Loading...
HomeMy WebLinkAboutConstruction Observation Report 05.20.16HEPWORTH-PAWLAK GEOTECHNICAL May20, 2016 SiUch Construction Inc. Attn: Scott Henriksen 1461 River Bend Wny Glenwood Springs, Colorado 81601 Cscou@silichhomcs .com ) l·kr\umh·P.1\\'bl.: Gcl•rcchnic:il, Inc. 5020 Cnumy Ro;iJ 154 Glcnw•><>J Sprin:,:s, C1lora,l11 81601 Phnnc: 9i0·9H-798R F.1x 9i0-945-S.J;4 cm.111 hr~cn®hrl:!co11:.:h rnm Job No. 115 066H Subject: Construction Observation and Testing Completion Letter, Proposed Residence, Lot 291, lronbridge Development, River Bend Way, Garfield County, Colorado Gentlemen: As requested, we are providing a summary of our observation and testing services provided for the above referenced project. The reports of the services requested and performed for the project are attached. We previously conducted a subsoil study for design of foundations at the site and presented our findings in a report dated October 26, 2015, Job No. 113 471T. The foundation bearing soils within the building excavation were observed and tested for compaction on December 16 and 17, 2015 and are suitable for the recommended bearing pressure of 1,500 psf. Perimeter grade beam reinforcement steel was observed on January 26, the post-tensioned slab tendons were observed on January 27 and the fresh concrete for the foundation was sampled on January 28, 2016. Tensioning of the tendons was observed on February 3, 2016 according to the project specifications. The results of the tendon tensioning were submitted to Fuhrmann & Graf for their approval. We did not observe placement of the rigid foam insulation along the building perimeter, but since the perimeter grade beam has a minimum depth of 36 inches. it provides adequate frost protection rather than by insulation. Based upon inferences drawn from our observation and testing, as documented by the attached daily field and laboratory reports, it is our professional opinion that the referenced construction has achieved the specified conditions. Please recognize that construction observation and testing are sampling functions that involve direct Parker 303 -841 -7119 • Colorado Sprin gs 719-633-5562 • Silverthorne 970-468-1989 Silich Construction Inc . May20, 2016 Page2 observation and testing of very limited nm ount of the overall work to evaluate the construction compliance. If you have any questions or need further assistance, please call our office. Sincerely, HEPWORTH -PAWLAK GEOTCHNICAL , INC . Attachments: Observation & Testing Reports: 12/16/15 through 2/03/16 cc: Silich Construction-John Silich <iohn@silichcon'>truction.com) Job No . I t.5 066H ~tech 6020 County Road 154 Gl•nwood Springs, Colorado 81801 Phon•: 970.945-7188 Fu: 1170-1146-M54 HEPWORTH·PAWLAK GEOTECHNICAL bpqeo@bpgeo!p.cqm Earthwork Compaction Testing Report Client: Slllch Construction Inc. Job No.: 115 066H Day: Wednesday Attn: Attn: Scott Henriksen Date: 12116/15 303 AABC, Suite J Page: 1 of 1 Aspen, Colorado 81611 Project: Proposed Residence, Lot 291, lronbrldge Development, River Bend Way, Garfield County, Colorado Weather: Cloudy, calm, snow overnight Temperature: 18°at11 :oo am Earthwork Contractor: Logan Equipment Used : Ground Heater & Blankets Description of Earthwork Planned residence building pad was tested at slab subgrade in 3 locations. Tested: Results Indicated unacceptable compaction at about 1 to 5 percent above optimum moisture. Slab area was blanketed and being heated at the time of testing. Sample{s) Obtained: Verbal Communication: Steve Pawlak in our office was informed of our test results. Placement and Compaction Procedure: Not observed by HP Geotech. lift Thickness: Max. Rock Size : Moisture Conditioning: Compactor(s) Used: Number of Passes: Nuclear Gauge Moisture/Densitv Test Results Location Field Dry Field Field Min. Test Depth or Density Moisture Comp. Comp. Proctor No. Elev. {pct) Content (%) Req . Lab No. % (%) 1 SE comer, 6' N., 4' W. slab 93 .9 15.7 82 98 006-15 subarade 2 center of building, 1 O' W. of water slab 95.2 17.1 83 98 006-15 pipe subarade 3 west side 20' N., 4' E. of SW corner slab 103.9 13.2 90 98 006-15 subarade Proctor Sample Reference: lab No. Method Description Max. Ory Opt. Dens. ocf Moist.{%) 006-15 ASTM 0698 (113 471A & 115 0668): Sandv Slit and Gravel 114.9 12.3 '"""""'....,.f'"""" lllS •. ' *'"A RUYLl gi;o t 1M OISERVAf!Ql'fMW FIU. -11. m: HAVl AELIEO Ott 1ltl 1 urffO C1 IHTVM APl'LTINli TH ; MC COMPACT11/E EFFORT AND MOIS1URE TO FIU. DURING 'Qtl 1MS WHEH OUR 08RRV!lt IS NOT 09SEIMHG OPERATIONS TIE HIJCl.EAA DENSOMETER MEntOO Of TUTINO WAS USl!D .. suarANTIAI. ACCORDANCE WITH ASTM D 6138 DlstribuUon: Aspen Signature Homes of lronbridge, U.C • Uwyd Ecclestone Uecc:Jntone@pblhfl.ntt> Slllch ConstrucUon -Hayden Horsford ChhoflfonflbH!chconttmction.com> Sltich Construction -John Slllch llobn@elllehconstruct1on.com) Slllch ConstnJcUon -Scott Henriksen flcattlbllleflbom!!.com> Jljf Tom Westhoff, CET Steven L. Pawlak, P .E. Field Technician Reviewed By ~£tech 5020 County Roed 154 GIHWood Springs, Colo,.do 81601 Phone: 970-945-7988 Fu: 970-945-8454 HEPWORTH•PAWLAK GEOT£CHNICAL hDGeo@boaeoled!.cqm Earthwork Compaction Testing Report Client: Slllch Construction Inc. Job No.: 115 066H Day: Thursday Attn : Attn: Scott Henriksen Date: 12/17/15 303 AABC, Suite J Page: 1 of 1 Aspen, Colorado 81611 Project: Proposed Residence, Lot 291, lronbrldge Development, River Bend Way, Garfield County, Colorado Weather. Partly cloudy, calm, dry Temperature: 21° at 4:00 pm Earthwork Contractor: Logan Equipment Used: Trackhoe, Vibratory waJk .. behind double drum roller Description of Earthwork Planned residence slab subgrade had been reworked and re-compacted. Three Tested : re-tests were performed Indicating acceptable compaction at about 1 percent above optimum. Slab area was blanketed after testing. Sample(s) Obtained: Verbal Communication: Logan crew on-site and Steve Pawlak In our office was Informed of our test results. Placement and Compaction Procedure: Not observed by HP Geotech. Lift Thickness: Max. Rock Size: Moisture Conditioning: Compactor(s) Used: Number of Passes: Nuclear Gauge Moisture/Densit)' Test Results Location Fie1d Ory Field Field Min. Test Depth or Density Moisture Comp. Comp. Proctor No. Elev. (pcf) Content {o/o) Req. Lab No. % (%) 1A retest of #1 (12-16-15) slab 112.0 13.1 98 98 006·15 subarade 2A retest of #2 (12-16-15) slab 112.2 13.1 98 98 006-15 subgrade 3A retest of #3 (12-16-15) slab 112.6 13.4 98 98 006-15 subgrade Proctor Sample Reference: Lab No. Method Description Max. Ory Opt. Dens. pcf Moist.(%) 006-15 ASTMD698 Sandy Slit with Gravel 114.9 12.3 I Ml:ll lltl'QRI PRES ;Nlll Ut'll'IKm5 M "Rl:SUL T D• OUR OB"""v,\11urr.11.w ~L PLACEMENT."" HAVE Rl:L..:u OH THE c-'""C'TOll TO \0\ .. I .. uE APPL"""' THE Rl!C~OEO CDMPACTM! UFORT AHO MOISTURE TO FILL DURING TtlE TIM!5 WHEN OUR OBSERVER IS NOT OBSERVING OPERATIONS THE HUQ.eAA OENSOMET!ll METH00 OF l!STING WAS USED IN SUBSTNfTIAL ACCOIUWICI! WITH~ 019311 Distribution · Aspen Signature Homes of lronbrldge, LLC • Llwyd Ecclestone (ffccltslOD!fRpblhfl.net) SIUch ConstrucUon -Hayden Horsford (hho[!fordOtlllchconstrucUon.com> SIHch Construction -John Slllch OohnCblllchconstnzction.com> Slllch Construction -Scott Henriksen {Jcott0!111chhomu.cqm) /ljf Tom Westhoff, CET Steven L. Pawlak, P.E. Field Technician Reviewed By c:;c.;'£tech 5020 County Road 154 Glenwood Springs, CO 81601 Phone: 970-945-7988 HEPWORTH ·PAWLAK GEOTECHNICAL Fax: 970-945-8454 bpgeo@)hpqeotech.cam REINFORCEMENT STEEL INSPECTION REPORT Client: Slllch Construction Inc. Attn: Scott Henriksen 303 AABC, Suite J Aspen, Colorado 81611 Job No.: 115 066H Day: Date: Page: Tuesday 1/26/16 1 of 1 Project: Proposed Residence, Lot 291, lronbridge Development, River Bend Way, Garfield County, Colorado Area of Inspection: Rebar for Grade Beam Trenches. Reference Documents Sheet FD1, F1.0R (added wall along south side). Used: Inspection Notes: Inspection Status: D Preliminary 181 Final [g] Concrete reinforcement as noted above was judged to be in reasonable conformance with the referenced construction documents. 0 Exceptions Noted: Verbal Communication: Distribution: Scott with Silich Homes was lnfonned that reinforcement was installed according to construction documents. Aspen Signature Homes of lronbridge, LLC • Llwyd Eccleston• flec;cJestone@pblhfl.net> Slllch Construction -Hayden Horsford fhhorsford@!llh:hconstryc;tton.com> Slllch Construction -John Slllch UobnO!lllchc9n1tructfon.com) Slllch Construction -Scott Henriksen ftcotb!lttlllcbhomes.com) njt Paul Weiser Steven L. Pawlak, P .E. Field Technician Reviewed By ~tech 6020 County Road 154 Glenwood Springs, CO 81601 Phone: 970-945-7988 HEPWORTH-PAWLAK GEOTECHNICAL Fax: 970·945-8454 hpgeo@hpgeotech.com REINFORCEMENT STEEL INSPECTION REPORT Client: Silich Construction Inc. Attn: Scott Henriksen 303 AABC, Suite J Aspen, Colorado 81611 Job No.: 115 066H Day: Date: Page: Wednesday 1/27/16 1 of 1 Project: Proposed Residence, Lot 291, lronbridge Development, River Bend Way, Garfield County, Colorado Area of Inspection: Tendons for post-tensioned slab. Reference Documents Structural Plans Sheet F1.0R Used: All tendons were set at proper length and spacing. Inspection Notes: Inspection Status: 0 Preliminary (81 Final [8J Concrete reinforcement as noted above was judged to be in reasonable conformance with the referenced construction documents. D Exceptions Noted: Verbal Communication: Distribution: Aspen Signature Homes of lronbridge, LLC -Llwyd Ecclestone flecclestone@pblhD.neU Slllch Construction -Hayden Horsford Chhorsfonf@slllchconstructlon.com) Slllch Construction -John Slllch (!ohnAsfllchconstructfon.coml Slllch ConstrucUon -Scott Henriksen r1cott@sl!lchhom!!.coml lljf Paul Weiser Steven L Pawlak. P.E. Field Technician Reviewed By c;Sc!)tech HEPWORTH -PAWLAK GEOTECHNICAL 5020 County Road 154 Glenwood Springs, CO 81601 Phone; 970·945-7988 Fax: 970-945-8454 hpgeo@hpgeotech.com CONCRETE TEST REPORT Silich Construction Inc. Attn: Scott Henriksen 303 AABC, Suite J Aspen, Colorado 81611 Job No. 115 066H Date Cast: 01-28-16 Sheet: 1of1 Project: Proposed Residence, Lot 291, lronbridge Development, River Bend Way, Garfield County. Colorado Placement Location: Foundation Slab Supplier: United Time Batched: Truck No: 6042 Time Arrived : Ticket No : 33306320 Time Placed : Mix Design: 37010551 1 COOT Class D Method of Placement: Pump Time Sampled: 8:05 am Wet Unit Wt: Air Temp: 10° Slump: Concrete Temp: 66a Air Content: Water Added: 10 gallons per Contractor 7:14 am 7:55am 7:57 am Sample Point: 139.4 pcf SY. inches 3.8% Load Size (Yds). Yds Delivered: Yds Ordered: Truck Discharge 10.0 10.0 80 .01 Communication: The Contractor and Supplier were informed of our field test results. Time Cylinders Cast: 8:15 am Initial Cure Time On Site: 1 day Field Storage : Insulated Cure Box with Heat Packets Date in Lab: 01-29·16 Cylinder Temperature at Pick Up: 54° Min/Max: 54 °/65° 2015 Lab Age Date Number Days 053A 4 02-01-16 0538 28 02-25·16 053C 28 02-25-16 0530 28 02-25-16 Compressive Strength Data Load Diameter Area lbs. in . in 2 54,900 4.01 12.63 78.500 4.01 12.63 82,500 4.01 12.63 80.900 4.01 12.63 Compressive Strength (psi) 4350 6220 6530 6410 28 Day Avg . {psi) 6390 Specified Strength for Structure: 4000 psi at 28 days Specified Strength for Mix: 4000 psi at 28 days ---·------------------··------------------- Noles: OislribuUon : Aspen Signature Homes of lronbrldge, LLC -Llwyd Eccles tone (lecclestone@pblhn.net) Slllch Construction -Hayden Horsford (hhorsford@slllchconstruclion.com) Slllch Construction -John Silich <iohn@silichconstruction.com) Slllch Construction -Scott Henriksen (scott@sllichhomos.com) Silich Construction -Amanda Jenkins (amanda@slllchconstruction .com) United Distribution Chris Newberry Field Technician Thomas J . Westhoff, CET Reviewed By ~ech HEPWORTH· PAWLAK GEOTECHNICAL POST TENSIONING FIELD REPORT Client: Sllich Construction Inc. Attn: Scott Henriksen 303 AABC, Suite J Aspen, Colorado 81611 Job No.: 115 066H 6020 County Road 154 Glenwood Springs, CO 81601 Phone: 970·945-7988 Fax: 970-945-8454 hpgeo@hpgeotech.com Day: Date: Page: Wednesday 02-03~16 1 of2 Project: Proposed Residence, Lot 291, lronbridge Development, River Bend Way, Garfield County, Colorado Weather: Partly Cloudy, light wind, dry Temperature: °F Field Notes: Tendon Location Jacking Gauge Calculated Measured Elonaation Cin.l 11jf No. Force Reading Elongation End 1 (kios} (csil (in.) A west side 5400 4% 5% B west side 5400 4% SY2 c west side 5400 4% 5% D west side 5400 4% 5% E west side 5400 4% 4% F west side 6400 4Ya 4Y2 G west side 5400 4% 4% H west side 5400 4 4~h I west side 5400 4 4o/1 la north side 5400 1¥. 2 J west side 5400 4 4% K west side 5400 3% 4% L west side 5400 3'l'a 4% M west side 5400 3'l'a 4% 1 north side 5400 27/a 3y .. 2 north side 5400 2% 3 3 north side 5400 2v. 3% 4 north side 5400 2v. 3% 5 north side 5400 2¥1 3 6 north side 5400 2% 3% 7 north side 5400 2v. 3% 8 north side 5400 2v. 3 9 north side 5400 2% 3% 10 north side 5400 2% 3 Aspen Signature Homes of lronbrldge, LLC -Llwyd Eccleston• Otcdestonefllpblhft.net> Slllch Construction -Hayden Horsford «hbor!fgrdOIJllCl!construct!OMO!!J) Slllch Construcllan -John Slllch OohnCll!JHchcqnstrvctlon .c.om) Slllch Const.ructlon -Scott Henriksen l!CQtlO!IlteN!pmn,c Fuhnnann & Graf ·Nathan Graf «npgraH!lfu!ymanntng!rmrtnq.com) Paul Weiser Field Technician End2 Total Deviation (%) Steven L. Pawlak, P.E. Reviewed By GScbtech HEPWORTH-PAWLAK GEOTECHNICAL POST TENSIONING FIELD REPORT Client: Slllch Construction Inc. Attn: Scott Henri ks en 303 AABC, Suite J Aspen, Colorado 81611 Job No.: 115 066H 5020 County Road 154 Glenwood Springs, CO 81601 Ptiona: 970-945-7988 Fax: 970-945-8454 hpgeo@hpgeotech.com Day: Date: Page: Wednesday 02-03-16 2of2 Project: Proposed Residence, Lot 291, lronbridge Development, River Bend Way, Garfield County, Colorado Weather: Partly Cloudy, light wind, dry Temperature: °F Field Notes: Tendon Location Jacking Gauge Calculated Measured Elonaatlon Cin.) No Force Reading Elongation End 1 (kips) (psi) (in.) 11 north side 5400 2Ya 2% 12 north side 5400 2¥1 2% 13 north side 5400 2Ya 2¥1 14 north side 5400 2¥1 2% 15 north side 5400 2¥1 3 16 north side 5400 1% 1% 17 north side 5400 :lh :1h Aspen Slgnatunr Homes of lronbrldge, LLC • Uwyd Ec:clestone f!eccltstontOob!hf!·"'" Slllch Construction -Hayden Horsford (hborJfQrd@!llldlconstrue1Jon.com1 Slllc:h ConstrucUon -John Slllc:h Clohnfl!snfcbcombuctloo.com• Slllc:h Construc:Uon -Scott H1nrlksen fscotUh!llc:hhomts.com) Fuhnn;inn & Graf • N;ith;in Graf (nparaftllfuhm!ann!J!alD!!rtna.com) Paul Weiser Field Technician End2 Total Deviation (%) Steven L. Pawlak, P .E Reviewed By