HomeMy WebLinkAboutConstruction Observation Report 05.20.16HEPWORTH-PAWLAK GEOTECHNICAL
May20, 2016
SiUch Construction Inc.
Attn: Scott Henriksen
1461 River Bend Wny
Glenwood Springs, Colorado 81601
Cscou@silichhomcs .com )
l·kr\umh·P.1\\'bl.: Gcl•rcchnic:il, Inc.
5020 Cnumy Ro;iJ 154
Glcnw•><>J Sprin:,:s, C1lora,l11 81601
Phnnc: 9i0·9H-798R
F.1x 9i0-945-S.J;4
cm.111 hr~cn®hrl:!co11:.:h rnm
Job No. 115 066H
Subject: Construction Observation and Testing Completion Letter, Proposed
Residence, Lot 291, lronbridge Development, River Bend Way, Garfield
County, Colorado
Gentlemen:
As requested, we are providing a summary of our observation and testing services
provided for the above referenced project. The reports of the services requested and
performed for the project are attached. We previously conducted a subsoil study for
design of foundations at the site and presented our findings in a report dated October 26,
2015, Job No. 113 471T.
The foundation bearing soils within the building excavation were observed and tested for
compaction on December 16 and 17, 2015 and are suitable for the recommended bearing
pressure of 1,500 psf. Perimeter grade beam reinforcement steel was observed on
January 26, the post-tensioned slab tendons were observed on January 27 and the fresh
concrete for the foundation was sampled on January 28, 2016. Tensioning of the tendons
was observed on February 3, 2016 according to the project specifications. The results of
the tendon tensioning were submitted to Fuhrmann & Graf for their approval. We did not
observe placement of the rigid foam insulation along the building perimeter, but since the
perimeter grade beam has a minimum depth of 36 inches. it provides adequate frost
protection rather than by insulation.
Based upon inferences drawn from our observation and testing, as documented by the
attached daily field and laboratory reports, it is our professional opinion that the
referenced construction has achieved the specified conditions. Please recognize that
construction observation and testing are sampling functions that involve direct
Parker 303 -841 -7119 • Colorado Sprin gs 719-633-5562 • Silverthorne 970-468-1989
Silich Construction Inc .
May20, 2016
Page2
observation and testing of very limited nm ount of the overall work to evaluate the
construction compliance.
If you have any questions or need further assistance, please call our office.
Sincerely,
HEPWORTH -PAWLAK GEOTCHNICAL , INC .
Attachments: Observation & Testing Reports: 12/16/15 through 2/03/16
cc: Silich Construction-John Silich <iohn@silichcon'>truction.com)
Job No . I t.5 066H
~tech 6020 County Road 154
Gl•nwood Springs, Colorado 81801
Phon•: 970.945-7188
Fu: 1170-1146-M54
HEPWORTH·PAWLAK GEOTECHNICAL bpqeo@bpgeo!p.cqm
Earthwork Compaction Testing Report
Client: Slllch Construction Inc. Job No.: 115 066H Day: Wednesday
Attn: Attn: Scott Henriksen Date: 12116/15
303 AABC, Suite J Page: 1 of 1
Aspen, Colorado 81611
Project: Proposed Residence, Lot 291, lronbrldge Development, River Bend Way, Garfield County,
Colorado
Weather: Cloudy, calm, snow overnight Temperature: 18°at11 :oo am
Earthwork Contractor: Logan
Equipment Used : Ground Heater & Blankets
Description of Earthwork Planned residence building pad was tested at slab subgrade in 3 locations.
Tested: Results Indicated unacceptable compaction at about 1 to 5 percent above
optimum moisture. Slab area was blanketed and being heated at the time of
testing.
Sample{s) Obtained:
Verbal Communication: Steve Pawlak in our office was informed of our test results.
Placement and Compaction Procedure: Not observed by HP Geotech.
lift Thickness: Max. Rock Size : Moisture
Conditioning:
Compactor(s) Used: Number of Passes:
Nuclear Gauge Moisture/Densitv Test Results
Location Field Dry Field Field Min.
Test Depth or Density Moisture Comp. Comp. Proctor
No. Elev. {pct) Content (%) Req . Lab No.
% (%)
1 SE comer, 6' N., 4' W. slab 93 .9 15.7 82 98 006-15 subarade
2 center of building, 1 O' W. of water slab 95.2 17.1 83 98 006-15 pipe subarade
3 west side 20' N., 4' E. of SW corner slab 103.9 13.2 90 98 006-15 subarade
Proctor Sample Reference:
lab No. Method Description Max. Ory Opt.
Dens. ocf Moist.{%)
006-15 ASTM 0698 (113 471A & 115 0668): Sandv Slit and Gravel 114.9 12.3
'"""""'....,.f'"""" lllS •. ' *'"A RUYLl gi;o t 1M OISERVAf!Ql'fMW FIU. -11. m: HAVl AELIEO Ott 1ltl 1 urffO C1 IHTVM APl'LTINli TH ; MC
COMPACT11/E EFFORT AND MOIS1URE TO FIU. DURING 'Qtl 1MS WHEH OUR 08RRV!lt IS NOT 09SEIMHG OPERATIONS
TIE HIJCl.EAA DENSOMETER MEntOO Of TUTINO WAS USl!D .. suarANTIAI. ACCORDANCE WITH ASTM D 6138
DlstribuUon:
Aspen Signature Homes of lronbridge, U.C • Uwyd Ecclestone Uecc:Jntone@pblhfl.ntt>
Slllch ConstrucUon -Hayden Horsford ChhoflfonflbH!chconttmction.com>
Sltich Construction -John Slllch llobn@elllehconstruct1on.com)
Slllch ConstnJcUon -Scott Henriksen flcattlbllleflbom!!.com>
Jljf Tom Westhoff, CET Steven L. Pawlak, P .E.
Field Technician Reviewed By
~£tech 5020 County Roed 154
GIHWood Springs, Colo,.do 81601
Phone: 970-945-7988
Fu: 970-945-8454
HEPWORTH•PAWLAK GEOT£CHNICAL hDGeo@boaeoled!.cqm
Earthwork Compaction Testing Report
Client: Slllch Construction Inc. Job No.: 115 066H Day: Thursday
Attn : Attn: Scott Henriksen Date: 12/17/15
303 AABC, Suite J Page: 1 of 1
Aspen, Colorado 81611
Project: Proposed Residence, Lot 291, lronbrldge Development, River Bend Way, Garfield County,
Colorado
Weather. Partly cloudy, calm, dry Temperature: 21° at 4:00 pm
Earthwork Contractor: Logan
Equipment Used: Trackhoe, Vibratory waJk .. behind double drum roller
Description of Earthwork Planned residence slab subgrade had been reworked and re-compacted. Three
Tested : re-tests were performed Indicating acceptable compaction at about 1 percent
above optimum. Slab area was blanketed after testing.
Sample(s) Obtained:
Verbal Communication: Logan crew on-site and Steve Pawlak In our office was Informed of our test
results.
Placement and Compaction Procedure: Not observed by HP Geotech.
Lift Thickness: Max. Rock Size: Moisture
Conditioning:
Compactor(s) Used: Number of Passes:
Nuclear Gauge Moisture/Densit)' Test Results
Location Fie1d Ory Field Field Min.
Test Depth or Density Moisture Comp. Comp. Proctor
No. Elev. (pcf) Content {o/o) Req. Lab No.
% (%)
1A retest of #1 (12-16-15) slab 112.0 13.1 98 98 006·15 subarade
2A retest of #2 (12-16-15) slab 112.2 13.1 98 98 006-15 subgrade
3A retest of #3 (12-16-15) slab 112.6 13.4 98 98 006-15 subgrade
Proctor Sample Reference:
Lab No. Method Description Max. Ory Opt.
Dens. pcf Moist.(%)
006-15 ASTMD698 Sandy Slit with Gravel 114.9 12.3
I Ml:ll lltl'QRI PRES ;Nlll Ut'll'IKm5 M "Rl:SUL T D• OUR OB"""v,\11urr.11.w ~L PLACEMENT."" HAVE Rl:L..:u OH THE c-'""C'TOll TO \0\ .. I .. uE APPL"""' THE Rl!C~OEO
CDMPACTM! UFORT AHO MOISTURE TO FILL DURING TtlE TIM!5 WHEN OUR OBSERVER IS NOT OBSERVING OPERATIONS
THE HUQ.eAA OENSOMET!ll METH00 OF l!STING WAS USED IN SUBSTNfTIAL ACCOIUWICI! WITH~ 019311
Distribution ·
Aspen Signature Homes of lronbrldge, LLC • Llwyd Ecclestone (ffccltslOD!fRpblhfl.net)
SIUch ConstrucUon -Hayden Horsford (hho[!fordOtlllchconstrucUon.com>
SIHch Construction -John Slllch OohnCblllchconstnzction.com>
Slllch Construction -Scott Henriksen {Jcott0!111chhomu.cqm)
/ljf Tom Westhoff, CET Steven L. Pawlak, P.E.
Field Technician Reviewed By
c:;c.;'£tech 5020 County Road 154
Glenwood Springs, CO 81601
Phone: 970-945-7988
HEPWORTH ·PAWLAK GEOTECHNICAL Fax: 970-945-8454
bpgeo@)hpqeotech.cam
REINFORCEMENT STEEL INSPECTION REPORT
Client: Slllch Construction Inc.
Attn: Scott Henriksen
303 AABC, Suite J
Aspen, Colorado 81611
Job No.: 115 066H Day:
Date:
Page:
Tuesday
1/26/16
1 of 1
Project: Proposed Residence, Lot 291, lronbridge Development, River Bend Way, Garfield
County, Colorado
Area of Inspection: Rebar for Grade Beam Trenches.
Reference Documents Sheet FD1, F1.0R (added wall along south side).
Used:
Inspection Notes:
Inspection Status: D Preliminary 181 Final
[g] Concrete reinforcement as noted above was judged to be in reasonable conformance with the
referenced construction documents.
0 Exceptions Noted:
Verbal
Communication:
Distribution:
Scott with Silich Homes was lnfonned that reinforcement was installed
according to construction documents.
Aspen Signature Homes of lronbridge, LLC • Llwyd Eccleston• flec;cJestone@pblhfl.net>
Slllch Construction -Hayden Horsford fhhorsford@!llh:hconstryc;tton.com>
Slllch Construction -John Slllch UobnO!lllchc9n1tructfon.com)
Slllch Construction -Scott Henriksen ftcotb!lttlllcbhomes.com)
njt Paul Weiser Steven L. Pawlak, P .E.
Field Technician Reviewed By
~tech 6020 County Road 154
Glenwood Springs, CO 81601
Phone: 970-945-7988
HEPWORTH-PAWLAK GEOTECHNICAL
Fax: 970·945-8454
hpgeo@hpgeotech.com
REINFORCEMENT STEEL INSPECTION REPORT
Client: Silich Construction Inc.
Attn: Scott Henriksen
303 AABC, Suite J
Aspen, Colorado 81611
Job No.: 115 066H Day:
Date:
Page:
Wednesday
1/27/16
1 of 1
Project: Proposed Residence, Lot 291, lronbridge Development, River Bend Way, Garfield
County, Colorado
Area of Inspection: Tendons for post-tensioned slab.
Reference Documents Structural Plans Sheet F1.0R
Used: All tendons were set at proper length and spacing.
Inspection Notes:
Inspection Status: 0 Preliminary (81 Final
[8J Concrete reinforcement as noted above was judged to be in reasonable conformance with the
referenced construction documents.
D Exceptions Noted:
Verbal
Communication:
Distribution:
Aspen Signature Homes of lronbridge, LLC -Llwyd Ecclestone flecclestone@pblhD.neU
Slllch Construction -Hayden Horsford Chhorsfonf@slllchconstructlon.com)
Slllch Construction -John Slllch (!ohnAsfllchconstructfon.coml
Slllch ConstrucUon -Scott Henriksen r1cott@sl!lchhom!!.coml
lljf Paul Weiser Steven L Pawlak. P.E.
Field Technician Reviewed By
c;Sc!)tech
HEPWORTH -PAWLAK GEOTECHNICAL
5020 County Road 154
Glenwood Springs, CO 81601
Phone; 970·945-7988
Fax: 970-945-8454
hpgeo@hpgeotech.com
CONCRETE TEST REPORT
Silich Construction Inc.
Attn: Scott Henriksen
303 AABC, Suite J
Aspen, Colorado 81611
Job No. 115 066H
Date Cast: 01-28-16
Sheet: 1of1
Project: Proposed Residence, Lot 291, lronbridge Development, River Bend Way, Garfield
County. Colorado
Placement Location: Foundation Slab
Supplier: United Time Batched:
Truck No: 6042 Time Arrived :
Ticket No : 33306320 Time Placed :
Mix Design: 37010551 1 COOT Class D
Method of Placement: Pump
Time Sampled: 8:05 am Wet Unit Wt:
Air Temp: 10° Slump:
Concrete Temp: 66a Air Content:
Water Added: 10 gallons per Contractor
7:14 am
7:55am
7:57 am
Sample Point:
139.4 pcf
SY. inches
3.8%
Load Size (Yds).
Yds Delivered:
Yds Ordered:
Truck Discharge
10.0
10.0
80 .01
Communication: The Contractor and Supplier were informed of our field test results.
Time Cylinders Cast: 8:15 am
Initial Cure Time On Site: 1 day Field Storage : Insulated Cure Box with Heat Packets
Date in Lab: 01-29·16 Cylinder Temperature at Pick Up: 54° Min/Max: 54 °/65°
2015
Lab Age Date
Number Days
053A 4 02-01-16
0538 28 02-25·16
053C 28 02-25-16
0530 28 02-25-16
Compressive Strength Data
Load Diameter Area
lbs. in . in 2
54,900 4.01 12.63
78.500 4.01 12.63
82,500 4.01 12.63
80.900 4.01 12.63
Compressive
Strength (psi)
4350
6220
6530
6410
28 Day
Avg . {psi)
6390
Specified Strength for Structure: 4000 psi at 28 days Specified Strength for Mix: 4000 psi at 28 days
---·------------------··-------------------
Noles:
OislribuUon :
Aspen Signature Homes of lronbrldge, LLC -Llwyd Eccles tone (lecclestone@pblhn.net)
Slllch Construction -Hayden Horsford (hhorsford@slllchconstruclion.com)
Slllch Construction -John Silich <iohn@silichconstruction.com)
Slllch Construction -Scott Henriksen (scott@sllichhomos.com)
Silich Construction -Amanda Jenkins (amanda@slllchconstruction .com)
United Distribution
Chris Newberry
Field Technician
Thomas J . Westhoff, CET
Reviewed By
~ech
HEPWORTH· PAWLAK GEOTECHNICAL
POST TENSIONING FIELD REPORT
Client: Sllich Construction Inc.
Attn: Scott Henriksen
303 AABC, Suite J
Aspen, Colorado 81611
Job No.: 115 066H
6020 County Road 154
Glenwood Springs, CO 81601
Phone: 970·945-7988
Fax: 970-945-8454
hpgeo@hpgeotech.com
Day:
Date:
Page:
Wednesday
02-03~16
1 of2
Project: Proposed Residence, Lot 291, lronbridge Development, River Bend Way, Garfield
County, Colorado
Weather: Partly Cloudy, light wind, dry Temperature: °F
Field Notes:
Tendon Location Jacking Gauge Calculated Measured Elonaation Cin.l
11jf
No. Force Reading Elongation End 1 (kios} (csil (in.)
A west side 5400 4% 5%
B west side 5400 4% SY2
c west side 5400 4% 5%
D west side 5400 4% 5%
E west side 5400 4% 4%
F west side 6400 4Ya 4Y2
G west side 5400 4% 4%
H west side 5400 4 4~h
I west side 5400 4 4o/1
la north side 5400 1¥. 2
J west side 5400 4 4%
K west side 5400 3% 4%
L west side 5400 3'l'a 4%
M west side 5400 3'l'a 4%
1 north side 5400 27/a 3y ..
2 north side 5400 2% 3
3 north side 5400 2v. 3%
4 north side 5400 2v. 3%
5 north side 5400 2¥1 3
6 north side 5400 2% 3%
7 north side 5400 2v. 3%
8 north side 5400 2v. 3
9 north side 5400 2% 3%
10 north side 5400 2% 3
Aspen Signature Homes of lronbrldge, LLC -Llwyd Eccleston• Otcdestonefllpblhft.net>
Slllch Construction -Hayden Horsford «hbor!fgrdOIJllCl!construct!OMO!!J)
Slllch Construcllan -John Slllch OohnCll!JHchcqnstrvctlon .c.om)
Slllch Const.ructlon -Scott Henriksen l!CQtlO!IlteN!pmn,c
Fuhnnann & Graf ·Nathan Graf «npgraH!lfu!ymanntng!rmrtnq.com)
Paul Weiser
Field Technician
End2 Total Deviation
(%)
Steven L. Pawlak, P.E.
Reviewed By
GScbtech
HEPWORTH-PAWLAK GEOTECHNICAL
POST TENSIONING FIELD REPORT
Client: Slllch Construction Inc.
Attn: Scott Henri ks en
303 AABC, Suite J
Aspen, Colorado 81611
Job No.: 115 066H
5020 County Road 154
Glenwood Springs, CO 81601
Ptiona: 970-945-7988
Fax: 970-945-8454
hpgeo@hpgeotech.com
Day:
Date:
Page:
Wednesday
02-03-16
2of2
Project: Proposed Residence, Lot 291, lronbridge Development, River Bend Way, Garfield
County, Colorado
Weather: Partly Cloudy, light wind, dry Temperature: °F
Field Notes:
Tendon Location Jacking Gauge Calculated Measured Elonaatlon Cin.)
No Force Reading Elongation End 1 (kips) (psi) (in.)
11 north side 5400 2Ya 2%
12 north side 5400 2¥1 2%
13 north side 5400 2Ya 2¥1
14 north side 5400 2¥1 2%
15 north side 5400 2¥1 3
16 north side 5400 1% 1%
17 north side 5400 :lh :1h
Aspen Slgnatunr Homes of lronbrldge, LLC • Uwyd Ec:clestone f!eccltstontOob!hf!·"'"
Slllch Construction -Hayden Horsford (hborJfQrd@!llldlconstrue1Jon.com1
Slllc:h ConstrucUon -John Slllc:h Clohnfl!snfcbcombuctloo.com•
Slllc:h Construc:Uon -Scott H1nrlksen fscotUh!llc:hhomts.com)
Fuhnn;inn & Graf • N;ith;in Graf (nparaftllfuhm!ann!J!alD!!rtna.com)
Paul Weiser
Field Technician
End2 Total Deviation
(%)
Steven L. Pawlak, P .E
Reviewed By