HomeMy WebLinkAboutConstruction Observation 05.23.16HEPWORTH-PAWLAK GEOTECHNICAL
May23, 2016
Silich Construction Inc.
Attn: Scott Henriksen
1461 River Bend Way
Glenwood Springs, Colorado 81601
(scott@silichbo mes&gm)
Hq11n1nb-Pawl,1I: G<!111c-:hnicnl. Jn~
5020 Couniy Rtl.lJ 154
Glcnw.,.,J Sprin:.:s. Colur.1Jn S 160 l
Ph inc: 970-945-i9SS
F.1x 9i0-945-l.H5~
~m.111: hps:w@hpiic11tcd1.rnm
Job No. l 15 066G
Subject: Construction Observation and Testing Completion Letter, Proposed
Residence, Lot 289, lronbridge Development, River Bend Way, Garfield
County, Colorado
Gentlemen:
As requested, we are providing a summary of our observation and testing services
provided for the above referenced project. The reports of the services requested and
performed for the project arc attached. We previously conducted a subsoil study for
design of foundations at the site and presented our findings in a report dated September
16 1 2015, Job No. l 13 471Q.
The foundation bearing soils within the building excavation were observed nnd tested for
compaction on December 21, 2015, January 6, 13, 19 and 21, 2016 and are suitable for
the recommended bearing pressure of I ,000 psf. Grade beam reinforcement steel was
observed on February 9, the post-tensioned slab tendons were observed on February IO
and the fresh concrete for the foundation was sampled on February 12, 2016. Tensioning
of the tendons was observed on February IS, 2016 according to the project specifications.
The results of the tendon tensioning were submitted to Fuhrmann & Graf for their
approval. We did not observe placement of the rigid foam insulation along the building
perimeter, but since the perimeter grade beam has n minimum depth of 36 inches, it
provides adequate frost protection rather than by insulation.
Based upon inferences drawn from our observation and testing, as documented by the
attached daily field nnd laboratory reports, it is our professional opinion that the
referenced construction has achieved the specified conditions. Please recognize that
construction observation and testing are sampling functions that involve direct
Parker 303-841-7119 • Color;:ido Springs 719-633-5562 • Sih·erthomc 970-468-1989
Silich Construction Inc.
May 23, 2016
Page2
observation and testing of very limited umount of the overall work to evaluate the
construction compliance.
If you have any questions or need further ussistance, please call our office.
S incerely,
HEPWORTH -PAWLAK GEOTCHNlCAL, INC.
Steven L. Pawlak. P .
SLP/ksw
Attachments: Observat ion & Tesling Reports: 12/21115 through 2/15/16
cc: Silich Construction -John Silich <i oho@sHic hconstruction,com)
Job No. I IS 0660
~tech 6020 County Road 154
Glenwood Springs, Colorado 81601
Phone: 170-945-711811
Fax: 170..945-8454
HEPWORTH·l'AWLAK GEOTECHNICAt hpqeoChpgeotecf!.corn
Earthwork Compaction Testing Report
Client: Silich Construction Inc. Job No.: 115 066G Day: Monday
Attn: Scott Henriksen Date: 12121/15
303 AABC, Suite J Page: 1 of 1
Aspen, Colorado 81611
Project: Proposed Residence, Lot 289, fronbridge Development, River Bend Way, Garfield County,
Colorado
Weather: Cloudy, light wind, snow overnight Temperature: 35° at 3:45 pm
Earthwork Contractor: Logan
Equipment Used: Ground heater & blankets, jumping jack tamper
Description of Earthwork Building slab subgrade area was being heated and no frost was noted in the
Tested: ground. Compaction of some areas between the grade beam trenches had
been attempted using a jumping jack tamper. Four tests were performed.
Results indicated unacceptable compaction at about 4 to 5 percent below
optimum moisture.
Verbal Communication: Logan crew was informed of our test results.
Placement and Compaction Procedure: Observed by HP Geotech.
Lift Thickness : Max. Rock Size: Moisture
Conditioning :
Compactor(s) Used: Number of Passes:
Nuclear Gauge Moisture/Densi~' Test Results
Location Field Dry Field Field Min.
Test Depth or Density Moisture Comp. Comp. Proctor
No. Building Slab Subgrade Elev. (pcf) Content (%) Req. Lab No .
% (%)
1 East side slab 110.7 7.6 96 98 006-15 subgrade
2 Westside slab 110.3 7.9 96 98 006-15 subgrade
3 North side slab 105.0 7.1 91 98 006-15 subgrade
4 South side slab 104.4 8.3 91 98 006-15 subarade
Proctor Sample Reference:
Lab No. Method Description Max. Dry Opt.
Dens . ccf Moist.(%)
006-15 (113471H) ASTM0698 Sandy Slit with Gravel 114.9 12.3
TlllS iu;pgRJ PftESENlS OPINIONS AS A Rf: SULT OF OUR 1.1ui.ERVATION:i0 fill. PUICEMElfT WE HAVE RELIEO OH THE COffTAACTOR TO CONTINUE APPi. YINO THE RECQW.Erl~D
COMPACTIVE EFFOR r AHO MOISTURE TO FILL OURIHG THE TMES WtEH OUR OBSERVER 1$ HOT OllSERVIHG OPERATIONS
'lllE HUCLl:AA OEHSOMETER METHOD OF TESTltlGWAS USED IN suasrNnlAI. ACCORDANCE WITHASTAI ow.a
Oistributlon :
Aspen Signature Homes of lronbridge,. LLC • llwyd Eccles tone <Jecdttt9ne0pblbflnt5)
Sillch ConstrucUon -Scott Henriksen ftsot101mcbhomn.coml
Stlich Construction -John Slllch HohnCb!Uchgon&uctlon.com >
TJW/ Tom Westhoff Steven L. Pawlak, P .E.
Field Technician Reviewed By
~tech 6020 County Road 154
I Glenwood Springs. Colorado 81601
Phon1:970-945-7988
Fax: 970-94~54
HEPWORTH·PAWVJ< GEOTECHNICAL bpqoo@hpgeotecb.com
Earthwork Compaction Testing Report
Client: Sllich Construction Inc. Job No.: 115 066G Day: Wednesday
Attn: Hayden Horsford Date: 1/6/16
303 AABC, Suite J Page: 1 of 1
Aspen, Colorado 81611
Project Proposed Residence, Lot 289, lronbrldge Development, River Bend Way, Garfield County,
Colorado
Weather: Cloudy, calm, dry Temperature: 39 • at 12:00 pm
Earthwork Contractor; Logan
Equipment Used: Mini Excavator
Description of Earthwork Building slab subgrade was being heated w i th a ground heater and contractor
Tested: had watered top of subgrade creating a very muddy surface. The retests
indicated poor compaction due to surface water. The contractor discussed
pouring the grade beams before compacting the subgrade.
Sample(s) Obtained:
Verbal Communication· Logan's supervisor was informed of our test results.
Placement and Compaction Procedure : Not observed by HP Geotech.
Lift Thickness : Max. Rock Size: Moisture
Conditioning :
Compactor(s) Used: Number of Passes:
Nuclear GauQe Moisture/Density Test Results
Location Field Dry Field Field Min.
Test Depth or Density Moisture Comp. Comp. Proctor
No. Elev. (pcf) Content (%) Req . Lab No.
% (%)
1A east side slab 83.9 21.5 73 98 006-15 subgrade
2A west side slab 101 .5 18.8 88 98 006-15 subarade
28 west side under mud slab 106.3 15.3 93 98 006-15 subgrade
Proctor Sample Reference:
Lab No. Method Description Max. Dry Opt.
Dens. pcf Moist.(%)
006-15 ASTM 0698 Sandy Silt with Gravel 114.9 12.3
n ws.._.,,,. ....... sems ~NIOHSAS ARnlA.T Ci' ....... --··~ I~ FILLPl.AC_,., M HAW:r<eui:u ... TIE •.u•uRACTO R l OC(IN1...,. ...... a.:,llt\> na.R£C~D
COMPACTlllE EFFORT AHO t.IOISTURe TO FILL DURING THE n.tES WHEtl OUR OBSERVER IS NOf OB$ERVIHG 0P£RATIOHS
lllE NUCLEAR DEllSOMETER METHOD OF TESllNG WAS USED .. St18 STAHTPAL ACCORD.\NCE WITH ASTM D 6938
Oistrlbulion:
Aspen Signature Homes of lronbridge, LLC - Llwyd Ecclestone (JtcelntgneCl!pblban!J)
SUlch Construction -Hayden Horsford (hbof!fordOIJD.obcontlM;tfpn.som)
Sllich ConstrucUon-John Slllch UohnOtlJ!dJconWutVon.com>
Paul Weiser Steven L. Pawlak, P.E.
Jljf Field Technician Reviewed By
~tech 6020 County Road 164
Glenwood Springs, Colorado 81601
Phone: 970-945-7988
Fax: 970-945-8454
HEPWORTH· PAWLAK GEOTECHNICAL b~
Earthwork Compaction Testing Report
Client: Silich Construction Inc. Job No.: 115 066G Day: Wednesday
Attn: Scott Henriksen Date: 1/13/16
303 AABC, Suite J Page: 1 of 1
Aspen, Colorado 81611
Project: Proposed Residence, Lot 289, lronbrldge Development, River Bend Way, Garfield County,
Colorado
Weather: Clear, calm, dry Temperature: 5° at8:30am
Earthwork Contractor: Logan
Equipment Used: Ground heater & blankets, trackhoe, remote double drum roller, water hose
Description of Earthwork Building slab subgrade area was blanketed and being heated at the time of our
Tested : site visit Since our fast visit the grade beam trenches were filled in and the
area was cut to 1 foot below subgrade. The soil from 1 to 2 feet below
subgrade was then reportedly watered and blended to near optimum moisture,
spread and compacted using a remote double drum roller. Three in-place
density tests were performed. Results Indicated acceptable compaction at 2
percent below to 1.2 percent above optimum moisture.
Verbal Communication: Trent with Logan was informed of our test results. He Informed us they
l!lanned to (!lace the to2 foot of filf tomorrow and would call for testing.
Placement and Compaction Not observed by HP Geotech. Procedure:
Lift Thickness : Max. Rock Size: Moisture
Conditioning:
Compactor(s) Used: remote double drum roller Number of Passes:
Nuclear Gauge Moisture/Density Test Results
Location Field Ory Field Field Min .
Test Depth or Density Moisture Comp. Comp. Proctor
No. Building Slab Area Elev. (pct) Content (%) Req. Lab No.
% (%)
1 10' S. of N side at building 1' below slab 112.8 10.3 98 98 006-15 center subarade
2 6' N, 15' E of SW building 1' below slab 116.5 12.7 101 98 006-15 comer subarade
3 10' S, 10' E of NW bulldlng 1' below slab 112.5 13.5 98 98 006-15 comer subgrade
Proctor Sample Reference:
Lab No. Method Description Max. Dry Opt.
Dens. ocf Moist.{%)
006-15 (113471H) ASTM 0698 Sandv Slit with Gravel 114.9 12.3
TttS REPORT PRESENTS OPINIONS AS A RESU~T Of OUR 06S€RV'-TIONSOF FIU. Pl.At;EMcn 1 WE HAVE RtLlli11 UN TIE l;UNTMCTOR TQ COHlltlUE .YPLYING lHE RECOIAMEHtlED
COMPACTlllE EFFORT AND MOISTURE TO Fl.L DURING TH! TIMES WHEN OUR OBSERVER IS NOT ODSERWlG OPERATIONS
THE NUCl£AR DENSOl.llETER METHOD OF TESTING WAS USED IN SU8STAHTIAL ACCOROANCE WITH ASTM 01931
Distribution
Aspen Signature Homes or lronbrtdge, LLC • Uwyd Ecclestone (lfcctnlCntOPWbll.!l@
Sillch Construction-Scott Henrlks====
Sillch Construction -John Slllch (I
TJWI Tom Westhoff Steven L. Pawlak, P.E.
Field Technician Reviewed By
~tech 5020 County Road 164
Glenwood Springs, Colorado 81601
Phone: 970·945-7988
Fax: 170-945-8454
HEPW CIRllf ·PAWLAK GEOTECHNICAL hpqeo@hpg!!Otedt .com
Earthwork Compaction Testing Report
Client: Sllich Construction Inc. Job No.: 115 066G Day: Tuesday
Attn: Scott Henriksen Date: 1/19/16
303 AABC, Suite J Page: 1 of 2
Aspen, Colorado 81611
Project: Proposed Residence, Lot 289, lronbrldge Development, River Bend Way, Garfield County,
Colorado
Weather: Cloudy, calm, snow overnight Temperature: 28° at 9:00 am
Earthwork Contractor: Logan
Equipment Used. Mini Excavator & Loader
Description of Earthwork The contractor placed under slab backfill and had compacted the northeast
Tested: corner of the residence area before the compactor broke down yesterday. The
remaining backfill appeared wet from snow last night The subgrade is heated
with a ground heater and covered with blankets. The test on the northeast
corner indicated adequate compaction. A return visit was scheduled for later
today.
Sample(s) Obtained:
Verbal Communication: Logan's crew was infonned of our test results.
Placement and Compaction Procedure: Not observed by HP Geotech.
~
Lift Thickness : Max. Rock Size: Moisture
Conditioning:
Compactor{s) Used: Number of Passes:
Nuclear Gauge Moisture/Densit'l' Test Results
Locati on Field Dry Field Field Min.
Test Depth or Density Moi sture Comp. Comp. Proctor
No. Elev. (pcf) Content (%) Req . Lab No.
% (%)
1 NE corner of residence subgrade 113.7 9.6 99 98 006-15
Proctor Sam ple Reference:
Lab No. Method Description Max. Dry Opt. I
Dens. oef Moi st.(%)
006-15 ASTMD698 Sandv Slit with Gravel 114.9 12.3
nus REPORT PR i:;;;o .... ~ ... ~ ........... qA RESU Lf OF OUR u -VAIKJHSIW l'IU.Pl.AC~. wi:HAVE RE11EDOH (ftl;l;ClHnw;;tORTO _T..,..TliER
COMPAC'TlVE EFFORT AND "'OIST\JRE TO Fill OUR1JIG TlfE TIMES WHEN OUR OBSERVER IS NO T OBSERVING OflERATIOHS
TME NUCLEAR DEHSOMETl!R METHOD OF TESTIHG WAS USED IN SUBS f NITW.ACCCRDAHC G WITH ASTM D 69311
Distribution:
Aspen Signature Homes of lronbrldge, LLC -Uwyd Ecclestone OtcclutQl!pbJ!JO.net>
Slllch Construction -Scott Henriksen f1cctt8sDld!homn,C.Qm)
Sill ch Construction -John Slllch QobnOslifChCOnttructlon.comJ
Paul Weiser Steven L . Pawlak, P.E.
Fie fd Technician Reviewed By
/ijf
~ech 5020 County Road 154
Glenwood Sptfn09, Colorado 81601
Phone: 1170°945-7988
Fax: 970°946-8454
HEPWOR'lli ·PAWLAK GEOTECHNICAL hpqeofthpgeo«ecb.com
Earthwork Compaction Testing Report
Client: Silich Construction Inc. Job No.: 115 066G Day: Tuesday
Attn: Scott Henriksen Date: 1/19116
303 AABC, Suite J Page: 2 of 2
Aspen, Colorado 81611
Project: Proposed Residence, Lot 289, lronbridge Development, River Bend Way, Garfield County,
Colorado
Weather: Partly cloudy, light wind, snow overnight Temperature: 38° at 2:30 pm
Earthwork Contractor: Logan
Equipment Used: Ground heater & blankets, track hoe, remote double drum roller
Description of Earthwork Building slab subgrade area had been replaced to slab subgrade and
Tested: compacted. Three tests were performed. Two of the three tests Indicated
unacceptable compact1on. Mo1sture readings were about 5to10 percent above
optimum moisture. The soils in the area of Test #2 were noted to contain more
gravel and cobbles, resulting in the higher measured density. Building area Is
being blanketed and heated at night and no frost was noted In the work area.
Verbal Communication: Trent with Logan was informed of our test results. We recommended repJaclng
the wet top lift with material near optimum and recompacting or otherwise
drvlng the soil to near optimum and recompactina.
Placement and Compaction Procedure: Not observed by HP Geotech.
Lift Thickness : Max. Rock Size: Moisture
Conditioning :
Compactor(s) Used: Number of Passes :
Nuclear Gauge Moisture/Densii,• Test Results
Locati on Field Dry Field Field Min.
Test Depth or Moisture Comp. Proctor
No. Elev. Density Content Comp. Req. Lab No. Bullding Slab Subgrade (pcf) % (%) (%)
1 Southeast area slab 109.7 18.0 96 98 006·15 subnrade
2 Northeast area slab 116.4 16.9 101 98 OD6·15 subgrade
3 Southwest area slab 102.7 21 .8 89 98 006-15 subgrade
Proctor SamDle Reference:
Lab No. Method Description Max. Dry Opt.
Dens. ccf Moist.(%)
006·15 (113471H) ASTM 0698 Sandv Slit with Gravel 114.9 12.3
THIS nu'Ul<T PRESENTS OPIHKJHSAS A ~ULT OF QUR OBSERVATION...,.-FIU PLACtltltltr. WE HAVE RELIED UN Tl'4E COtflRACTOR TO CONTINUE ,.,....,YIHt> '"' "'"'"-"''""'
COMPACTIV& !J'FORT AND MOISTURE TO FIU. DURING THE flMES V'MEH OUR OllSEfM!R IS NOT OBSERVING OPl!RATIONS
THI! NUCl.EAR DEHSOM&;TER ME™DD Of TESTIHG WAS USED 1H SUllSTNfTIAl ACCORDANCE wmt ASTM D 6iJI
Distribution :
Aspen Signature Homes of lronbrldge, LLC • Uwyd Ecclestone «eecitttpoeOpblhft.ntti
Slllch Construction -Scott Henriksen ltccoWRtlJlchbomn.com)
Slllch Construction -John Slllch tlohnlbfllchcomtructfon,sgm)
TJWI Tom Westhoff Steven L. Pawlak, P.E.
Field Technician Reviewed By
~tech 5020 County Road 154
Glenwood Springs, Coloroido 81601
Phone: 970·945-7988
Fax: 970-945-8454
HEPWORTH· PAWLAK GEOTECHNICAL hpge9c'tl!llpgeotecl1 com
Earthwork Compaction Testing Report
Client: Silich Construction Inc. Job No.: 115 066G Day: Thursday
Attn: Scott Henriksen Date: 1121/16
303 AABC, Suite J Page: 1 of 1
Aspen, Colorado 81611
Project: Proposed Residence, Lot 289, lronbridge Development, River Bend Way, Garfield County,
Colorado
Weather: Clear, calm, dry Temperature: 26° at 1 :00 pm ---
Earthwork Contractor: Logan
Equipment Used: Ground heater & blankets, track hoe, remote double drum rolJer
Description of Earthwork Since our last visit the top lift of the building slab subgrade area had been re-
Tested: excavated, blended with drier soil and then re-compacted. Five tests were
performed. Test results indicated acceptable compaction at moisture contents
about 1 to 3 percent above optimum moisture. Building area is being
blanketed and heated at night and no frost was noted In the work area.
Verbal Communication: Trent with Logan was informed of our test results.
·-
Placement and Compaction Procedure : Not observed by HP Geotech.
-·--·-----
Lirt Thickness: Max. Rock Size: Moisture
Conditioning:
Compaclor(s) Used: Number of Passes:
-
Nuclear Gauqe Moisture/Density Test Results
Location Field Dry Fiel d Field Min .
Test Depth or Moistu re Comp. Proctor
No. E lev. Density Content Comp. Req . Lab No. Building Slab Subgrade (pcf) % (%) (%)
:
1A Re-test of #1 (1-19-16), Southeast slab 112.2 15.0 99 98 0 06-15 area subgrade
2A Re-test of #2 (1-19-16), Northeast slab 116.8 14.3 102 98 006-15 area subgrade
JA Re-test of #3 (1-19-16), So uthwest slab 113.7 15.2 100 98 006-15 area subgrade
1 Center of north side slab 116.0 13.0 101 98 006-15 subgrade
2 Northwest area slab 111.5 15.0 98 98 006-15 subgrade
Proctor Sample Reference:
Lab No. Method Description Max. Dry Opt. F
Dens . ocr Moist.(%)
006-15 (113471H) ASTM D 698 Sandy Silt with Gravel 114.9 12.3
1 HIS R~l'ORT PRESENTS OPINIOllS AS A R'ESUL l OF OUR oB~ERVAl IOtlSOf FILL l'LACHllHIT, WE lllWE REllEO Otl lttE COllTRAC TOR TO COIHINUE llPPl YlllG TltE Rf.COl.IP.1ENO !O
COMP.ACTIVE EFFORT ANO l.IOISTURE TO Fill OUrtlNG THE rn.1es \'lllEH OUR OOSERVER IS 11or ODSERVIPIG Ol'ERATlOrlS
me llUC:lEAR OENSOl.IETER l.1ETllOO OF TESllNG VIAS USED ltl SUBST...,Hllll ACCORDANCE \"ltTll ASlr.t 0 6~le
Distribution:
Aspen Signature Homes of lronbridge, LLC -Llwyd Ecclestone (lecclestone@pblhO.net)
Sllich Construction -Scott Henriksen (scott@silichhomes.com)
Silich Construction -John Silich Clohn@silichconstruction.com)
TJW/ Thomas J . Westhoff, CET Steven L. Pawlak, P .E.
Field Technician Reviewed By
~ech 5020 County Road 154
Glenwood Springs, CO 81601
Phone: 970°945-7988
HEPWORTH-PAWLAK GEOTECHNICAL
Fax: 970-945-8454
hpgeo@hpgeotech.com
REINFORCEMENT STEEL INSPECTION REPORT
Client: Sillch Construction Inc.
Scott Henriksen
303 AABC, Suite J
Aspen, Colorado 81611
Job No.: 115 066G Day:
Date:
Page:
Tuesday
2/9/16
1 of 1
Project: Proposed Residence, Lot 289, lronbridge Development, River Bend Way, Garfield
County, Colorado
Area of Inspection: Interior Trench Beams.
Reference Documents Structural Plans
Used : Sheet FD1
Inspection Notes:
Inspection Status: 0 Preliminary [81 Final
181 Concrete reinforcement as noted above was judged to be in reasonable conformance with the
referenced construction documents.
D Exceptions Noted ;
Verbal
Communication :
Ray with Silich was informed that reinforcement was installed according
to construction documents.
Distribution.
Aspen Signature Homes or lronbrldge, LLC -Llwyd Ecclestone flecot!!lOQi@pbUtfJ.ne.t)
Sllich Construction -Scott Henriksen (1cotlO!Jllghbomn..com>
Slllch ConstrucUon -John Slllch Uohnft!!Jkbconstn.Jcl9.fl&9
Slllch Construction -Amanda Jenkins tam!ndaOtD!cbconstrus:tfon·coml
Fuhnnann & Graf· Nathaniel Graf fnegrtfOfubrmannengl'l!fj'fng.i;om)
/ljf Paul Weiser
Field Technician
Steven L. Pawlak, P.E.
Reviewed By
~ech 5020 County Road 154
Glenwood Springs, CO 81 601
Phone: 970·945·7988
HEPWORTH -PAWLAK G EOTECHNICAL
Fax: 970-945-8 454
hpgeo@hpgeotech.com
REINFORCEMENT STEEL INSPECTION REPORT
Client: SUich Construction Inc.
Scott Henri ksen
303 AABC, Sutte J
Aspen, Colorado 81611
Job No.: 115 066G Day:
Date :
Page:
Wednesday
2/10/16
1 of 1
Project: Proposed Residence, Lot 289, lronbrfdge Deve l opment, Rlver Bend Way, Garfiel d
County, Colorado
Area of Inspection: Tendons for post-tensioned slab.
Refe rence Documents Structural Plans
Used: Sheet F1 .0
Inspection Notes :
Inspecti on Status : D Preliminary 181 Final
(81 Concrete re inforcement as noted above was j udged to be in reasonab le confonnance with the
referenced construction documents .
D Exceptions Noted:
Verba l
Commun ication :
Ray with Silich was Informed that tendons were installed a ccording to
construction documents.
Distributi on:
Aspen Signature Homes of lronbrldge, LLC • Llwyd Ecclestone (l ecclestone@pblhfl.net )
Silich Construction -Scott Henr iksen (s c ott@sfflchhomes.com>
Slflch Construction -John Slllch (!ohn@slllchconstruction.com)
Slllch Constructlon • Amanda Jenki ns <amanda@sl!lchconstn1ctlon.co m)
Fuhnnann & Graf · Nathaniel Graf (npgrafftfyhD!lannanglneerfng.com )
/tjf Pau l Weiser
Field Technici an
Steven L . Pawlak, P.E.
Reviewed By
~tech
HEPWORTH-PAWLAK GEOTECHNICAL
5020 Counly Road 154
Glenwood Springs, CO 81601
Phone: 970-945-7988
Fax; 970-945-8454
hpgeo@hpgeotech.com
CONCRETE TEST REPORT
Silich Construction Inc.
Attn : Hayden Horsford
303 AABC, Suite J
Aspen, Colorado 81611
Job No. 115 066G
Date Cast: 02-12-16
Sheet: 1of1
Project: Proposed Residence, Lot 289, lronbridge Development, River Bend Way, Garfield
County, Colorado
Placement Location : Post-Tensioned Slab
Supplier: United Time Batched: 7:18 am Load Size (Yds): 10
Truck No: 6394 Time Arrived: 7:55 am Yds Delivered: 10
Ticket No: 33306383 Time Placed : 8:00 am Yds Ordered: 80
Mix Design: 37610554
Method of Placement: Pump Sample Point: Truck Discharge
Time Sampled: 8:05 am Wet Unit Wt: 140.8 pcf S12e cifica tions :
Air Temp : 25° Slump: 3% inches Slump: 4inches
Concrete Temp: 74° Air Content: 5.4% Air Content: 5to8%
Water Added: None
Communication : The Contractor and Supplier were informed of our field test results.
Time Cylinders Cast: 8:15 am
Initial Cure Time On Site: 1 day Field Storage : Insulated Cure Box
Date in Lab: 02-13-16 Cylinder Temperature at Pick Up: 62° Min/Max: 43°/71°
Compressive Strength Data
2016 Compressive 28 Day Lab Age Date Load Diameter Area Strength (psi)
Number Days lbs. in . in 2 Avg. (psi)
074A 3 02-15-16 54,300 4.01 12.63 4300
0748 7 02-19-16 63,000 4 .01 12.63 4990
074C 28 03-11-16 75,000 4.01 12.63 5940
0740 28 03-11-16 77,900 4 .01 12.63 6170 5980
074E 28 03-11·16 73,700 4.01 12.63 5840
Specified Strength for Structure: 4500 psi at 28 days Specified Strength for Mix: 4500 psi at 28 days
Noles:
Distribution:
Aspen Signature Homes of lronbr ldge, LLC -Llwyd Ecclestone (lecclestone@pblhfl.net)
Sllich Construction -Hayden Horsford {hhorsford@silichconstruction.com)
Slllch Construction -John Silich fjohn@sllichconstruction.com)
SUich Construction -Amanda Jenkins (amanda@slllchconslruction .com)
United Companies Distribution List
/ljf Paul Weiser
Field Technician
Thomas J. Westhoff, CET
Reviewed By
~tech
HEPWORTH· PAWLAK GEOTECHNICAL
POST TENSIONING FIELD REPORT
5020 County Road 164
Glenwood Springs, co 81601
Phone: 970·945·7988
Fax: 970-945-8454
hpgeo@hpgeatech.com
Client: Silich Construction Inc. Job No.: 115 066G Day;
Date:
Monday
2115/16
1 of2
Attn: Scott Henriksen
303 AABC, Suite J
Aspen, Colorado 81611
Page:
Project: Proposed Residence, Lot 289~ Jronbridge Development, River Bend Way, Garfiel d
County, Colorado
Weather: Cloudy, Calm, Ory Temperature: 38°F at 9:30 am
Field Notes: Cable tensioning was performed using Jack# 539 by Gary Anderson & crew with K&G
Rebar, starting at the s l ab northwest corner and progressing to the slab southeast
corner.
Tendon Location Jacking Gauge Length Calculated Elonaation (in .)
Force Reading No. Ckiosl (psil (fl) Min .
13 NW Corner 27 5400 33% 2%
12 West Side 27 5400 33% 2%
11 West Side 27 5400 33% 2%
10 West Side 27 5400 41 2%
9 West Side 27 5400 41 2%
8 West Side 27 5400 42% 3
7 West Side 27 5400 42Yz 3
6 West Side 27 5400 42% 3
SA West Side 27 5400 52Yz 3%
4A West Side 27 5400 52% 3%
3A West Side 27 5400 52% 3%
2A West Side 27 5400 52% 3%
1A SW Corner 27 5400 52% 3%
Distribution·
Aspen Signature Homes of lronbridge, LLC • Llwyd Ecclestone Utcc!e!lpn!@pbtbft .neU
Slllch Construction -Scott Henriksen fseottlbl!lcbsomtnfSiti~comt
Slllch Construction -John Slllch fl2hnf!l!llchconstrvctlon.cam >
Slllch Construction • Amanda Jenkins l•mandi'b!ll9bconttructlon·C':2!!J)
Fuhrmann & Graf· Nathaniel Graf (npcnf@habnna nnenglM!!fng,.coml
TJW/
Max.
3
3
3
3%
3%
3o/.I
3%
3%
4%
4%
4%
4%
4%
Measured
Elongation (in .)
2%
2%
2%
3Ya
3
3%
3%
3%
4Y..
4%
4Ya
4%
4Y..
Thomas J . Westhoff, CET Steven l . Pawlak, P .E.
Field Technici an Reviewed By
. . .
5020 County Road 154
Glenwood Springs, CO 81601
Phone: 970-945-7988
HEPWORTH · PAWLAK GEOTECHNICAL
Fax: 970·945-8454
hpgeo@hpgeotech.ccm
POST TENSIONING FIELD REPORT
Cli en t: Sllich Construction Inc. Job No.: 115 066G Day: Monday
2/15/16
2 of2
P roj ect:
Attn: Scott Henriksen
303 AABC, Suite J
Aspen, Colorado 81611
Date:
Page:
Proposed Residence, Lot 289, lronbridge Development, R iver Bend Way, Garfield
County, Colorado
Weather: Cloudy, Calm, Dry Temperat ure: 38°F at 9:30 am
F ield Notes: Cable tensioni ng was performed using Jack# 539 by Gary Anderson & crew with K&G
Rebar, starting at the slab northwest corner and progressing to the slab southeast
corner.
Tendon Loca tion Jacking Gauge Lengt h Calculated Elongation (in.)
No. Force Read ing (ft.) Min. (kips) (psi \
AO SW Comer 27 5400 13% Va
A1 South Side 27 5400 13% %
A2 South Side 27 5400 13% %
A South Side 27 5400 40 2Va
B South Side 27 5400 40 2%
c South Side 27 5400 40 2%
D South Side 27 5400 40 2Va
E South S ide 27 5400 40 2Ya
F South Side 27 5400 40 2%
G South Side 27 5400 40 2%
H South Side 27 5400 40 2%
I South Side 27 5400 40 2%
J South Side 27 5400 40 2Ya
K South Side 27 5400 31Ya 2%
L South Side 27 5400 31 Ya 2%
M SE Corner 27 5400 23Ya 1%
Distri bu ti on:
Aspen Signature Homes of lronbrldge, LLC -Llwyd Ecclest one OeccJestone@pblhft.net>
Slllch Construction -Scott Henriksen (!cott@slllc;hconstructfon.com)
Slflch Construction -John Sltich rlohneslllchconstnictlon.coml
Slllch Construction -Amanda Jenkins (1mand!8!11!chconslnJctlon.com)
Fuhrmann & Graf -Nathani el Graf (npgrafetuhnnannenalneerlnq.com)
TJWI
Max.
1%
1%
1%
3Yz
3Yz
3Yz
3Yz
3Yz
3Yz
3Yz
3Yz
3Yz
3Yz
2%
2%
2Ya
Measured
Elongation (i n.)
1
1
1
2¥.
3%
3%
3%
3%
2%
3%
3%
3%
3
2Yz
2Yz
1~
Thomas J. Westhoff, CET Steven L. Pawlak1 P.E .
Field Techn ician Reviewed By