - H-P GEoTECH -8- SUBSURFACE CONDITIONS Graphic logs of the subsurface conditions encountered at the site are shown on Figs. 2, 3 and 4. Below about t/z to I foot of topsoil the subsoils rypically consist of fine-grained soils overlying relatively dense, sandy gravel, cobbles and boulders (river alluvium) at depths between 2 to 42 feet. Drilling in the dense gravel with auger equipment was difficult due to the cobbles and boulders and drilling refusal was encountered in the deposit. The upper soils are typically low to medium plastic clay, silt and sand that are medium to stiff and loose to medium dense. Laboratory testing performed on samples obtained from the borings included natural moisture content and densiqv, gradation analyses and liquid and plastic limits. Results of swell-consolidation testing performed on relatively undisrurbed drive samples of the upper fine grained soils, presented on Figs. 6-10, ,qenerally indicate low to moderate compressibility under conditions of light loading and wetting. The drier samples typically showed a low to moderate collapse potential (settlement under constant load) when wetted and moderate to high compressibility under increased loading. Results of gradation analyses performed on small diameter drive samples (minus lVz inch fraction) of the coarser subsoils are shown on Figs. 11 and 12. Hveem stabilometer 'R' value test results performed on the upper silt and clay soils are shown on Fig. l3 and 14. The iaboratory testing is summarizeci in Table L Free water was typically not encountered in the borings at the time of drilling. Free water was ensountered in Boring 10, located in the north end of the property, at a depth of 10 feet. The groundwater level could be relatively shallow in the lower, northerii and easiern parts of the property near the Roaring Fork River. The subsoils in the higher non-irrigated areas were typically slightly moist and the subsoils in irrigated fields were moist to very moist. GEOLOGIC SITE ASSESSMENT It should be possible to develop the property much as proposed on the September 26,1997 Sketch Plan without encountering geologic constraints. There are, however, several conditions of a geologic nature which should be considered in project planning H.P GEoTECH t -9- and design, as discussed below. The more severe constraints are associated with alluvial fan flooding and the potential for sinkholes. These conditions may require some modifications to the project layout as indicated on the September 26,lgg7 Sketch plan. ALLUVIAL FAN FLOODING The ephemeral channels and alluvial fans (Qaf-l and Qaf-2) in the project area are susceptible to debris floods and viscous debris flows (hyperconcentrated flows) associated with unusually intense thunderstorm precipitation or unusually heavy snowpack melt. The alluvial fans in the project area appear to be geomorphically active and recurrence periods for major flow events are probably in the range of 50 to 500 years. Because of the potential for channel blockage, the existing fan channels should not be relied on to convey potential hyperconcentrated flows, unless site specific hydraulic analysis sho*'s otherwise' The entire fan surfaces should be considered in a potential flood area. Nature of Hyperconcentrated Flows: Hyperconcentrated flows differ from water floods with low sediment concentrations. It is imponant that alluvial fan flood hazard evaluation and mitigation consider these differences (Juilen and O'Brie n, 1997). Hyperconcentrated flows represent a continuous transition between water floods and earthflow type landslides. Water floods typically have sediment concentrations of less than2Oohby volume. Debris floods are very fluid, comparable to water floods, and typically have sediment concentrations between20o/o and,45Yo by volume. Viscous debris flows are highly viscous fluid masses that typically have sediment concentrations between 45?,o and 55%by volume. They are capable of rafting boulders near their surface and can travel long ciistances on moderaie siopes. They form levees and lobate,Jeposits on alluvial fans. Granular debris flows typically have sediment concentrations of greater than 509/c by volume. Flow momentum and energy dissipation is largely by inter-partial dispersive stress. They attain high velocities on very steep slopes, but they also require steep slopes to remain in motion and most stop near the fan head. . The alluvial fans in the project area could experience flood hazards associated with water floods, debris floods and viscous debris flows and all three types of flows could occur during a single flood event. There does not appear to be a potential for granular debris flows in the project area. The flood hazard hydraulic analysis should H-P Georecx -10- account for sediment bulking and the non-Newtonian nature of the hyperconcentrated flows. Mitigation Concepts: The need for and type of alluvial fan flood hazard mitigation for the development should be based on a site-specific analysis by a hydraulic engineer. Straight uniform section channels are best for conveying the water and sediment associated with debris lloods across the alluvial fan. Channel bed and bank stability may be critical and channel lining or other protection methods may be needed. Detention basins, deflection structures and spreading, or channel and levee conveyance systems are best suited for viscous debris flow mitigation. It may be feasible to directly protect individual buildings by flood proofing and building wall reinforcement at sites where flow ciepth. flow velocities and impact loadings are relatively small. Direct building protection can be Cesigned to provide a reasonable level of safety for an individual building and its occupants, but direct building protection will not prevent property damage resulting from erosion and the deposition of mud and debris. Relatively large design flows should be considered on the Northeast Dry park Gulch alluvial fan (Qaf-1) because of its relatively large drainage basin and the steep, highly erodible slopes where the gulch crosses through the bluff. If a detention basin is used for mitigation, it would have to be constructed off of the property at the fan head. <- Basin storage volumes can be estimated by bulking the design water flood hydrograph at the fan head by a factor of two. Mitigation with a deflection structure and spreading would involve deflecting the design debris flood and debris flow to one side of the fan and spreading the flows onto open space or the golf course away from occupied structures. To be effective the deflection structure would hai'e to stan cff the prcperry near the fan heaci. For the Northeast Dry Park Gulch fan, it appears that a straight channel and levee conveyance system will prove to be the best mitigation method. The channel and levee conveyance system should start at the fan head which is off of the property. A straight, uniform section channel would be constructed from the fan head to the river. The main channel would be designed to permit some overbank flow. Levees or a larger outer channel, would be constructed parallel to the main channel with an appropriate setback for storage of mud and debris. All three mitigation concepts w.ill require a maintenance plan for the removal and disposal of mud and debris. H-P GEoTEcH - 11- Relatively small design flows can be considered on the other alluvial fans (Qaf-2) because of the small size of their drainage basins. As shown on the September 26,lggT Sketch Plan, the golf course should provide a buffer zone between the upper part of these fans and the residential development area. It is likely that site-specific hydraulic analysis will show that design flow depths, flow velocities and impact loadings are relatively low in the proposed residential area. Mitigation, if required, for the small drainage basin fans (Qaf-2) will probably be flood proofing and direct building protection. SINKHOLES The possible sinkholes shown on Fig. I and other sinkholes and shallow subsurface voids that may be encountered during construction should be avoided as building sites, road alignments and underground utility corriclors, or site-specific studies should be undertaken to determine if the sinkholes and voids can be stabilized. Setbacks from the possible sinkholes should be based on site-specific srudies, but for preliminary pianning a rninimum setback of 20 feet is recommended. Roads can often be constructed over sinkholes after stabilization but because of possible future subsidence, settlement sensitive utility lines should still avoid the sinkhole area. The probability of encountering sinkhole related problems in areas away from the possible sinkholes is considered to be low, but the developer and prospective home owners should be aware that the development can not be considered totally sinkhole risk free. The potential for subsurface voids should be considered when planning site-specific foundation exploration at ali building sites. If voids or other conditions indicative of possible problems are encountered, the site should be avoided or the feasibility of mitigation considered. Mitigation metho,is that can sometimes bc used to reduce poteniial sinkhole relateC problems include: (l) void stabilization by grouting, or by excavation and backfilling; (2) deep foundation systems; (3) structurally bridging the potential problem area; and (4) mat foundations or other foundation systems capable of withstanding loss of support over large areas. Even with mitigation it may not be possible to prevent some structural damage to buildings, but it should be feasible to prevent sudden building collapse and provide a reasonable level of safety for the building occupants. H-P GEoTECH -t2- REGIONAL EVAPOzuTE DEFORMATION The development is in an area where regional ground deformations have been associated with evaporite dissolution and flowage from beneath the area. It is uncertain if this deformation is still an active geologic process or if deformation has stopped. If ground deformation is still occurring, it is likely the deformation rates are very slow and occur over relatively broad areas. Although the potential for ground deformation problems appears to be low, the project area can not be considered totally risk free. The risk of building damage can be reduced by special foundation designs such as a heavily reinforced mat and without a basement level. RIVER TERRACE ESCARPMENT SETBACKS In a few areas residentiai lots are planned next to steep terrace escarpments which - lead directly down to the river. In these areas there is a potential for instability if the building site is located too close to the top edge of the escarpment. It is recommended that a minimum building site setback of 2:l (horizontal to vertical) measured from the edge of the river channel be considered on these lots. Building envelopes that are closer to the top of slope should be evaluated on a site specific basis. CONSTRUCTION RELATED SLOPE INSTABILITY We do not expect rnajor problems with construction related slope instability associated with grading for roads and building sites if grading is not considered on slopes steeper than about 30%. If it is necessary to perform extensive grading on slopes steeper than 30o2, the proposed grading should be evaluated by a site specific geotechnica! study. Preliminary recommendations for site grading are presented in the Site Grading section of this report. EARTHQUAKES The project area could experience moderately strong earthquake related ground shaking. Modified Mercalli Intensity VI ground shaking should be expected during a reasonable service life for the development, but the probability for stronger ground shaking is low. Intensity VI ground shaking is felt by most people and causes general alarm, but results in negligible damage to structures of good design and construction. All H-P GEoTEcH t3- occupied structures in the development should be designed to withstand moderately strong ground shaking with little or no damage and not to collapse under stronger ground shaking. The region is in the Uniform Building Code, Seismic Risk Zone l. Based on our current understanding of the earthquake hazard in this part of Colorado, we see no reason to increase the commonly accepted seismic risk zone for the area. PRELIMINARY DESIGN RECOMMENDATIONS The conclusions and recommendations presented below are based on the general proposed development plan, subsurface conditions encountered in the exploratory borings, and our experience in the area. The recommendations are suitable for planning and preliminary design of the subdivision. Site specific studies should be conducted for significant structures such as tanks, runnels and walls and for individual lot development. FOUNDATIONS Bearing conditions will vary depending on the specific location of the proposed buildings and structures on the properry. Based on the nature of the proposed construction spread footings bearing on the natural subsoils should be suitable for typical lightly loaded residences. We expect the footings can be sized for an allowable bearing pressure in the range of 1,000 psf to 1,500 psf for the upper fine-grained soils and 3,000 psf to 5,000 psf ior the dense gravel alluvium. The drier soils encountered in non-irrigated areas typically have a collapse potential when wetted and there could be some post construction settlement. The highly moist silt and clay soils in irrigated areas could also have a settlernent potential rvhen loaded. Heavily reinforced foundations and maintaining dry bearing soils will help limit the risk of settlemenr and building distress. Wet subgrade areas could require stabilization to provide a suitable surface for footing support. Foundation walls should be designed to span local anomalies and to resist lateral earth loadings when acting as retaining structures. Below grade areas and retaining walls should be protected from wetting and hydrostatic loading by use of an uncierdrain system. The footings should have a minimum depth of 36 inches for frost protection. H.P GEoTEcH -t4- FLOOR SLABS Slab-on-grade construction should be feasible for bearing on the natural soils. There could be some post construction slab settlement at sites with hyrocompressive soils. To reduce the effects of some differential movement, floor slabs should be separated from all bearing walls and columns with expansion joints. Floor slab control joints should be used to reduce damage due to shrinkage cracking. A minimum 4 inch thick layer of free-draining gravel should underlie basement level slabs to facilitate drainage. UNDERDRAIN SYSTEM Although free water was typically not encountered in the exploratory borings, it has been our experience in the area that the groundwater level can rise next to rivers and that local perched groundwater can develop during times of heavy precipitation or seasonal runoff. An underdrain system should be provided to protect below-grade construction, such as retaining walls, crawlspace and basement areas from wetting and hy,irostatic pressure buildup. The drains should consist of drainpipe surrounded above the invert level with free-draining granular material. The drain should be placed at each level of excavation and at least 1 foot below lowest adjacent finish grade and sloped at a minimum l% to a suitable gravity outlet. The lower level of buildings should be at least 2 feet above the high groundwater level. SITE GRADING The risk of construction-induced slope instability at the site apoears low provided the buildings are iocated in the less steep part of ihe property as planned and cut and fill depths are lirnited. Cut depths for the building pads and driveway access should not exceed about 10 feet. Fills should be limited to about 10 feet deep and not encroach steep terrace escarpments. Structural fills should be compacted to at least 95% of the maximum standard Proctor density near optimum moisture content. prior to fill placement, the subgrade should be carefully prepared by removing all vegetation and topsoil. The fill should be benched into slopes that exceed 20% grad,e. The on-site soils excluding oversized rock and topsoil should be suitable for use in embankment H-P GEoTECH -15- fills. The highly moist to wet soils will probably need to be dried before they can be reused as structural fill. Permanent unretained cut and fill slopes should be graded at2 horuontal to I vertical or flatter and protected against erosion by revegetation, rock riprap or other means. This office should review site grading plans for the project prior to construction. SURFACE DRAINAGE The grading plan for the subdivision should consider runoff from steep uphill slopes through the project as described above in Alluvial Fan Ftooding and at individual sites. Water should not be allowed to pond which could impact slope stability and foundations. Wetting of hydrocompressive bearing soils could result in building settlement and distress. To limit infiltration into the bearing soils next to buildings, exterior backfill should be well compacted and have a positive slope away from the building for a distance of at least 10 feet. Roof downspouts and drains should discharge weli beyond the iimits of all backfill and landscape irrigation shculd be restricteC. PAVEMENT SUBGRADE The subgrade soils encountered throughout the development area consist mainly of slightly sandy to sandy silt and clay which is a poor material for support of pavements. An Hveem 'R' value of 52 was obtained on a silt sample and 29 was obtained on a silty clay sample. An Hveem 'R' value in the range of 15 to 30 appears suirable for pavement design. Some of the subgrade soils in irrigated field areas are highly moist and could require drying or stabilization to provide a suitable surface for pavement construction. A detailed pavement design study should be conducted when the road alignment, grading and traffic load have been determined. LIMITATIONS This study has been conducted according to generally accepted geotechnical engineering principles and practices in this area at this time. We make no warranty - H-P Georecn -16- either expressed or implied. The conclusions and recommendations submitted in this report are based upon the data obtained from the field reconnaissance, review of published geologic reports, the exploratory borings located as shown on Fig. l, the proposed type of construction and our experience in the area. Our findings include interpolation and extrapolation of the subsurface conditions identified at the exploratory borings and variations in the subsurface conditions may not become evident until excavation is performed. If conditions encountered during construction appear different from those described in this repoft, we should be notified so that re-evaluation of the recommendations may be made. This report has been prepared for the exclusive use by our client for planning and preliminary design purposes. We are not responsible for technical interpretations by others of our information. As the project evolves, we should provide continued consultation, conduct additional evaluations and review and monitor the implementation of our recorunendations. Significant design changes may require additional analysis or modifications to the recommendations presented herein. We recommend on-site observation of excavations and foundation bearing strata and testing of structural fill by a representative of the geotechnical engineer. Respectfu lly Submitted, HEPWORTH - PA ECHNICAL, INC. Steven L. Pa Engineering Geologist SLP/ro cc: High Country Engineering - Attn: Joe Hope H.P GEoTEcH 1 5222 : "y/r'tls'i t7- REFBRENCES High Country Engineering, 1997, Drainage Report for Rose Ranch PUD - Sketch Plan Submittal, Garfield County, Colorado: Job No. 97A42.02, July 7, 1997. Juilen, P.Y. and o'Brien, J.s., 1997, on the Importance of Mud and Debris Flow Rheologt in Structural Design in Debris-Flow Hazards Mitigation, Chen, C. editor : American Society of Civil Engineers, New York, New york. Kirkham, R.M. and Others, 1996, Geologt Map of the Cattle Creek Quadrangle, Garfield County, colorado: colorado Geological Survey open File Report 96-r. Kirkham R.N{. and Widmann B. L., '1997, Geologt Map of the Carbondale Quadrangle, Garfield County, Colorado: Colorado Geological Survey Open File Report 97-3. Kirklram, R.M. and Rogers, w.P., 1981, Earthquake Potential in Colorado - A Preliminary Evaluation' colorado Geological Survey Bulletin 43. MTI GEO, 1996, Preliminary Geotechnical Investigation Rock'n Rose Ranch, 0408' county Rood 109, Garfield county, colorado: Prepared for Mr. Jim Rose, Glenwood Springs, Colorado (Job No. G96lZ\,May 24,1996). Tweto, and Others,1978, Geologt Map of the Leadville l" X 2" euadrangle, Northwestern Colorado.' U.S. Geological Survey Map I-999. H-P GeorrcH BORING 1 ELEV. : 6010' sA2 wC=5.2 DD-91 -200.=87 16/12 wC=6.7 DD=100 3s/12 BORING 2 ELEV : 6O13' -200=89LL-2J Pl=6 -52 lvC=J.6 100 BORING 3 BORING 4 ELEV. : 5957' ELEV. : 6O10' 22/12 WC=11.8 DtFt19 -20O=91LL-26 Pl=11 1 /12 WC:26.0 20/6 23/12 Y,c:2.2 DD-1O5 -2OO:24 oc, LL I -c o-q)o 40 o)otr I -c ooo 1O/12 wC=2.9 DD-78 -20|.F.7A 22/12 BOTTOM OF BORING AT 45' 30/12 37 /12 Note: Explonotion of slrnbols is shown on Fig. 5. 197 327 HEPWORTH PAWLAK GEOTECHNICAL, INC.LOGS OF EXPLORATORY BORINGS 12/6.30/6 15 wC:J.0 DD:I11 BORING 5 ELEV. : 5966' BORING 6 ELEV. : 5940' BORING 7 ELEV. : 5945' BORING 8 ELEV. : 5980' 16/12 wC=7.5 DD-95 1642 1/12 wC:20.2 DD-'l0l -2OO-75lL-27 Pl:11 2o/+ 12/6 15/6.2o/3-] tryc:r.7 ts +.{:++ _J -2oFrl 67 /12 e/12 wC=5.9 DD-81 -20G63 2+/12 17 /12 WC=1.6 +4-27 -20O=23 o lD LL I -c o- 0)a 2s /12 oot! I o_oo Note: Explonotion of s)rnbols is Fig.5. 197 327 HEPWORTH PAWLAK GEOTECHNICAL, INC.LOGS OF EXPLORATORY BORINGS Fig. 3 BORING 9 ELEV. : 5998' BORING 1O ELEV. : 5930' BORING 11 BORING 12 ELEV. : 5942' ELEV. : 5926' 12/12 5/12 \tC=11.4 0D:95 6n2 31/12 wc:7-4 DD-94 -20,G77LL-37 Pl=19 5o/6 3/12 @ a)t! I -c o- o)o 15fi2 o() LL I coo Note: Explonotion of synbols is shown on Fig. 197 327 HEPWORTH PAWLAK GEOTECHNICAL, INC.LOGS OF EXPLORATORY BORINGS Fig. 4 -l I i/" croo=u iJm ljrzrz L I trc=za.s DD-90 1s/5 ffi'13;"'' -:; :::.:: :,:::,,;^::'."" d'rk n.s, br.wn .w,. medum I H n CmV (Ct-); silty. sondy, medium stiff to stiff, slightly moist to very moist, brown, low to a::.-;'^:: .:,;::.:; ;J:J,"sondy,mediumstiff tostiff,siehtymoist. ishtbrown IlA low PlosticitY- I I A stlr (ul); sondy, scottered srovel, stiff, moist, tisht brown. I I W SAND AND SILT.(SM-ML); grovelly. some cobbles, loose to medium dense, slightly moist, mixed U.o*n".1 t ffi il :-t, ;:^;.. (.M-GM); s*ty. cobbres. medium dense, sriehry moisr, brown. Itt I ffiJ cRAVEL, CoBBLES AND BouLDERS (cP-GM): stishtty sitty, sondy, dense, stightty moist to wet below I I H woter level, brown, rounded river terroce rock- Itt I F Relotively undisturbed drive somple; 2-inch l.D. Colifornio liner somple. I{,1 I I Drive somple; stondord penetrotion test ( Sef ), 1 3/}-inch l.D- split spoon somple. ASru D - f SaO- ] l_, ^ Drive somple blow count; indicotes thot 9 blows of o'l 40-pound hommer folling 30 inches were 19/12 required to drive the Colifornio or SPT sompler 12 inches. I l- - -, : Free woter level in boring of time of drilling. I I r Disturbed bulk somple. I l--r -------) Coved depth wtren checked on July 8, 1997. I I f Procticol rig refusol. Where shown obove bottom of boring, indicotes thot multiple ottempts I I were mode to odvonce the boring. I NOTES: lf. e*ptorotory borings were drilled on July 2, 3 ond 8, 1997 with o 4-inch diometer continuous flight I power ouge!'. I Z. Locoticns of explor.ctory borings were meosured ooproximotely by pocing from feotures shown I on the site plon provided by High Country Enginegring. | 3. Elevotions of explorotory borings were estirnoted from the contour plon. The logs ore drown to depth. I a. The explorotory boring locotions ond elevotions should be considered occurote only to the degree implied I by the method used. I S. fh" lines between moteriols shown on the explorotory boring logs represent the opproximote boundories I between moteriol tlpes ond tronsitions moy be groduol- | 6. Woter level reodings shown on the logs were mode of the time ond under the conditions indicoted. ! Fluctuotion in woter level moy occur with time. No free woter wos encountered in the borings when I I checked on July 8, 1997. | 7. Loborotory Testlng Results: -2OO : Percent possing No. 2O0 sieve. I *a : woter content ( % ) LL : Liquid Limit ( %. ) I DD : O.v Oun=ity ( plf )' pt : Ptosticity-tMex ( % ) I fO : pJrcent retoined on No. 4 sieve- 'R- : Hveem 'R' Volue 197 327 HEPWORTH PAWLAK GEOTECHNICAL, INC.LEGEND AND NOTES Fig. 5 i. 100 0.1 1 hq 0 c .ooo-P1o- Eo() 2 1 4 0 1 be2 c "9ot?U)JoLo E 5 6 1001.0 10 APPLIED PRESSURE - ksf 1.0 10 APPLIED PRESSURE - ksf Moisture Content : 6.7 percent Dry Density : lOO pcf Somole of: Sondv Silt onci Clov From: Boring 1 of 5 Feet \ Compression upon wetting \ \ \ Moisture Content : 3.6 percent Dry Density : 1OO pcf )omPre or: )onoy 5lrr ono uroy From: Boring 2 of 3 Feet Compression uPon wetting 197 327 HEPWORTH PAWLAK GEOTECHNICAL, INC.SWELL_CONSOLIDATION TEST RESULTS Fig. 6 \ Moisture Content : 3.0 Percent Dry Density Weight : 111 pcf Somple of: Silty Sond with Grqvel From: Boring 4 qt 15 Feet - Compression upon wetting \ \ \ \ \ \ 0 1 2 cO1"a !) U'a' (LE,O+o t L, 6 7 8 I 10 11 0.1 1.0 10 APPLIED PRESSURE - ksf 100 SWELL_CONSOLIDATION TEST RESULTSHEPWORTH _ PAWLAK GEOTECHNICAL, INC.197 327 \ -I I Moisture Content = 7.5 percent Dry Density Weight : 95 pcf Somple of: Sondy Silty Cloy From: Boring 5 of 2 Feet - Compression upon wetting \ ll 0 1 2 BI cOz'-tr, J u,o La EO+() 5 6 1.0 10 APPLIED PRESSURE - ksf0.1 SVVELL_CONSOLIDATION TEST RESULTSHEPWORTH PAWLAK GEOTECHNICAL, INC.197 327 100 _l a $q C .o an 0) o_ EoO ol 1 t_ z 4 cr,, 6 7 8 I 10 o.'l 1.0 10 APPLIED PRESSURE - ksf 100 Moisture Content : 28.5 percent Dry Density Weight = 90 pcf Somple of: Sondy Silty Cloy From: Boring 1O of 5 Feet No movement upon wetting \ \ \ \ \ 197 327 HEPWORTH PAWLAK GEOTECHNICAL, INC.SWELL_CONSOLIDATION TEST RESULTS Fig. 9 \ \ \ \ Moisture Content : 11.4 Percent Dry Density Weight : 95 PCf Somple of: SondY Silt ond CloY From: Boring 11 of 3 Feet 0 n 2 be =o?.6r {) oE.o"t() 3 6 7 I I 10 11 12 10 APPLIED PRESSURE - ksf SWELL_CONSOLIDATION TEST RESULTSHEPWORTH PAWLAK GEOTECHNICAL, INC.197 327 1.0 2,1 l{R 7 HR IIC RE DI}IGS 60 llH.lg lll{. 4 lllit I U.S. STANOAM EEES CLEAR Scr,ARE OP€'{'IGS 9.5r25 !C-O SILT AND CLAY 11 % o trJz. Ftrl E. t-zLrjOu. TJJo- (9 z.6tn o- F-z.tljO E, UJI ,i5 rmE 00 a 70 ao 50 rlo J) 20 to o o 10 20 JO .tO 50 6(, m to eo SAMPLE OF: Stightly Silty Sond ond Grovel FROM: Boring 7 ol 7 ond 10 feet Combined uN.4Ultd tulN. .oos .oos ,o9 .o:t7 .o74 -'150 .600 t, o 10 20 JOotd4 F Ld50or t--z.60 Ld()Em LrJ o_ ao s loo 1 roo F EooL E aoE F E70t L *E *[ I*[ t :I ':l (9 z. U) <n o_ l-- LrJ(J d LiJ L .oo5 .009 .or9 .o37 .O71 .rSO Jm '6m I SAND 45 % 2 132 127 GRAVEL 44 % LIQUID LIMIT %PLASTICITY INDEX % HR. 7ux. 15 HR DIAMEIER OF PARTICLES IN MILLIMETERS DIAMETER OF PARTICLES IN MILLIMETERS GRADATION TEST RESULTSHEPWORTH PAWLAK GEOTECHNICAL, INC.197 327 GRA\EL 27 % . LIQUID LIMIT % SAMPLE OF: Silty GrovellY Sond % SILT AND CLAY 23 Z PLASTICITY INDEX % FROM: Boring 8 of 1O ond 15 Feet Combined SAND 50 cr-EAR SOajARf, OPOiINGSU.S STAI{DAFD S€RIESIt€ READINGS oLJrr{, z. F LrJ E, soF z Ld(J E.laj o_ 60 (5z. 60aa L trJ() LY L-rln- 4{' 2aHR 7ln 45 tltN. t5 LN. EO LN.'19 LN. ,+ Ulrl. r l!X. Fm .cos .m r00 .O71 .lSO .5oo .6oo 1-'l! 2.J6 1.73 9'5125 1g'O J''5 7!.2 .o152 2oll DIAMETER OF PARTICLES IN MILLIMETERS GRADATION TEST RESULTSHEPWORTH PAWLAK GEOTECHNICAL, INC.197 327 GRAVEL 25 % UQUID UMIT SAMPLE OF: Silty Grovelly Sond SILT AND CLAY 39 z PLASTICITY INDEX FROM: Boring 9 ot 10 ond 15 Feet Combined SAND 35% z U.S. STAIOARD SERE CLE R SUJARE (POIIiIGS 30 ?o TEST SPECIMEN 1 2 3 4 MOTSTURE CONTENT (%)12-1 13.0 14.7 DENSTTY (pcf)119 118.4 115.1 "R" vALUE/ExuDATtoN PRESSunE (psi)61 /547 s1 /267 44/1ss ''R" VALUE AT Pst 100 90 "R" 80 V 7A A L60 U 50 E 40 30 20 10 U i00 200 300 400 500 600 EXUDATION PRESSURE (Psi) SOIL TYPE: Sondy Cloyey Silt SAMPLE LOCATION: Borins 2 ot 1 5 Feet 07GRAVEL% SAND SILT AND CLAY PLASTICITY INDEX 89% 6%LIQUID LIMIT % % -c't rt' d 197 327 HEPWORTH _ PAWLAK GEOTECHNICAL, INC. HVEEM STABILOMETER TEST RESULTS Fig. 15 'f l TEST SPECIMEN 1 2 3 4 MOTSTURE CONTENT (%)15.1 17.O 18.9 DENSITY (p"f)11J.3 109.9 101.0 "R" VALUE/EXUDATTON PRESSURE (psi)36/4s6 2+/216 17 /1+O "R" VALUE AT 300 psi : 29 100 90 "R" Bo V 70 A L60 U 50 E 40 30 2A 10 o ioo zoo Joo 4oo 5oo 600 7oo 8oo EXUDATION PRESSURE (psi) SOIL TYPE: Sondy Cloy SAMPLE LOCATION: Boring 1o ot 1 thru 5 Feet GRAVEL % SAND % SILT AND CLAY 83 % LIQUID LIMIT 30 % PLASTICITY INDEX 12 % -,O ,/ d 197 327 HEPWORTH - PAWLAK GEOTECHNICAL, INC. HVEEM STABILOMETER TEST RESULTS Fig. 1+ i ?. I ' i f HEPWORTH-PAWLAK GEOTECHNICAL, rr.rc. TI\BLE I SUMMARY OF LABORATORY TEST RESULTS . JoB No. 197 327 Page 1 ot 2 SAMPLE LOCATION NATURAL MOISTUSE CONTENT (%| NATUBAI- OBY OENSITY (pct) GRADATION PERCENT PASSINTj NO. 200 SIEVE ATTERBERG I.IMITS AASHTO classrFtcATotN HVEEM.R' VATUE soll oR BEDSOCT TYPE EORING DEPTH lroot) GBAVEL (%t SAND (%) LIOUID LIMIT l%t PTASTIC INDEX (%t 1 2 5.2 91 87 Sandy silt and clay 5 6.7 100 Sandy silt and clay 2 'l-5 89 23 6 A-4(3)52 Sandy clayey silt 3 3.6 100 Sandy silty clay I 2.9 7B 78 Sandy clayey silt 3 1 1 1.8 119 91 26 'l 1 A-6(8)Silty clay tr 26.O 96 Sandy silty clay 4 5 2.2 105 28 Silty sand with gravel 15 3.O 11 ',l Silty sand with gravel 5 2 7.5 95 Sandy silty clay 6 2 20.2 101 75 27 11 A-6(6)Sandy silty clay 7 7 & 10 (combined) 1.7 44 45 11 Slightly silty sand and gravel I 2 5.9 B1 63 Sandy silt 10 & 15 (combined) 1.6 27 50 23 Silty gravelly sand 30 2.2 39 Silty gravelly sand ,,V,L COLORADO DEPARTMENT OF TRANSPORTATION STATE HIGHWAY ACCESS PERMIT SH No/MP/Side: Local Jrrrisdiction: Dist/Section /Pal(ol DOT Permit No.: Permit Fee: Date of Transmittal 82Al005. 020/RIcHT carf ield 03/32/L2 3 97 156 300.00 70/24/e7 THE PERMITTEE; Roaring Fork fnvestments LLC 19555 E Main St Ste 200Parker, CO 80134 -1374 (303) 841--8072 APPLICANT: Ron Heggeme:j-er 19555 E Main SL Ste 200 Parker, CO 8013 4-'7374 Ron Heggemeier - (303) 841-8072 is hereby granted permission to construct and use an access to the state lrighway at the location noted below. The access shall be constructed, maintained and used in accordance with the terms and conditions of this permit, including the State Highway Access Code and listed attachments. Th,(s permit may be revoked by the issuing authority if at any time the permitted access and its use violate any of the terms and conditions of this permit. The use of advance warning and construction signs, flashers, barricades and flaggers are required at alltimes during access construction within State right-of-way in conformance with the MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES, Part Vl. The issuing authority, the Department and their duly appointecl agents and employees shall be held harmless against any action f or personal injury or property damage sustained by reason of the exercise of the permit. LOCAT!ON: On the west side of S.H. 82, a dist.ance of 100 feet east from M.P. 5also known as County Road l-54. ACCESS TO PROVIDE SERVICE TO: Single-Family Detached Housing (Zg+ Each) ..Residential Condominium/Townhouse (50 Each)GoIf Course (1 Each) PBRCENT 27.00 z 62.00 z 11.00 ? OTHER TERMS AND CONDITIONS: SEE ATTACHBD SHEET (S) FOR TERMS AND COND]TIONS MUNICIPALITY OR Required only when COUNTY APPROVAL the appropriate local authority retains issuing authority. Upon the signing of this permit the permittee agrees to the terms and conditions and referenceo' attrchments contained herein. All construction shall be completed in an expeditious and safe manner irnd shall be finishecl within 45 days from initiation. The permitted access shall be completed in accordance with the terms and conditions of the permit prior to being used. The permlttee shall notily wlth the Golorado Departmenl of Transportation In G'l enwood Spri ngs at 970-g4q-'1 44) at least 48 hours prlor to commenclng construclion wlthin the State Hlghway right-of-way. The person signing as the permittee must be the owner or legal representative rtf the property served by the permitted access and have fqll a-ull-tority te t the permit and all it's terms and conditions.euf ,. L. L.C Ro,u^l [,rl .l i e^ e-t Zi ,444./4rer<_ This permit is not valid until signed by a duly authorized representative of the Department. DEPARTMENT OF TRAry$PORTATION, STATE OF COLORADO Make copies as necessary for; LocalAuthorily lnspector MTCE Palrol Trilllic Enqineer 1. District (Original) 2. Applicant ) .r rr n^\^/ Previous Editions are Obsolete and will not be used CDOT Form fl101 7 /91 COPY DISTSIBUTION: Bv (x)Date Title Rri an G'i ar.k Permittee (X) Bv (x)Title ld^ddd n^^*A.i n-ts^.. \ DATE: October 24, L997 ACCESS PERMIT NUMBER 397L55 - SHEET 2 ISSUED TO: Roaring Fork Investments LLC TERMS AND COND]TIONS If there are any questions regarding this permit, please contact Charles Dunn at (970) 248-7234. NOTE: If you are unable to contact the person listed on the front of the permit. please use the following: For t.he Craig area calI Christy Beckerman, 970-824-2030 For the Grand Junction area call the Maintenance office 91 0 -248 -7360 The Permitt.ee shall refer to alI additional. requirements on the back of this permiL and additional terms, conditions, exhibi[s and attachments. st-andard any enclosed noted Not.hing in this permit shall prohibit Ehe chief engineer from exerci-sing Lhe right grant.ed in C.R.S. 43-3-1,02including but not Iimited to restricting left hand turns by construction of physical medial seperations. This access permit is issued for the traffic volumesindicated in the applications traffic study only. Any increase in the indicated traffic voLumes which change the leve1 of service and are attributable l-o the permitted development will require a new permit and will void this permit. This permitt.ed access is only for the use and purpose stated in t.he Applicat j-on and Permit. WaLer, sanitary, sewer, gds, electrir:al-, communication, landscaping, and telephone instal-lat icns will requireindividual additional permits. The Permittee is responsible for obtaining any necessaryadditional federal, state and/or City/County permits or clearances required for construction of the access. Approval of this access permit does not constituteverification of this action by the PermitLee. The Permit.teelega1 descripE Department as The Permittee recorded final shall submit a survey plat, warrantyion for all property to be dedicated new right.-of-way. shall provide the Depa:rtment a copy p1at. deed and Lo Ehe of t.he 10 IA A11 cosLs associated with the instal-.LaEion of traffic lights for t.his, access are the responsibilil-y of the Permittee. This includes the design, constructi<>n, uLility relocation, t.est.ing of materials and inspection. Any rvork wj-thin Stat.e Flighway right-of -way shall begin aft.er B:30 A.M. and all work and equipment shall- be off the highway BEFORE 3:30 P.M. each day. i2. lic highwa), lane cl-osures cr one-way l-raf fic will be al-l-owed and13. No work will be allowed at night, sal-urdays, sundays,legaI holidays without prior authori:zation from the Department. The Department may also resLrict work within the State Highway right-of-way durinq adverse weather conditions. It is Lhe responsibilit.y of the Permj-Ltee Lo prevenE all livestock from entering the St.aLe HilJhway right-of -way at t.his access location. Any livesLock that does enLer the highway right-of-way shall be the sol.e responsibility of the 1-4 . 1. 3. 4. 7. B. DATE: OcLober 24, 1-997 ACCESS PERM]T NUMBER 397155 . SHEET 3 ISSUED TO: Roari-ng Fork fnvestments LLC TERMS AND CONDITIONS (CONT'D) Permittee. 15. In the event Lhe landscaping becomes unsightly or consideredto be a traffic hazard, The DeparLment may require tha[ itbe removed promptly by the Permittee and at no cost to the Depart.ment. 15. Landscaping sha1I not obst.ruct sight. distance at any State Highway access point. 1.'7 . A FULLY EXECUTBD COMPLETE COPY OF THIS PERMTT MUST BE ON THE JOB SITE WITH THE CONTRACTOR AT ALL T]MES DUR]NG THE CONSTRUCTION. FAILURE TO COMPLY W]TH THIS OR ANY OTHER CONSTRUCTION REQUIREMENT MAY RBSULT IN THB IMMEDIATE SUSPENSION OF WORK BY ORDER OF THE DEPARTMENT INSPECTOR OR THE ISSUING AUTHORITY. 18. AI1 materials, equipment, installati,:n, construction anddesign, including the auxiliary lane (s) and intersection improvement (s) wit.hin the State Highway shalt be in accordance with the following Depart-ment standar:d references, as applicable:a. Roadway. Design ManuaIb. Mat.erials Manual-c. Construction Manuald. Standard Specificat.ions for Road and BridgeConstruction, latest. editione. Colorado Standard Plans (lA & S Scandards)f. Manua] on Uniform Traffic ConLroI Devices (M.U.T.C.D.) for Streets and Highways and t.he Coforado Supplement theretog. A Po]i,cy on Geometric Desrgn of l{ighwalzs and SLreets, American Association of St.at.e Highway and Transportation Of f icials (AASHTO) , Iat.est editionh. Inst.itute of Transportation Engineer's Trip Generation manual, latest editioni. State Highway Access Code 2 CCR 601-1j. Roadside Design Guide Some of t.he reference materials listed above (a t.hrough e) may be purchased from: Colorado Department. of Transport.ationBid Plans Room 4201- East Arkansas Avenue Denver, Colorado 80222-3400 Telephone Number: (303) 757-9313 The Access Code may be purchased frorn: The PubIic Record Corporation 1-666 Lafayett.e Street P.O. Box 18185 Denver, Colorado B02l-B Telephone Number: (303) AZZ-8262 19. Survey ma::kers or monumenLs must be preserved 1n theiroriginal positions. Notify t.he Department at (970) 248-7220 immediately upon damage Lo or discovr:ry of any such markersor monuments at the work sit.e. Any liurvey markers or monurnents disLurbed during Ehe execul-ion of this permitshall be repaired and/or replaced imrnediately at. the expenseof the Permittee. 20. The Permittee, through a Colorado re<listered professional engineer shall provide design, constLuction, pavementstriping and signing plans t.o the De1>artment for approval 45 days prior to commencement of any work. Design plans mustinclude but not limited to layout of speed change Ianes,utilit.y locations, presenL and proposed drainage, present and proposed right-of-way lines, present. and proposedtraffic control devices, and clear zone analysis. (Par. DATE: OcLober 24, L997 ACCESS PERMIT NUMBER 397]-56 - SHEBT 4 ISSUED TO: Roaring Fork fnvestments LLC 2L 22 TERMS AND CONDITIONS (CONT'D) 4.L0.]-7, 2 CCR 601-1) The design must be done at. a Level of Service C for thetwent,y year project.ed build out Desi,Jn Hourly Volume. ThisprojecLdd volume shall be noted on the design plans. The colorado Regist.ered Professionar Engineer sha}I sear theplans in accordance withe C.R.S. l2-25-Lt't in addition onthe first. page of the design plans t.hat the following not.eis requiredI'THIS DESIGN IS IN FULL COMPLIANCE WTTH SECTION 4 OF THE STATE HIGHWAY ACCESS CODE, 2 CCR 601-1 EXCEPT FOR THE FOLLOWING APPROVED VARIANCES:'r . ;;;" >>>>> ALL ,LANS MUsr BE suBMrrrED oN 11,, x .. 7,, 'HEETSAT A MINIMUM SCALE OF 1rr = 100' NO OTHER PLAN SHEET SIZES ARE AUTHORIZED. A11 construction work must be under the direction of aColorado Registered Professional- Engineer and uponcompletion of the work, t.hat respons.ible Engineer shal-1 submiL an rrAs Buil,t,r' p1ans, showing in detail all approvedconsLruction changes, modifications and revisions. The "AsBuilt. Plans musL be sealed i-n accordance with C.R.S.t2-25-117. It. shall- be the responsibility of the permittee to verify t.he location of the exist.ing ut.ilitit:s and notify a1lutilit.y owners or operators of any wr:rk that might involveutilities within the State Highway r.Lght-of -way. Any work necessary to protect. existing permitt-ed utilities, such asan encasement will be t.he responsibi.lity of the permittee. Any damage or disruption t.o any util.Lties during theconstruct.ion shall be the Permittee's responsibility andshall be repaired or replaced aL no (tost to t.he Department.. Any damage to any present highway fa,:ilities includingt.raffic control devices shal-1 be repaired immediately at nocosL to the Department and prior to continuing other work. Any mud or other maLerial tracked or oLherwise deposited onthe roadway shall be removed daily or as ordered by the Department inspector. Areas of roadway and/or right-of-way disLurbed dr-rring thisinstall-ation shal1 be restored to their origionalconditions, to insure proper strength, drainage and erosioncontrol. Any incomplet.e construct.ion activity on the SLaLe tlighwaythat must be left overnight, shaII be barricaded and signed in accordance with t.he Manual on Uniform Traffic Control Devices and ot.her appl icable standards. Open cuts which are 6 inches in depth, within 30 feet of the edge of the St.at.e Highway traveled way wiII noL be lefC openat night, ofl weekends, or on holidayr;. No more than 5 feet of Lrench areas r;ha11 be opened at any one time. Open trenches and other excavations within the St.at.e Highway right-of -way shall be l>ackfilled and/or paved before 3:30 P.M. of each working day or be protected in accordance with the M.U.T.C.D.. The area around the new work shafl be well graded to drain, top soiled, fertilized, mulched and ::e-seeded in accordancewith the Department standard specific:ations. 23 24 25 26 21 )a TERMS AND CONDIT]ONS (CONT'D) 29. when it is necessary Lo_ remove any highway right-of-wayfence, the posts on either side oi the access entrance sha1lbe securely braced with approved end posts and inconformance with the Department,s M-G07-1 st.andard, beforethe fence- is cuL, to prevent slacking of che remainingfence. A11 posts and wire removed shall be ret.urned to theDepartment. DATE: October 24, Lg97 ACCESS PERMTT NUMBER 397156 - SHEET 5fSSUED TO: Roaring Fork fnvestments LLC The Permitt.ee shall have designed and instal-l_ a righL turndeceleration and a right. turn acceleration rane 12 feet. 1nwidth in conformance with section 4 of the State HighwayAccess Code, 2CCR G01-1. The Permit.tee shalr have designed and install a left turndecelerati-on lane 1,6 feet in wiatrr, in conformance withsection 4 of the state Highway Access code, 2 ccR 601-1. Thetaper wil-r begin with an immediate asymmetricar reversecurve bay taper of 7/3L then 2/3L with the remainingrequired taer length at furl l-ane width. Note L is thest.raight t.aper length. A11 excavations for uLitity rines, cul.verts, trenches ortunnels shalr meeL the requirements of t.he occupational,safeLy and Heal-th Administration (osHA) , coloraho rndust.riarcommission, Col-orado Division of Mines or t.he CoforadoDepartmenL of Transportation, whichever applies. Arl work that. requires Lraffic contro] shalr be supervisedby a registered professional traffic enqineer or by atraffic control supervisor certified by Lhe American TrafficSafet.y Services Associat.ion (ATSSA) or the ColoradoContractors Association (CCA). When flagging personnel arerequired, they sharr be certified by the contractor inaccordance with the Department standards. construct.ion t.raffic contror devices, when noL in use, shalrbe removed or turned away from traffic. 111 t.emporary pavemenL st.riping shall be done by thePermit.tee/contractor in comiormrnce with section 62i of LheDepartment's standard soecifications for Road and BridgeConst.ruction (latest edition) . 111 finar signing and pavement striping sharl be done by thePermittee or the contracLor i-n conflrmlnce with theDepart.ment's M & s standards and the M.u.T.c.D., unlessotherwise agreed to by Lhe Department and the permitt.ee. Afina.l signing and pavement striping plan sharl be submittedto the Region 3 Traffic Engineei a-minimum of 45 workingdays prior t.o commencement. of work. No work sharr beginwithouL prior approval and authorizaLion from theDepartment.. The roadway shourder shal-r be widened to 4 feet along thespeed change ranes and surfaced with HBp in accordanle withthe Depa,.:trnent. specif icaticns. The shoufder: widening aJ-ongt.hrough lanes slralr be no ress than 4 feet prruJ oi ilatcrrexisting and paved. The access shal] be constructed 50 feet wide, wiLh 50 footradii. The access sharl- be constructed perpendicurar to the travel-lanes of the st.ate Highway for a miiimum distance of 50feet, and sha]t slope down and away from t.he adjacentpavement edge at. a rate of 2z grade for a minirnum of 20feet. rf curb and gutEer are present, the slope sharr be ?n 31 JZ 33 34. 35. 36 37 3B 39 4l rJJUuu rv: r\uc[r Ltlg l' Lrl-JL l-rrvcEjLtltcl TERMS AND CONDITIONS (CONT'D) cal-culated from pan line t.o pan line. Any revisions to this requirement shall be subject Lo Department review and approval prior Lo commencement of any work within the highway right-of-way The access shall be completed in an r:xpedit.ious and safe manner and shall be finisired within 45 days from initiation of consLruct.ion within St.at.e Highway right-of -way. Pursuant Lo section 4.10.2 of the State Highway Access Code, the access roadway shal-I not exceed a maximum grade of 10 percent within the highway right.-of-way, ds measured 50 feet beyond the pavemenL edge and extending t.o the righL-of-way Iine. The access vertical grade shal} be designed and consLructed in conformance with the DeparLment M & S standard M-203-1. The design of the horizontal and vertical sight distance shalI be no less Ehan the minimum re(fuirements, as provided in section 4.9 of t.he State Highway Access Code, 2 CCR 601-1. AIl required access improvemenLs shaIl be insLalled prior Lo the herein authorized use of this access. The access shalI be surfaced immediately upon completion of eart.hwork const.rucLion and prior t.o use. Compaction of Hot Bituminous PavemenL shall be in accordance with section 40L,17 of the Department's standard specifications. Compaction of t.he Aggregate Base Course shall- comply with section 304.05. Compaction of subgrade, embankmenLs and backfill shall be in accordance t.o secti-on 203.07 of the DeparEment's st.andardspecifications. Placement of base course materials shall be in accordance with section 304.04 of the standard spec,if icac.ions. Compaction shall be in conformance with 7\ASHTO procedure T-99. The surfacing shall meet. t.he DeparLment's specifications with the fol1owing material placed for final grade: 12 inches ABC, Class l;6 inches ABC, Class 6 and 4 inches of Hot Bit.uminous Pavement (Grading C or CX) placed in the following lifts: 2 - 5 inch lifts Class L;1 - 6 inch lift C1ass 6; 2 - 2 inch lifts HBP. 42 45 The new as t.he Slopes 1 ratio State Highway pavement shall slope on the same plane present. pavemenL surface. shall be at. a 5 to 1 ratio on t.he roadway and a 5 to on t.he approach. 51-The exist.ing asphalt adjacent to all new pavement shall- be saw cut and removed a minimum of one foot back from theexisting edge, at until an acceptabl-e existing cross slopeis achieved t.o assure a straight edge for the joint. The top layer of plant mix biL.uminous pavement shall not be placed between October 1 and Apr11 7, unless oterwise ap;:rroved krlr 31"r. Depart.ment . If frost, water or moisture is present in the subgrade, ro surfacing materials shalI be placed until all frost, water or moisture is gone or removed. lnstructions: - contact the Department of Highways or your local government to determine your issuing authority.- contact the issuing authority to determine what plani and other documents are retuired to-be submitled with yourapplication. - complete this form.(som.e questions may not apply to you) & attach all necessary documents and submit it to theissuing authority. submit an apprication for each access iequested.- if you have any questions contact the issuing authority. Please prlnl or type 1) Property owner (Permiilee) Roaring Fork Invest street address, city,street address, iity, 19555 E. Mainstreet, Suistate & zip state & zip 3) Address of property to ue served uy pe7il@iiil] 4) Legal description of property: 5) What state highway are you requesting access f rom?6) What side of the highway?DN trS EE 6W How many feet is the proposed """".. fro ctrcle_-feet(N s E W )from rntersection of county Road 154, U.S. Highway 82 and Frontage Roa8) Check here il you are requesting a E new access EI temporary access 6 improvement to existing access E change in access use9) Wnrt ,t Spring,1998 Do you have knowledO 6I no lf "yes" - rvhat are the permit number(s)?and/or, permit date11) Does the property owner own or hare any inlerests ir-nyia1acilftzJ@ tr yes 6 no lf "yes" - please describe: 12) Are there erirti = 6 Yes tr no lf "Yes' ur plans and indicate the proposed and existing access points.13)llyouarerequestingcommercialorindUStrial, footage of each? I - 18-Ho1e Golf Course 14) lf you are requesting agricultural tietO access - how many acres will the access serve? 15) lf you are requesting residential development access,what is the type (single lamily, apartmenffi number of units number of units Sinsle F 16) Provide the following vehicle "o,. your counts are peak hour volumes D or average daily volumes E. # of passengers cars and lighftrucks # of multi unit trucks # ol other vehicles # of single unit vehicles in excess of 3O f t # ollarm vehicles (field equipmen[Total Counl o, All Vetrtcles See Traffic Stud Highway and driveway plan and profile. .?i1ir9:,Oll" showing impact to the highway right_of_way.Map and tetters detailing utility locations before ind afterdevelopment in and along the right-of-way. Subdit,ision, zoning, or development plan- e) Property map indicating other access, bordering roads and streets.f) Proposed access designgl Parcel and ownership maps including easements.h) Signing and striping ptans. i) Traffic control planj) Proof ot liability insurance lf an access permit is issued to you it will state the terms and condition with the terms and conditions listed on the permit may be considered a violation of permitted access not consistent the permit. THE APPLICANT DECLARES UNDEH PENALTY OF PERJURY IN THE SECOND DEGREE, AND ANY OTHERA,i:.JpA?i.^:IlIr.^?LI5?:ltl.ly{-1c_ l;r}FonMArbr,r FnovroED oN rHrs FSRM ANDii Jo \,il iE ;; ; f . r; )-i,T cE J, r'#i?=1j :i:L:::l,r*,11,1^::,11.1,i:?l:^.^"11lrly: !?: !,ir,"i ;;;;;t;;i" written ;,id;;;;i-rhis sisnature shal constituteasreement with this application by all owners-of-intere.t ,nr.r.'.;;i"d i;;;i,1;n.'i'i"-r'J;.;lii';."jL1il"?i*tJlt,T:property owner will be listed as the permittee. T,V ,4. wes*,-1 ea,-1s_ 1a." -ttL14) Property owner signature ta*ettrlL. /=oRtZ : /4+-a-/ COLORADO DEPARTMENT OF HlGHWAYS APPLICATION FOR STATE HIGHWAY ACCESS PERTT'IIT Prpvlou. pdlllonq mav be uled unlil sunnlles aro erh;;;;; block tot, I section . township range business square footage, business square footage al b) c) i\ A PARCEL OF AND LOTS ?, LAND SITUATED 3, 4, 5, 6, 7, IN B, BOUNDARY- SURVEY LOTS 4, 5, 10, 11, 12,, 13, 15, 16, t7, 22, 23, ?4, 28,9, t2, r.3, 14, 15, 16 AND THE NW1/4NW1/4 AND THET.7 S., R.Bg W., OII THE 6TH P.M., 29, 30 AND 34, swt/4Nw1/4 oF OF' SECTION SECTION 12, COUNTY OF GARFIELD, STATE OF COLORADO gffG'5 SrArtExr SANDERS RANCH k,,r. *.,,..-. -rft ? ' ;: Ls2z:nrci ror r .i LoT r; |, flg r. |ilrstq. o {[ry sr^rt !{t txrl ffi smtp&o r Htq 6xrd arcrfEatE. rt. a6 J{t r. ffiN rur t, t5 ru & fficl ?o rht trrl r w {tr(a ExeaE. t--aB l, ffitElG. t.!. E. t6[ LOT JI s€c I Lor rE .... ' " sEc 1?2&m LOT 1Osfc 12 Lot r ei LoT r)sc t2 hL s[c ra , I -- .. -.t=: Eir ffi'5 _--.-. ---r-eg?fl l.F ..... .....nag+ CRAPHIC SCALE \,t .*o "*"-El !orr- rro rw$ '6 Bffme [o ux suYrere.q csr@r{9cuEao@r maB rfi rqaEqnastr-.o ,, t$c LOT 2 r S€C12! (rxEE)LOT 2t jsfc lji LOI9 . S€c L.. Lor 19 s€c 12 ,( TELLER SPRINGS SUBDIVISION LOT 52 LOI 5 sEc r sEc r LOT 20 S€C 12 -T- I !) /'l*4 ,gct LOT IO s€c r {q xc.arg . rini axD LOT JJ s€c r Gq:Nqrila ' la[s Lor 2r El! sEc t2 3lo LOI 22 SEC 12 sEc 12 I I I'hl sYtl/.s't1/1Bi s€c 12 i I LOI ra sEc I LOI 25 s€c rLOT IJ s€c I fw w. i0 S6lZr!.2z.q ro s codrc 12r 4@gffEllnsw 2U._q rgcttE4 I Na72.' a-G[Crrnls w t.^rd rGlfE la4..lr' EF&.r'€a. r. Frt Ear rt uar 6 rrr.i-. trnrdr-_d-rrEE{rr!t roo,.r. ,. InrE.twr{E-r,('r. l. -rt,UrEEh.tffi[.@r*,lE(r E E!5r ff., rd,ax gfu@oqar lcr'E ".. r.Ee ar .. i.tlir,tsoa.'rrr- rd'Ed! EGr'ffi.6i.id{E.(t@E arEttd-dnlr@. l. Gr qr.'r -rB - ffi.t a.lrtAr , ra rtrarr a t. ro x (r.l -r'E r {ra,Eatn'.r'rt',^lrrtE ?.,1?i1:,3' t;E .E r o'6'i' t !d.. .4rl I r'r'r' r rrr.n.(t. t.,'lt. l n.,|.,llt. o.x $' r rrr.tl tlltt! x .'qt {'- r E'6E('6r'tr"^(oa t6. a r'r' . rr.D l'lllo r'' ... *.'.I l<8,rrr-o.ar? -.4.q EI , o l rr'. .a'trd t rar.I raar (€ @. t rt rt' r rat.d !'illo.', *.. ^..rra.r t(rr ts. qrB &a t I'rr'ar', . o.ittsd ,ta.rt raat (E 15 . r'n .a' r !rr.r .ftr)..r'-r'Id-.aaraExE'.oaEard*,4.Er6trE.- '(t - . ctu Ea , r.'- rr. ^arrrE t s.r. .(? (6 15 . {'$ t' . D t,ur) rrd ra.fi .atr ro H @ft 5wq't ctirlarqr€ *6rTto THrs - uY d rt-. At-r., rf, r{ csrtto ryE rEt fd rrmrrow t€ sffY t^r5tMi ff(rtrq rt _- ry: ura: t[rE rrmrrq: =ctta _. rffirF _. lffi _. q t{ !. !6.. t. ia. 'a. tt. a, ,r, r.x. i, !Ert Gfuc| -oBr, l..,,. a. t. rr. rl. tl.'at sr'a tr. r*'. , ah, E a rtt t ( l,!h ira,rrG'o,-. a'tr t ry'(Lo. tt.t( t Ade: 9.O .Er t6l'E s {'orr a cg'c -.d!6: s 5 5 5 PARCEL A LOI 15 s€c 12 ,*1[;lTn" llll / ____-Lof 16 / -/ LOr 2J Lt lsig, ,/;,\/.. \ LOI 2{ sEc r ---\ .1 1l . Lor 26: s€ct : i LOT I s€c 12 i -\'''": : luIAW@/Bssm 4-. .- ,. ....x223' : ffiE\ i\\WEST EANK ii. a': i LOI 5 sEc r ..')r' ' ..t *asct6\urc -7@.N- -. r. t r.a $. a u.rr raar,. r s.x r' a 9r,r rrar,. I at..r'r. a r.r.!r .aal.. tr.rr'!.aH.E.trrt. r n.9'9'a ,..t, raar E. a.r o r a[rcr !r<, or r, d sra lar'r r: EE !4r- 9.o urrat,at E..r'r' a 4x x 6rttr rra, (dt rr. , - t. .orrt& , ,r-.a raatr riE re,- 9'a tartir tr!r -.rt €! I {.r..aai ro x qEI qa r hr E.nrErn 'r E f! .r.g rq, E ry'(!o oh oa- -td'a rrrd; EE ri .to- arr tat 6{i rE Eat[tr !'t , ar! qm: LOT 12 i LOT 16 SEC 12 : SEC 12 ; : i TROUT PROPERTY r!.t r(ar ro E ffif <. t ,. 2! ! i EE;q6gdE t d$ o 9r8Q -2c a5t 9G PROJECI NO. 96624.O SIIEET I 0fl ROSE RANCFI erch an ^ PARCEL OF La\D St rL-ATID t\ LOTS.. r. to. I l. r:. D, tt. t6. tr.::.:j. :r.:t:9.10 ANO l{ Ot SECnOrr I A.\D LOTS :.1.r.?.t.e.l:. r ,.l i, t6 Of sEcno\I:. TOW}{SHIP 7 SOUTH. RANGE t9 WESTOF T}IE SIXTH PRJNCIPAL IIERIDIAN, COUNTY oF GAR.FIELD. sTATT oF coLoR^Do, A PARcEL oFL,\\O SITTJATED IN LOTS:] ANO:B OF SECNON I AND LOTS 1.:.6.7,I' TIIEsI l/.Nwl/a A\O ntE Swt,'lNwt6 OF SE(T|O\ r: TOB.:lSlltp; SO(;TH. tu\NGE t9 u'EST OF nlE Sl.nH pRt\ctpAl Mt-RtDtAN. coL:i.I.\. ()F (;AR}'IELO. ST^TE OF COLOR^DO .1 |:n l Adir. lt..r..r,!n l'vl ,., Ac . ,. . Mulri U* SK PI FIGURE 2. t-t, e---Ea I i;Lr"lj.,.T.s: PA'*--J- 15.31 5q. fr. V;a. L.r l!0 I crr Flo<lphn -2'<'. @ffi Co.,Ki.,r ro 16r B.^L Lra<h Gn(llel6r:.rt Pot.nri:J Ot.rld,r Vicinity Map Y.rr Flmdplri^ -l: ---i\,tr r 1'--.j ::.ffi 5c. rr I::a l.i l:-:'Otra StjK ,butt.tToa .; .ll l Dupl.r Lo. Pritr.. OFa Spr. t&m6r Slctch Plu Ccocral Norc: [:nd Ux Sumrury ,rc Forl Typiol Lot Kcy *-;).:. rljI__== €:-: ,in-+.rt$-*-<-- i:-t-:l--l.l ---r\ - PA' IJ.CCO Sq. FL,Vi^. Ld I=L....H--4 H , Ogocn: qhdtr+*-tt(t 6d17+*4rr{ brldLkrLLCrRr'ah4kE DcvcloF: tdakl.d@Ll-C I[tt E kr,R J!1. P ,ELr. C&& atl Drl. of Prrn!!hq. JulJ rr r€t - ---:- Shd fidc: Slach Phn Shct Nudb<r Scelc.l'.10O.0' ICC Yu Floodptrid -:' -1 ..,.1 i. t, . Yolk b.rl.HarJur . T.ih . nrAin3 (fa laion Only) &*mor tAt ,c,c& Sq. Fr Mi6. Ld .1,, I'- - I '-. L', .: j. .''i-:( PAT lr.@ Sq. F!. Min. ld t^t&Or.rtFLlE 0 t@2m SCALI: 1" : 2000' TEMPMAP ROARING FORK INVESTMENTS CARFIELD COUNTY, COLORADO ROSE RArcH l{ctll,VAY 82 ACCESS PEH[rn UCXNTTY MAP i$ti@i ;iIl NE -+ t $oP sv <rr Q 148 (86)T 98:l LEFT 2Z RIGHT<r 132 (7e)I 99:l HIGHT . 1Z LEFTrr> -G rRs(\r-{= + t oPc, (\l-sy 59 - ROSE RANCH TRAFFIC (24) . EXISTING TRAFFIC r DIHECTIONAL DISTRIBU]ION DETEHMINED BY FIELD SUHVEY HGURE 4 sg 59 = ROSE HANCH TRAFFIC (24) . EXISTING THAFFIC r DIRECT1ONAL DISTHIBUT1ON DETERMINED BY FIELD SUHVEY 103(75) r 982 LEFT+- 2Z RIGHT , 99L RIGHT 17. LEFI 155 (e6) t $lo = cR 154 -1.,f^ l<ro',EUI A I soro cr)-= 9 -N (\t + a EE + FIGURE 9 N@ =I; E8 I I I I I I i Al,l') ;Vl:iit,i2,/ Scale: l" :2r000r - 0*Regional Location Map North $ d s ( rN FESr )I hch - lO0 lL E PROPOSED RE]AININC WAI PR@OSEO ASPHALT PROPOSEO GR^\€L GRAPHIC SCALE GRADING PLAN ] Er[H; '{69dbt dW d PtrP 3ZiX 8eiJ X+9Y'Zci ;3 fr;Eii Pu! 55 pE out H, PROJECI NO. 9704201 SHEET J OF4 f fi d E g t B s B s CRAPHIC CN ^I F ( rN rsEr ) I i.cb = 100 lL EOULOER. R€IAIN,A]c fi fuF Eu) $sf-Eq $= OEC€LERAIfr UN€ ,/:,/ aatsE powpJpore alo iiir RAISE FohFopolt aro iiue.,... ,1,1,:,ii': 3;.%%,^rv o,rr --"i#.o - - iob-Trilnbab-R-I- - -l_"lrf*; LEGEND ffi eneosto RETATNTf,G w u ffi eneo*o esererr f] enoeosro cnewr SITE AND STRIPING PLAN 2c n 5 ErEiIat.E (4 E Pt^e 1z1A Bc !3 9I: ;i fr;E;i e52 5g PEoUp IU, PROJECT NO. 970420t SHEET 2 OF1