HomeMy WebLinkAboutConstruction Observation 05.23.16HEPWORTH-PAWLAK GEOTECHNICAL May23, 2016 Silich Construction Inc. Attn: Scott Henriksen 1461 River Bend Way Glenwood Springs, Colorado 81601 (scott@silichbo mes&gm) Hq11n1nb-Pawl,1I: G<!111c-:hnicnl. Jn~ 5020 Couniy Rtl.lJ 154 Glcnw.,.,J Sprin:.:s. Colur.1Jn S 160 l Ph inc: 970-945-i9SS F.1x 9i0-945-l.H5~ ~m.111: hps:w@hpiic11tcd1.rnm Job No. l 15 066G Subject: Construction Observation and Testing Completion Letter, Proposed Residence, Lot 289, lronbridge Development, River Bend Way, Garfield County, Colorado Gentlemen: As requested, we are providing a summary of our observation and testing services provided for the above referenced project. The reports of the services requested and performed for the project arc attached. We previously conducted a subsoil study for design of foundations at the site and presented our findings in a report dated September 16 1 2015, Job No. l 13 471Q. The foundation bearing soils within the building excavation were observed nnd tested for compaction on December 21, 2015, January 6, 13, 19 and 21, 2016 and are suitable for the recommended bearing pressure of I ,000 psf. Grade beam reinforcement steel was observed on February 9, the post-tensioned slab tendons were observed on February IO and the fresh concrete for the foundation was sampled on February 12, 2016. Tensioning of the tendons was observed on February IS, 2016 according to the project specifications. The results of the tendon tensioning were submitted to Fuhrmann & Graf for their approval. We did not observe placement of the rigid foam insulation along the building perimeter, but since the perimeter grade beam has n minimum depth of 36 inches, it provides adequate frost protection rather than by insulation. Based upon inferences drawn from our observation and testing, as documented by the attached daily field nnd laboratory reports, it is our professional opinion that the referenced construction has achieved the specified conditions. Please recognize that construction observation and testing are sampling functions that involve direct Parker 303-841-7119 • Color;:ido Springs 719-633-5562 • Sih·erthomc 970-468-1989 Silich Construction Inc. May 23, 2016 Page2 observation and testing of very limited umount of the overall work to evaluate the construction compliance. If you have any questions or need further ussistance, please call our office. S incerely, HEPWORTH -PAWLAK GEOTCHNlCAL, INC. Steven L. Pawlak. P . SLP/ksw Attachments: Observat ion & Tesling Reports: 12/21115 through 2/15/16 cc: Silich Construction -John Silich <i oho@sHic hconstruction,com) Job No. I IS 0660 ~tech 6020 County Road 154 Glenwood Springs, Colorado 81601 Phone: 170-945-711811 Fax: 170..945-8454 HEPWORTH·l'AWLAK GEOTECHNICAt hpqeoChpgeotecf!.corn Earthwork Compaction Testing Report Client: Silich Construction Inc. Job No.: 115 066G Day: Monday Attn: Scott Henriksen Date: 12121/15 303 AABC, Suite J Page: 1 of 1 Aspen, Colorado 81611 Project: Proposed Residence, Lot 289, fronbridge Development, River Bend Way, Garfield County, Colorado Weather: Cloudy, light wind, snow overnight Temperature: 35° at 3:45 pm Earthwork Contractor: Logan Equipment Used: Ground heater & blankets, jumping jack tamper Description of Earthwork Building slab subgrade area was being heated and no frost was noted in the Tested: ground. Compaction of some areas between the grade beam trenches had been attempted using a jumping jack tamper. Four tests were performed. Results indicated unacceptable compaction at about 4 to 5 percent below optimum moisture. Verbal Communication: Logan crew was informed of our test results. Placement and Compaction Procedure: Observed by HP Geotech. Lift Thickness : Max. Rock Size: Moisture Conditioning : Compactor(s) Used: Number of Passes: Nuclear Gauge Moisture/Densi~' Test Results Location Field Dry Field Field Min. Test Depth or Density Moisture Comp. Comp. Proctor No. Building Slab Subgrade Elev. (pcf) Content (%) Req. Lab No . % (%) 1 East side slab 110.7 7.6 96 98 006-15 subgrade 2 Westside slab 110.3 7.9 96 98 006-15 subgrade 3 North side slab 105.0 7.1 91 98 006-15 subgrade 4 South side slab 104.4 8.3 91 98 006-15 subarade Proctor Sample Reference: Lab No. Method Description Max. Dry Opt. Dens . ccf Moist.(%) 006-15 (113471H) ASTM0698 Sandy Slit with Gravel 114.9 12.3 TlllS iu;pgRJ PftESENlS OPINIONS AS A Rf: SULT OF OUR 1.1ui.ERVATION:i0 fill. PUICEMElfT WE HAVE RELIEO OH THE COffTAACTOR TO CONTINUE APPi. YINO THE RECQW.Erl~D COMPACTIVE EFFOR r AHO MOISTURE TO FILL OURIHG THE TMES WtEH OUR OBSERVER 1$ HOT OllSERVIHG OPERATIONS 'lllE HUCLl:AA OEHSOMETER METHOD OF TESTltlGWAS USED IN suasrNnlAI. ACCORDANCE WITHASTAI ow.a Oistributlon : Aspen Signature Homes of lronbridge,. LLC • llwyd Eccles tone <Jecdttt9ne0pblbflnt5) Sillch ConstrucUon -Scott Henriksen ftsot101mcbhomn.coml Stlich Construction -John Slllch HohnCb!Uchgon&uctlon.com > TJW/ Tom Westhoff Steven L. Pawlak, P .E. Field Technician Reviewed By ~tech 6020 County Road 154 I Glenwood Springs. Colorado 81601 Phon1:970-945-7988 Fax: 970-94~54 HEPWORTH·PAWVJ< GEOTECHNICAL bpqoo@hpgeotecb.com Earthwork Compaction Testing Report Client: Sllich Construction Inc. Job No.: 115 066G Day: Wednesday Attn: Hayden Horsford Date: 1/6/16 303 AABC, Suite J Page: 1 of 1 Aspen, Colorado 81611 Project Proposed Residence, Lot 289, lronbrldge Development, River Bend Way, Garfield County, Colorado Weather: Cloudy, calm, dry Temperature: 39 • at 12:00 pm Earthwork Contractor; Logan Equipment Used: Mini Excavator Description of Earthwork Building slab subgrade was being heated w i th a ground heater and contractor Tested: had watered top of subgrade creating a very muddy surface. The retests indicated poor compaction due to surface water. The contractor discussed pouring the grade beams before compacting the subgrade. Sample(s) Obtained: Verbal Communication· Logan's supervisor was informed of our test results. Placement and Compaction Procedure : Not observed by HP Geotech. Lift Thickness : Max. Rock Size: Moisture Conditioning : Compactor(s) Used: Number of Passes: Nuclear GauQe Moisture/Density Test Results Location Field Dry Field Field Min. Test Depth or Density Moisture Comp. Comp. Proctor No. Elev. (pcf) Content (%) Req . Lab No. % (%) 1A east side slab 83.9 21.5 73 98 006-15 subgrade 2A west side slab 101 .5 18.8 88 98 006-15 subarade 28 west side under mud slab 106.3 15.3 93 98 006-15 subgrade Proctor Sample Reference: Lab No. Method Description Max. Dry Opt. Dens. pcf Moist.(%) 006-15 ASTM 0698 Sandy Silt with Gravel 114.9 12.3 n ws.._.,,,. ....... sems ~NIOHSAS ARnlA.T Ci' ....... --··~ I~ FILLPl.AC_,., M HAW:r<eui:u ... TIE •.u•uRACTO R l OC(IN1...,. ...... a.:,llt\> na.R£C~D COMPACTlllE EFFORT AHO t.IOISTURe TO FILL DURING THE n.tES WHEtl OUR OBSERVER IS NOf OB$ERVIHG 0P£RATIOHS lllE NUCLEAR DEllSOMETER METHOD OF TESllNG WAS USED .. St18 STAHTPAL ACCORD.\NCE WITH ASTM D 6938 Oistrlbulion: Aspen Signature Homes of lronbridge, LLC - Llwyd Ecclestone (JtcelntgneCl!pblban!J) SUlch Construction -Hayden Horsford (hbof!fordOIJD.obcontlM;tfpn.som) Sllich ConstrucUon-John Slllch UohnOtlJ!dJconWutVon.com> Paul Weiser Steven L. Pawlak, P.E. Jljf Field Technician Reviewed By ~tech 6020 County Road 164 Glenwood Springs, Colorado 81601 Phone: 970-945-7988 Fax: 970-945-8454 HEPWORTH· PAWLAK GEOTECHNICAL b~ Earthwork Compaction Testing Report Client: Silich Construction Inc. Job No.: 115 066G Day: Wednesday Attn: Scott Henriksen Date: 1/13/16 303 AABC, Suite J Page: 1 of 1 Aspen, Colorado 81611 Project: Proposed Residence, Lot 289, lronbrldge Development, River Bend Way, Garfield County, Colorado Weather: Clear, calm, dry Temperature: 5° at8:30am Earthwork Contractor: Logan Equipment Used: Ground heater & blankets, trackhoe, remote double drum roller, water hose Description of Earthwork Building slab subgrade area was blanketed and being heated at the time of our Tested : site visit Since our fast visit the grade beam trenches were filled in and the area was cut to 1 foot below subgrade. The soil from 1 to 2 feet below subgrade was then reportedly watered and blended to near optimum moisture, spread and compacted using a remote double drum roller. Three in-place density tests were performed. Results Indicated acceptable compaction at 2 percent below to 1.2 percent above optimum moisture. Verbal Communication: Trent with Logan was informed of our test results. He Informed us they l!lanned to (!lace the to2 foot of filf tomorrow and would call for testing. Placement and Compaction Not observed by HP Geotech. Procedure: Lift Thickness : Max. Rock Size: Moisture Conditioning: Compactor(s) Used: remote double drum roller Number of Passes: Nuclear Gauge Moisture/Density Test Results Location Field Ory Field Field Min . Test Depth or Density Moisture Comp. Comp. Proctor No. Building Slab Area Elev. (pct) Content (%) Req. Lab No. % (%) 1 10' S. of N side at building 1' below slab 112.8 10.3 98 98 006-15 center subarade 2 6' N, 15' E of SW building 1' below slab 116.5 12.7 101 98 006-15 comer subarade 3 10' S, 10' E of NW bulldlng 1' below slab 112.5 13.5 98 98 006-15 comer subgrade Proctor Sample Reference: Lab No. Method Description Max. Dry Opt. Dens. ocf Moist.{%) 006-15 (113471H) ASTM 0698 Sandv Slit with Gravel 114.9 12.3 TttS REPORT PRESENTS OPINIONS AS A RESU~T Of OUR 06S€RV'-TIONSOF FIU. Pl.At;EMcn 1 WE HAVE RtLlli11 UN TIE l;UNTMCTOR TQ COHlltlUE .YPLYING lHE RECOIAMEHtlED COMPACTlllE EFFORT AND MOISTURE TO Fl.L DURING TH! TIMES WHEN OUR OBSERVER IS NOT ODSERWlG OPERATIONS THE NUCl£AR DENSOl.llETER METHOD OF TESTING WAS USED IN SU8STAHTIAL ACCOROANCE WITH ASTM 01931 Distribution Aspen Signature Homes or lronbrtdge, LLC • Uwyd Ecclestone (lfcctnlCntOPWbll.!l@ Sillch Construction-Scott Henrlks==== Sillch Construction -John Slllch (I TJWI Tom Westhoff Steven L. Pawlak, P.E. Field Technician Reviewed By ~tech 5020 County Road 164 Glenwood Springs, Colorado 81601 Phone: 970·945-7988 Fax: 170-945-8454 HEPW CIRllf ·PAWLAK GEOTECHNICAL hpqeo@hpg!!Otedt .com Earthwork Compaction Testing Report Client: Sllich Construction Inc. Job No.: 115 066G Day: Tuesday Attn: Scott Henriksen Date: 1/19/16 303 AABC, Suite J Page: 1 of 2 Aspen, Colorado 81611 Project: Proposed Residence, Lot 289, lronbrldge Development, River Bend Way, Garfield County, Colorado Weather: Cloudy, calm, snow overnight Temperature: 28° at 9:00 am Earthwork Contractor: Logan Equipment Used. Mini Excavator & Loader Description of Earthwork The contractor placed under slab backfill and had compacted the northeast Tested: corner of the residence area before the compactor broke down yesterday. The remaining backfill appeared wet from snow last night The subgrade is heated with a ground heater and covered with blankets. The test on the northeast corner indicated adequate compaction. A return visit was scheduled for later today. Sample(s) Obtained: Verbal Communication: Logan's crew was infonned of our test results. Placement and Compaction Procedure: Not observed by HP Geotech. ~ Lift Thickness : Max. Rock Size: Moisture Conditioning: Compactor{s) Used: Number of Passes: Nuclear Gauge Moisture/Densit'l' Test Results Locati on Field Dry Field Field Min. Test Depth or Density Moi sture Comp. Comp. Proctor No. Elev. (pcf) Content (%) Req . Lab No. % (%) 1 NE corner of residence subgrade 113.7 9.6 99 98 006-15 Proctor Sam ple Reference: Lab No. Method Description Max. Dry Opt. I Dens. oef Moi st.(%) 006-15 ASTMD698 Sandv Slit with Gravel 114.9 12.3 nus REPORT PR i:;;;o .... ~ ... ~ ........... qA RESU Lf OF OUR u -VAIKJHSIW l'IU.Pl.AC~. wi:HAVE RE11EDOH (ftl;l;ClHnw;;tORTO _T..,..TliER COMPAC'TlVE EFFORT AND "'OIST\JRE TO Fill OUR1JIG TlfE TIMES WHEN OUR OBSERVER IS NO T OBSERVING OflERATIOHS TME NUCLEAR DEHSOMETl!R METHOD OF TESTIHG WAS USED IN SUBS f NITW.ACCCRDAHC G WITH ASTM D 69311 Distribution: Aspen Signature Homes of lronbrldge, LLC -Uwyd Ecclestone OtcclutQl!pbJ!JO.net> Slllch Construction -Scott Henriksen f1cctt8sDld!homn,C.Qm) Sill ch Construction -John Slllch QobnOslifChCOnttructlon.comJ Paul Weiser Steven L . Pawlak, P.E. Fie fd Technician Reviewed By /ijf ~ech 5020 County Road 154 Glenwood Sptfn09, Colorado 81601 Phone: 1170°945-7988 Fax: 970°946-8454 HEPWOR'lli ·PAWLAK GEOTECHNICAL hpqeofthpgeo«ecb.com Earthwork Compaction Testing Report Client: Silich Construction Inc. Job No.: 115 066G Day: Tuesday Attn: Scott Henriksen Date: 1/19116 303 AABC, Suite J Page: 2 of 2 Aspen, Colorado 81611 Project: Proposed Residence, Lot 289, lronbridge Development, River Bend Way, Garfield County, Colorado Weather: Partly cloudy, light wind, snow overnight Temperature: 38° at 2:30 pm Earthwork Contractor: Logan Equipment Used: Ground heater & blankets, track hoe, remote double drum roller Description of Earthwork Building slab subgrade area had been replaced to slab subgrade and Tested: compacted. Three tests were performed. Two of the three tests Indicated unacceptable compact1on. Mo1sture readings were about 5to10 percent above optimum moisture. The soils in the area of Test #2 were noted to contain more gravel and cobbles, resulting in the higher measured density. Building area Is being blanketed and heated at night and no frost was noted In the work area. Verbal Communication: Trent with Logan was informed of our test results. We recommended repJaclng the wet top lift with material near optimum and recompacting or otherwise drvlng the soil to near optimum and recompactina. Placement and Compaction Procedure: Not observed by HP Geotech. Lift Thickness : Max. Rock Size: Moisture Conditioning : Compactor(s) Used: Number of Passes : Nuclear Gauge Moisture/Densii,• Test Results Locati on Field Dry Field Field Min. Test Depth or Moisture Comp. Proctor No. Elev. Density Content Comp. Req. Lab No. Bullding Slab Subgrade (pcf) % (%) (%) 1 Southeast area slab 109.7 18.0 96 98 006·15 subnrade 2 Northeast area slab 116.4 16.9 101 98 OD6·15 subgrade 3 Southwest area slab 102.7 21 .8 89 98 006-15 subgrade Proctor SamDle Reference: Lab No. Method Description Max. Dry Opt. Dens. ccf Moist.(%) 006·15 (113471H) ASTM 0698 Sandv Slit with Gravel 114.9 12.3 THIS nu'Ul<T PRESENTS OPIHKJHSAS A ~ULT OF QUR OBSERVATION...,.-FIU PLACtltltltr. WE HAVE RELIED UN Tl'4E COtflRACTOR TO CONTINUE ,.,....,YIHt> '"' "'"'"-"''""' COMPACTIV& !J'FORT AND MOISTURE TO FIU. DURING THE flMES V'MEH OUR OllSEfM!R IS NOT OBSERVING OPl!RATIONS THI! NUCl.EAR DEHSOM&;TER ME™DD Of TESTIHG WAS USED 1H SUllSTNfTIAl ACCORDANCE wmt ASTM D 6iJI Distribution : Aspen Signature Homes of lronbrldge, LLC • Uwyd Ecclestone «eecitttpoeOpblhft.ntti Slllch Construction -Scott Henriksen ltccoWRtlJlchbomn.com) Slllch Construction -John Slllch tlohnlbfllchcomtructfon,sgm) TJWI Tom Westhoff Steven L. Pawlak, P.E. Field Technician Reviewed By ~tech 5020 County Road 154 Glenwood Springs, Coloroido 81601 Phone: 970·945-7988 Fax: 970-945-8454 HEPWORTH· PAWLAK GEOTECHNICAL hpge9c'tl!llpgeotecl1 com Earthwork Compaction Testing Report Client: Silich Construction Inc. Job No.: 115 066G Day: Thursday Attn: Scott Henriksen Date: 1121/16 303 AABC, Suite J Page: 1 of 1 Aspen, Colorado 81611 Project: Proposed Residence, Lot 289, lronbridge Development, River Bend Way, Garfield County, Colorado Weather: Clear, calm, dry Temperature: 26° at 1 :00 pm --- Earthwork Contractor: Logan Equipment Used: Ground heater & blankets, track hoe, remote double drum rolJer Description of Earthwork Since our last visit the top lift of the building slab subgrade area had been re- Tested: excavated, blended with drier soil and then re-compacted. Five tests were performed. Test results indicated acceptable compaction at moisture contents about 1 to 3 percent above optimum moisture. Building area is being blanketed and heated at night and no frost was noted In the work area. Verbal Communication: Trent with Logan was informed of our test results. ·- Placement and Compaction Procedure : Not observed by HP Geotech. -·--·----- Lirt Thickness: Max. Rock Size: Moisture Conditioning: Compaclor(s) Used: Number of Passes: - Nuclear Gauqe Moisture/Density Test Results Location Field Dry Fiel d Field Min . Test Depth or Moistu re Comp. Proctor No. E lev. Density Content Comp. Req . Lab No. Building Slab Subgrade (pcf) % (%) (%) : 1A Re-test of #1 (1-19-16), Southeast slab 112.2 15.0 99 98 0 06-15 area subgrade 2A Re-test of #2 (1-19-16), Northeast slab 116.8 14.3 102 98 006-15 area subgrade JA Re-test of #3 (1-19-16), So uthwest slab 113.7 15.2 100 98 006-15 area subgrade 1 Center of north side slab 116.0 13.0 101 98 006-15 subgrade 2 Northwest area slab 111.5 15.0 98 98 006-15 subgrade Proctor Sample Reference: Lab No. Method Description Max. Dry Opt. F Dens . ocr Moist.(%) 006-15 (113471H) ASTM D 698 Sandy Silt with Gravel 114.9 12.3 1 HIS R~l'ORT PRESENTS OPINIOllS AS A R'ESUL l OF OUR oB~ERVAl IOtlSOf FILL l'LACHllHIT, WE lllWE REllEO Otl lttE COllTRAC TOR TO COIHINUE llPPl YlllG TltE Rf.COl.IP.1ENO !O COMP.ACTIVE EFFORT ANO l.IOISTURE TO Fill OUrtlNG THE rn.1es \'lllEH OUR OOSERVER IS 11or ODSERVIPIG Ol'ERATlOrlS me llUC:lEAR OENSOl.IETER l.1ETllOO OF TESllNG VIAS USED ltl SUBST...,Hllll ACCORDANCE \"ltTll ASlr.t 0 6~le Distribution: Aspen Signature Homes of lronbridge, LLC -Llwyd Ecclestone (lecclestone@pblhO.net) Sllich Construction -Scott Henriksen (scott@silichhomes.com) Silich Construction -John Silich Clohn@silichconstruction.com) TJW/ Thomas J . Westhoff, CET Steven L. Pawlak, P .E. Field Technician Reviewed By ~ech 5020 County Road 154 Glenwood Springs, CO 81601 Phone: 970°945-7988 HEPWORTH-PAWLAK GEOTECHNICAL Fax: 970-945-8454 hpgeo@hpgeotech.com REINFORCEMENT STEEL INSPECTION REPORT Client: Sillch Construction Inc. Scott Henriksen 303 AABC, Suite J Aspen, Colorado 81611 Job No.: 115 066G Day: Date: Page: Tuesday 2/9/16 1 of 1 Project: Proposed Residence, Lot 289, lronbridge Development, River Bend Way, Garfield County, Colorado Area of Inspection: Interior Trench Beams. Reference Documents Structural Plans Used : Sheet FD1 Inspection Notes: Inspection Status: 0 Preliminary [81 Final 181 Concrete reinforcement as noted above was judged to be in reasonable conformance with the referenced construction documents. D Exceptions Noted ; Verbal Communication : Ray with Silich was informed that reinforcement was installed according to construction documents. Distribution. Aspen Signature Homes or lronbrldge, LLC -Llwyd Ecclestone flecot!!lOQi@pbUtfJ.ne.t) Sllich Construction -Scott Henriksen (1cotlO!Jllghbomn..com> Slllch ConstrucUon -John Slllch Uohnft!!Jkbconstn.Jcl9.fl&9 Slllch Construction -Amanda Jenkins tam!ndaOtD!cbconstrus:tfon·coml Fuhnnann & Graf· Nathaniel Graf fnegrtfOfubrmannengl'l!fj'fng.i;om) /ljf Paul Weiser Field Technician Steven L. Pawlak, P.E. Reviewed By ~ech 5020 County Road 154 Glenwood Springs, CO 81 601 Phone: 970·945·7988 HEPWORTH -PAWLAK G EOTECHNICAL Fax: 970-945-8 454 hpgeo@hpgeotech.com REINFORCEMENT STEEL INSPECTION REPORT Client: SUich Construction Inc. Scott Henri ksen 303 AABC, Sutte J Aspen, Colorado 81611 Job No.: 115 066G Day: Date : Page: Wednesday 2/10/16 1 of 1 Project: Proposed Residence, Lot 289, lronbrfdge Deve l opment, Rlver Bend Way, Garfiel d County, Colorado Area of Inspection: Tendons for post-tensioned slab. Refe rence Documents Structural Plans Used: Sheet F1 .0 Inspection Notes : Inspecti on Status : D Preliminary 181 Final (81 Concrete re inforcement as noted above was j udged to be in reasonab le confonnance with the referenced construction documents . D Exceptions Noted: Verba l Commun ication : Ray with Silich was Informed that tendons were installed a ccording to construction documents. Distributi on: Aspen Signature Homes of lronbrldge, LLC • Llwyd Ecclestone (l ecclestone@pblhfl.net ) Silich Construction -Scott Henr iksen (s c ott@sfflchhomes.com> Slflch Construction -John Slllch (!ohn@slllchconstruction.com) Slllch Constructlon • Amanda Jenki ns <amanda@sl!lchconstn1ctlon.co m) Fuhnnann & Graf · Nathaniel Graf (npgrafftfyhD!lannanglneerfng.com ) /tjf Pau l Weiser Field Technici an Steven L . Pawlak, P.E. Reviewed By ~tech HEPWORTH-PAWLAK GEOTECHNICAL 5020 Counly Road 154 Glenwood Springs, CO 81601 Phone: 970-945-7988 Fax; 970-945-8454 hpgeo@hpgeotech.com CONCRETE TEST REPORT Silich Construction Inc. Attn : Hayden Horsford 303 AABC, Suite J Aspen, Colorado 81611 Job No. 115 066G Date Cast: 02-12-16 Sheet: 1of1 Project: Proposed Residence, Lot 289, lronbridge Development, River Bend Way, Garfield County, Colorado Placement Location : Post-Tensioned Slab Supplier: United Time Batched: 7:18 am Load Size (Yds): 10 Truck No: 6394 Time Arrived: 7:55 am Yds Delivered: 10 Ticket No: 33306383 Time Placed : 8:00 am Yds Ordered: 80 Mix Design: 37610554 Method of Placement: Pump Sample Point: Truck Discharge Time Sampled: 8:05 am Wet Unit Wt: 140.8 pcf S12e cifica tions : Air Temp : 25° Slump: 3% inches Slump: 4inches Concrete Temp: 74° Air Content: 5.4% Air Content: 5to8% Water Added: None Communication : The Contractor and Supplier were informed of our field test results. Time Cylinders Cast: 8:15 am Initial Cure Time On Site: 1 day Field Storage : Insulated Cure Box Date in Lab: 02-13-16 Cylinder Temperature at Pick Up: 62° Min/Max: 43°/71° Compressive Strength Data 2016 Compressive 28 Day Lab Age Date Load Diameter Area Strength (psi) Number Days lbs. in . in 2 Avg. (psi) 074A 3 02-15-16 54,300 4.01 12.63 4300 0748 7 02-19-16 63,000 4 .01 12.63 4990 074C 28 03-11-16 75,000 4.01 12.63 5940 0740 28 03-11-16 77,900 4 .01 12.63 6170 5980 074E 28 03-11·16 73,700 4.01 12.63 5840 Specified Strength for Structure: 4500 psi at 28 days Specified Strength for Mix: 4500 psi at 28 days Noles: Distribution: Aspen Signature Homes of lronbr ldge, LLC -Llwyd Ecclestone (lecclestone@pblhfl.net) Sllich Construction -Hayden Horsford {hhorsford@silichconstruction.com) Slllch Construction -John Silich fjohn@sllichconstruction.com) SUich Construction -Amanda Jenkins (amanda@slllchconslruction .com) United Companies Distribution List /ljf Paul Weiser Field Technician Thomas J. Westhoff, CET Reviewed By ~tech HEPWORTH· PAWLAK GEOTECHNICAL POST TENSIONING FIELD REPORT 5020 County Road 164 Glenwood Springs, co 81601 Phone: 970·945·7988 Fax: 970-945-8454 hpgeo@hpgeatech.com Client: Silich Construction Inc. Job No.: 115 066G Day; Date: Monday 2115/16 1 of2 Attn: Scott Henriksen 303 AABC, Suite J Aspen, Colorado 81611 Page: Project: Proposed Residence, Lot 289~ Jronbridge Development, River Bend Way, Garfiel d County, Colorado Weather: Cloudy, Calm, Ory Temperature: 38°F at 9:30 am Field Notes: Cable tensioning was performed using Jack# 539 by Gary Anderson & crew with K&G Rebar, starting at the s l ab northwest corner and progressing to the slab southeast corner. Tendon Location Jacking Gauge Length Calculated Elonaation (in .) Force Reading No. Ckiosl (psil (fl) Min . 13 NW Corner 27 5400 33% 2% 12 West Side 27 5400 33% 2% 11 West Side 27 5400 33% 2% 10 West Side 27 5400 41 2% 9 West Side 27 5400 41 2% 8 West Side 27 5400 42% 3 7 West Side 27 5400 42Yz 3 6 West Side 27 5400 42% 3 SA West Side 27 5400 52Yz 3% 4A West Side 27 5400 52% 3% 3A West Side 27 5400 52% 3% 2A West Side 27 5400 52% 3% 1A SW Corner 27 5400 52% 3% Distribution· Aspen Signature Homes of lronbridge, LLC • Llwyd Ecclestone Utcc!e!lpn!@pbtbft .neU Slllch Construction -Scott Henriksen fseottlbl!lcbsomtnfSiti~comt Slllch Construction -John Slllch fl2hnf!l!llchconstrvctlon.cam > Slllch Construction • Amanda Jenkins l•mandi'b!ll9bconttructlon·C':2!!J) Fuhrmann & Graf· Nathaniel Graf (npcnf@habnna nnenglM!!fng,.coml TJW/ Max. 3 3 3 3% 3% 3o/.I 3% 3% 4% 4% 4% 4% 4% Measured Elongation (in .) 2% 2% 2% 3Ya 3 3% 3% 3% 4Y.. 4% 4Ya 4% 4Y.. Thomas J . Westhoff, CET Steven l . Pawlak, P .E. Field Technici an Reviewed By . . . 5020 County Road 154 Glenwood Springs, CO 81601 Phone: 970-945-7988 HEPWORTH · PAWLAK GEOTECHNICAL Fax: 970·945-8454 hpgeo@hpgeotech.ccm POST TENSIONING FIELD REPORT Cli en t: Sllich Construction Inc. Job No.: 115 066G Day: Monday 2/15/16 2 of2 P roj ect: Attn: Scott Henriksen 303 AABC, Suite J Aspen, Colorado 81611 Date: Page: Proposed Residence, Lot 289, lronbridge Development, R iver Bend Way, Garfield County, Colorado Weather: Cloudy, Calm, Dry Temperat ure: 38°F at 9:30 am F ield Notes: Cable tensioni ng was performed using Jack# 539 by Gary Anderson & crew with K&G Rebar, starting at the slab northwest corner and progressing to the slab southeast corner. Tendon Loca tion Jacking Gauge Lengt h Calculated Elongation (in.) No. Force Read ing (ft.) Min. (kips) (psi \ AO SW Comer 27 5400 13% Va A1 South Side 27 5400 13% % A2 South Side 27 5400 13% % A South Side 27 5400 40 2Va B South Side 27 5400 40 2% c South Side 27 5400 40 2% D South Side 27 5400 40 2Va E South S ide 27 5400 40 2Ya F South Side 27 5400 40 2% G South Side 27 5400 40 2% H South Side 27 5400 40 2% I South Side 27 5400 40 2% J South Side 27 5400 40 2Ya K South Side 27 5400 31Ya 2% L South Side 27 5400 31 Ya 2% M SE Corner 27 5400 23Ya 1% Distri bu ti on: Aspen Signature Homes of lronbrldge, LLC -Llwyd Ecclest one OeccJestone@pblhft.net> Slllch Construction -Scott Henriksen (!cott@slllc;hconstructfon.com) Slflch Construction -John Sltich rlohneslllchconstnictlon.coml Slllch Construction -Amanda Jenkins (1mand!8!11!chconslnJctlon.com) Fuhrmann & Graf -Nathani el Graf (npgrafetuhnnannenalneerlnq.com) TJWI Max. 1% 1% 1% 3Yz 3Yz 3Yz 3Yz 3Yz 3Yz 3Yz 3Yz 3Yz 3Yz 2% 2% 2Ya Measured Elongation (i n.) 1 1 1 2¥. 3% 3% 3% 3% 2% 3% 3% 3% 3 2Yz 2Yz 1~ Thomas J. Westhoff, CET Steven L. Pawlak1 P.E . Field Techn ician Reviewed By