HomeMy WebLinkAbout1.01 Application Part_2•
SpringRidge Reserve
Preliminary Plan Application
List of Exhibits
1 . Vicinity Map
2. Land Ownership/Management Map
3. Garfield County Zoning Map
4. Land Use and Land Cover Map
5. Slope Analysis Map
6. Slope Hazard and Flood Plain Map
7. Wildfire Hazard and Slope Analysis Map
8. Soil Type Map
9. Soil Hazards Map
10. Existing Vegetation Map
11. Adjacent Conservation Easements Map
12. Conservation Easements Map
13. Illustrative Site Plan Map
14. Development Phasing Plan Map
15. Bald Eagle Activity Areas Map
16. Black Bear Activity Areas Map
17. Brazilian Free-tailed Bat Activity Areas Map
18. Elk Activity Areas: Summer Map
• 19. Elk Activity Areas: Winter Map
20 . Mountain Uon Activit-f Areas MaP
21 . Mule Deer Activity Areas: summer MaP
22. Mule oeer Activity Areas: Winter MaP
23. QspreY Activity Areas MaP
24. Turl<eY Activit-j Areas MaP 25. Gartield county Board of count-1 commissioners Conditions on Spring Ridge II
s1<etch Plan (Resolul1on 2003-77)
26. planners Response to conditions
27. Engineering Report
2B. Drainage Study
29. Geo-Technica\ Report
• 30. soil oescrip\ions
3 ~ . Land Tit\e
32. water Righ\S and Well permits
33. oeed of conservation Easement
34. Master oeclaration of covenants. conditions and Restrictions
35 . weed Management P\an
36. Wildfire Hazard Assessment and Mitigation Plan
37. Revegetation P\an
38. Landscape Plant Material List
39. (\pplication for pUD zone District Te~\ Amendment
40. Pre-Anne~ation Agreement
• 41 . county Engineer ADT email correspondence
\ \
Legend
--Hi ghw a ys
--Coll ect or Roads
--Ri v ers and Streams
~Ci t ies • [~~] Sp ri ngridge II Propert y
Exh ibit 1
Vicin ity Map
1:100 .0 0 0
Da ta from COO T
and Garfi eld Co unty
•
Legend
LJPrivate
LJ State
LJ Division of Wi ldlife
LJBLM
LJUSFS
Exhibit 2
Land Owners h ip/ Management
1:1 00 ,000
U~=-~~~ SpringRidge Reserve Boundary
-Highways
--Co llector Roads
--Local Roads
USFS
Data from CDOT.
and Garfield Co unty
•
•
ARRD
OS
OS
Legend
CJ Agricultural/Industrial
CJ Agricultural/ResidenballRural Density
CJ Open/Space
CJ Planned Development
c::J Pl anned Unit Development
Residential/limitecl'Subur ban Density
--Coll eclDr Roads
-Streams
OS
ARRD
OS
SpringRidge Reserve
Exhibit 3
Garfield County Zoning
1:24.000
[=:_-_J SpringRidge Reserve Boundary
PD
ARRD
\
ARRD
OS
OS
Data fro m
Ga rfield County,
and USGS .
6
6
Legend
c:::J 1 -Cropland and Pasture
c:::J 2-0eciduousForestLand
c:::J 3 -Evergreen Forest Land
c:::J 4 -Herbaceous Rangeland
c:::J 5-ether Agricultu ral Land
c:::J 6-ethe r Urban or Built-Up Land
c:::J ?-Residential
LJ 8 -Shrub and Brush Range la nd
CJ 9 -Transitional Areas
c=J SpringndgeProperty
6
--,, ·-,,
...... ,\
I
S . R "d R ~-j~ pnng 1 ge es erv e i
'-----... --.. --...
i ;
! IS _______ _!
6
Ex hi bit 4
6
Land U se and Land Cover
1:24.000
0 0 .2 5 0.5 ~~~~~iiiiiiiiiiiiiiiiii~~~~~~~~ Mil es
Data from NDIS, COOT ,
and Ga rfield Cou nty
•
•
Legend
Slope
.. 0-8%
8-20%
21 -30%
.. 31-100%
[~~~J SpringRidge Reserve Boundary
Exhibit 5
Slope Analysis
1:12 .00 0
Data fr om CD OT ,
Garfie ld Count y,
and USGS .
~Major Slope Hazard
C:=J Moderate Slope Hazard
C:=J 100-yr Floodplain
Streams
i -----i
l_ ______ i SpringRidge Reserve Boundary
SpringRid ge Reserve
:--... ---
!
J
!
i
!
_____ _! -----
Exhibit 6
Slope Hazard and
Flood Plain
1:12 .000
I -I
Data fr om Ga rfi e ld co un ty,
and USGS .
0 0.125 0.25 ~~~~~iiiiiiiii~~~~~~~~0.5 : Miles
Legend
C=:J Hi gh Densi t y Vegetat ion
I · · ~-1 Medi um Dens ity Veget at io n
~ Me dium /High Densi ty Ve getation
l«:<,YJ Low De ns it y Vegetatio n
Slope
-0-8%
8-20%
21 -30%
Exhibit 7
Wildfire Hazard and
Slope Analysis
1:12 .000
-31 -100% 0 0 .125 0 .25 0.5
[~Spring Ridge Reserve Boundary ~~~~~---jil~~~~~~~~ Miles
Data fr om CDOT ,
Garfield Count y,
and USGS .
0
1 -Almy loam 1 to 12% slope
2 -Almy loa m 12 to 25% slope
3 -Ar1 e-Ansa ri
n 5-Goslin
· 6 -T orri orth en ts
[~~] SpringRidge Reserve Boundary
I
'l
' I • ~
,. ,,
' .. '
' • ~ ~ ,. 1, ""
"' • >,fl..._.; h I.
-lJ. w •. ..,· ••;.1•
<
lf\ J•
J j
'I
5 .,,. t· ,_,
(, ·"· 'i'
Exhibit 8
Soil Types
1:12 .000
} 1, J
~I' ' 'I : ,,)._
1 :---... --_ .. __ _
j
!
f
i
j
i '"'"------...
Data from Garfie ld Co unty,
SCS. and USGS .
Legend
1§\~j Major Soil Hazard
I I Moderate Soil Hazard
--Streams and Rivers
[~=-J Springridge II Property
I
I
I
I
I
I
I
I
I
I
I
I
I
I L
1
SpringRidge R'
L ------~ I
I
I
Exhibit 9
Soil Hazards
1:24 .000
Data from
Ga rfi eld Count y and
U SGS .
Legend
--Collector Roads
--Streams
LJ 1-Dry Land Crops
LJ 2 -Deciduous Oak Type
LJ 3 -Big Sagebrush Type
LJ 4 -Aspen Type
D 5 -Spruce-Fir Type
LJ 6 -Pin yon-Juniper Type
C:::-J SpringR idge Reserve Boundary
0
Exhibit 10
Existing Vegetation
1:24.000
0 .25 0.5
Data from
Garfield County, NDIS
and US G S .
/
I I
'----·--_;
P VT
USFS
Legend
D Private
LJBLM
L]USFS
BLM
PV T
I
'"--/
I
I
I . r--.
I
i
....--"-.-··;..,· ~
I .
I
BLM
Exhibit 11
Adjacent Co nservation
0 Faranhyll Conservation Easement
[=] SpringR idge Reserve Boundary
Ease m ents
1:36 ,00 0
n
----i
I
\ l
\ BLM J L_~ \
Data from COOT ,
and Garft eld Co unty
Total Property Area= 484 acres
Total Open Space= 309 acres
Legend
Conservation Easement
r----; SpringR idge
Exhibit 12
Conservatio n Easements
L _____ J Reserve Boundary 1:12,000
o~~~o.~12m5mmmmom.~25~~~~~~o.5
L Miles
Data from CD OT.
Ga rt ield County,
and USGS .
/
Legend
[==:J 1 acre or less lots
l==:J 1 -2 acre lots
CJ 2 - 3 acre lots
3 - 4 acre lots
4 acres or more lots
C] Conservation Easement
....--.., L l SpringRidge Reserve Boundary
~7
'r-··I --\ J . (
Exhi bi t 13
Illustrative Site Pl an
1:36 .00 0
Total Lots = 81
Data from
Garfi eld County,
and U SGS .
Legend
LJ Phase 1
CJ Phase2
Phase 3
Phase 4
---· Powerline
----Trails
Exhibit 14
Development Phase Plan
1:36.000
0 0 .25 0 .5 1
_ Conservation Easement
""'""""'"'I ~ SpringRidge Reserve Boundary ~~~iiiiiiiiiiiiil~~~~~ Miles
Data from
Garfield County,
and USGS .
---
"",.•,,. • 'S , .-.. <" r.. ,.._A,.......-. '. •"-
, ... ''L , ...... v ,,.-y ,. '•/ '\{ '·.! ..... · ·.·
I """""'"' X.\."' .... ~ ....... ·'· /', )' .. :.\. :.1.
/ . , . v y ){ )t' ":/. ·-~ • ..,,_. ....... ...,, , . • /. /'. 7 . _;o; JI, '· Jf. _. A
11
;
I
, .
"'I I
f •'"
;;.; .
/ I • I
\ .
" I
/I
I
; I
I
I
\
(
BLM
r----~ ..... , .~ .. -.. -,---------t
y· I ......._ \ •. ~· '","\------+ tz::c::;;2".:S;:=::::::::::~=====~~===::s,r~?r -,----.
t:===~===~~~~t====1 -.,_k ··., ·1::::::::::~~~s~~~~~~~=:::::::jt::::::::=;--...:-;: ,, .... __ -----------------&+-• ____ ! ""''\ .. ,~
BlM
.·,/V·~·,,.· -;_''-
>~ A_'\/', ', i'\. '
'"==;:::===========--l· ====· " •,
r-~ : "' '~=======d::===============::;==d t========================~·-~======. ' ' ', ~!1 ----------------------+ !--------------~.\--~! \ \ \ ~ ''\-----------------------! 1'.------------~~+-~--1 ', ' \ !-'~----------------------1
"------------~'~'~n.>.--..:J.-, ', j ~\--,--------------------1
1------_.,:'.~';;.-L1 __ Sp_ri_ng _R_idge Reserve -'··--··-··-=j!1 ~~~~~~~~~§
+----------.a.-"-!----------'<-,---------->.·-==-i-----------------1
D
+-------------! _________ ., \ 1=----~J -----------------1
1----------4~·.----) ·=======:=:J~====================l BLl\rl
E~~~~~~1:1~~~~-~~~j·-~~.,-=-=-=-=-=1 -__ ~ __ -_-------i~~-~-rr.·_:'_,-_-, __ -j ~,~~~~~~~~~~~~~~~
PVT USFS
Legend
~ Wnter Forage
c=EJ Wnter Range
--Collector Roads
--Local Roads
---Streams
,------j SpringRidge Reserve
-+------' Boundary
A
--·
' ,
,,, ' • ,, \ \
l
\
\ ...... , \
\.>
\""' .-\
\ \ . \
'"o \..I . -" ,,. " " \ " .
\ ,,,.. \ l ' j ,,,.. "
/
;
; ,/ \ '
Exhibit 15
Bald Eagle Activity Areas
1:24 .000
\
, '
/ '
\
I
BL M
Data from ND IS. COOT ,
and G ar fi el d Co unty .
'
SL M
SL M
PVT USFS
Legend
Q Human Conflict Area
~ Fall Concentration Area
--Collector Roads
--Local Roads
--Streams
,---~--! SpringRidge Reserve
-------' Boundary
Map 16
Black Bear
Activity Areas
1:24 .000
~1 ~~0~.2~5iiiiiiiiiiiiiiiiiio~.5~~~~~1 c= Miles
BL M
SL M
Data from ND IS , COOT ,
and G arfi eld Co unty .
I ,,·~I '/f'
'
,____=======
-
1--
I-
~ -
t:. -
1----
1-
.... _ ----:=-
II
PVT USFS
Legend
BL M
§I Overall Range
-Collector Roads
--Streams
--~
, .
, . -,_
' .
-. '
--
, ---, ,/ --.,, -' ' .. ~ --t:.-~r _,_ ~·-s !~ \; ! " ',-..: __ ,_
!
I
f
i SpringRidge .Reserve ·---------.
,. i, , I=---·=~[ , \I i ---I --[~ ____ : ___ _J ___ ---)
'
Exhibit 17
Brazilian Free-tailed Bat
Activity Areas
c::=J SpringRidge Reserve Boundary 1:24 .000
0 0 .25 0 .5 ~~~~--~~~~~~~Miles 1
-
BLM
BUvl
Da ta from ND IS, COOT ,
and Ga rfi eld County
I n'!
IR
II
IL Bllllr
c -
t ~
II -Ill
I~
II
USFS
Legend
///"./; //,./ . / . / / / / /
/ , v ,/ E_ L_ / -.-
WI ",,. ./ /. "",,./ •
, ,. / , / / . ,,· / _/ /
;p / •. ·· .I"//
'// L~L~,/~, .P / "."'/////
/ ... / /
/ / ,, ... ,,.
/ / /,r'/ I / , L , . / /
I ,_. / / I' / \,'. .... / ,. /
// _/\,,..,,..... .. / // // /
/.//•'_L I «I /.L l / / /;/.-
·" / / _/__,,,, ,Y'/, ~ / / .. / /
........ _L_ ... /. " ' , ,..
/ / ·'"''' • / / .!}/ _L__,L
/ / /I / " · / / " .L
/ / / / / .L .· BbM //.-'/ ///·//
,I / "/////_L_
I / "L,, ///,./_L_·'...L
/ / .r ,.· / / / . ,,· /
_L //// -'_L_." GI
//~--··:,, .. ·:,.i~· ... ~':· .·<. -~ : ... /.~ ...... ~// / /
//,//\I L /.t •'/ ////'/
.. ·,. / / ---1 .. ,' .... · .... / / __L__ / / / // ~'-/,.
/ .• ·,_,.. ,,
/ /
/
/ ·'
. · / ... ,. / / ./ ,. '
,..,.. ... _LL /.,.../ // .· / . / ,.. ..
/ / ,.. \•i;:,..-,. ,. / / / . / / / /
/ / ~ ,.., ... /
///,,//_,'y /// , .. ,, '/
/ / _/ /
/ / ,· /
/ -1>/ / / / "
.' / /
, .. , . ..\
•' ·'
, .· .L . I'/ "lrrr..
/_ . / ,,
/////'-_;"llt,,.
/////.•
• ,, / / / / / L . '"-
/ / ,I'/ . _L_ ' / ,,,.,_.
•'/,/./ //.-.. ,
·:'.:~. / / -~ / .. / _L •. ·~ ,,.,.~--~ .-·-~::· .. ~ ~ .. -7 >· / / ,·, / ..
/'/.·_L /.· /...... '////
/ /
/ / /
/ ·" /
'/
/ / . ,, _L _L , _L
/ ,\ ./' .' /
/ , .• / ,,•
/
. /
,,. ,, / ,'
" , , / / /
/
/ , / /
/
'
{
/ _ .. ,
/ ...
-·
--
.• L _L
/ ,.. /
/ _.,,. , / /' /
,I ~· / / •
/ / " / , ·'. _ ... ,,,,,. "" ,
/ / / ,
///////_ .. ·
/ /
/ ,.
·" .' . / / .• _.' / /
/ / ,· .. / ? / .•
.·/ .-/·'// /,•'// / //.
-=""'" //If'.-/ / / .· / . / , I'/ .·\ ,' / ... '"" ,.· / / / / / .. '/ . , ,.·
Ex h ibi t 18
... ,_ / / , "
/ / ,' I' ..
.· -'I . / ,, ,, I'
I' ... •
" /
/
, / / ,. /
Data fr om ND IS, COOT .
and G arft eld Co unty
High w ay Crossing
Q Summer Range
§ Overall Range
Elk Act iv ity A reas:
S umm e r
1:24 .000
Collector Roads
Local Roads
Streams o 0 .2 5
[~~--_] SpringR idge Reserve Boundary ~~~~§iiiiiiiiiiiiiiiiil~~~~~~~~ Mil e s
0 .5 1
r
/J
J / I ..,,
'·, ''" l''-/'v
....... , .... ..,....._,..._. ,.,
...... ,,,.
,., /:.
, .,,. Y. ~~ '( v
J"\,,A_, '•.•f"\ '' V .,,,,·, ''-•'
'·
. ···"
;:<.x.
Legend
/"
"M-
\ --t
Highway Crossing
~Severe Winter Range
§ Winter Range
Collector Roads
Local Roads
Streams
\' 1". ·..: ·..: "
., L"\. /' r ·. ,,."\A •• /' ,.., ,":.; \
I
\
' '
_\'\.\,··~..c: ...:. 7<. 7<. ., . .. ~ ...
... ··,·"'\
• • ..... ' '.if ,. \' '<' ;r
i• ~. X Y, r •. ?-. · ...,_ :0 1 ,, -·~'
ll .~ ,Y ' ' "' ~./ ..... ,.,, ...... './"\,-'\
..... '('I( 'y ',( """'" ~< " )(.l
,...._ •A/_._ , • ._,,..._,ro._.A./'I
,_ .......
'
.......
·.·;.::
' ,.,,..~./, ,-. ~ ·-:-,•',\
Exhibit 19
Elk Activity Areas:
Winter
1:24.000
\
'
'
/
0 0.25 0 .5 [_-_-_-~J SpringRidge Reserve Boundary~~~~§~iiiiiiiiiiiiril.~~~~~~~~_j Miles
\
\ \
'
I
,
J' -· ~ ,.... }II'. , .... ,,,., ,,-., ...... ,....,/,/'• .. ""·-'
Data from N D IS. C OOT .
and G arfield Co unty
I ,
i
I '" , T "' , -,, . .... ·--.. ' , I c ~ ~""" I ,_, I ' T ' , . ' ~
L , / --"" ~ . ~ ---~ -I 7 . --7 7 ... '..:-" --. " -~ -~ . ' .r -c;;r-,, " ~ ,
UJ -, \ ... \ -, -BLM /Ol -~
II BbM / I
/ I
I ' . \I ,,
./I
/ .
I
I
I
f I • • I
I ----... .... .. · . . ' lo '\ ....... .,,
'• '.1·-~~:· :-.. ~ , ' '•, i~_i BL M \ -'<> '· .... •v• \.,,_ .... / I ~ I '-·---"~· 1---"''" ·. __ .. "-• ' -. .. .... ~. ~
1
...
l . ' " ~ '! .. " ..._ .
!
-, ' . ' .• ' \ \ i \ ..
f
\ : \ ,. ~ ' ' J
I• " -i ' ~-t : SRringRid~e-Reserve , __
h .. ---·-., ..
[ ..
LI ll ,,
! ' " r \ \ -~
[ ' \ : II ' ,,
B.l M ' ---__ ! I ~ --... -...::.:.:..__, f -·-
!
E Ll'vl .
j -· ..--•
1
u '--. ' --. -=J ' II -~ / ,, L .. " ------------; "' ,,, " ' -. , " ' I -" ' ,. , ' / ' • ' 7 . --,; " ' , " ' ' , -. ' / \ ~ ' ,, -"" \
\ ~ \
\ ' ..., \ I
\ ~ J
~l;_M .. -
~ . ··~ ~
\ l \ ,____ .. ' ,____
~ . ,___
"'"' .. \ I-' • I-\ ' \ I-
"" \
,.. \ .. \I -" ;\ --. ~ \ "' ' M USFS .u. " /
' . / BL M .·•·'"""'·"'""'" ~ . • --, ,
Legend Exhibit 20 Da ta from ND IS. COOT .
and Ga rfi eld County
13 Overall Range Mountain Lion Activity Areas ---Collector Roads 1:24 .000
---Local Roads
---Streams ·c::=J SpringRidge Reserve Boundary
\\ ,,~,
0 0 .25 0.5 1 /" I F.J
Miles
,_
lo
II
II
BLl'\i1
Ir
Bl:.M , __
I'/ / ,·· /
, ,·
/ ,, /
/ / ,I' ~· / / / / I'
I' ,, /_J / _I' / / ' ... / . _,,,. ,·' , ,. / / / ,·
~ ,,,·// /
/ f / I'/ .' /
,I', ,.
/ . ,' ,/ / / /
/ / / ,..
/ / ,.· , .·
/
-~
Bl:M
USFS
Legend
~ Migration Corridor
LJ Summer Range
~ Overall Range
Collector Roads
Local Roads
Streams
, / ,/.-:.· I / , / / / /, / . ,
/ &.' / / . /,. , .·
. / / / ,f / / / / / / I'
//,•////
'/ / / ,· I' / / / ./ ~ ,,
/ / . r/ ,. .I' / ,,. ,,. / .. , / / / r /V / I' ' ,. / / •• •• / A / / / / / .'\/ , '
// //' //J7 /•/ ... ,/ / / /'
/ .-' .· ,,· / _.,· /
/ / . I' / ,. / "' / / .• / ~' .. / ,.· / / I' , • "'· -..-/ , I'
/,("/~//'!//•· / / ... /' ,· / ,,. """"' ... • L!f·. / / I' _, •• / ... ''\.· ... ·' .-1~·~"~,-~~~~/~,-~,~~~~~~~~-~/~--~~--~~~/~·~/~/~V~~//~/~ , /
/ /
,. / ,-
/ "
/ '"A... I /// I /
,-: , ,.1,,/" IV"'la.
/ /,, _., -...:. / .. ~ /
/ /. _/ /
/ , ,. /
/ • I' !<(-I' ·" /
./ / . / / _,
/I /
• / / / • I' •• /
·'
"/ 1'///' / ......::/." /
/ .·· / / / / / • / /I / ,, /
i"'l\i . .· / / / ,• / . ",,. / ,. / / .. · / / •' ,. I' / •' / :' I' ~-;.::-·
/ / ,· ,. • • .-' / ,.· / , I' / ,I' ,. / / • """' I'
/ / / / • •• / • / ,. / • / I' ,. / / / / • / ,.,. ,, ,.
;,,/' ////,'/ .·.·-·'<"////./
/I' , ... ,. •• ,,/.· •'//' ,•/1'//1'_,\
... / /
/ / / /
-
... / .• • ./' / / / -·' / • .I' / . /
,. ,.., , , .I' • / / / • ,/ :' ,· .-· .. / / / .I' , •/!\·// /// ////.-'/,,·
, / ... . .. ,. ,.· .. · .' / .· .. '\.•' , _, / / .. / / / / / . / ./ ....... --~ ... .. ·" / /~ / / / , ... _/ . / " , / / .· / "\.. ,. / "'( ~ , , / . / / / / .-... .· / , .. / . ,.,,/ / ,. / / / / _/ / / / / , , / / " / / .• /\., / . / ,· / . / / .' / / ,.. .. ,. / /
/ .• "\..I' / / ,. L°X • / " / J' / ,' / ,· / , , ·' ,. ,. \,' / ,' / , , / , ·' .I' I' ,
/ / x .... , ......... ·' / .. / / / ' / / .' ,. / / , ,. / \'" _/ ' / ,, .. /' ;' / / ./ / / / .... / ,.. / / ,. ,' / ..
, .-......: , .. ..I' .' / / .. .I' / / / / .I'
,. /. ·' ,, .. / / .' X / ,. / ; '/
/ / ,
,. / ... ,, / / / ){ 1: . / /
/ .... / ·'
/ .. /
• /_.I' , \..·1'0" /
• / / .I' ...
I ' / • /
/ . / / /
/ / / /
• / / • .l'·\.·\:.OV / / " ~r .· __ , ,, ; . / / / ,,. _,
·// //\.·// t "//'.'/,•_// / ... ,.,,./////',,-
////,.1'_\'//.1'1''//' /'///
/ / ,,,,.,, _..,.; .. , .. /,'_.//,.//
/ / / / ... ·:1• ,_, ,. , / / ... / / , / , " / ./ / / .I'
/ ///.-///_--,,,.-/
/ / / , / ,.\. /l / / / / ,. / / ..... ,.. / / .I' / • / ,. ... .· ,/ ,· ," ,.· .·
/ / ... ,. " ,\..I' ,. / / /
.I' •• ... ;"\/ , , / / ...... ./ / ,/ / ' / / •
.; _/ ." , / / / ·' ,''\ "' .I' / / / ' . / / .' /
,.-.;"/// .I'/'/ .I'/,.·/,·/ / , / '// '/.'.._V ///
-" / " //.I' ,• • .I' / . , L ' .· / / / , ,. ,' , .I' ... / / / .I'' / /\,· . /
/ /
/
,..,,,. ,•
/
, / ,· .., ... x . ·"
. / / / ...
/ / ,. /
/ , ,. / , / " , .· \1 / / / ./ / / . / / / "
•• • • _.I' .. / ... / ,,,· / / / / ,. / .I' ' , .; " • _.I' , / / / / / • .I' / /
/-·~-'.I' I'/ •• / .' ,.-/ , , .... / .-· /
_, r -,, . .I'.
,. "'lo.'. .... y / .. / ·' ... / " /
/ .I',,.
. / / "'-
/
... / ,. . / -"
/
/ " /f '/ /'\//// ,,., .. /,.· B.l:..M / .
" / .. ... .I' / _/ / ,,,, / / "'~ , / . / / / /
Exhibit 21
... /-...· .I' .-· ·' .• •
//• / ,.. / / r ..-
~///-/.'
/ , . / / ,,,-
Data from NDI S , CDOT ,
and Garfield Co unty .
Mule Deer Activity Areas:
Summer
1:24.000
0 0 .25 0 .5 .~
~------1 SpringRidge Reserve
L ___ _: Boundary
-
IJI O•
1
It BLM
II
I ~
ll
!
11
,_
PVT USFS
Legend
Migr~ion Corridor
~ Severe Winter Range
§ Winter Range
Collector Roads
Local Roads
Streams
~',•,A.· •.
, .,, -..,·.··-·
l/ ,,.,. " /' ,~ x \ '. ,.· '\. '\.
v x ( )..' :.; ')i. ""'--ro \ .· .... /•_/, .... ~
I / V v y ., >!' """'-
.-I ~I , _, ,/ ~ .. ,..., ... .(,,._/.,/.:"-."
, • .,. '"'· ,_,, 'v .,, • ·,··.· ·.-
.< :.-)'( .< x x )' ·..: _,...,
f / 1 1 V v
,. ,,. -• 'J .,. ·,, • •• • ...... ' ........ ,., • ·-. "' " , )', XX X)'. X ,;: ~.X ~A)'./, .... )l,
I
I
I
I
/
•
,,
\; > "
-/.,. ,
....... "\, .. ',. , '_/ ,....... '. ,, . ..,.,_, .... _, '· .
v~YYVYYY~Y ~~-xx :v.x
/• ,., , . , . ·'\.-"·
·,.· v ,. · .••.. _, ·. '/ -,r . ., ... , ·..-,_, . '• ,
1 , >. ,~ .r , • X • ,.o., ,,.. .I\ , ,• ·"'• .•'. ,'\ A .<. ,Y ll J> .. ,, .,,,_ ... ,, · .. ·'"'\.·'
_>(_ ... ;..·x · y·w:x .... <,.(.•';tf)\ X'11."Y)( XX.II. ,"'f.,,ll,,Y..,,•
'· ,, ' • ,· ,·· '· • ,• •,•' • • './''V" '-' '\./ , I•,/•,
'lo: , ,_. ._ .,. .,. •• , • .....-• ~ ·.-·~· ·r ·.._, .._. v .,.
_,., A_.,/' A, ,J<, • _" .... >/'.V:~.~~ > ~ :::. :": :.. ,.•, X.,~
-•••• ._,, ······/'-'-·--~-:1
, X ,,; ~ ... x ',( ~ . ~-.-:. ~; )'. ",:~ ,,.., ·" ;, X _'~ '>l •-.,~_,,x., ,~
_'< ·;: y w' 1 )..: y ·JI' X v y "> X A .% ;<. >: •f ':< Y '>I ,,, -< • V X X
-"-/'. ,,.. ••• /• '-'"'• F' A,. ,.. ,. ...._ ,.. ;
. •. --.... . v v -v •• •.; v '..,. -..-• .. x .• .. "I.~.·,,,-..,· XX , A~A A /'>\A.,',.
• XX%• x ··: ;<).: ... )' ... "'-,. < Jl ;.·
.
\
'
. \ ·....,·,
\)( . _,._ ·x· ,
,.. X .:\_ ': A ,>; <:. X •
. •,/ "'''·. ,.·,
.... . ')I
. ,• ._,., ·--··
:< x "'-"· .~ ·-x ~< . ;< ')• . ..;,, A y ,
v
,. ' -( ·,.· )( Ylo " • >' ,( ..... x ·: ),;
/-. /\. _/. ,,, I" ,• ''-•• ··'
...... ~ "' ............. .., ...... '>! '!<" "' --.: ' "< '< '/'-v•'\',, • ; "'-!' '..-.. .._, ,."' 'V •< ··,('
,,__ ,. .. /• , ... ,-..... A.. ,... ,, •. ... "'.
1\ ~~,' ~ ~<"-:~ ~ ;· ;~-~-~.:-~;,.,_ ~.·:v~~ ,.)\ .. ~ .. ;,. ',_...~, ;<~~". >::·' ·~ ~~.!·~~~,. "'x' ~ ~,.:< ~/ .. " ... ,
'V ··: y .}'. "-../ '" ~-· '-' '..<
•' .'•, , ... , ~ ,._ .......... A ."-.
'V'•'·' V ''/'v ">./ / /-.,,---.,,'\'y
•A •~•••>•••V ~•xX~XA
' ,• " . ,. -••• ·.t ><' ·" '-t "· ·..., .• ,,. '/ ,,. _... ··-·' -.· ,( "" ,_.. , . .,. x ·· ...,.
..... ,ro, fi., • ;-,.",. .>\,'•, -"'
' ' . ...,,"./'•,I'' ,,,,_.,. '· ..... ·.
~· >.X ·'>:X;.-(~~<-..: ···',YX'<Xx>:'>'.>''' :• .(.'' Y
,,. ' / ' ,.~. ,... / _/'>. ,. ' "' / ...... ,... .... • .... ,. ,,
y' '_'( _.( x v '.! ·~ )< ~< x ,, v y ...., ( '-:/ ·.c y 'y .... V' x ':{ '·'
'A.A .o.,,-. .JI)(• ,A, • ,•,. A '\
........ -.,,,.-.,,.. '
" ,( "-·"-.'{ x ·~ '" ,( • x
F ,.'• ,-. ,..., _/' /\ •-'-.... ./'> ·' '' ." ,' ,''> ,/', • ... ,,
. -~· _,
·' '·.·' _,. .. ,.._,.. , .. ,· ... '
' 1: ·": ){ .. / .;: < )o.' ·,[ ·,. '" '{ :..: ·~· ;. .. ); )( ....
v )("
xx
,,,,_
--
·--
~-: v "!: }: ~ ....... , ..... ,._. .. • , ... ...
x :,
x ~-
"!< .......
~· .
Exhibit 22 Data from ND IS, CD OT ,
and Gar fi eld Co unty
Mule Deer Activity Areas:
Winter
1:24 ,000
0.5 0 0,25
:-·----, SpringR idge Reserve Boundary ~~~~§iiiliiiliiiliil~~~~~~~~ Miles
I tsJ
BL M
BLM
BL M
PVT USFS
Legend
~ Forage Area
--Collector Roads
--Local Roads
--Streams
BLM
r ----t .. --~"'-,
I'-I ~-
10--. · ·, BLM i ~ i ' : \·~! ' ......
I ~
i -~"-"11
I ,
i [\ : I
I '-----------
Li SpringRidge Reserve ·\1
! i
' ' i : : _________ ! f __________ ! )
i i
: I ; ______________________ j (
Exhibit 23
Osprey Act ivity Areas
1 :2 4 .0 00
c~:~:~J SpringR idge Reserve Boundary
0 0.25 0.5 ~~~~--~~~~~~Miles
BLM
BLM
Data from NDI S, COOT ,
and Ga rf ield County .
--~ rj
_,. , I
l .J BLM _vu I
'fl J
BLM I
: -,
.. 7
f I /
I/
1 II i ------.,
Y" I l ... ,
1:Z:c_2-~,:::::========-:u~-I~·-. ( < < l=====t1\..======.~.,,"'~f;;;;-::::;;;:::;.;;;t= .==~-'-i , ~ i ''~ ...
II
BLM
t===>===============::j·r::====1 ., ___ .._J ->-----------\-·--· '
----. :ri~ ·-.~: ~'--------,1
-1--------~.>--~: ~ ! t===============~·~===' \.. ' ~I--==--==--==--==--==--==--==--==-_.,!~.~~ .... ==-! ! \
'---------~~1.--~: ' ,
--+-------'~_.·~,\--rS ~n~~Rid'~~eseNe r~~~~J
>-----------+l-':.---i ~\ I \ ~~~~1g~~~~~-..;.;~~~L ------------~-~----J "' II
\
-'.
----,, \
'
' '
-81 M 1---4_-~--'~·-.-------_____._~\ ~
--T ' -·-\ ~ ---
ork~
~ )
I
~
-
I
'
I
BL M
,~-------' ~
f
I
I
-1-----,~='-n --'.--l-'---------~\.. ,~'--------1
• ---
-
Legend
~ Overall Range
--Collector Roads
--Local Roads
--Streams
,
\ " ,{) \ ~
V I
Exhibit 24
}urkey Act ivity Areas
1:24 .0 37
l--"""'i---j SpringRidge Reserve Boundary
0 0.25
BbM
Data from NDIS. CDOT.
and Garfie ld County
.~
,11111111111111111111111111111111"' ''( 1111111111111
)07 10/14/2003 03:57P B1529 ~~o0 M ALSDORF
, .16 R 0.00 D 0.00 GARFIELD COUNTY CO
STATE OF COLORADO )
)ss
County of Garfield )
At a regular meet ing of the Board of County Commissioners for Garfield County,
Colorado, held in the Commissioners' Meeting Room, Garfield County Plaza Building, in
Glenwood Springs on Tuesday, the 27th day of May, 2003, there were present:
~Jo=hn~M==art"""m=· =-------------------•Commissioner Chairman
=L=arry ......... ~M~c~C~o~wn~----~---------~• Commissioner ·
-=-T=re=s..._i .... H=o"""up"""'t=------------------'' Commissioner
=D~o=n~D~e=F~o=rd=-----------------'CountyAttomey
=-M=il=dr=ed"-=-"A-=l=sd=o'-=-'rf=---------------'' Clerk of the Board
-=E=d-=G=r..:.ee=n"------------------• County Manager
when the following proceedings, among others were had and done~ to-wit:
RESOLUTIONNO. 2003-77
A RESOLUTION CONCERNED WITH TH E APPROVAL OF A PLANNED UNIT
DEVELOPMENT APPLICATION FORS & S RANCH LLC, SBJ RANCH LLC
FREEMAN RANCH LLC, GSB RANCH L LC, WILD MOUNTAIN RANCH LLC,
FOR THE SPRINGRIDGE II PLANNED UNIT DEVELOPMENT
WHEREAS, the Board of County Commis'sioners of Gameld County, Colorado,
received a Planned Unit Development (hereinafter "PUD") application from S & S Ranch
LLC, SBJ Ranch LLC, Freeman Ranch LLC, GSB Ranch LLC, and Wild Mountain
Ranch LLC (collectively defined herein as th e "Applicant") to develop the "Greenwald
Ranch" (hereinafter the "Property") which consi sts of 484 acres and is practically located
on Dry Park Road (CR 125) approximately 1 mile from the intersection with Four Mile
Road (CR 117) in the Dry Park Valley; and
WHEREAS, the Applicant proposed to rezone the Property from Agricultural I
Residential I Rural Density (AIR/RD) to PUD which is more fully described in "Exlu'bit
A" (PUD map) and ''Exhibit B" (PUD zoning) which provides the .appropriate zoning on
the Property to 1) allow a subdivision of 150 acres more or less into 81 residential lotS
which range from 0.7 acres to larger than 4 acres in size referred as a the "Residential
Area" and 2) to designate approximately 308 acres more or less of the Property as open
space to remain undeveloped and defined on the PUD plan as "Reserved";
WHEREAS, on January 8, 2003, th e Garfield County Planning Commission
,f';_,. ,. -
.. \
considered a proposed sketch plan and PUD for SpringRidge II and forwarded a
recommendation of approval with conditions to the Board of County Commissioners for
the PUD; and
WHEREAS, on March 17, 2003, the Board of County Commissioners opened a
public hearing upon the question of whether the PUD should be granted, granted with
conditions, or denied at which hearing the public and interested persons were given the
opportunity to express their opinions regarding the issuance of said PUD; and
WHEREAS, the Board of County Commissioners closed the public hearing on the
2ih day of May 2003 to make a-final decision; and
WHEREAS, the Board of County Commissioners, on the basis of substantial
competent evidence produced at the aforement ioned bearing, bas made the following
determination of facts:
1. That proper publication, public notice, and posting was provided as required by law
for the hearings before the Planning Commission and before the Board of County
Commissioners.
2. That the hearings before the Planning Commission and the Board of County
Commissioners was extensive and complete; .all pertinent facts, matters and issues
were submitted; and that all interested parties were beard at those hearings.
3. The application is in compliance with the standards set forth in Section 4 :00 of the
Garfield County Zoning Resolution of 1978 , as amended.
4 . That the proposed PUD is in compliance with the Comprehensive Plan of 2000 for
the unincorporated areas of the County.
5. The proposed use is in the best interest of the health, safety, morals, convenience,
order, prosperity and welfare of the citizens of Gaifield County.
NOW, THEREFORE, BE IT RE SOLVED by the Board of County
Commissioners of Garfield County, Colorado, th at based on the determination of facts · set
forth above, the request is approved to rezone th e Property from AIR/RD to PUD (further
described in "Exhibit B" attached hereto) which would provide the appropriate zoning on
the Property to 1) allow a subdivision of 150 acres more or less into 81 residential lots
and 2) to designate 309 acres more or less o f the Property as open space to remain
undeveloped . This approval is granted with the fo llowing conditions:
1. That all representations made by the Appl icant in the application, and at the public
hearing before the Board of County Commissioners and Planning Commission, shall
be conditions of approval, unless speci fi cally altered by the Board of County
Commissioners.
~u.. ~a:: _o
=o -en
-...10 !!!! a: u
-:C>--..... -NZ = U> ::> _NO -a..u
!!!! 0) c
=N...1
-Ul u.I !!!!m~
-a:: .......:. a.. a:
=l"'-C>
-ICI = .. CS)
-rJ "!
-Q =C"I •es>c
!!~ ISi = ........ CS> -· . .... CS>
=~o:: ...... -.... ~ =s iii: 'Ci !!!M
-COM
2. The Applicant shall submit the plans and /or maps finally approved by the Board of
County Commissioners to the Building and Planning Department in an acceptable
digital fonnat as part of final plat.
3. The Applicant shall delineate appropriate building and landscaping envelopes on all
proposed lots in the subdivision as part of the Preliminary Plan application that are
sensitive to geologic constraints (steep slopes and rockfall hazards) as well as the
preservation of wildlife patterns throughout the site. As a part of this PUD, the
Applicant shall fully define and describe what may occur within the building and
landscaping envelopes within the protective covenants to be submitted as part of the
Preliminary Plan application.
4. The Applicant shall be required to obtain all necessary "road cut permits" from
Garfield County in the event the Applicant intends to place the extended sewer
service line in any County public right-of-way such as CR 117 and /or CR 125. The
Applicant shall submit all necessary information required from a road cut application
to the Building and Planning Department and the Road and Bridge department as
part of the Preliminary Plan application.
5. The Applicant shall provide the following information regarding providing sewer
service from the City of Glenwood Springs as part of the Preliminary Plan:
A) Provide a specific plan and design indicating exactly where the sanitary sewer
line will be installed.
B) Submit detailed standards for review of how any County roadway (if used)
will be replaced after installation of utilities.
C) Submit a swnmarized phasing plan for the entire sanitary sewer system for
review and comment.
6. Lift stations shall have double pumps and emergency power.
7. Regarding fire flow, the proposed water system shall meet the requirements of the
1997 Uniform Fire Code, Division III, Fire Protection, Appendix III-A, Fire Hydrant
Location and Distribution, Appendix A-III-B.
8. For any homes proposed in SpringRidge II over 3,600 sq. ft., they shall need to have
an interior fire sprinkler system installed. These systems to be designed and installed
to meet or exceed the standard set forth in NFPA 13R or 13D 1999.
9. The Applicant shall design all roadways, driveways, and water supply systems to
meet the Uniform Fire Code 1997 specifications of Article 9. Exception: omit all of
Section 902.3 Access to Building Openings.
- ------------
I 0. The Applicant shall develop 1) a wildland fire fuels reduction mitigation plan for the
entire Subdivision and 2) a plan to maintain the reduced vegetation fuel load .
Guidelines to develop this plan may include but are not limited to: Colorado State
Forest Defensible Space Thinning Standards (current edition), Uniform Fire Code
1997, Division II, Special Hazards Appendix II-A, Sections 1,2,3,5,7,10,
12,13,14,15,16,17,18,20,23,24. This shall be submitted with the Preliminary Plan
application.
11. The Applicant shall submit a Weed Management Plan which includes 1) a map and
inventory the property for noxious weeds found on the site, 2) a statement regarding
what entity will be responsible for common area weed management in the future
including such areas as parks and trails. This Plan shall also be referenced in the
protective covenants fot the project. This plan shall be submitted with the
Preliminary Plan application for review.
12. Newly created landscaped areas within SpringRidge II shall be limited to 1,300
square feet and shall use drought resistant native plant materials. A list of acceptable
materials shall be compiled and included in the Prelimin~ry Plan submittal for
review by the Garfield County Vegetation Director. Drip or mist irrigation shall be
used within all landscaped areas.
13. The Applicant shall provide a general outline of a Soil Management Plan as part of
the preliminary plan submittal. A detailed plan will be submitted for county approval
prior to the commencement of construction. Specifically, the Applicant shall provide .
a proposed Soil Management Plan that includes 1) provisions for salvaging on-site
topsoil, 2) a timetable for eliminating topsoil and/or aggregate piles, and 3) a plan
that provides for soil cover if any disturbances or stockpiles will sit exposed for a
period of 90 days or more. This plan shall be submitted with the Preliminary Plan
application for review by the County's Vegetation Manager.
14. The Applicant shall submit 1) a plant material list, 2) planting schedule, 3) a map of
areas impacted by soil disturbance outside of building envelopes (in terms of acres)
which are proposed to be disturbed and subsequently reseeded including all road cuts
and utility disturbances, and 4) th~ provision of a revegetation security which shall
be provided at the time of Final Plat. The amotint of the security shall be determined
by the County Vegetation Manager and the Applicant based on the information
above and provided at the time of Final Plat The Applicant shall provide estimates
for revegetation that include costs for seeding, mulching, and other factors that may
aid in plant establishment. The security shall be held by Garfield Colinty until
vegetation has been successfully reestablished according to the attached Reclamation
Standards.
15. The Applicant sha11 provide for the on-going flood irrigation of open space areas B
and C. Provisions will be made to irrigate these areas by the Home Owners
Association as an on-going obligation of the Association. In addition, the Applicant
~-----------·----
IL.
~
0
0 en
...10 a;o
C>-
1-•z co::> NO
IL<.>
CJ) 0
N...J
lfl ILi ........
COIL
It:
D.. a:
..... C>
Ill
••Q
fl) CS)
CS>·
CS)
M
ISIC
C5)
NCS>
....... 6l .,. .
... Q ......
IS) It: ... co ........
Q
U) ... ao o
I")
coin
shall submit detailed calculations at the Preliminary Plan phase showing how the
well will be recharged by maintaining irrigation.
16. The Applicant shall submit a revised dra inage study in the Preliminary Plan
application that calculates a 100-year flood discharge for the project site so that
residences are sited such that there is no threat to flash flood.
17. The Applicant shall submit a summarized phasing plan for the entire storm water
control system for review and comment by the County Engineer during Preliminary
Plan .
18. The Applicant shall design all ditches at a minimum of six feet for all secondary
access roads per County regulations.
19. County Road 125 (Dry Park Road) shall be paved according to approved engineering
standards from the end of the present pavement on Dry Park Road to the entrance of
the SpringRidge II subdivision as soon as the weather allows in the first phase of
development.
20. The proposed emergency entrance between SpringRidge phase I and SpringRidge
phase lI shall be constructed so that it may be locked for access only be emergency
personnel. The gate that blocks the emergency access shall have combination type
locks so that owners in SpringRidge I could open it in case of an emergency.
21. School bus tum-around I pull off shall be designed as part of the Preliminary Plan
submittal to be located at the entrances to SpringRidge phase I and phase II.
22. The Applicant may be allowed to construct the trail southward along the knoll above
lots 55 through 61 so long as the trail is constructed out of dirt or wood chips.
23. The Applicant will be allowed to construct the cul-de-sac which ultimately serves
lots 13 and 17 of the PUD plan so long as the two cul-de-sacs (ending at lots 13 I 17
and at 18 I 19) are connected by an emergency road right-of-way which shall include
an improved pedestrian trail within the right-of-way. The design of the emergency I
trail right-of-way shall accommodate the ability to handle the passage of large
emergency vehicles. This design shall be provided to Staff in the preliminary plan
submittal.
24. The Applicant shall be required to obtain driveway permits for four roadway cuts
into SpringRidge II PUD from the Road and Bridge Department as part of the Final
Plat application process.
25. The Applicant shall revise all sections in accordance with road ditch width
standards. The drainage report should detail how deep all ditches need to be and
drawings should ·delineate them accurately and in relation to drainage report
recommendations. All culverts shall be sized and located per stonn drainage report
recommendations. Refer to section 9:35 of the Garfield County Design and
Improvement Standards. This information shall be provided during Preliminary Plan
to allow adequate review by the County Engineer.
26. All roadways within the development shal l be dedicated to the public.
27. Prior to submitting the Preliminary Plan application, the Applicant shall forward the
proposed traffic generation analysis to the County Engineer so that an accurate ADT
calculation shall be calculated regarding the proposed trips to be generated from the
development.
28. The Applicant shall improve CR 125 from the intersection of CR 117 to the main
entrance of SpringRidge II. Further, the Applicant shall not be required to improve
CR 125 beyond the main entrance to the eastern end of the development. The
Applicant shall consider the possibility of relocating an existing school bus
turnaround on CR 125 to the main entrance of SpringRidge II or at an appropriate
location given topographic constraints and as appropriate engineering practices
allow.
29. The Applicant shall be allowed to construct the proposed cul-de-sac which
ultimately serves lots 77 -81 (which is longer than 600 linear feet) as it serves as a
secondary emergency egress I ingress for the PUD and is approved by the Board of
County Commissioners.
30. The Applicant shall construct the SpringRidge II PUD pursuant to the following
phasing schedule provided below and shown on "Exhibit C" as attached to this
Resolution. In addition, that Applicant shall submit a summarized phasing plan for
the entire road system for review as part of preliminary Plan.·
Phase Lots In Phase Commencement Comoletlon
I 7-29 and 44-48 (Total of 28) 12 Months after Final Plat Within 12 Months of
Commencement
II 30-43 and 49-61 (Total of27) No Later than 36 Months after Within 12 Months of
Comaletion of Phase I Commeneement
Ill 62-81 (Total of 20) No Later than 36 Months after Within 12 Months of
Comoletion of Phase II Commencement
IV 1-6 (Total of 6) 12 Months after Completion of Within 12 Months of
Phase Ill Commencement
31. Construction work for all co'nstruction phases for SpringRidge II shall occur between
the hours of7:00 AM and 5:00 PM, Monday through Saturday.
32. In accordance with the opinion of the Division of Water Resources, the proposed
water supply can be provided without causing material injury to decreed water
rights, and is adequate, as long as: 1) the District's plan for augmentation, the
Founnile Creek SWSP and the wells are operated according to their
decreed/approved terms and conditions; and 2) the applicant obtains the
aforementioned well permits and the contract with the District. The applicant shall
-u. !!!!! er _o
-Cl -"' --10 =a:(.)
iii lC >--.... -IOZ =co::>
-NO -0...(.)
-enc
-N..J
-Ul UJ _ .........
-mu.
• er -0..-a: =,...u . ..,
-•• ISi
; tiJ CS> 19· ~M CS)
•C!>IO !~e;i = ...... CS) . .,. .
• ..... 15) -...... : CS> a:: ..... · .... ~ : cg ·co ... 1 ao o !C"> 'co,..
be required to produce these approved well permits as part of the Preliminary Plan
process and include provisions for man agi ng the water system (what entity ((i .e .
Home Owner's Association)), will own and operate/manage the water supply system
) within the protective covenants.
33. Water usage at the new homes shall be limited to 18,000 gallons per month and shall
be metered and strictly enforced. This lim itation may be reconsidered if the parties
agree at a later date based on how th e wells respond and drought conditions.
External read out water meters shall be required to be in place as a condition of final
certificate of occupancy.
34. The Applicant shall submit a copy of the approved contract with the West Divide
Conservancy District for 34 acre-feet and the required approved well permits as part
of the submittal materials for Preliminary Plan so that they may serve as proof of a
legal and adequate supply of water.
35. The development of the second well and second tank shall be tied together to
provide back up provisions for both SpringRidge phase I and phase II.
36. The second well that is to be drilled, Well #2, will be drilled downstream of Well #1
(during phase I of construction within the right-of-way of SpringRidge Court) to
offset the possibility of depletion of Well #1. Well #2 is presently permitted for a
location downstream of Well #1. A third well will be permitted, but not drilled to be
available as a backup if depletion starts to appear to be a problem.
37. The Applicant has agreed to upgrade and pipe the Atkinson Ditch from the divided
box at the fire station to the SpringRidge II property in order to increase its
efficiency. This upgrade and piping of the ditch shall occur in the first phase of
construction.
38. The irrigation of the meadows in SpringRidge II shall continue as they have been
irrigated in the past until the commencement of construction for each approved
phase of SpringRidge II construction.
39. All foundations for all of the units in this development shall be required to have
properly engineered foundations due to the potential for hydro-compactive soils in
the area. In addition, the units on Lots 1 -6 and lots 63 -81 shall be required to be
properly located within designated build ing envelopes to effectively avoid any
potential for rockfall hazards on those lots. This condition shall be addressed during
the Preliminary Plan review and included as a plat note on the final plat.
40. The Applicant shall submit an updated geotechnical report for the property that
addresses the current project configuration as part of the Preliminary Plan
application.
41. CGS recommends that an engineering geologist be retained to assist in the siting of
residences for lots 1 through 6 and all those that flank the Maroon dip slope on the
east side (lots 63-81). This should be completed prior to construction because if
u~stable rock features are located, they can be easily removed with little cost.
42. All lot owners shall be provided with information in the protective covenants which
shall serve as a reminder to land owners as to bow they can reduce wildlife I people
conflicts and ultimately understand how to live with wildlife present in rural Garfield
County.
43. The Applicant shall place building envelopes on perimeter lots to minimize
disturbance to existing native sage shrub communities. This is very crucial to try
and also preserve as much of the winter forage and cover for deer and elk. These
building envelopes shall be shown on the plat provided as part of the preliminary
plan submission.
44. Lot owners shall be restricted from erecting perimeter fences around the boundaries
of lots. This will allow free movement of wildlife to, from, and between properties
and will serve to help minimize wildlife caught in fences. Lot owners shall only be
allowed to construct backyard privacy fences not to exceed 50x75 in area for their
dogs. Further, these fenced areas should be constructed prior to a C.O. is issued.
45. During the winter and early spring, maintain closure of the hillside pedestrian trails.
This area is very important to wintering deer and elk for forage and cover, and
human or dog intrusion can have a large impact on wintering animals.
46. Keeping lots I -6 and their building envelopes down as close to county road 125 as
possible. The adjacent hillside is one of the key areas to wintering deer and elk and
disturbance in this area could significantly impact wildlife use of the area. The
western hillside is steeply sloped, and avoiding construction up the slope will help
lessen the impacts to wildlife.
47. The Applicant may be allowed to construct the trail southward along the krioll above
lots 55 through 61 so long as the trail is constructed out of dirt or wood chips and is
closed to use from January 15th through March 15th of each year to prevent
disturbing deer and elk when they are in a weakened condition or are calving.
48. The Applicant should incorporate the following items, in addition to "Exhibit A":
"Living in Rural Western Colorado" in the protective covenants:
a) Dogs should not be allowed to rorun and homeowners should also be advised
that dogs chasing wildlife is illegal and can lead to legal action. The Colorado
Division of Wildlife will issue fines for dogs harassing or chasing wildlife. If
a dog is observed chasing or harassing wildlife it may be shot. No more than
one dog per household with a kennel restriction; furthermore an electric fence
should not be considered a kennel. Dogs that are not kenneled must be
iiiiiiiiu.. -a: =o iiiiiiii~
-..Jo -a:o
-C>--~ _ooz
=co=> _NO
-0..U
!!!CJ) 0
=N..J
-IO llJ
!!!!!! a;~
-a: _o..a:
=t-CJ
-IO =~~ -CS> •
-15) =(")
-~Q
!!!!!! N CS> =-...csi _..,..
-"CSI =~i:t:
iiiii" -,..~
=&»
iiiii :g 'O
!!!!!! C"J
-COOi
leashed at all times . Proof of kenne l construction should be required before a
Certificate of Occupancy is issued. No dogs allowed by construction workers
during the development process.
b) Bear/human conflicts have the potential to be a reoccurring problem in this
area and it is paramount that certain measures be taken to minimize these
conflicts:
);> All homeowner have and use an approved bear-proof container for
storing all trash/garbage. Trash compactors inside the house can help
eliminate bulk and odors, which will further reduce potential problems;
);> Bird feeders (including hummi ngbird feeders) can be used but do not
mount · humming bird feeders on windows or the · siding of the house.
Seed feeders should be strung up at least 1 O' from the ground with a seed
catchment to discourage other wil dlife foraging
);> Pets should be fed indoors, and pe t food or food containers should not be
left outside;
);> Horse feed should also be stored in a bear proof container and locked; a
job box with a padlock can adequately prevent bears from breaking into
horse feed containers;
»-BBQs should also be securely housed in the garage or cleaned with a
bleach solution when not in use due to the fact that leftover food and
grease are an overwhelming bear attractant;
»-Round door knobs on the outside of doors rather than lever-type can limit
bear access into houses as well as installing a cooling system rather than
leaving windows open, as this is the main way bears access homes in the
summer. Storm shutters that can be closed and locked when the house is
not being used can also discourage bears from entering vacant houses;
)> Under current state laws, the Division of Wildlife is not liable for damage
to real or personal property by bears.
»-For homeowners keeping horses on their property, fencing haystacks with
8' mesh fence for wildlife proofing at the homeowners expense is
reconunended . ·
)> Eliminating plantings of any berry, fruit, or nut producing plants or
shrubs will also discourage bears and other wildlife from feeding on
expensive landscaping. Homeowners also need to be aware that the
Division of Wildlife is not liable for any damage to landscaping by deer,
elk, or bear.
)> Maintaining as much of the native mountain shrub communities inside
the building envelopes is encouraged to continue to provide the highest
value to existing wildlife.
c) Due to the fact that wildlife does travel through the area, all fencing should be
eliminated. If absolutely necessary, homeowners need to adhere to wildlife
fiiendly fencing consistent with the Colorado Division of Wildlife approved
fences. For wire fencing, a maximum height of 48" with no more than 4
strands and a 12" kickspace between the top two strands is sufficient. Rail
--u.. !!!!!!!! 0:: _o
-0 -cno
=~U
!!!!!!!!! >--:Ct-
-z -e»=> =coo -N<.>
-CL
-0 =e» ..J -NIU
_IO ... _ .... ~
-al 0::
-a: -0..1!1 ="" -IOCS> =··Q M• =CS> CS> =Mc
-tS>
-C!ilt'i> -NIS) ='. _.,.«SI _ ...
-'0:: =es> _ ... co -... "" =t'i> ... -co 0 -co !!!!! .., C5I
-CO ...
.·-._
fencing should be held to a max.irnwn height of 42" with at least 18" between
two of the rails. Mesh fencing is strongly discouraged, as it significantly
impairs wildlife movement.
d) During the construction process, large areas of disturbed soil will be inviting
to noxious weeds. Weeds can out-compete native vegetation, thus degrading
the quality of the habitat. Precautions should be taken so that heavy
machinery does not spread noxious weeds within the area. After construction
is complete, a weed management plan should be drafted to further ensure that
weeds do not invade the native plant community habitat.
e) The surrounding lands are heavily hunted during big game seasons. Hunting
in the area will not be eliminated due to development.
t) Mountain lions may frequent the area and if one is seen in the area, small pets
and children should not be left outside unattended during the early mornings
and late evenings. Pets and any livestock should be kept in a kennel or
enclosed area during the night.
49. The Applicant shall agree that completion of a phase means the completion of all
construction including infrastructure for the subject phase.
50. SpringRidge phase II agrees to work with the SpringRidge phase I Home Owners
Association to look into areas of mutual benefit on shared expenses and shared
maintenance.
51. The Applicant shall include the following plat notes on the Final Plat:
a) "Colorado is a "Right.to-Fann" State pursuant to C.R.S. 35-3-101, et seq.
Landowners, residents and visitors must be prepared to accept the activities,
sights, sounds and smells of Garfield County's agricultural operations as a
normal and necessary aspect of living in a County with a strong rural character
and a healthy ranching sector. All must be prepared to encounter noises, odor,
lights, mud, dust, smoke chemicals, machinery on public roads, livestock on
public roads, storage and disposal of manure, and the application by spraying or
otherwise of chemical fertilizers, soil amendments, herbicides, and pesticides,
any one or more of which may naturally occur as a part of a legal and non-
negligent agricultural operations."
b) "All owners of land, whether ranch or residence, have obligations under State
law and County regulations with regard to the maintenance of fences and
irrigation ditches, controlling weeds, keeping livestock and pets under control,
using property in accordance with zoning, and other aspects of using and
maintaining property. Residents and landowners are encouraged to learn about
these rights and responsibilities and act as good neighbors and citizens of the
County. A good introductory source for such infonnation is "A Guide to Rural
I
I
I
I
I
I
I
I
I
I
I
I
-u..
!!!!!!!!!!!! « _o -c -enc
-...IU -a: = >--lCI-
-:z: -6>::> =t-o
_('f()
-A.
-Cl ==~ irl
-l(JM _ .... u.
-a>~
-a: -A.C> =t-
-IOQ = ··151 M • =6>151
=Mo
-151
-QIS)
-NCS> ='-. -·CS) _ ....
-'~ =l5) _ .... IO -.... =~c...
iiiii ~ 0
!!!!!! M .-f
-ID ...
Living & Small Scale Agriculture" put out by the Colorado State University
Extension Office in Garfield County."
c) "All exterior lighting will be the minimum amount necessary and all exterior
lighting will be directed inward and downward, towards the interior of the
subdivision, except that provisions may be made to allow for safety lighting that
goes beyond the property boundaries."
d) "One (I) dog will be allowed for each residential unit and the dog shall be
required to be confined within the owner's property boundaries."
e) '.'Each lot shall have water sufficient to irrigate 3,500 square feet."
f) No open hearth solid-fuel fireplaces will be allowed anywhere within the
subdivision. One (1) new solid-fuel burning stove as defied by C.R.S. 25-7-401,
et. sew., and the regulations promulgated thereunder, will be allowed in any
dwelling unit. All dwelling units will be allowed an unrestricted number of
natural gas burning stoves and appliances.
Dated this 13th day of October, A.D. 2003.
COUNTY
OF
GARFIELD
BOARD
COMMISSIONERS,
GARFIE COUNTY,
COL?
Upon motion duly made and seconded the foregoing
the following vote:
John Martin A -=::.=!~=..!:'~-------------:__------~• ye -=L=arry~~M~c~C~o~wn~-----------------~----'Aye -Absent
Tresi Hount Aye ~.:=~~~~~~-~~~~-~~~~--~--~-~~~~~~·
STATE OF COLORADO )
)ss
County of Garfield )
.'
-EXHIBIT
Pr
-u.. -0:: --0 -o !!!!! VI 0 _ ..... u
--a: = >--s: ....
- z _N:::I
=~8
iiiii CL 0 !!!!! en_,
=NUJ
_Kl ... _ .... u.
-ma:
-a: __ a., Cl
_:;;CS>
-•• t5) ;;;;;;;;~ Q -=C"Jo
-CS) .
-CS) t5) -NCSl -...... iii .. IS) _ ....
....... « ==61 ... _ ........ -.... ,._
=es> ... --co 0
-GI) !!'!! (f) (f) __ co ....
• Legend
I
./ ...... N--"-
( -N"-Y......,
./ 1..a , ..... .. 10. .... C.-.
• ,• o..t...i • -.... -u..
L. Springridge II Sketch Plan
c~~:-~~~=::~:~on
T otol Lots .., 81
1000 0 1000 Feet
1:12000 1• -1000'
·,
l
"Exhibit B"
Exhibit B is an attachment to the Resolution approving the SpringRidge II Planned Unit
Development that specifies the specific description of the approved PUD zones
(Residential Zone, Reserved Zone, and Infrastructure Zone), uses, and dimensional
requirements. ·
~RiJ1a~ntt~1:~6.n~: -~~~iatr~rmorit6~lust:;Jl~~J1<~~lt~t~;ii~~;~~~~~~~~ri1~~,1t~~~~~1~ti~Wi'f~~1;~1;;~~->li(~?~')(1H
Uses by Right One sini:ile-familv dwellinq per lot
Dimensional
Requirements
One accessory garage per lot for a minimum of two cars, wither attached
or detached -
Accessory Uses customarily associated with single-family detached
dwellinas
Home Occuoations
Trails Cross Countrv Ski and Eauestrian Trails
Open Soace
Gazebo & Picnic Facilities
Underground utilities and appurtenant surface facilities and existing
overhead utilities
lrriaation Eauioment necessarv to irriaate fields ..
Ditches and Pioelines
Roads and Drivewavs
Minimum Lot Area: As depicted on the proposed and approved site plan
for the PUD
Maximum Building Height: 25 feet as calculated by the Garfield County
Zoning Resolution of 1978, as amended.
Maximum Lot Coverage: 15% as calculated by the Garfield County Zoning
Resolution of 1978, as amended.
Minimum setbacks: Front= 50 feet from front lot line
Rear :::: 25 feet from rear lot line
Side = 10 feet from side lot lines
(These shall apply except that Applicant may create building envelopes
which are more restrictive than the above, in which case said building
envelooes shall overrule and shall control)
Additional Requirements: Same as AIR/RD & Supplemental Regulations in
the Garfield Countv Zonina Resolution of 1978 as amended.
facilities and existing
inclement weather
iiiiiiiiu_ -a:: --o =c -.,,o _ _.()
-ex = >--:Ct-
-· z _.,. ::l
=~8 -a.
-c !!!!!!!!! en_,
=NU.I _Ill ....
-riU.. -Ill~
-a..c.:> =r-iiiiii lf1 Q -··S -.., . =6)«5>
=MCI
-Q
-CSJQ _NCS> ='. _.,.G>
-~"' ===GJco _ ....
-ri .... =(5) ... -co 0 -Cl) !!!! C") Ill _co,...
Barns related to the Aaricu ltu ral Production
Uses authorized bv PUD Aooroval
Conditional Grazing and keeping of animals
Uses
Dimensional Minimum Lot Area: As aooroved and shown on the PUD site plan
Requirements Maximum Building Height: 25 feel as calculated by .the Garfield County
Zonina Resolution of 1978 , as amended.
Maximum Lot Coverage: 15% as calculated by the Garfield County Zoning
Resolution of 1978, as amended.
Minimum setbacks: Front = 50 feet from front lot line
Rear = 25 feet from rear lot line
Side = 10 feet from side lot lines (as calculated by
the Garfield Countv Zonina Resolution of 1978, as amended.)
Additional Requirements: Same as NR/RD & Supplemental Regulations in
the Garfield Countv Zonina Resolution of 1978, as amended.
Infrastructure Zones:
A Utility Zones: The purpose of this zone shall be for the construction, installation,
and repair of utility lines along all roads and lot lines within the SpringRidge II
development. The zone shall be 10 feet wide along both sides of all roads and all
lot lines as approved and shown on the PUD site plan. plus 10 additional feet (in
width) along these zones .
B. Water Tank Zone: This zone shall be considered a 200' x 200 ' square around
the water tank location as shown on the PUD documents for the purpose of the
placement of the water tank to serve the SpringRidge II PUD development.
C. Water Well Zone: The purpose of this zone is to designate areas for no more
than 2 water wells created with in the PUD Plan under "Reservation and
Recreation Plan." Additionally, this zone shall include the ability to construct a
well house and treatment facility no t to exceed an area of 20' x 20' for each well.
Said well houses shall be constructed with wood siding and painted with subtle
earth tones tio blend with the surrou ndings.
iiiii "-
-a: -o iiiii 0. -ino
=cl." = >--:Ct-~r!!i =N8 -a.
-c !!!!!!m ..J
=N&l.I _in ...
-'"IL _aao::
-« _llLO ="'"' !!!!!!! '!! i -.., . =6)Q
=C"'JCl :zt!i)
-NS ='· -~(5) -" _ ....... ..::
-(5) __ ... ~ -,..
=CS) Ce--co 0 -IO !!!!!!! C"I IO -'°""'"
Legend
tr.' -~·· . •.· .;
N """"" N----N-N .. _......,
N ,,., ..... S-loaf~ ..... ~ ~ ... _____ ,
• ·: ,.,......u,,. ~.._ •
_;, . '._'' _,:\'~f6;~;~
....
.'~"· :_:,:
'\
1000
-·
Springridge II Sketch Plan
Exhibit 15 -
Development Phase Plan
Data So<nce ' 8oM dola and
Carfoun, tfigh Countty El>Q i""ring;
5'1e O..lgn, Otak, Inc.
Dale l'nporod ' July 8, 1001
DPhaseOne
DPhaseTwo
• Phase Three
• Phase Four
. ¥.
0 1000 fffl (I\
1:12000 l" = 1000' \AJ
Responses to BOCC General Conditions on the Springridge II Sketch Plan
(Resolution 2003-77)
1. This Preliminary Application is consistent with the SpringRidge II Sketch Plan.
The SpringRidge II PUD includes the follow i ng:
484 total acres
152.5 acres devoted to 81 single-family lots
13. 7 4 acres devoted to internal road right-of-ways
8.9 acres devoted to right-of-way for Dry Park Road
309 acres devoted to lands under conservation easement
The Applicant agrees that all representations made in the Preliminary Plan
application and at the public hearing before the Board of County Commissioners
shall be conditions of approval.
2. The Applicant agrees to submit all plans and maps approved by the Board of
County Commissioners to the Building and Planning Dept. in an acceptable
digital format as part of final plat.
3. Building envelopes for all lots are delineated on the Preliminary Plan map and
will be recorded on the final plat. Uses permitted within the building envelopes
and the landscape envelopes are fully described within the Preliminary Plan
application. These uses are fully defined and described in the Master Declaration
of Covenants. Conditions and Restrictions for Springridge Place Phase II
Subdivision.
4. All the necessary information to acquire the required road cut permits is
contained within the Engineering Report, included with this application as
Exhibit 27.
5. Information pertaining to the proposed City of Glenwood Springs sewer service
can be found in this Preliminary Plan as Exhibit 41.
6. This information can be found within the Engineering Report Exhibt 27.
7. This information can be found within the Engineering Report Exhibt 27.
8. Language has been included in the Master Declaration of Covenants. Conditions
and Restrictions for Springridge Place Phase II Subdivision that requires homes
that exceed 3,600 feet to have interior sprinkler systems. Again, these covenants
are included as Exhibit 34.
9. All roads and driveways and water supply systems have been designed to meet
the Uniform Fire Code 1997 specifications, except Section 902 .3.
10. A Wildfire Hazard Assessment and Mitigation Plan is included with this
Preliminary Plan as Exhibit 36. Language has been included in the Master
- -------------
Declaration of Coven a nts , Conditions and Restrictions for Springr idge Place
Phase II Subdivision that specifically addresses maintenance of defensible s pace
for wildfire hazard mitigati on .
11 . A Weed Management Plan is include d with this Pre liminary Plan as Exhibit 35 .
The Weed Management Plan is refere nc e d i n the Master Declaration of
Covenants, Conditions and Restrictions fo r Springridge Place Phase II
Subdivision.
12. The PUD approval restricted new landscap ing to 13 00 sq. ft . The PUD a pproval
also requires each lot to have sufficient w ater to irrigate 3500 sq. ft . The excess
water to be available to irrigate pre-existing vegetation a nd may also serve to
supplement fire flows within the project ..
13. A general outline of a soil management pla n is included within the Engineering
Report, included as Exhibit 27 .
14. A Plant Material List is included as Exhibi t 38. A Planting Schedule is attached
to the Plant Material List. The ground dis turbance that will occur outside the
building envelopes is available on the Revegetaion Plan, included as Exhibit 37.
The Applicant will submit a revegetation security at the time of Final Plat.
15. The on-going flood -irrigation of pasture l ands protected under conservation
easements Nos. 2 and 3 i s mandated by the Deed of Conservation Easement
(included as Exhibit33) as well as the Master Decla ration of Cove nants,
Conditions and Restrictions for Springridge Place Phase II Subdivision.
Furthermore, the Applicant has agreed to pipe the irrigation water at the head-
gate on Four Mile Creek to the property (p e r Condition #37, below). The piping of
the ditch will increase transport efficiency, thereby increasing the volume of
water available to irrigate the pastures wit h .
16. A Drainage Study is included a s Exhibit 28 . Within the Drainage Study,
recommendations are made regarding the s uggested top of foundation elevations
for specific lots in order to avoid the threat of a flash flood.
17. A phasing plan for the entire storm water co ntrol system has been provided in
the Engineering Report that accompanies t his Preliminary Plan.
18 . All ditches have been designed to meet this condition .
19 . The Applicant would like to clarify this co n dition. The Applicant agrees to paving
County Road 125 (Dry Park Road) from the end of present pavement at the
entrance to SpringRidge I to the entrance of SpringRidge II . The Applicant
agrees to complete this task in Phase I of t his developme nt.
20. The proposed emergency entrance betwee n SpringRidge I and SpringRidge II
shall be constructed so that it may be locke d for access only by emergency
personnel. The gate that blocks the emerge ncy access shall have a combination
type lock. This condition is documented on page 11 of the application.
21. A new school bus turn-around located at the entrance to SpringRidge II will be
developed in Phase I. The existing bus turn-around located at the entrance to
SpringRidge I will be mai ntained until it h a s been determined that the school
bus needs to pick up children at the entrance to SpringRidge II. At this time the
existing bus turnaround will be reclaimed b ecause the bus will be picking-up
children at the new turnaround, then proce eding to the entrance to SpringRidge
I to pick-up children on its way back to Four Mile Road.
22. The Preliminary Plan specifically states tha t this trail will be a natural surfaced
trail on page 8 of the application .
23 . In regards to the proposed cul-de-sac that w ould ultimately serve lots 13 and 17 ,
an emergency access right-of-way has been included on the Preliminary Plan
that connects this cul-de -sac with the one to the east that ultimately serves lots
18 and 19 . An improved p edestrian trail is i ncluded within this emergency access
right-of-way.
24. The Applicant will obtain driveway permits for four roadway cuts as part of the
Final Plat application process.
25. The Applicant has revised all ditch sections to a six-foot (6') width. The Drainage
Report details all ditch specifications.
26. All roadways within Springridge II shall b e dedicated to the public, but will be
privately owned and mai ntained.
27. The Applicant has submitted the traffic generation analysis to the County
Engineer for review. The County Engineer's recommendation regarding ADT has
been used to calculate the Off-site Road Impact Fee, and his response regarding
this matter is documented in Exhibit 40.
28. The Applicant proposes to improve County Road 125 (Dry Park Road) from the
current end of pavement at the entrance t o SpringRidge I to the entrance of
SpringRidge II. The Applicant proposes to develop a school bus turnaround at
the entrance to SpringRidge IL These improvement will occur in Phase I of the
development.
29. The road in question will serve as a secondary emergency access .
30. The phasing plan included in the BOCC conditions has been adopted and is on
page 7 and page 18 of the Preliminary Plan application. The phasing plan also
includes details related to road, trail, utilit y and school bus turnaround
construction phasing.
31. The Applicant has noted that construction shall occur between 7:00AM and 5:00
PM in the application text.
32. The well permits are included as Exhibit 32. The provisions for managing the
water system are included in the Master Declaration of Covenants, Conditions
and Restrictions for Springridge Place Phase II Subdivision.
33. Water usage provisions have been include d i n the Master Declaration of
Covenants, Conditions and Restrictions for Springridge Place Phase II
Subdivision.
34. A copy of the approved contract with the West Divide Conservancy District is
included within Exhibit 32.
35. The second well (Springridge Well No. 2) and water tank shall be tied together to
provide back up provisions for both SpringRidge I and SpringRidge II. This
provision is detailed in the Engineering R eport, attached as Exhibit 27.
36. Springridge Well No .2 shall be drilled downhill from Well No.1, as detailed in the
Engineering Report.
37 . The Applicant agrees with this condition, as detailed in the Engineering Report.
38. Irrigation of the pastures will continue as it has been in the past until the
commencement of construction for each approved phase of SpringRidge II.
39. The Applicant agrees to include these con ditions as a note on the Final Plat.
40. The geotechnical report submitted with the Sketch Plan summarized the geologic
conditions of the entire Property. It is the op inion of the Applicant that the
geotechnical report is valid regardless of the development plan proposed for the
Property. Therefore , it is the opinion of the Applicant that the geotechnical
report prepared by Hepworth-Pawlak Geo technical, Inc. remains valid for this
Preliminary Plan. The Applicant has taken care to ensure that any and all
hazards or potential hazards identified in t he report have been avoided or are
mitigated in the development plan for Spri ngridge IL
41. An engineering geologist will be retained to assist in the siting of residences for
lots 1-6 and all those that flank the Maroon dip slope on the east side of the
property (lots 63 -81).
42. Specific language regarding wildlife/people conflicts has been included in the
Master Declaration of Covenants, Conditions and Restrictions for Springridge
Place Phase II Subdivision.
43. Building envelopes are included for all lots on the Site Plan and will be included
in the Final Plat. Building envelopes on p erimeter lots have been designed to
minimize disturbance to native sage shrub communities.
44. Language prohibiting the construction of perimeter fencing is included in the
Master Declaration of Covenants, Conditions and Restrictions for Springridge
Place Phase II Subdivision. Language in the covenants also specifies that privacy
fencing shall be limited to 50X75. Furthermore, language in the covenants
specifically identifies the design and type of fencing that is permitted within
Springridge II.
45. Language identifying seasonal trail closure is included in the Master Declaration
of Covenants, Conditions and Restrictions for Springridge Place Phase II
Subdivision.
46 . Building envelopes for lo t s 1-6 have been loc ated as near to County Road 125 as
possible.
47. The trail will be natural surfaced and will be subject to seasonal closure as
identified in the Master Declaration of Cove nants, Conditions and Restrictions
for Springridge Place Phase II Subdivision.
48. These items have been included in the Master Declaration of Covenants,
Conditions and Restrictions for Springridge Place Phase II Subdivision.
49. The Applicant agrees that all infrastructure construction for specific phases will
be completed prior to the commencement of infrastructure construction for
subsequent phases. However, once lots have been sold as part of a phase,
construction on these lots may occur independently of infrastructure construction
for subsequent phases.
50. The Applicant will encourage a working relationship between SpringRidge I and
SpringRidge II homeowner's associations.
51. The Applicant shall include the notes listed in condition 50 on the Final Plat.
Pat Fitzgerald
Glenwood Brokers, LTD.
P.O. Box 1330
Glenwood Springs, CO 81602
Re: Springridge Reserve, PUD, Preliminary Plan Application
SE Job No. 24040.01
Dear Pat:
This Jetter comprises an engineering report for the Preliminary Plan Application to Garfield County .
Introduction
•
July 9, 2004 I
The site is approximately 4 79 acres on the East Side of Four mile Cree k. The site is generally comprised of irrigated pasture ,
hay fields , scrub/sage brush and some juniper/pin yon forest. The site is accessed from County Road 125 (Dry Park Road).
An irrigation ditch (Atkinson Ditch) conveys water from the southeast corner of the site across to the north at a 1-% slope.
Water Svstem
Water Supply
Existing and proposed wells will provide a legal supply of potable water to the proposed treatment, storage and distribution
~ystem. The adjacent development to the north, Springridge Place Phase I (22 single family homes) utilizes the existing well
~ith a water chlorination system, storage tank and distribution system. To meet the calculated demand an additional well will
be developed to provide adequate physical supply to meet water demands of 103 single family homes. The Proposed
development will construct a new water storage tank and distribution s ystem that will be designed and connect into the
existing system.
Springridge Well No. 1 (the existing well that serves Spring Ridge Phase I) and Springridge Well No. 2 (not yet drilled) are
decreed (Case No. 93CW51) to serve the Spring Ridge Subdivision and Springridge Reserve. A second well will be drilled
and connected to the water system.
Out of priority diversions from these two wells are allowed under the West Divide Water Conservancy Augmentation Plan
decreed in Case No. 94CW344. Springridge Reserve has acquired additional contract water from West Divide Water
Conservancy District to meet the full augmentation needs of the propo sed development. The wells are decreed to serve up to
125 single-family units however the combined demand for domestic and irrigation requirements is based on a total of 103
units for the Springridge Place Phase I (22 uni ts) and Springridge Reserve (81 units). The existing well has been evaluated
for quantity and quality.
Water Treatment
The water treatment building is currently next to and connected to the existing well. After chlorination the water is pumped
to the existing tank for storage. The second well to be located in the school bus turn around will be connected to the existing
treatment building where it will be chlorinated and combined with the water from well #1 and pumped to the storage tanks.
502 Main Street• Suite A3 •Carbondale, CO 8162 3 • (970) 704-0311 •Fax (970) 704-0313
SOPRIS ENGINEERING • llC civil consultants
~Water Storage
Pat Fitzgerald
Jul y 6, 2004
Page 2 of 5
The syste m will be designed to provide a re li ab le water s upply adequate to meet exis tin g fire flow requirements and the in-
house ne eds of the subdivision p ro p erty owners . S op ri s Engineering recommends the inst a llation of a minimum of 252, 100
ga llons of water storage in two storage tanks to me et the re qu ired fir e flow requirements . This vo lume is based on 1500 gpm
minimum flow for 2 hours (180,000 gal) p lu s 2-day average use for domestic water s torage (350 gal/day/lot x 103 lots x 2 =
72,lOOga l) fo r a total of 252,100 ga ll ons.
The existin g tank has been field meas ured and is 33.7 feet in diameter by 25 feet high. If the water le ve l is assumed to be 22
feet high this tank will hold 146,708 gallons. We h ave ass um ed a conservative operating storage capacity of 145 ,000 gallo ns.
We are proposing the new tank be 29 feet in diamete r by 25 fee t high to ma tch the height of the ex isti n g tank. Assuming the
water le ve l to be 22 feet high the new tank storage volume will be 108,640 gallons. Therefore the tota l cap acity of the two
tanks will be 253 ,640 gallons.
•
The existing storage tank is located at an elevation of 6574 feet. The sta tic hea d in this tank is no t a dequ ate to m eet the
required fire flow for all the Springridge Reserve development. P o tential tank sites have b ee n evaluated for use with the
proposed distribution system during thi s design phase . There is ample space available at hi g her e le va tions on the site to
c o nstruct the additional water storage capacity. B ase d on our findings it is fea sible to de s ign a new s torage facility loca ti o n at
a higher elevation that would provide adequate pressure for fire fl ows fo r Springrid ge Res erve.
A tank base elevation of 664 7 feet will be required to s upply fire flow a nd water service to the highest point in the
development, Spring Ridge Reserve L ot #39. Sopris Engineering recommends th at a new tank be constructed at a locatio n
6647 feet in elevation. Once the new tank is on lin e, the exi stin g tan k w ill be re located adjacent to it so that the e nti re project,
Springridge Phase I and Springridge :';.e serve will b e served at one pressure head . This will eliminate the ne ed for two
~-ressure zo ne s and the installation of pressure reducing valves. W e have determined that th e c···ns tructio n of a new smaller l'nk combined with the relocation of the existing tank is more economic than building a single larger tank.
Appropriate construction methods will be incorporated to minimize disturbance on the hillsid e and provide an effective
foundation and access route to th e proposed infrastructure improvements.
Water Distribution
A 10 " water main is required to extend from the tank into the developme nt with 8" water mains distributing the water through
the development and 6" mains to fire hy drants. Individual homes will utilize 1" water servi ce taps. The existing 6" water
service to Springridge Phase I will be connec ted to the 10" line from the tank at the intersectio n with Dry P ark Road.
The proposed new lines are adequate to provide 1500 gpm fire flows to all fire h ydrants located within the Springridge
Reserve deve lopment. Connection of Springridge Phase I to the new s torage tank will improve the fire flows to all the
existing fire hydrants located in this development. The Lots 1 thru 5 in Springridge Reserve will have taps connected to the
existing water main that serves Springridge Phase I where it runs para llel along Dry Park Road .
Water Phasing Plan
Sopris Engineering re commends that the water storage tanks and well be c o nstructe d during the first phase of development.
The wate r distribution piping throughout the development will follow the phasing of the de ve lopment. All piping to serve 29
lots (6 , 7-29 & 44-48) will be constructed during Phase I. In addition the water line in Elk Ridge Drive will also be
constructed to provide water to the sewer lift station. During Ph ase II co nstruction additional water piping will be installed to
serve 27 lots (30-43 & 49 -6 1). Phase III piping will interconnect the loop on Hidden Valley Drive and provide service to 20
lots (62-81). Phase IV construction will consist of providing taps on the existing water line to prov ide service to 5 lots (1-5).
All water sys tems will be designed installed and tested to meet the requirements of the Colorado Departme nt of Heal th.
Sewer System
Gra v itv Se\ver Svstem
Pat Fitz gerald
July 6, 200 4
Page 3 of 5
The proposed 81 lo ts will be served by a c e ntral 8 " g ravi ty s ew er sys tem, which w ill tie in Lo a lift s tati o n locate d in th e ope n
space across from lots SO and 81. The majorit y of the gravity s ewer line s and manho le s will be locate d wi thin the road ri g ht
of way. To provide interconnection some of the sewer line s will cro ss o pen s pa c e .
Forced Sewer Svstern
The lift station will pump the sewage through a 3" forced main line ap proximately 3 .7 mile s (1 9,400 f ee t) to a connection to
the Glenwood Springs sanitary sewer at the Fourmile Ranch Subdivi sio n. The concept of the proposed system is delinea te d
on the attached plan. The forced main will be installed parallel to the g ravity in utili ty easements within Springridge Re s erve
to Dry Park Road. On Dry Park Road the forced main will run down the north side of the as phalt with clean out manhole
provided where the forced main enters the Dry Park Road right of way. Sopris Engineering recommends that the forced
sewer main be installed within the gravel shoulder or existing paveme n t if no shoulder exis ts along Fourmile Road. This
location will place the centerline of the forced main generally within the road bench approximately 4 feet east of the break
point (edge of asphalt or shoulder). See drawing detail for clarification . Traffic control/interruptions and length of
construction period was a big factor in forced main location. We beli eve this location will minimize the impacts on traffic.
Examination of the existing utilities along Fourmile Road indicate th a t they are located outside of the pavement on each side
of the road except for road crossings s o the edge of road installation should also minimize conflicts with the utilities . We
have proposed cleanout manholes be installate d every 2,500 feet min i mum to be able to remove any blockage in the for ce d
main .
(he count~ Road Cut Sp~cial Pro:ision Permit s?ecifies tha: the Co~~t y Comm_is ~ioners must ~pprove an~ i~stallation over
,000 feet 111 length . The 111format10n requested for the Special Prov1s10ns Permit 1s rncluded with the Prehmrnary Plan
Drawings. We are asking that the County Commissioners approve th e Road Cut permit for the extended Forced main as part
of the PUD Application.
Lift Station
The average daily sanitary sewer flow was calculated to be 20 ,250 gal/day at build out. The sewer lift station will be required
to handle the peak flow of 30,375 gal/day, 1.5 times the average. The lift station will be equipped with two pumps for
redund ancy. Each pump will be capable of pumping the full flow requirement. The lift station within the development is
proposed a t a finish floor elevation of 6396.5, the high point of the forced main at Dry Park and Fourmile intersection is an
elevation of 6488 and the discharge to gravity 19 ,372 lineal feet away is at an elevation of 6022. The pump pressure
necessary to over come head loss and friction losses to the high point a t Fourmi!e Road and Dry Park Road is 120 psi. From
the high point to discharge into the Glenwood Springs gravity sewer sy stem at Fourmile Ranch the head gain of 466 feet
down hill will over come the friction loss within the pipe. The forced main has been sized at 3" to balance the head loss,
friction loss, flow velocity (4.5 ft/sec) and head gain for a proposed flow rate of 100 gallon per minute . Normal sewage
inflow will require th at the pump operate for a tota l of 3.4 hours per d ay. The volume of the 3" line is 7087 gallons, which is
approxima tel y 35% of the daily storage volume.
The lift station tank has been sized to hold a volume of 5445 gal up to the flow line of the gravity sewer in a (8' x 14")
rectangular concrete tank. The volume contained within the tank is equal to approximately 25 % of the average daily volume.
The tank will be completely buried underground, the pumps and control system will be mounted on top of the tank and
enclosed within small building that will protect the lift station and allow maintenance. Emergency power backup for the lift
station was required as part of the conditions for approval. We have p ro posed a pump system that uses natural gas for back up
power however it could use propane. It is proposed that the entire lift station will be a design build . Controls will be
designed to pump the sewage when the normal full level is reached . Should a peak ev e nt occur that one pump cannot ke ep up
lith; the second pump will be programmed to start and double the fl ow out of the tank. Should all sys tems, alarms and
'1ckup power fail, the lid elevation of the tank is lower than the lowes t proposed finished floor of any lot.
Sewer Phasing Plan
Pat Fitzgerald
July 6, 2004
Page 4 of 5
The sewe r system will follow the pha si ng p lan proposed for the overall proj ect. The forced main from the lift s tatio n to
di sc harg e point at Fourmile Ranch and the Lift station will be constructed durin g Phase I. The s ewer ma in and sewe r service
to 29 lots (7-29 & 4 4-4 8), sew e r lin e across Res e rve Area "B " wi ll be co ns tructed d ur ing Phase I. The sewe r main and
service lines to 27 lo ts (6, 30-43 & 49-61) \Vi l! be co n structed dur ing P hase II. The sewe r main and sewe r se rv ic e lines to 20
lo ts (62-81) will be constructed during Phase III. The sewe r mai n and sewe r service lines to 5 lots (1-5) wi ll be co ns tru cted
du rin g Phase IV. All sewer mains shall terminate at a se\ve r manhole at the comple tio n of eac h phase . All sanitary systems
shall be designed installed and tested to meet th e requirem e nt s of th e Colorado Department of H ea lth.
Irri!wtion System
•
The existing irrigation sys tem which receives raw water from the (A tki n son Ditch) flows along t he sout h sid e of Dry Park
Road to th e entrance to Springridge Pha se L Spring Ridge Road, where it crosse s Dry Park Roa d . The ditch sys tem continues
from thi s point in a se ries of s malle r d itches a nd laterals through the project providing flood irrigation to th e ex isting fields
within the project.
W e have proposed that the Atkinson Ditch be pip ed in a 24 " pipe from the di ve rsion weir at Four Mile Road and Dry Park
Road intersection to th e point w h e re it crosses Dry Park Road at Springridge Drive . The existing di ve rsio n to provide
irrigation water to Springridge Phase I will be reconnected to the pip ed ditch at this point. Th e 24" p ipe will continue along
the east s ide of Dry Park Road until it reaches the boundary between lo ts 11 and 12 where a Diversion manhole will be
constructed. Surface drainage from the hills above that were hi storically collected in th e irri gation di tc h will be allowed to
lllnter th e 24" pipe at specific locations. The irrigatio n ditches beyon d lots 11 a nd 1 2 will no longer be req uired and will be
IJb andoned.
The Diversion manhole will have o n e 12" irrigation o utl et and a 24" overfl ow. The 12" irrigation pipe will route water to the
existing fields that are to remain and to des ignated Lots. Irrigation ri se rs will be provided at open channel lateral location s
placed within the pastureland to flood irrigate this land more efficiently th a n the present system. A winter drain will be placed
at the low point on the 12" irrigation pipe within the pa st ur eland. On ly 27 designated Lots (8-20, 41-50, 62, and 67-69) that
are within th e area of existing irrigated fields will be allowed to co nn ect to th e irrigation sys tem. Irrigation laterals will
extend from the 12" main line to each of these designated lots. Lot own e rs will have to provide their own irrigatio n system.
The 24" overflow will parall e l the 12" line to the pastureland and day ligh t in an open discharge . We anticipate th a t the
overflow will route large r storms along the historic p a th. Constructio n of all irrigation improvements w ill be accomplished
during the first phase of development.
Flood Plain
The entire site is excluded from the limits of the FEMA 100-year flo o dplain zone. The site does not contain any active
streams except for the existing irrigatio n ditches. Garfield County Flood plain Special Use Permitting is not applicable to this
site.
Drainage
Attached drainage study dated June 17, 2004 discusses the proposed site draina ge . The drawings s ho w the installation of 6
detention b as ins to control the s urface runoff from a 25 and 100-year sto rm. The detention basins effectively control this
runoff so that the 100-year peak runoff of 95 CFS historical rate will be reduced to 21 CFS post development leaving the site.
~Road Design
Pat Fitzgerald
July 6, 2004
Page 5 of 5
The existing Co u nty Road 125 (Dry Park Road) will be improved to the e n trance of the d evelo pment. The road
improvement will be designed as a minor collector with 12 ' Jan e widths, 6 ' shoulders and 6' bo rrow di tc h. All necessary
drainage imp rovements will be mad e with the add i tion of c ul verts to route storm water to th e proposed detention b asins.
Based on th e estimated Vehicle tr ips per day, the interior s ubdi vis ion roads will be d esigned as Secondar y Access roads. The
minimum right-of-way will be 50 ' with 11 ' Jane w idths, 4' shoulder w idth s and 6 ' borrow ditch . The Road design will be in
accordance with Garfield Cou nty Stre et and Roadway design standards how eve r roads w ill b e owned and maintained by the
HOA.
Roads will be constructed in accordance with the phasing plan. Phase I will require construction of all improvements to Dry
Park Road, Spring View Drive, High Point Drive, Sopris Way, Elk Ridge Drive, Wa te r Tank R oad a nd Hidd e n Valley Drive
from lot 44 to the intersection with Elk Rid ge Drive. Ph ase II wi ll re q u;r e the continued construction of Hidden Valley Drive
from lo t 44 to lot 50. Phase III will requir e the continu e d construction of Hid d en Valley Drive from lot 50 to the inte rsection
with Elk Ridge D rive. Phase IV will req u ire construction of the dri veways to lots 1 thru 4.
Pede strian Trails
P e d es trian trails are provided around a ll the major interior roads. These tra ils will be 8 feet wide and soft surfaced . An
additional nature trail will be provided beginning at lot 5 1 and end ing a t lot 68 through th e und eveloped a re a to th e south of
the project. This nature trail will be confined to betwee n 18 and 24 inc hes in width and will be constructed out of th e existin g
rock and soil within the area of the trail surface. This trail will have restricted use as described in th e PUD application, so as
~ot to impose on the wild life. Proper drainage for the tr ai l will need to b e inco rp ora ted in the field based up on site -spec ific
J:onditions.
If you have any questions or need any additional information please give me a cal l.
DRAINAGE STUDY
FOR
SPRINGRIDGE PLACE PHASE II PUD
COUNTY ROAD 125
GARFIELD, COLORADO
PREPARED FOR:
THE GREENWALD CHILDREN'S TRUST
C/O GLENWOOD BROKERS, LTD . --
ATTN: PAT FITZGERALD
P .O. BOX 1330
GLENWOOD SPRINGS, COLORADO 81602
SUB1\1ITTED TO :
GARFIELD COUNTY BUJLDING & PLANNING DEPARTMENT
109 gm STREET, SUITE 100-C
GLENWOOD SPRINGS, COLORADO 81601-3360
John E. Kornfeld, P .E.
PREPARED BY:
Sopris Engineering, LLC
502 Main, Su it e A3 .
Carbondale, CO 81623
SE Job No. 20102.02
May20, 2002
Revised June 17, 2004
502 Main Street • Suite A3 • Carbo_ndale, CO 81623 • (970) 704-0311 • Fax (970) 704-0313
SOPRIS ENGINEERING LLC civil consultants
TABLE OF CONTENTS
SECTION 1.0 INTRODUCTION AND PURPOSE 3
SECTION 2.0 EXISTING DRAINAGE CONDITIONS 3
2 .1 Onsite Hydrologic Conditions 3
100-Year Floodplain Affecting Onsit e Development 4
Existing Runoff Rates 4
2.2 Offsite Hydrologic Conditions 5
SECTION 3.0 DEVELOPMENT DRAINAGE PLAN 5
Grading and Finished Floor Elevations of Permanent Structures 7
Detention 7
Culverts 7
Roadway Ditches 8
SECTION 4.0 ANALYSIS METHODS AND ASSUMPTIONS 8
SECTION 5.0 SUMMARY 8
Exhibit I -Existing Drainage Map (7.5 min quadrangle scale)
Exhibit 2 -Existing Drainage Map (onsite I"= 600 ')
Exhibit 3 -Post Development Drainage Plan
Exhibit 4 -Swnmary of Detention Basins
Exhibit 5 -Stage-Storage-Discharge Data of Detention Basins
Appendix I
Appendix II
Appendix ill
Appendix IV
Appendix V
Drainage Calculations and Hydrologic Data for Existing Conditions
Drainage Calculations and Hydrologic Data for Developed Conditions
Culvert Calculation Worksheets
Ditch Hydraulic Capacity
Rainfall Intensity -Duration -Frequency Curves
2
1.0 INTRODUCTION AND PURPOSE
Springridge Phase II is located in Garfield County, about 5 miles south and west of Glenwood
Springs, Colorado. The proposed development lies along County Road 125.
The planned development consists of eight-one (81) si ngle family lots. The lots range from 1 acre
to more than 4 acres in size . Six lots lie "uphill" (west) of County Road 125, and the remaining
lots are located east of County Road 125, which lie in the "flatter" areas of the site. Additionally,
the developed site includes significant open areas . The total area of the subject property is
approximately 483 acres.
Based on the location of this development and the proposed activity, the purpose of the drainage
study is three-fold:
• First, to estimate the stormwater peak runoff rates that may be expected due to
development. Pre-development is defined as the existing condition prior to any
development construction. Post-development is referred as the Springridge Place
Phase II with all Jots developed with infrastructure roadways.
• Second, to provide detention for any increase in developed peak runoff rates above
the historic peak runoff rates, such that stormwater leaving the site does not increase.
• Third, to meet compliance of approved drainage standards per Land Use Regulations
for Garfield County.
2.0 EXISTING DRAINAGE CONDITIONS AND FEATURES
Onsite Hydrologic Conditions
The subject site consists of 483 acres. The parcel generally consists of undeveloped property
with native vegetation and irrigated pasture . Existing vegetation consists predominately of
sagebrush in the valley areas and pinyon-juniper woodlands on the steeper slopes and ridgetops .
The flatter areas near the center of the site consist of irrigated pasture. Other than County Road
125, there are not any improved roads across the property. See Exhibit 1 -Existing Drainage
Map.
Several irrigation ditches are located on the site. The Atkinson Ditch is proposed to be piped
through the development.
The overall land slopes from south to north. Slopes vary from more than 30 percent on the
sideslopes to about 2 percent in the flatter valley areas . The central portion of the site is
characterized as a 'gently sloping valley bottom'. In contrast, the south, west and east sides have
steeper slopes.
Soils in the area are quite variable. According to the geotechnical study entitled "Preliminary
Geotechnical Study, Proposed Springridge Place Phase II, County Road 125, Garfield County" by
3
'~,·, . ·. \
ti : · .. ; ri
(i ~-\;( ..
:''\ . ·-.........::::. j; \ : ( .... '·
: \ · 1 : \. :
fQ)\ \I_,
~I · .. \{.
(!)1 '-" \~
r;:/ \ ~-!-~.
Q:J ~-
/ '\· ~ ..
~\ ~
I
I
HP Geotech, dated February 26, 2001 , the valley bottoms have about 1 to 1 Yz feet of surface soils
that are medium textured . The subsoils are variabl e in depth, d ep e nding on the position on the
slope. Areas that are steep and rocky have an overall soil depth that is shallow to moderately
deep . However, the soils in the valley bottoms are very deep to bedrock, i.e., greater than 60
inches in depth. According to the geotechnical engineer, groundwater is usUally more than eight
feet below the surface .
100-Year Floodplain Affecting Onsite Development
Although this site is not affected by a 100-year floo dp lain of any major drainage, several small
ephemeral stream channels occur within the project site that merit attention as to potential
flooding along the drainages .
Likewise, small alluvial fans also occur near the eastern portion of the site. The geotechnical
engineers identified several small alluvial fans occur for several of the lots at the mouth of several
drainages .
Existing Runoff Rates
Four drainage basins are identified across the site. The principal drainage basin, Basin 1,
encompasses most of the site. This drainage area includes significant offsite drainage from the
south. The second drainage area occurs in the extreme northeast corner of the site, which
combines with the larger drainage immediately north of the property. A third drainage area lies
along a pronounced ridge that drains offsite to the west. Lastly, a fourth drainage area lies in the
extreme northwest corner of the property and drains o ffsite . No development is proposed for the
three smaller basins, as these areas are proposed as open space with no surface disturbance.
Runoff curve numbers '51' and '58' represent the m aj ority of the existing hydrologic conditions .
Curve number '51' represents sagebrush (with grass understory) in fair condition with "B"
hydrologic soils. Curve number '58' represents piny on-juniper woodlands in fair condition with
"B" hydrologic soils. The sagebrush areas generally occur in the central portion of the site on the
flatter slopes, whereas the pinyon-juniper woodland areas occur on the steeper slopes and
ridgelines. These values are representative of the existing vegetative composition and density, as
well as the gravelly and cobbly soils along the flood p lain of the Roaring Fork River.
The time of concentrations for the stormwater to travel from the most hydraulically remote part of
the site to the point of concentrations varies from 5 7 minutes for the large watershed to less than
10 minutes for the smaller drainage basins. The time of concentration consists of sheet flow,
shallow concentrated flows, and channelized flow. P lease refer to Section 4.0 Analysis Methods
and Assumptions for the details pertaining to the methods and input parameters .
The peak discharges generated onsite for the 25-year and 100-year design storms are :
Drainage Area
Basin IA
Basin lB
Combined Basin 1
Basin 2
Basin 3
Basin 4
25 Year -24 Hour
Design Storm (cfs)
16
4
20
0
2
0
4
100 Year-24 Hour
Design Storm (cfs)
74
24
95
4
8
2
Hydrologic data calculations for the existing conditions are included in Appendix I. Exhibit 2
also shows additional detailed information for existing onsite drainage.
Two of the smaller basins produce less than 1.0 cfs of runoff during the 25-year design storm.
This is due to the pervious soils, the vegetative cover, and the small drainage area.
The southern boundary of Springridge Phase I development coincides with the north boundary of
Springridge Phase II development. Two existing residences along the southern boundary of
Phase I lie near the flow line of the natural drainage way of runoff leaving Phase II. Based on the
existing peak runoff rates from Phase II, the finish floor elevations of the two structures do not lie
significantly higher than the existing elevations of the swale where runoff enters Phase I.
Offsite Hydrologic Conditions
The site is affected by off site stormwater from the south and east of th~ site. The offsite drainage
basins consist of natural conditions, are undeveloped, and have similar hydrologic characteristics
as the basins within the project site. The drainage basin areas and peak runoff rates are listed
above in the 'Onsite Hydrologic Conditions'. Basin IA is the offsite contribution of Basin 1.
3.0 DEVELOPMENT DRAINAGE PLAN
Access roads will link the residential development with County Road 125 . Roadways are
planned to be paved with ditches constructed on each side of the roadway to convey stonnwater
runoff from the lots and roads. The conveyed stormwater will then drain to the proposed
detention basins, where detention will be provided to reduce peak runoff rates and accommodate
additional stormwater volumes generated from development.
The development consists of 81 lots. Lot sizes range from about one acre to more than four acres .
Remaining areas of the proposed development include undisturbed open areas and roadways.
Refer to Exhibit 3 -Developed Drainage Plan.
Due to the size of the lots, a majority of the surface area within each lot will remain in the native
state. To estimate runoff potential with development, several assumptions are necessary to
quantify stonnwater increases. The assumptions are described below.
Roof Area
Driveway = 18' x 50'
Sidewalk = 3' x 60'
Patios = 12' x 12' and 10' x 10'
Total hnpervious
Grass/Landscaping = 50' x 50' (front)
= 3,000 SF
= 900 SF
= 180 SF
= 244 SF
=4,324 SF
plus 50' x 30' (rear) = 4,000 SF
Curve Number 98
Curve Number 70
Natural (assume one acre lot -so, 35,236 SF = 35,236 SF Curve Number 51
So, 35,236 SF remaining)
5
)
'
/
<= DIRECTION OF SURFACE DRA INAGE
BASIN IB DRAINAGE BASIN DESIGNATION
EXHIBIT 2
EXISTING DRAINAGE
GRAPHIC SCALE
0 300 600 1200
(INFUT)
I inch = 600 ft.
.. Wt CN per lot= 57.4 Use 58
Lots larger than 1 acre will result in a slightly lower curve number than 58.
The developed weighted curve number can then be compared with the existing curve number to
measure the increase in peak runoff rates with development. Calculations for the stonnwater
increase with development are located in Appendix II.
The site is divided into sub-drainage basins. Runoff from each sub-drainage area will drain into
one or more detention basins before leaving the site to the north.
Below are the peak runoff rates after development .
Identifying Drainage Area 2 5 Year -24 Hour 100 Year-24 Hour
No.* D esign Stonn (cfs) Design Storm (cfs)
I Offsite Basin IA 16 74
2 Detention F 13 68
3 Area 19 0 1 4 Combined (2 and 3) 13 69
5 Detention E 10 27
6 Area2 1 3
7 Area6 1 3 .. 8 Combined ( 6 and 7) 1 6
9 Detention A 0 2
IO Area3 1 6 11 Area 7 0 2
12 Combined (I 0-11) 1 8
13 Area8 0 I 14 Area9 0 I
15 Combined (12, 13 and 14) 2 10
16 Area 10 0 0
17 Combined (15 and 16) 2 10
18 Combined (5 and 17) 11 30
19 Detention B 7 27
20 Area4 2 7 21 Area 11 0 1
22 Combined (20 and 21) 2 8
23 Area 15 0 0
24 Area 16 0 0 25 , Combined (22-24) 2 8
26 Area 12 0 0
27 Area 13 0 0 28 Combined (26-27) 0 I
29 Area5 2 9
30 Area 14 0 0 31 Combined (29-30) 2 9 .. 32 Combined (28 and 31) 2 10
33 Combined (25 and 32) 4 18
34 Area 17 0 1
35 Combined (33 and 34) 4 19
6
..
..
..
36 Combined (19 and 35) 8 28
37 Detention C 5 23
38 Area 18 1 3
39 Combined (37 and 38) 5 24
40 Detention D 4 21
* Used to identify the routing and sequence of drainage areas involved in column 2 .
Caution should be used with reference to the 100-year peak runoff rates from the detention
basins. Once significant overtopping of the detention basin spillway occurs, the modeling may
not be accurate. The primary purpose of the 100-year peak runoff rates is to compare the runoff
potential of the individual drainage basins .
Grading and Finished F1oor Elevations of Permanent Structures
"The grading plan for the subdivision should consider runoffthroug}I_the project and at
individual sites." All structures should be located above of the 100-year floodplain . All finished
floor elevations of structures in the project will be above the 100-year water surface elevation.
The general drainage plan includes establishing a minimum top of foundation elevation at least
1.0 feet above the highest adjacent grade of the structure.
Detention
To compensate for the increase in runoff potential from development, detention basins are
proposed to temporary store the increase in stormwater volumes and reduce the peak flow
downstream.
Six (6) detention basins are proposed. Exhibit 4 shows the detention basins, elevations, low and
mid flow orifices and elevations, grate elevations, and spillway elevations. Also included are the
volumes and the water surface elevations for the 25-year and 100-year design stonns.
The volume of each basin is based upon variable depths and sideslopes . Exhibit 5 shows the
stage-storage-discharge relationship of each detention basin.
The above basins will retard runoff sufficiently to reduce historic peak runoff rates leaving the
property with development. This is evident upon a comparison of existing and developed runoff
rates . For example, compare the existing (historic) rat e of 20 cfs from Basin 1 with the outflow
from Detention Basin D (4 cfs). Similarly, the 100-year peak is reduced from 95 cfs to 21 cfs
leaving the site at the north boundary. This will sign i ficantly benefit downstream hydraulic
conditions when major storms larger than the 25-y ear event occur.
Culverts
The minimum culvert size for roadway crossings is 15-inch, except for a proposed 12-inch
culvert for the roadway accessing the water tank . Eighteen to thirty-six inch culverts are
proposed for the roadways crossing the center of the s ite where the offsite drainage from the
south drains through the property. All proposed culvert sizes will maintain a headwater depth
about equal to the culvert diameter. Appendix ID has culvert calculation worksheets for the 15-
inch, 18-inch, 24-inch, 30-inch, and 36-inch diameter sizes.
7
I I
EXHIBIT4
SUMMARY OF DETENTION BASINS, WATER SURFACE ELEVATIONS, & OUTLET STRUCTURES
Detention Elevation Elevation Outlet Pipe Low Flow Orifice Low Flow Mid Flow Orifice Mid Flow Grate
Basin at Bottom at Top Dlemeter Size (In) Diameter Size (In) Orifice Elevation Diameter Size (In) Orifice Elevation Elevation
A 6542.0 6546 .0 8 8 6542 .0 NA NA NA
B 6422 .0 6426 .0 30 2·10" Openings 6422 .0 3· 1 O" Openings 6423 .5 6425 .5
c 6396 .0 6400.0 24 12 6396.0 3·10" Openings 6398 .0 6399.5
D 6388.0 6392 .0 24 8 6388.0 3-1 O" Openings 6390 .0 6391 .5
E 6439.5 6444 .0 30 2-10" Openings 6439 .5 3-10" Openings 6440 .5 6443 .. 5
F 6472 .5 6476 .0 36 3-1 O" Openings 6472 .5 3-10" Openings 6473 .0 6474 .9
Nole : All spillways lo be constructed 0 .50 feel below the top or embankment.
Q25 Historic Leaving Site = 20 cfs 025 peye/ooed Leaving Site • 4 cfs
Q100 Historic Leaving Site= 95 cfs Q100 Deyeloped Leav/na Site• 21 cfs
Detention Volume Available 25 Year Water Approximate Vol 100 Year Water Approximate Vol
Basin Approx (cf) Surface Elevation Used (cf)· 25 Year Surface Elevation Used (cf) ·100 Year
A 46,003 6542 .46 4,000 6543 .54 14 ,000
B 237 ,662 6423.57 61 ,000 6424 .87 144,000
c 294 ,559 6397 .72 83,000 6399 .65 257 ,000
D 208,994 6390.24 83,000 6391 .81 183,000
E 254,450 6440.88 39 ,000 6443 .90 253 ,000
F 104,258 6472 .63 28 ,000 6476 .01 104 ,000
# # #
EXHIB/T5
STAGE-DISCHARGE DA TA
SPRINGRIDGE PHASE II DEVELOPMENT
Stage • Discharge Curve for Det•ntlon A
Orifice Grete
Ef1M1tlon H .. d Arel 8"(•2 NoofPl~s O(cf•l Heed Are110· No of Pl~ O(cfsl Tot1f Q (tf•l Head Q (cf•l Total Q (cf•l
6542.0 0.0 0.348 1 0.000 0.0 0 0 0.000 0.000 0 0.000 0.000
6543.0 1.0 0 .348 1 1.878 0.0 0 0 0.000 1.676 0 0 .000 1.676
6544.0 2.0 0.348 1 2.370 0.0 0 0 0.000 2.370 0 0.000 2.370
6545.0 3.0 0.348 1 2.902 0.0 0 0 0.000 2.902 0 0 .000 2.902
6546.0 4.0 0 .348 1 3.m 0.0 0 0 0.000 3.351 0 0.000 3.351
Stage • D/1charge Curve for Detention B
Orifice Grate
Ele't18tlon Head Area 10" (•Q No of Pie!!_ O(cf•l Hoed Arllt 10" NoofPl~s O(cfsj Total Q (cfsl He act Q (cfSl Total Q (cfs/
6422.0 0.0 0.545 2 0.000 0.0 0.545 3 0.000 0.000 0.0 0.000 0 .000
8423.0 1.0 0.545 2 5.248 0.0 0.545 3 0.000 5.248 0.0 0.000 5 .246
6423.5 1.5 0.545 2 8.428 o.o 0.545 3 0.000 8.428 0 .0 0.000 6.428
6424 .0 2.0 0 .545 2 7.422 0.5 0.545 3 5.567 12.989 0 .0 0.000 12.989
6424.5 2.5 0 .545 2 8.298 1.0 0.545 3 7.873 18.171 0.0 0.000 16.171
8425.0 3.0 0 .545 2 9 .090 1.5 0.545 3 9.842 18.732 0.5 12.017 30.750
Stage • Dl1ch1rge Curve for Detention C
Orifice Grate
Elrntfon Head Are112• (•Q No of Pie!!_ O(cf•l Head An• 10" No of Pie.es O(cfsj Tottl Q (cfsl Head Q(cf•l Total Q (cfsl
8398.0 0.0 0 .785 1 0.000 0.0 0.545 3 0 .000 0.000 0.0 0.000 0 .000
6397 .0 1.0 0 .785 1 3.780 0.0 0.545 3 0.000 3.780 0 .0 0.000 3.780
6396.0 2.0 0 .765 1 5.345 0.0 0.545 3 0 .000 5.345 0 .0 0.000 5.345
6399.0 3.0 0.765 1 8.547 1.0 0.545 3 7.873 14 .419 0.0 0.000 14 .419
6400.0 4.0 0 .765 1 7.560 1.0 0.545 3 7.673 15.432 0 .5 12.017 27.449
Stage. Dlscharg• Curve for Detention D
Orifice CJrate
Elevatlon Heed Ant 8"(•2 No of Pie." Q (Cf•j Hetd Arw110• NoofPlf!!.• Q(cf•l Total Q (cf•l Head Q (•fsl Totel Q (cf•l
6386.0 0.0 0.346 1 0.000 0.0 0.545 3 0.000 0.000 0 .0 0.000 0.000
8369.0 1.0 0 .346 1 1.676 0.0 0.545 3 0.000 1.679 0.0 0 .000 1.676
8390.0 2.0 0 .346 1 2.370 0.0 0.545 3 0.000 2.370 0 .0 0 .000 2.370
8391.0 3.0 0.346 1 2.902 1.0 0.545 3 7.673 10.775 0 .0 0.000 10 .775
6392 .0 4.0 0.346 1 3.351 1.0 0.545 3 7.873 11 .224 0.5 12.017 23.24 1
Stage • Discharge Curve for Detention E
Or/flee CJ rate
El1M1tlon Heed Arw110• (•2 No of Pl~ Q (•'•1 H11d Arw110· NoofPlf!!.• O(cfsl Total Q (•'•l ·Heed Q (cfsl Totat Q (cfsl
6439.5 0 .0 0 .545 2 0.000 0.0 0.545 3 0.000 0 .000 0.0 0.000 0.000
6440.0 0.5 0.545 2 3.711 0.0 0.545 3 0.000 3.711 0.0 0.000 3.7 11
6440.5 1.0 0 .545 2 5.248 0 .0 0.545 3 0.000 5.246 0 .0 0.000 5.248
8441 .0 1.5 0.545 2 8.428 0.5 0 .545 3 5.567 11 .995 0.0 0.000 11 .995
6442.0 2.5 0.545 2 8.298 1.5 0.545 3 9.842 17.940 0.0 0.000 17.940
8443.0 3.5 0.545 2 9.819 2.0 0 .545 3 11 .1 33 20 .952 0.0 0.000 20.952
6444.0 4.5 0.545 2 11 .133 2.0 0.545 3 11 .133 22 .287 0 .5 5.000 27 .267
Stage • Discharge Curve for Detention F
Orifice Grate
Elevatlon Head ArHfO" No of Pl~ Q (cf•l Head Arw110· No of Pl~ Q(cfsl Toto/ Q (cf•1 Hoed Q(cfsl Tot•I Q (e's/
6472.5 0 .0 0 .545 3 0.000 0.0 0.545 3 0 .000 0.000 0.0 0.000 0.000
8473.0 0 .5 0 .545 3 5.597 0.0 0.545 3 0.000 5.567 0.0 0.000 5.567
8474.0 1.5 0 .545 3 9 .842 1.0 0.545 3 7.673 17.514 0 .0 0 .000 17 .514
8475.0 2.5 0 .545 3 12.448 2.0 0 .545 3 11 .133 23 .561 0 .1 1.075 24 .656
6475.5 3.0 0 .:545 3 13.636 2.5 0.545 3 12.448 26 .083 0 .0 15.797 41 .860
6476.0 3.5 0.545 3 14.726 3.0 0 .545 3 13 .638 28.384 1.1 39.214 67.578
..
..
..
Roadway Ditches
Developed flows across the site that drain to the roadway ditches will be contained in the ditch
section. The ditches are proposed to be 2 feet deep with 3 to 1 side slopes. For a 1 % slope, the
capacity of the ditch is 57.3 cfs. This capacity exceeds all of the above peak rates. Appendix IV
has the hydraulic calculations of the ditch at several longitudinal slopes .
4.0 ANALYSIS METHODS AND ASSUMPTIONS
The NRCS TR55 method was used for the time of concentration calculations and the curve
numbers. HEC-1 was used to estimate peak runoff rates.
The design stonns used for this analysis include the 25-year and the 100-year frequency events,
based on the 24-hour duration. The precipitation data is based on the Hydrain-Drainage Design
Systems, of the Federal Highway Administration. A copy of the precipitation data is included in
Appendix V .
Runoff curve numbers used to calculate the peak discharges include the following:
Surfuce Type
Existing Sagebrush with Fair Condition
"B" hydrologic soils
Existing Pinyon-Juniper Woodlands
With Fair Condition "B" hydrologic soils
Turf and Landscape Areas (Average)
Proposed Asphalt & Impervious Surfaces
5.0 SUMMARY
Curve Number
51
58
70
98
The results from this drainage study suggest that no long-term, adverse impacts to drainage are
anticipated with the development of the Springridge Phase II Development.
Onsite peak discharges will increase slightly with development. The additional increase in
stormwater volumes will be provided in the proposed detention basins.
The proposed detention basins significantly reduce the developed peak rates less than historic
rates . This provides some assistance to the low finished floor elevations of existing structures to
the north in Phase I and subdivision developments further to the north.
Since surface disturbance is proposed only within the building envelope areas and the roadways,
the historical drainage pattern will be maintained. Compliance with Garfield County Drainage
Standards will be adhered .
8
1
, ........ ~ .......................... .
*
*
*
*
I ***************************************
*
FLOOD HYDROGRAPH PACKAGE (HEC-1)
SEPTEMBER 1990
VERSION 4.0
*
*
*
*
* * RUN DATE 04/21/2004 TIME 08:29:37 *
* * *****************************************
*
*
*
*
*
*
*
* U.S. ARMY CORPS OF ENGINEERS *
HYDROLOGIC ENGINEERING CENTER *
609 SECOND STREET * DAVIS, CALIFORNIA 95616 * ( 916) 756-1104 *
*
***************************************
x x xxxxxxx xxxxx x x x x x x xx x x x x x xxxxxxx xx xx x xxxxx x x x x x x x x x x x x x x xxxxxxx xxxxx xxx
THIS PROGRAM REPLACES ALL PREVIOUS VERSIONS OF HEC-1 KNOWN AS HECl (JAN 73), HEClGS, HEClDB, AND HEClKW.
THE DEFINITIONS OF VARIABLES -RTIMP-AND -RTIOR-HAVE CHANGED FROM THOSE USED WITH THE 1973-STYLE INPUT STRUCTURE .
THE DEFINITION OF -AMSKK-ON RM-CARD WAS CHANGED WITH REVISIONS DATED 28 SEP 81. THIS IS THE FORTRAN77 VERSION
NEW OPTIONS: DAMBREAK OUTFLOW SUBMERGENCE / SINGLE EVENT DAMAGE CALCULATION, DSS:WRITE STAGE FREQUENCY,
DSS:READ TIME SERIES AT DESIRED CALCULATION INTERVAL LOSS RATE:GREEN AND AMPT INFILTRATION
KINEMATIC WAVE: NEW FINITE DIFFERENCE ALGORITHM
LINE
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
HEC-1 INPUT
ID ....... 1 ••••.•• 2 ••••••• 3 ••••••• 4 ••.•••• 5 ••....• 6 .•.•.•• 7 .•.•..• 8 ..••... 9 ...•.• 10
ID
ID
ID
ID
SPRINGRIDGE PHASE II DEVELOPMENT
EXISTING CONDITIONS
25-YEAR 24-HOUR DESIGN STORM
ID
*DIAGRAM
IT 5 21APR04
5
1200 300
IO
KK AREA lA
BA 1. 581
PH 0.41 0.78 1.33
LS 55
UD 0. 78
KK AREA lB
BA 0.581
LS 53
UD o. 408
1. 71 1. 86 2.09 2.23 2.32
PAGE 1
7 IO
IT
1
+
+
+
+
+
+
+
I
EXISTING CONDITIONS
25-YEAR 24-HOUR DESIGN STORM
OUTPUT CONTROL VARIABLES
IPRNT 5 PRINT CONTROL
I PLOT 0 PLOT CONTROL
QSCAL 0 . HYDROGRAPH PLOT SCALE
HYDROGRAPH TIME DATA
NMIN 5 MINUTES IN COMPUTATION INTERVAL
I DATE 21APR 4 STARTING DATE
I TIME 1200 STARTING TIME
NQ 300 NUMBER OF HYDROGRAPH ORDINATES
NDDATE 22APR 4
NDTIME 1255
I CENT 19
COMPUTATION INTERVAL
TOTAL TIME BASE
ENGLISH UNITS
ENDING DATE
ENDING TIME
CENTURY MARK
.08 HOURS
24 .92 HOURS
SQUARE MILES
INCHES
FEET
DRAINAGE AREA
PRECIPITATION DEPTH
LENGTH, ELEVATI ON
FLOW CUBIC FEET PER SECOND
STORAGE VOLUME
SURFACE AREA
TEMPERATURE
ACRE-FEET
ACRES
DEGREES FAHRENHEIT
FLOW IN
RUNOF F SUMMARY
CUBIC FEET PER SECOND
TIME IN HOURS, AREA IN SQUARE MILES
PEAK TIME OF AVERAGE FLOW FOR MAXIMUM PERIOD
OPERATION STATION FLOW PEAK
6-HOUR 24-HOUR 72-HOUR
HYDROGRAPH AT
AREA 1 16. 13. 75 8. 2. 2.
HYDROGRAPH AT
AREA 1 4. 13.42 2. o . 0.
2 COMBINED AT
COMB IN 20. 13.67 9. 3. 3.
HYDROGRAPH AT
AREA 2 0. 13.08 0. 0. o.
HYDROGRAPH AT
AREA 3 2. 12. 75 1. 0. 0.
HYDROGRAPH AT
AREA 4 0. 13.00 '0. 0. 0.
I
BASIN MAXIMUM TIME OF
AREA STAGE MAX ST AGE
f.58
.58
2 .16
.09
.06
. 0 4
TABULAR HYDROGRAPH METHOD Version 2 .00
~ct : SPRINGRIDGE II ~y : GARFIELD State: co
User: JEK
Checked:
Date:
Date:
Subtitle: EXISTING HYDROLOGIC CONDITIONS
Total watershed area: 2.395 sq mi Rainfall type: II Frequency: 25 years
Area ( sq mi)
Rainfall(in)
Curve number
Runoff (in)
Tc (hrs)
(Used)
TimeToOutlet
Ia/P
Time
(hr)
11.0
11.3
11.6
11.9
-12.3
12.4
12. 5
12.6
12. 7
12. 8
13. 0
13. 2
13 .4
13. 6
13. 8
14. 0
14. 3
14. 6
15.0
.15. 5
16.0
16.5
17.0
• 20.0
22.0
26.0
(Used)
Total
Flow
0
0
0
0
0
5
4
2
4
5
8
10
12
14
16P
14
13
12
11
9
8
7
6
6
5
5
5
5
4
4
3
0
P -Peak Flow
--------------------------Subareas --------------------------
lAl lBl 2 3 4 5
1.58* 0.58* 0 .09* 0 .06* 0.04* 0.04*
2.3 2.3 2.3 2.3 2.3 2.3
55*
0.05
1.30*
1.25
0 .00
0.71
0.50
53*
0.03
0.68*
0.75
0.00
0.76
0.50
lAl lBl
0
0
0
0
0
0
0
0
1
2
4
6
8
10
12P
12
11
10
9
8
7
6
5
5
4
4
4
4
3
3
2
0
0
0
0
0
0
0
0
0
1
2
3P
3
3
3
3
2
2
2
2
1
1
1
1
1
1
1
1
1
1
1
1
0
52*
0.02
0.29*
0.30
0.00
0.80
0.50
58*
0.09
0.08*
0.10
0.00
0.62
0.50
54*
0 .04
0.12*
0.10
0.00
0.73
0 .50
55*
0.05
0.08*
0 .10
0.00
0.71
0.50
--
Subarea Contribut ion to Total Flow (cfs)
2 3 4 5
0
0
0
0
0
0
0
lP
1
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
3P
2
1
1
1
1
1
1
1
1
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
lP
1
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
lP
1
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
* -value(s) provided from TR-55 system routines
TIME OF CONCENTRATION AND TRAVEL TIME Version 2.00
~ t · SPRINGRIDGE II ~ : GARFIELD State: co
:ubtitle: EXISTING HYDROLOGIC CONDITIONS
User: JEK
Checked:
Date:
Date:
·-----------------------------Subarea #1 -lAl -------------------------------
1low Type 2 year Length Slope Surface n Area Wp Velocity Time
rain (ft) (ft/ft) code (sq/ft) (ft) (ft/sec) (hr)
iheet 2. 32
ihallow Concent'd
>pen Channel
>pen Channel
50
200
3150
8800
.16
.16
J
u
0.043
0.009
2 0.438
3 0. 815
Time of Concentration = 1.30*
=====
·------------------~----------Subarea #2 -lBl -------------------------------
?low Type 2 year Length Slope Surface n Area Wp Velocity Time
rain (ft) (ft/ft) code (sq/ft) (ft) (ft/sec) (hr)
3heet 2.32
3hallow Concent'd
)pen Channel
50
20
5600
.08
.08
J
u
0.056
0.001
2.5 0.622
Time of Concentration = 0.68*
=====
--------------------------------Subarea #3 -2 -------------------------------
~low Type 2 year Length Slope Surface n Area Wp Velocity Time
rain (ft) (ft/ft) code (sq/ft) (ft) (ft/sec) (hr)
3heet 2.32
3hallow Concent'd
)pen Channel
50
20
2150
.10
.10
J
u
0.052
0.001
2.5 0.239
Time of Concentration = 0.29*
=====
--------------------------------Subarea #4 -3 -------------------------------
~low Type 2 year Length Slope Surface n Area Wp Velocity Time
rain (ft) (ft/ft) code (sq/ft) (ft) (ft/sec) (hr)
Sheet 2.32
Shallow Concent'd
)pen Channel
50
200
450
.27
.27
~nerated for use by TABULAR method
J
u
0.035
0.007
3 0.042
Time of Concentration = 0.08*
----------
TIME OF CONCENTRATION AND TRAVEL TIME Version 2.00
~ct : SPRINGRIDGE II ~y : GARFIELD State: co
User: JEK
Checked:
Date:
Date:
Subtitle: EXISTING HYDROLOGIC CONDITIONS
--------------------------------Subarea #5 - 4 -------------------------------
Flow Type 2 year Length Slope Surface n Area Wp Velocity Time
rain (ft) (ft/ft) code (sq/ft) (ft) (ft/sec) (hr)
Sheet 2 .32
Shallow Concent 1 d
Open Channel
50
100
850
.30
.30
J
u
0.033
0.003
3 0. 079
Time of Concentration = 0 .12*
=====
--------------------------------Subarea #6 - 5 -------------------------------
Flow Type 2 year Length Slope Surf ace n Area Wp Velocity Time
rain (ft) (ft/ft) code (sq/ft) (ft) (ft/sec) (hr)
Sheet 2.32
Shallow Concent 1 d
Open Channel
50
200
400
~ ---Sheet Flow Surface ~ Smooth Surface
B Fallow (No Res.)
C Cultivated < 20 % Res.
D Cultivated > 20 % Res.
E Grass-Range, Short
.27
.27
Codes ---
J
u
F Grass, De n se
G Grass, Bunnuda
H Woods, Light
I Woods, De n se
J Range, Natural
* -Generated for use by TABULAR method
3
0.035
0.007
0.037
Time of Concentration = 0.08*
=====
Shallow Concentrated
Surf ace Codes
P Paved
U Unpaved
RUNOFF CURVE NUMBER COMPUTATION Version 2.00
~ct : SPRINGRIDGE II ~y : GARFIELD State: co
Subtitle: EXISTING HYDROLOGIC CONDITIONS
Subarea : lAl
User: JEK
Checked:
Date:
Date:
---------------------------------------------------------·----------------------
COVER DESCRIPTION
i\RID AND SEMIARID RANGELANDS
Pinyon -juniper fair
Sagebrush (w/ grass understory) fair
Total Area (by Hydrologic Soil Group)
SUBAREA: lAl TOTAL DRAINAGE AREA: 1012 Acres
A
Hydrologic Soil Group
B C D
Acres (CN)
607(58)
405(51)
1012
WEIGHTED CURVE NUMBER: 55
RUNOFF CURVE NUMBER COMPUTATION Version 2.00
~ct : SPRINGRIDGE II ~y : GARFIELD State: co
Subtitle: EXISTING HYDROLOGIC CONDITIONS
Subarea : lBl
COVER DESCRIPTION
ARID AND SEMIARID RANGELANDS
Pinyon -juniper fair
Sagebrush (w/ grass understory) fair
Total Area (by Hydrologic Soil Group)
SUBAREA: lBl TOTAL DRAINAGE AREA: 372 Acres
User: JEK
Checked:
Date:
Date:
A
Hydrologic Soil Group
B C D
Acres (CN)
93(58)
279(51)
372
WEIGHTED CURVE NUMBER: 53
RUNOFF CURVE NUMBER COMPUTATION Version 2.00
~~t · SPRINGRIDGE II ~ : GARFIELD State: co
;ubtitle: EXISTING HYDROLOGIC CONDITIONS
;ubarea : 2
COVER DESCRIPTION
ffiID AND SEMIARID RANGELANDS
'inyon -juniper fair
>agebrush (w/ grass understory) fair
~otal Area (by Hydrologic Soil Group)
)UBAREA: 2 TOTAL DRAINAGE AREA: 60 Acres
User: JEK
Checked:
Date:
Date:
A
Hy drologic Soil Group
B C D
Acres (CN)
1 2(58)
48(51)
6 _0
WEIGHTED CURVE NUMBER: 52
RUNOFF CURVE NUMBER COMPUTATIO N Version 2.00
~ct : SPRINGRIDGE II ~y : GARFIELD State: CO
Subtitle: EXISTING HYDROLOGIC CONDITIONS
Subarea : 4
COVER DESCRIPTION
~ID AND SEMIARID RANGELANDS
Pinyon -juniper fair
Sagebrush (w/ grass understory) fair
Total Area (by Hydrologic Soil Group)
SUBAREA: 4 TOTAL DRAINAGE AREA: 23 Acres
User: JEK
Checked:
Date:
Date:
A
Hydrologic Soil Group
B C D
Acres (CN)
11(58)
12(51)
23
WEIGHTED CURVE NUMBER: 54
RUNOFF CURVE NUMBER COMPUTATION Version 2.00
~ct · SPRINGRIDGE II ~y ; GARFIELD State: CO
Subtitle: EXISTING HYDROLOGIC CONDITIONS
Subarea : 5
COVER DESCRIPTION
ARID AND SEMIARID RANGELANDS
Pinyan -juniper fair
Sagebrush (w/ grass understory) fair
Total Area (by Hydrologic Soil Group)
SUBAREA: 5 TOTAL DRAINAGE AREA: 27 Acres
User : JEK
Checked :
Date:
Date:
A
Hy drologic Soil Group
B C D
Acres (CN)
14(58)
13(51)
2 7
WEIGHTED CURVE NUMBER: 55
' ' -1
!***************************************** ***************************************
1
* * * * * FLOOD HYDROGRAPH PACKAGE (HEC-1) * * U.S. ARMY CORPS OF ENGINEERS * * SEPTEMBER 1990 * * HYDROLOGIC ENGINEERING CENTER * .. VERSION 4. 0 * 609 SECOND STREET
* * .. RUN DATE 06/17/2004 TIME 10:27:25 * * DAVIS, CALIFORNIA 95616 *
* ( 916) 756-1104 *
* * * * ***************************************** ***************************************
x x xxxxxxx xxxxx x x x x x x xx x x x x x xxxxxxx xx xx x xxxxx x x x x x x x x x x x x x x xxxxxxx xxxxx xxx
THIS PROGRAM REPLACES ALL PREVIOUS VERSIONS OF HEC-1 KNOWN AS HECl (JAN 73), HEClGS, HEClDB, AND HEClKW.
THE DEFINITIONS OF VARIABLES -RTIMP-AND -RTIOR-HAVE CHANGED FROM THOSE USED WITH THE 1973-STYLE INPUT STRUCTURE.
THE DEFINITION OF -AMSKK-ON RM-CARD WAS CHANGED WITH REVISIONS DATED 28 SEP 81. THIS IS THE FORTRAN77 VERSION
NEW OPTIONS: DAMBREAK OUTFLOW SUBMERGENCE , SINGLE EVENT DAMAGE CALCULATION, DSS:WRITE STAGE FREQUENCY,
DSS:READ TIME SERIES AT DESIRED CALCULATION INTERVAL LOSS RATE:GREEN AND AMPT INFILTRATION
KINEMATIC WAVE: NEW FINITE DIFFERENCE ALGORITHM
LINE
1
2
3
5
6
7
8
9
10
11
12
13
14
15
16
17
HEC-1 INPUT
ID ....... 1 ....... 2 ....... 3 ....... 4 ....... 5 ....... 6 ....... 7 ....... 8 ....... 9 ...... 10
ID
ID
SPRINGRIDGE II DEVELOPMENT
DEVELOPED CONDITIONS
ID 25-YEAR 24-HOUR DESIGN STORM
ID
*DIAGRAM
IT
IO
5 17JUN04
5
KK AREAlA
BA 1. 581
PH
LS 55
UD 0. 78
Kl< DETENTION F
KM 3-10" LOW LEVEL
KM 3-10" MID LEVEL
1200 300
o. 41 0. 78
DIAMETER OPENINGS
DIAMETER OPENINGS
1. 33
KM GRATE SET AT 2.0 ' ABOVE BASIN BO~TOM
KO 3
RS 1 ELEV
1. 71 1. 86 2.09 2.23 2.32
PAGE 1
I '
6 IO
IT
SPRINGRIDGE II DEVELOPMENT
DEVELOPED CONDITIONS
25-YEAR 24-HOUR DESIGN STORM
OUTPUT CONTROL VARIABLES
IPRNT 5
I PLOT 0
QSCAL 0.
HYDROGRAPH TIME DATA
NMIN
IDATE
ITIME
NQ
NDDATE
NDTIME
I CENT
5
17JUN 4
1200
300
18JUN 4
1255
19
COMPUTATION INTERVAL
TOTAL TIME BASE
ENGLISH UNITS
PRINT CONTROL
PLOT CONTROL
HYDROGRAPH PLOT SCALE
MINUTES IN COMPUTATION INT ERVAL
STARTING DATE
STARTING TIME
NUMBER OF HYDROGRAPH ORDINATES
ENDING DATE
ENDING TIME
CENTURY MARK
.08 HOURS
2 4 .92 HOURS
DRAINAGE AREA
PRECIPITATION DEPTH
LENGTH, ELEVATION
FLOW
SQUARE MILES
INCHES
STORAGE VOLUME
SURFACE AR8A
TEMPERATURE
FEET
CUBIC FEET PER SECOND
ACRE-FEET
ACRES
DEGR8ES FA HRE NHEIT
*** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** ***
1 2 KI<
16 KO
17 RS
**************
* *
* DETENT * ION F
* *
**************
OUTPUT CONTROL
IPR NT
I PLOT
QSCAL
VARIABLES
3
0
o.
PRINT CONTROL
PLOT CONTROL
HYDROGRAPH PLOT SCALE
HYDROGRAPH RO UTING DATA
STORAGE ROUTING
NSTPS
ITYP
RSVRIC
x
1 NUMBER OF SUBREACHES
ELEV TYPE OF INITIAL CONDITION
.00 INITIAL CONDITION
.00 WORKING RAND D COEFFICIENT
'
+
+
+
+
18
19
20
21
22
,
SA
SE
SQ
SE
SS
***
AREA
ELEVATION
DISCHARGE
ELEVATION
SPILLWAY
STORAGE
ELEVATION
STORAGE
OUTE"LOW
ELEVATION
CREL
SPWID
COQW
EXPW
.00
6472.50
.oo
.oo
6472.50
***
. 5
6472.50
0.
6472.50
6475.50
10.00
3.09
1.50
.90
6474.00
.28
5,57
6473.00
***
.. 7 . 8
6474.00 6476.00
6. 18. 25.
6473.00 6474. 00 6475.00
SPILLWAY CREST ELEVATION
SPILLWAY WIDTH
WEIR COEE"E"ICIENT
EXPONENT or HEAD
***
I
42.
6475.50
COMPUTED STORAGE-ELEVATION DATA
2 .39
6476 .00
68.
6476.00
COMPUTED STORAGE-OUTE"LOW-ELEVATION DATA
.90
17.51
6474.00
1. 60
24 .66
6475. 00
***
1. 98
41.88
6475.50
***
2.39
67. 58
6476.00
HYDROGRAPH AT STATION DETENT
PEAK FLOW TIME MAXIMUM AVERAGE E"LOW
6-HR 24-HR 72-HR 24.92-HR (CFS) (HR)
(CE"S)
13. 14.42 7. 2. 2. 2.
(INCHES) .043 .051 . 051 .051
(AC-E"T) 4. 4. 4. 4.
PEAK STORAGE TIME MAXIMUM AVERAGE STORAGE
6-HR 24-HR 72-HR 24.92-HR (AC-E"T) (HR)
1. 14.33 0. 0. 0. o.
PEAK STAGE TIME MAXIMUM AVERAGE STAGE
6-HR 24-HR 72-HR 24.92-HR (E"EET) (HR)
64 73.63 14.42 6473.15 6472.70 6472. 69 6472.69
CUMULATIVE AREA -1. 58 SQ MI
*** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** ***
**************
,
-~~~------------------------.............. ...........-
+
+
,
29 KK
32 KO
33 RS
34 SA
35 SE
36 SQ
37 SE
38 SS
***
PEAK FLOW
(CFS)
10 .
* *
* DE TENT * ION E
* *
**************
OUTPUT CONTROL
IPRNT
I PLOT
QSCAL
VARIABLES
3
0
0.
HYDROGRAPH ROUTING DATA
STORAGE ROUTING
NSTPS
ITYP
RSVRIC
PRINT CONTROL
PLOT CONTROL
HYDROGRAPH PLOT SCALE
NUMBER OF SUBREACHES
TYPE OF INITIAL CONDITION
INITIAL CONDITION
x
1
ELEV
.00
.00 WORKING R AND D COEFFICIENT
AREA . 4. . 6 1. 4 2.4
ELEVATION 6439.50 6440.00 6442. 00 6444.00
DISCHARGE o. 4. 5. 12.
ELEVATION 6439.50 6440.00 6440.50 6441. 00
SPILLWAY
CREL 6443.80 SPILLWAY CREST ELEVATION
SPWID 10.00 SPILLWAY WIDTH
COQW 3.09 WEIR COEFFICIENT
EXPW 1. 50 EXPONENT OF HEAD
***
18.
6442.00
COMPUTED STORAGE -ELEVATION DATA
STORAGE .00 .27 2.19 5.88
ELEVATION 6439.50 6440.00 6442.00 6444.00
COMPUTED STORAGE-OUTFLOW-ELEVATION
STORAGE ~00 .27 . 61 1.05 2.19 3.78
OUTFLOW .00 3.71 5.25 11. 99 17. 94 20.95
ELEVATION 6439.50 6440.00 6440.50 6441. 00 6442.00 6443 .00
*** *** *** ***
HYDROGRAPH AT STATION DETENT
TIME MAXIMUM AVERAGE FLOW
6-HR 24-HR 72-HR 24.92-HR
(HR)
(CFS)
15.50 7. 2. 2. 2.
(INCHES) .040 .050 .050 . 050
(AC-FT) 3. 4. ' 4. 4.
PEAK STORAGE TIME MAXIMUM AVERAGE STORAGE
21. 27.
6443.00 6444.00
DATA
5.88
27. 27
6444 .00
---------------------------------------~~~
+
+
I I
6-HR 24-HR 72-HR 24.92-HR
(AC-FT) (HR)
l. 15.50 l. o: 0. 0.
PEAK STAGE TIME MAXIMUM AVERAGE STAGE
6-HR 24-HR 72-HR 24. 92-HR
(FEET) (HR)
6440.88 15.50 6440.56 6439.82 6439.81 6439.81
CUMULATIVE AREA = l. 61 SQ MI
*** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** ***
49 KK
51 KO
52 RS
53 SA
54 SE
55 SL
56 SS
**************
*
*
*
*
DETENT *
* **************
ION A
OUTPUT CONTROL VARIABLES
IPRNT 3 PRINT CONTROL
I PLOT
QSCAL
0 PLOT CONTROL
0. HYDROGRAPH PLOT SCALE
HYDROGRAPH ROUTING DATA
STORAGE ROUTING
NSTPS
ITYP
RSVRIC
x
AREA
1
ELEV
.00
.00
. 2
ELEVATION 6542.00
LOW-LEVEL OUTLET
ELEVL
CAR EA
COQL
EXPL
SPILLWAY
CREL
SPWID
COQW
EXPW
STORAGE
ELEVATION
.00
6542.00
6542.30
.35
.60
.50
6545.90
10.00
3.09
1.50
.45
6544.00
NUMBER OF SUBREACHES
TYPE OF INITIAL CONDITION
INITIAL CONDITION
WORKING R AND D COEFFICIENT
.3 .3
6544.00 6546.00
ELEVATION AT CENTER OF OUTLET
CROSS-SECTIONAL AREA
COEFFICIENT
EXPONENT OF HEAD
SPILLWAY CREST ELEVATION
SPILLWAY WIDTH
WEIR COEFFICIENT
EXPONENT OF HEAD
***
COMPUTED STORAGE-ELEVATION DATA
1.05
6546.00
I
_........ .............. ----------------------~~~
+
+
+
+
***
PEAK FLOW
(CFS)
0.
OUTFLOW
ELEVATION
OUTFLOW
ELEVATION
STORAGE
OUTFLOW
ELEVATION
STORAGE
OUTFLOW
ELEVATION
TIME
(HR)
14.17
PEAK STORAGE TIME
(AC-FT) (HR)
o. 13.92
PEAK STAGE TIME
(FEET) (HR)
6542. 4 6 14.25
.oo
6542.00
3 .19
6545.90
.00
.00
6542.00
1. 02
3.19
6545.90
***
.00
6542.30
3.20
6545.90
.06
.00
6542.30
1.02
3.22
6545.91
***
• COMPUTED OUTFLOW-ELEVATION DATA
.98
6542.64
3.22
6545.91
1. 09
6542.72
3.27
6545.92
1. 22
6542.83
3.33
6545.93
1. 39
6542.99
3. 43
6545.94
1. 62
6543.23
3.56
6545.95
COMPUTED STORAGE-OUTFLOW-ELEVATION DATA
.13 .14 .17 .20 .26
.99 1. 09 1. 22 1. 39 1. 62
6542.64 6542.72 6542.93 6542.99 6543.23
1. 03 1. 03 1. 03 1. 04 1. 04
3.33 3. 43 3.56 3. 73 3.94
6545.93 6545.94 6545.95 6545.96 6545 .98
*** ***
HYDROGRAPH AT STATION DETENT
MAXIMUM AVERAGE FLOW
6-HR 24-HR 72-HR 24.92-HR
(CFS)
o. 0. o. o.
(INCHES) .033 .039 .039 . 039
(AC-FT) 0. 0. o. o.
MAXIMUM AVERAGE STORAGE
6-HR 24-HR 72-HR 24 .92-HR
0. o. o. 0 .
MAXIMUM AVERAGE STAGE
6-HR 24-HR 72-HR 24.92-HR
6542.40 6542.20 6542.19 6542.19
CUMULATIVE AREA = .08 SQ MI
1. 94
6543.63
3.73
6545.96
.35
1. 94
6543.63
1. 05
4.21
6546.00
2. 41
6544.36
3. 94
6545.98
.45
2 .19
6544.00
3.19
6545.90
4.21
6546.00
.54
2.41
6544.36
*** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** ***
85 KK
88 KO
************** ..
*
*
..
DETENT *
*
**************
ION B
OUTPUT CONTROL VARIABLES
IPRNT 3 PRINT CONTROL
+
+
+
+
89 RS
90 SA
91 SE
92 SQ
93 SE
94 SS
I PLOT
QSCAL
0 PLOT CONTROL
0. HYDROGRAPH PLOT SCALE
HYDROGRAPH ROUTING DATA
STORAGE ROUTING
NSTPS
ITYP
RSVRIC
x
AREA
1
ELEV
.00
.00
• 6
ELEVATION 6422.00
DISCHARGE
ELEVATION
SPILLWAY
CREL
SPWID
COQW
EXPW
0.
6422.00
6424.80
10.00
3.09
1. 50
NUMBER OF SUBREACHES
TYPE OF INITIAL CONDITION
INITIAL CONDITION
WORKING R AND D COEFFICIENT
1. 3 2.3
6424.00 6425.00
5. 6. 13.
6423.00 6423.50 6424.00
SPILLWAY CREST ELEVATION
SPILLWAY WIDTH
WEIR COEFFICIENT
EXPONENT OF HEAD
***
I
1 6.
6424.50
COMPUTED STORAGE-ELEVATION DATA
STORAGE
ELEVATION
.00
6422.00
1. BG
6424.00
3.66
6425.00
31.
6425.00
COMPUTED STORAGE-OUTFLOW-ELEVATION DATA
***
STORAGE
OUTFLOW
ELEVATION
PEAK FLOW TIME
(CFS) (HR)
7. 17.17
PEAK STORAGE TIME
(AC-FT) (HR)
1. 17.08
PEAK STAGE TIME
(FEET) (HR)
.00
.00
6422.00
***
• 7 4
5.25
6423.00
***
1. 24
6.43
6423.50
1. 86
12.99
6424.00
***
2.63
16.17
6424.50
HYDROGRAPH AT STATION DE TENT
MAXIMUM AVERAGE FLOW
6-HR 24-HR 72-HR
(CFS)
6. 2. 2.
(INCHES) . 031 . 045 . 04 5
(AC-FT) 3. 5. 5.
MAXIMUM AVERAGE STORAGE
6-HR 24-HR 72-HR
1. 0. 0.
MAXIMUM AVERAGE STAGE
6-HR 24-HR 7 2-HR
***
3.66
30.75
6425.00
24. 92-HR
2.
.045
5.
24.92-HR
0.
24.92-HR
I 6423.57 17.09 6423.39 6422.48 6422.46 6422.46
CUMULATIVE AREA = 1. 88 SQ MI
*** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** ***
147 KK
150 KO
151 RS
152 SA
153 SE
154 SQ
155 SE
156 SS
.... *
************** .. *
* DETENT "' ION C .. ..
**************
OUTPUT CONTROL
IPRNT
I PLOT
QSCAL
VARIABLES
3
0
o.
HYDROGRAPH ROUTING DATA
STORAGE ROUTING
NSTPS
ITYP
RSVRIC
PRINT CONTROL
PLOT CONTROL
HYDROGRAPH PLOT SCALE
NUMBER OF SUBREACHES
TYPE OF INITIAL CONDITION
INITIAL CONDITION
x
1
ELEV
.00
.00 WORKING R AND D COEFFICIENT
AREA . 7 1. 6 2.8
ELEVATION 6396.00 6398.00 6400.00
DISCHARGE o. 4. s. 14. 27.
ELEVATION 6396.00 6397.00 6398.00 6399.00 6400.00
SPILLWAY
CREL 6399.80 SPILLWAY CREST ELEVATION
SPWID 10.00 SPILLWAY WIDTH
COQW 3.09 WEIR COEFFICIENT
EXPW 1.50 EXPONENT OF HEAD
"'* ..
COMPUTE:D STORAGE-ELEVATION DATA
STORAGE .00 2.21 6.61
ELEVATION 6396.00 6398.00 6400 .00
COMPUTED STORAGE-OUTFLOW-ELEVATION
STORAGE .00 .86 2.21 4.10 6.61
OUTFLOW .oo 3. 78 5.34 14.42 27. 45
ELEVATION 6396.00 6397.00 6398.00 6399.00 6400.00
.. * .. *** ...... ***
DATA
I
+
+
+
+
I I
HYDROGRAPH AT STATION DETENT
PEAK FLOW TIME MAXIMUM AVERAGE FLOW
6-HR 24-HR 72-HR 24.92-HR
(CFS) (HR)
(CFS)
5. 21.58 5. 2. 2. 2.
(INCHES) .020 .033 .033 .033
(AC-FT) 2. 4. 4. 4.
PEAK STORAGE TIME MAXIMUM AVERAGE STORAGE
6-HR 24-HR 72-HR 24.92-HR
(AC-FT) (HR)
2. 21. 50 2. 1. 1. 1.
PEAK STAGE TIME MAXIMUM AVERAGE STAGE
6-HR 24-HR 72-HR 2 4 .92-HR
(FEET) (HR)
6397.72 21.58 6397.63 6396.63 6396.61 6396.61
CUMULATIVE AREA -2.20 SQ MI
*** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** ***
163 KK
166 KO
1 67 RS
168 SA
169 SE
170 SQ
171 SE
172 SS
**************
*
*
*
*
DETENT *
*
ION D
**************
OUTPUT CONTROL
IPRNT
I PLOT
QSCAL .
VARIABLES
3
0 o.
HYDROGRAPH ROUTING DATA
PRINT CONTROL .
PLOT CONTROL
HYDROGRAPH PLOT SCALE
STORAGE ROUTING
NSTPS
ITYP
RSVRIC
1 NUMBER OF SUBREACHES
x
AREA
ELEVATION
DISCHARGE
ELEVATION
SPILLWAY
CREL
SPWID
ELEV TYPE OF INITIAL CONDITION
.00 INITIAL CONDITION
.00 WORKING RAND D COEFFICIENT
. 4 1. 2 2.2
6388.00 6390.00 6392.00
0. 2. 2 . 11.
6388.00 6389.00 6390.00 6391. 00
6391.90 SPILLWAY CREST ELEVATION
20.00 SPILLWAY WIDTH
23.
6392.0 0
I
+
+
+
+
1
+
+
+
+
+
***
STORAGE
ELEVATION
STORAGE
OUTFLOW
ELEVATION
PEAK FLOW TIME
(CFS) (HR)
4. 24. 92
PEAK STORAGE TIME
(AC-FT) (HR)
2. 24.92
PEAK STAGE TIME
(FEET) (HR)
6390.24 24.63
OPERATION
HYDROGRAPH AT
ROUTED TO
HYDROGRAPH AT
COQW 3.09 WEIR COEFFICIENT
EXPW 1.50 EXPONENT OF HEAD
.00
6388.00
.oo
.00
6386.00
***
1.50
6390.00
.56
1. 66
6369.00
***
***
COMPUTED STORAGE-ELEVATION DATA
4.76
6392.00
COMPUTED STORAGE-OUTFLOW-ELEVATION DATA
1.50
2.37
6390.00
2.88
10. 77
6391.00
***
4.76
23.24
6392.00
***
HYDROGRAPH AT STATION DETENT
MAXIMUM AVERAGE FLOW
6-HR 24 -HR 72-HR 24.92-HR
(CFS)
3. 1. 1. 1.
(INCHES) .013 .018 .018 .016
(AC-FT) 2. 2. 2. 2.
MAXIMUM AVERAGE STORAGE
6-HR 24-HR 72-HR 24.92-HR
2. 1. 0. 0.
MAXIMUM AVERAGE STAGE
6-HR 24-HR 72-HR 24.92-HR
6390.03 6388.70 6388.68 6388.68
CUMULATIVE AREA = 2.27 SQ MI
RUNOFF SUMMARY
FLOW IN CUBIC FEET PER SECOND
TIME IN HOURS, AREA IN SQUARE MILES
PEAK TIME OF AVERAGE FLOW FOR MAXIMUM PERIOD
STATION FLOW PEAK
6-HOUR 24-HOUR 72-HOUR
AREAlA 16. 13.75 8. 2 . 2.
DETENT 13. 14.42 7. 2. 2.
AREA19 0. 13.58 o. 0 . 0.
BASIN MAXIMUM TIME OF
AREA STAGE MAX STAGE
1.56
1. 58
6473.63 14.42
.03
, ,
!***************************************** ***************************************
1
* *
*
*
*
*
FLOOD HYDROGRAPH PACKAGE (HEC-1)
SEPTEMBER 1990
VERSION 4.0
*
*
*
* * RUN DATE 06/17/2004 TIME 09:41:45 *
* *
*
*
*
*
*
*
*
*
U.S. ARMY CORPS OF ENGINEERS *
HYDROLOGIC ENGINEERING CENTER *
609 SECOND STREET *
DAVIS, CALIFORNIA 95616 *
( 916) 756-1104 *
*
***************************************** ***************************************
x x xxxxxxx xxxxx x x x x x x xx x x x x x xxxxxxx xxxx x xxxxx x x x x x x x x x x x x x x xxxxxxx xxxxx xxx
THIS PROGRAM REPLACES ALL PREVIOUS VERSIONS OF HEC-1 KNOWN AS HECl (JAN 73), HEClGS, HEClDB, AND HEClKW.
THE DEFINITIONS OF VARIABLES -RTIMP-AND -RTIOR-HAVE CHANGED FROM THOSE USED WITH THE 1973-STYLE INPUT STRUCTURE.
THE DEFINITION OF -AMSKK-ON RM-CARD WAS CHANGED WITH REVISIONS DATED 28 SEP 81. THIS IS THE FORTRAN77 VERSION
NEW OPTIONS: DAMBREAK OUTFLOW SUBMERGENCE , SINGLE EVENT DAMAGE CALCULATION, DSS:WRITE STAGE FREQUENCY,
DSS:READ TIME SERIES AT DESIRED CALCULATION INTERVAL LOSS RATE:GREEN AND AMPT INFILTRATION
KINEMATIC WAVE: NEW FINITE DIFFERENCE ALGORITHM
HEC-1 INPUT
LINE ID ....... 1 ....... 2 .... · ... 3 ....... 4 ....... 5 ....... 6 ....... 7 ....... B ....... 9 ...... 10
1
2
3
5
6
7
8
9
10
11
12
13
14
15
16
17
SPRINGRIDGE II DEVELOPMENT
DEVELOPED CONDITIONS
ID
ID
ID 100-YEAR 24-HOUR DESIGN STORM
ID
*DIAGRAM
IT 5 17JUN04
IO 5
KK AREAlA
BA 1. 581
PH
LS 55
UD O. 78
KK DETENTION F
1200 300
0. 4 8 0.95
KM 3-10" LOW LEVEL DIAMETER OPENINGS
KM 3-10" MID LEVEL DIAMETER OPENINGS
1. 69
KM GRATE SET AT 2.0 ' ABOVE BASIN BOTTOM
KO 3
RS 1 ELEV
2 .18 2 .37 2. 67 2.86 2. 98
PAGE 1
_....... .............. ------------------------~~~
6 IO
IT
OUTPUT CONTROL
IPRNT
I PLOT
QSCAL
HYDROGRAPH TIME
SPRINGRIDGE II DEVELOPMENT
DEVELOPED CONDITIONS
100-YEAR 24-HOUR DESIGN STORM
VARIABLES
5 PRINT CONTROL
0 PLOT CONTROL
0. HYDROGRAPH PLOT SCALE
DATA
I
NMIN 5 MINUTES IN COMPUTATION INTERVAL
IDATE 17JUN 4 STARTING DATE
ITIME 1200 STARTING TIME
NQ 300 NUMBER OF HYDROGRAPH
NDDATE 18JUN 4 ENDING DATE;
NDTIME 1255 ENDING TIME
I CENT 19 CENTURY MARK
COMPUTATION INTERVAL
TOTAL TIME BASE
.08 HOURS
24.92 HOURS
ENGLISH UNITS
DRAINAGE AREA
PRECIPITATION DEPTH
LENGTH, ELEVATION
FLOW
STORAGE VOLUME
SURFACE AREA
TEMPERATURE
SQUARE MILES
INCHES
FEET
CUBIC FEET PER SECOND
ACRE-FEET
ACRES
DEGREES FAHRENHEIT
ORDINATES
*** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** ***
12 KK
16 KO
17 RS
**************
*
*
*
*
DETENT * ION F
*
**************
OUTPUT CONTROL VARIABLES
IPRNT 3
I PLOT 0
QSCAL 0.
HYDROGRAPH ROUTING DATA
PRINT CONTROL
PLOT CONTROL
HYDROGRAPH PLOT SCALE
STORAGE ROUTING
NSTPS
ITYP
RSVRIC
1 NUMBER OF SUBREACHES
x
ELEV TYPE OF INITIAL CONDITION
. 00 INITIAL CONDITION ,
.00 WORKING R AND D COEFFICIENT
+
+
+
+
I
18 SA
19 SE
20 SQ
21 SE
22 SS
WARNING
WARNING
***
AREA
ELEVATION
DISCHARGE
ELEVATION
SPILLWAY
STORAGE
ELEVATION
STORAGE
OUTFLOW
ELEVATION
ROUTED
ROUTED
CREL
SPWID
COQW
EXPW
.00
6472.50
.oo
.00
647.2.50
OUTFLOW
OUTFLOW
***
.5
6472.50
o.
6472.50
6475.50
10.00
3.09
1. 50
.90
6474.00
.28
5.57
6473.00
68.) IS
68.) IS
***
' . 7 . 8
6474. 00 6476.00
6. 18. 25. 42.
6473.00 6474.00 6475.00 6475.50
SPILLWAY CREST ELEVATION
SPILLWAY WIDTH
WEIR COEFFICIENT
EXPONENT OF HEAD
COMPUTED STORAGE-ELEVATION DATA
2.39
6476. 00
68.
6476.00
COMPUTED STORAGE-OUTFLOW-ELEVATION DATA
• 90 1. 60 1. 98 2.39
17. 51 24.66 41. 88 67.58
6474.00 6475.00 6475.50 6476.00
GREATER THAN MAXIMUM OUTFLOW 68.) IN STORAGE-OUTFLOW TABLE
GREATER THAN MAXIMUM OUTFLOW 68.) IN STORAGE-OUTFLOW TABLE
*** ***
HYDROGRAPH AT STATION DE TENT
PEAK FLOW TIME MAXIMUM AVERAGE FLOW
6-HR 24-HR 72-HR 24.92-HR
(CFS) (HR)
(CFS)
68. 13.67 28. 8. 8. 8 .
(INCHES) .164 .186 .186 .186
(AC-FT) 14. 16. 16. 16.
PEAK STORAGE TIME MAXIMUM AVERAGE STORAGE
6-HR 24-HR 72-HR 24 .9 2-HR
(AC-FT) (HR)
2. 13.67 1. o. 0. o.
PEAK STAGE TIME MAXIMUM AVERAGE STAGE
6-HR 24 -HR 72-HR 24.92-HR
(FEET) (HR)
6476. 01 13.67 6474.57 6473.10 6473.08 6473.08
CUMULATIVE AREA ~ 1. 58 SQ MI
'
+
+
*** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** ***
29 KK
32 KO
33 RS
34 SA
35 SE
36 SQ
37 SE
38 SS
***
PEAK FLOW
(CFS)
27.
**************
*
*
*
*
DETENT *
*
**************
OUTPUT CONTROL
IPRNT
I PLOT
QSCAL
ION E
VARIABLES
3
0
0.
PRINT CONTROL
PLOT CONTROL
HYDROGRAPH PLOT SCALE
HYDROGRAPH ROUTI~G DATA
STORAGE ROUTING
NSTPS
ITYP
RSVRIC
x
AREA
ELEVATION
DISCHARGE
ELEVATION .
SPILLWAY
CREL
SPWID
COQW
EXPW
1 NUMBER OF SUBREACHES
ELEV TYPE OF INITIAL CONDITION
.00 INITIAL CONDITION
.00 WORKING RAND D COEFFICIENT
. 4 .6 1. 4 2. 4
6439.50 6440.00 6442.00 6444.00
0. 4. 5. 12.
6439.50 6440.00 6440.50 6441.00
6443.80 SPILLWAY CREST ELEVATI ON
10.00 SPILLWAY WIDTH
3.09 WEIR COEFFICIENT
1. 50 EXPONENT OF HEAD
***
18.
6442.00
COMPUTED STORAGE-ELEVATION DATA
STORAGE
ELEVATION
STORAGE
OUTFLOW
ELEVATION
TIME
(HR)
15.42
.00 .27 2.19 5.88
6439.50 6440.00 6442.00 6444.00
COMPUTED STORAGE-OUTFLOW-ELEVATION
.00 .27 .61 1. 05 2.19 3.78
.00 3. 71 5.25 11. 99 17. 94 20 .95
6439.50 6440.00 6440.50 6441. 00 6442.00 6443.00
*** *** **" "**
HYDROGRAPH AT STATION DETENT
MAXIMUM AVERAGE FLOW
6 -HR 24-HR 72-HR 24.92-HR
(CFS)
23. 8. 8. 8.
21. 27.
6443.00 6444 .00
DATA
5.88
27.27
6444.00
+
+
,
(INCHES) .134 .182 .182 .182
(AC-FT) 12. 16. 16. 16.
PEAK STORAGE TIME MAXIMUM AVERAGE STORAGE
6-HR 24-HR 72-HR 24.92-HR
(AC-FT) (HR)
6. 15. 42 4. 1. 1. 1.
PEAK STAGE TIME MAXIMUM AVERAGE STAGE
6-HR 24-HR 72-HR 24.92-HR
(FEET) (HR)
6443.90 15. 42 6443.30 6440.75 6440.70 6440.70
CUMULATIVE AREA = 1. 61 SQ MI
*** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** ***
49 KK
51 KO
52 RS
53 SA
54 SE
55 SL
56 SS
************•*
*
*
*
*
DETENT *
*
ION A
**************
OUTPUT CONTROL
IPRNT
I PLOT
QSCAL
VARIABLES
3
0
0 .
HYDROGRAPH ROUTING DATA
PRINT CONTROL
PLOT CONTROL
HYDROGRAPH PLOT SCALE
STORAGE ROUTING
NSTPS
ITYP
RSVRIC
1 NUMBER OF SUBREACHES
x
AREA
ELEV TYPE OF INITIAL CONDITION
.00 INITIAL CONDITION
.00 WORKING RAND D COEFFICIENT
.2 .3 .3
ELEVATION 6542.00 6544.00 6546.00
LOW-LEVEL OUTLET
ELEVL
CAR EA
COQL
EXPL
SPILLWAY
CREL
SPWID
COQW
EXPW
6542.30
.35
.60
.so
6545.90
10.00
3.09
1. 50
ELEVATION AT CENTER OF OUTLET
CROSS-SECTIONAL AREA
COEFFICIENT
EXPONENT OF HEAD
SPILLWAY CREST ELEVATION
SPILLWAY WIDTH
WEIR COEFFICIENT
EXPONENT OF HEAD
+++
+
+
+
+
I
COMPUTED STORAGE-ELEVATION DATA
STORAGE .oo .45 1.05
ELEVATION 6542.00 6544.00 6546.00
COMPUTED OUTFLOW-ELEVATION DATA
OUTFLOW .00 .00 .98 1. 09 1. 22 1. 39 1. 62 1. 94 2. 41 3 .19
ELEVATION 6542.00 6542.30 6542.64 6542.72 6542.83 6542.99 6543.23 6543.63 6544.36 6545.90
OUTFLOW 3.19 3.20 3.22 3.27 3.33 3. 43 3.56 3. 73 3 .94 4.21
ELEVATION 6545.90 6545.90 6545.91 6545.92 6545.93 6545.94 6545.95 6545. 96 6545.98 6546 .0 0
COMPUTED STORAGE-OUTFLOW-ELEVATION DATA
STORAGE .00 .06 .13 .14 .17 .20 .26 .35 .45 . 54
OUTFLOW .oo .00 . 98 1. 09 1. 22 1. 39 1. 62 1. 94 2 .19 2.41
ELEVATION 6542.00 6542.30 6542.64 6542.72 6542.83 6542.99 6543 .23 6543 .63 6544 .0 0 6544 .3 6
STORAGE 1. 02 1. 02 1.03 1. 03 1.03 1. 04 1. 04 1.05
OUTFLOW 3.19 3.22 3.33 3. 43 3.56 3. 73 3.94 4.21
ELEVATION 6545.90 6545.91 6545.93 6545.94 6545.95 6545.96 6545.98 6546.00
*** *** *** *** ***
HYDROGRAPH AT STATION DETENT
PEAK FLOW TIME MAXIMUM AVERAGE FLOW
.6-HR 24-HR 72-HR 24.92 -HR
(CFS ) (HR)
(CFS)
2. 13.58 1. o. o. 0.
(INCHES) .154 .175 .175 .175
(AC -FT) 1. 1. 1. 1.
PEAK STORAGE TIME MAXIMUM AVERAGE STORAGE
6-HR 24-HR 72-HR 24. 92-HR
(AC-FT) (HR)
o. 13.50 0. 0. 0. 0 .
PEAK STAGE TIME MAXIMUM AVERAGE STAGE
6-HR 24-HR 72-HR 2 4.92-HR
(FEET) (HR)
6543.54 13.58 6543.03 6542.36 6542.35 6542 .35
CUMULATIVE AREA = .08 SQ MI
*** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** ***
85 KK
**************
*
*
*
*
DETENT *
*
ION B
I
+
+
+
88 KO
89 RS
90 SA
91 SE
92 SQ
93 SE
94 SS
***
PEAK FLOW
(CFS)
27.
**************
OUTPUT CON TROL
IPRNT
I PLOT
QSCAL
VARIABLES
3
0
0.
HYDROGRAPH ROUTING DATA
STORAGE ROUTING
NSTPS
ITYP
RSVRIC
PRINT CONTROL
PLOT CONTROL
HYDROGRAPH PLOT SCALE
NUMBER OF SUBREACHES
TYPE OF INITIAL CONDITION
INITIAL CONDITION
I
x
1
ELEV
.00
.00 WORKING R AND D COEFFICIENT
AREA • 6 1. 3 2.3
ELEVATION 6422.00 6424.00 6425.00
DISCHARGE 0. 5. 6. 13. 16.
ELEVATION 6422.00 6423.00 6423.50 6424.00 6424.50
SPILLWAY
CREL 6424.80 SPILLWAY CREST ELEVATION
SPWID 10.00 SPILLWAY WIDTH
COQW 3.09 WEIR COEFFICIENT
EXPW 1.50 EXPONENT OF HEAD
***
COMPUTED STORAGE-ELEVATION DATA
STORAGE .oo 1.86 3.66
ELEVATION 6422.00 6424.00 6425.00
31.
6425.00
COMPUTED STORAGE-OUTFLOW-ELEVATION DATA
STORAGE .oo .74 1. 24 1. 86 2.63 3.66 OUTFLOW .oo 5.25 6.43 12.99 16.17 30.75 ELEVATION 6422.00 6423.00 6423.50 6424.00 6424.50 6425.00
*** *** *** ***
HYDROGRAPH AT STATION DETENT
TIM E MAXIMUM AVERAGE FLOW
6-HR 24-HR 72-HR 24.92-HR (HR)
(CFS)
16.75 23. 9. 8. 8. (INCHES) .115 .168 .168 .168 (AC-FT) 12. 17. 17. 17.
I
PEAK STORAGE TIME MAXIMUM AVERAGE STORAGE
6-HR 24-HR '72-HR 24.92-HR (AC-FT) (HR)
3. 16. 75 3. 1. 1. 1.
-~-~~~~~~~~~~~~~~~~------------------------------------
TABULAR HYDROGRAPH METHOD Version 2.00
~ct : SPRINGRIDGE ~I ~y : GARFIELD State: co User: JEK
Checked:
Date:
Date:
Subtitle: EXISTING HYDROLOGIC CONDITIONS
Total watershed area: 2.395 sq mi Rainfall type: II Frequency: 100 years
Area (sq mi)
Rainfall(in)
Curve number
Runoff (in)
Tc (hrs)
(Used)
TimeToOutlet
Ia/P
Time
(hr)
11.0
11.3
11.6
11.9
" 12.3
12.4
12.5
12.6
12.7
12.8
13.0
13.2
13.4
13.6
13.8
14.0
14.3
14.6
15.0
15.5
16.0
16.5
17.0
" 22.0
26.0
(Used)
Total
Flow
0
0
0
0
3
16
13
11
16
24
31
40
49
56
59P
56
50
46
42
37
33
29
26
23
22
19
18
17
15
13
10
1
P -Peak Flow
--------------------------Subareas --------------------------
lAl lBl 2 3 4 5
1.58* 0.58* 0.09* 0.06* 0.04* 0.04*
3.0 3.0 3.0 3.0 3.0 3.0
55*
0.19
1.30*
1.25
0.00
0.55
0.50
53*
0.14
0.68*
0.75
0.00
0.60
0.50
lAl lBl
0
0
0
0
0
0
0
1
4
8
13
20
27
37
43P
43
38
35
32
28
25
22
19
17
16
14
13
13
11
10
8
1
0
0
0
0
0
0
0
1
4
8
12
14
16P
14
12
10
9
8
7
7
6
5
5
4
4
4
4
3
3
3
2
0
52*
0.12
0.29*
0.30
0.00
0.62
0.50
58*
0.27
0.08*
0.10
0.00
0.49
0 .49
54*
0.17
0.12*
0.10
0.00
0.57
0.50
55*
0.19
0.07*
0.10
0.00
0.55
0.50
Subarea Contribution to Total Flow (cfs) ------------
2 3 4 5
0
0
0
0
0
0
2
3P
3
3
2
2
2
1
1
1
1
1
1
l.
1
1
1
l.
1
0
0
0
0
0
0
0
0
0
0
0
2
9P
6
3
3
3
2
2
2
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
0
0
0
0
0
0
0
0
3P
2
1
1
1
1
1
1
1
1
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
1
4P
3
2
1
1
1
1
1
1
1
1
1
1
1
0
0
0
0
0
0
0
O ·
0
0
0
0
0
* -value(s) provided from TR-55 system routines
TIME OF CONCENTRATION AND TRAVEL TIME Version 2.00
~ct · SPRINGRIDGE II ~y ; GARFIELD State: co
User: JEK
Checked:
Date:
Date:
Subtitle: EXISTING HYDROLOGIC CONDITIONS
--------------------------------Subarea #5 - 4 -------------------------------
Flow Type 2 year Length Slope Surface n Area Wp Velocity Time
rain (ft) (ft/ft) code (sq/f t ) (ft) (ft/sec) (hr)
Sheet 2.32
Shallow Concent'd
Open Channel
50
100
850
.30
.30
J
u
0.033
0.003
3 0. 079
Time of Concentration= 0.12*
=====
--------------------------------Subarea #6 - 5 -------------------------------
Flow Type 2 year Length Slope Surface n Area Wp Velocity Time
rain (ft) (ft/ft) code (sq/ft) (ft) (ft/sec) (hr)
Sheet 2.98
Shallow Concent'd
Open Channel
50
200
400
---Sheet Flow Surface
Smooth Surface
B Fallow (No Res.)
C Cultivated < 20 % Res.
D Cultivated > 20 % Res.
E Grass-Range , Short
.27
.27
Codes ---
J
u
F Grass, Dense
G Grass, Burmuda
H Woods, Li ght
I Woods, Dense
J Range, Natural
* -Generated for use by TABULAR method
..
0.031.
0.007
3 0.037
Time of Concentration= 0.07*
=====
Shallow Concentrated
Surf ace Codes
P Paved
U Unpaved
TIME OF CONCENTRATION AND TRAVEL TIME Version 2.00
~ct · SPRINGRIDGE II ~y ; GARFIELD State: co
Subtitle: EXISTING HYDROLOGIC CONDITIONS
User: JEK
Checked:
Date:
Date:
------------------------------Subarea #1 -lAl -------------------------------
Flow Type 2 year Length Slope Surface n Area Wp Velocity Time
rain (ft) (ft/ft) code (sq/ft) (ft) (ft/sec) (hr)
Sheet 2.32
Shallow Concent'd
Open Channel
Open Channel
50
200
3150
8800
.16
.16
J
u
------------------------------Subarea #2 -lBl
Flow Type 2 year Length Slope Surf ace n
rain (ft} (ft/ft) code
Sheet 2.32
Shallow Concent'd
Open Channel ..
50
20
5600
.08
.08
J
u
0.043
0.009
2 0.438
3 0.815
Time of Concentration = 1.30*
=====
-----~-------------------------
Area
(sq/ft)
Wp
(ft)
Velocity
(ft/sec)
Time
(hr)
0.056
0.001
2.5 0.622
Time of Concentration = 0.68*
----------
--------------------------------Subarea #3 - 2 -------------------------------
Flow Type 2 year Length Slope Surf ace n Area Wp Velocity Time
rain (ft) (ft/ft) code (sq/ft) (ft) (ft/sec) (hr)
Sheet 2.32
Shallow Concent'd
Open Channel
50
20
2150
.10
.10
J
u
0.052
0.001
2.5 0.239
Time of Concentration= 0.29*
----------
--------------------------------Subarea #4 - 3 -------------------------------
Flow Type 2 year Length Slope Surface n Area Wp Velocity Time
rain (ft) (ft/ft) code (sq/ft) (ft) (ft/sec) (hr)
Sheet 2.32
Shallow Concent'd
Open Channel
50
200
450
.27
.27
~enerated for use by TABULAR method
J
u
0.035
0.007
. 3 0.042
Time of Concentration = 0.08*
----------
TIME OF CONCENTRATION AND TRAVEL TIME Version 2.00
~ct : SPRINGRIDGE II
~~y : GARFIELD
Subtitle: DEVELOPED DRAINAGE
State: CO
User: JEK
Checked:
Date:
Date:
-------------------------------Subarea #5 -15
Flow Type 2 year Length Slope Surf ace n Area
(sq/ft)
Wp
(ft)
Velocity
(ft/ sec)
Time
(hr) rain (ft) (ft/ft) code
Sheet 2.98
Shallow Concent'd
Open Channel
100
200
400
.04
.06
J
u
2
0.114
0.014
0.056
Time of Concentration = 0.18*
=====
-------------------------------Subarea #6 -16 -------------------------------
Flow Type 2 year Length Slope Surface n Area Wp Velocity Time
rain (ft) (ft/ft) code (sq/ft) (ft) (ft/sec) (hr)
Sheet 2.98
Shallow Concent'd
Open Channel
Sheet 2.98
Shallow Concent'd
Open Channel
100
200
800
200
200
700
.08
.06
.02
.02
J
u
E
u
0.087
0.014
2 0.111
Time of Concentration= 0.21*
1.5
=====
0.295
0.024
0.130
Time of Concentration= 0.45*
=====
-------------------------------Subarea #8 -18 -------------------------------
Flow Type 2 year Length Slope Surface n Area Wp Velocity Time
rain (ft) (ft/ft) code (sq/ft) (ft) (ft/sec) (hr)
Sheet 2.98
Shallow Concent'd
Open Channel
100
200
3000
.06
.05
J
u
0.097
0.015
2 0.417
Ti~e of Concentration= 0.53*
=====
-------------------------------Subarea #9 -19 -------------------------------
Flow Type 2 year Length Slope Surf ace n Area Wp Velocity Time
rain (ft) (ft/ft) code (sq/ft) (ft) (ft/sec) (hr)
--------------------------------------------------------------------------
2. 98 100 . 06 E 0 .109
Shallow Concent'd 200 .03 U 0.020
Open Channel 1250 1.5 0.231
Time of Concentration = 0.36*
=====
RUNOFF CURVE NUMBER COMPUTATION Version 2.00
~ct : SPRINGRIDGE II
~ : GARFIELD
;ubtitle: DEVELOPED DRAINAGE
:>ubarea : 1
COVER DESCRIPTION
!:\RID AND SEMIARID RANGELANDS
State : CO
~inyon -juniper fair
Sagebrush (w/ grass understory) fair
rotal Area (by Hydrologic Soil Group)
User: JEK
Checked:
Date:
Date :
Hydrologic Soil Group
B C D
Acres (CN)
607(58)
405(51)
1012
SUBAREA: 1 TOTAL DRAINAGE AREA: 1012 Acres WEIGHTED CURVE NUMBER: 5 5
..
..
RUNOFF CURVE NUMBER COMPUTATION Version 2.00
~ct : SPRINGRIDGE II ~y : GARFIELD
;ubtitle: DEVELOPED DRAINAGE
:>ubarea : 2
COVER DESCRIPTION
~ID AND SEMIARID RANGELANDS
State: CO
?inyon -juniper fair
:>agebrush (w/ grass understory) fair
rotal Area (by Hydrologic Soil Group)
SUBAREA: 2 TOTAL DRAINAGE AREA: 27 Acres
..
User: JEK
Checked:
Date:
Date:
Hydrologic Soil Group
A B C D
Acres (CN)
16(58)
11(51)
27
WEIGHTED CURVE NUMBER: 55
RUNOFF CURVE NUMBER COMPUTATION Version 2.00
~ct : SPRINGRIDGE II
..... y : GARFIELD
Subtitle: DEVELOPED DRAINAGE
Subarea : 3
COVER DESCRIPTION
ARID AND SEMIARID RANGELANDS
State: CO
Pinyan -juniper fair
Sagebrush (w/ grass understory) fair
Total Area (by Hydrologic Soil Group)
SUBAREA: 3 TOTAL DRAINAGE AREA: 49 Acres
..
..
User: JEK
Checked:
Date:
Date:
A
Hydrologic Soil Group
B C D
Acres (CN)
29(58)
20(51)
49
WEIGHTED CURVE NUMBER: 55
RUNOFF CURVE NUMBER COMPUTATION Version 2.00
~ct : SPRINGRIDGE II ~y : GARFIELD
Subtitle: DEVELOPED DRAINAGE
Subarea : 8
COVER DESCRIPTION
~ID AND SEMIARID RANGELANDS
State: co
Pinyan -juniper fair
Sagebrush (w/ grass understory) fair
Total Area (by Hydrologic Soil Group)
SUBAREA: 8 TOTAL DRAINAGE AREA: 15 Ac r es
..
..
User: JEK
Checked:
Date:
Date:
A
Hydrologic Soil Group
B C D
Acres (CN)
5(58)
10(51)
15
WEIGHTED CURVE NUMBER: 53
RUNOFF CURVE NUMBER COMPUTATION Version 2.00
ct : SPRINGRIDGE II
y : GARFIELD
tle: DEVELOPED DRAINAGE
Subarea : 11
COVER DESCRIPTION
ARID AND SEMIARID RANGELANDS
State: CO
Pinyon -juniper fair
Sagebrush (w/ grass understory) fair
Total Area (by Hydrologic Soil Group)
SUBAREA: 11 TOTAL DRAINAGE AREA: 16 Acres
..
..
User: JEK
Checked:
Date:
Date:
A
Hydrologic Soil Group
B C D
Acres (CN)
2(58)
14(51)
16
WEIGHTED CURVE NUMBER: 52
RUNOFF CURVE NUMBER COMPUTATION Vers i on 2.00
~Qct : SPRINGRIDGE II ~y : GARFIELD
Subtitle: DEVELOPED DRAINAGE
Subarea : 12
COVER DESCRIPTION
ARID AND SEMIARID RANGELANDS
State: CO
Pinyan -juniper fair
Sagebrush (w/ grass understory) fair
Total Area (by Hydrologic Soil Group)
SUBAREA: 12 TOTAL DRAINAGE AREA: 4 Acres
..
User: JEK
Checked:
Date:
Date:
A
Hydrologic Soil Group
B C D
Acres (CN)
1(58)
3 ( 51)
4
WEIGHTED CURVE NUMBER: 53
RUNOFF CURVE NUMBER COMPUTATION Version 2.00
~ct : SPRINGRIDGE II ~y : GARFIEW
Subtitle: DEVELOPED DRAINAGE
Subarea : 14
COVER DESCRIPTION
ARID AND SEMIARID RANGELANDS
State: CO
Pinyon -juniper fair
Sagebrush (w/ grass understory) fair
Total Area (by Hydrologic Soil Group)
SUBAREA: 14 TOTAL DRAINAGE AREA: 6 Acres
User: JEK
Checked:
Date:
Date:
A
Hydrologic Soil Group
B C D
Acres (CN)
1(58)
5 (51)
6
WEIGHTED CURVE NUMBER: 52
RUNOFF CURVE NUMBER COMPUTATION Version 2.00
ct : SPRINGRIDGE II
y : GARFIELD
tle: DEVELOPED DRAINAGE
Subarea : 16
COVER DESCRIPTION
ARID AND SEMIARID RANGELANDS
State: CO
Pinyon -juniper fair
Sagebrush (w/ grass understory) fair
Total Area (by Hydrologic Soil Group)
SUBAREA: 16 TOTAL DRAINAGE AREA: 6 Acres
..
..
User: JEK
Checked:
Date :
Date:
A
Hydrologic Soil Group
B C D
Acres (CN)
1(58)
5 {51)
6
WEIGHTED CURVE NUMBER: 52
RUNOFF CURVE NUMBER COMPUTATION Version 2 .00
~ct : SPRINGRIDGE II ~y : GARFIELD
Subtitle: DEVELOPED DRAINAGE
Subarea : 18
COVER DESCRIPTION
ARID AND SEMIARID RANGELANDS
State: CO
Pinyan -juniper fair
Sagebrush (w/ grass understory) fair
Total Area (by Hydrologic Soil Group)
SUBAREA: 18 TOTAL DRAINAGE AREA: 40 Acres
..
..
User: JEK
Checked:
Date:
Date:
A
Hydrologic Soil Group
B C D
Acres (CN)
20(58)
20 (51)
40
WEIGHTED CURVE NUMBER: 54
TABU LAR HYDROGRAPH METHOD
•
ct : SPRINGRIDGE II
y : GARFIELD
Subtitle: DEVELOPED DRAINAGE
State: CO
User: JEK
Checked:
Continuation of subarea
--------------------------Subareas
information
Area (sq mi)
Rainfall(in)
Curve number
Runoff (in)
Tc (hrs)
(Used)
TimeToOutlet
Ia/P
(Used)
16 17 18
0.01* 0.04* 0.06 *
3.0 3.0 3.0
52*
0.12
0.21*
0.20
0.00
0.62
0.50
51*
0.11
0.45*
0.40
0.00
0.64
0.50
54 *
0.17
0.53 *
0.50
0.00
0.57
0.50
19
0.03*
3.0
51*
0.11
0.36*
0.40
0.00
Q.64
0.50
'SfL/tJO A
Version 2.00
Date:
Date:
Time
(hr)
-------------Subarea Contribut ion to Total Flow (cfs) ------------
11. 0
11.3
11.6
11.9
12.0 -12.4
12.5
12.6
12.7
12.8
13.0
13.2
13.4
13 .6
13.8
14. 0
14.3
14.6
15.0
15.5
16.0
16.5
17.0
17.5 w
22.0
26.0
P -Peak Flow
16 17 18 19
OP
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
1P
1
1
1
1
1
1
0
0
0
0
0
0
0
0
.0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
1
2P
2
2
2
2
1
1
1
1
1
1
1
1
1
1
1
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
l P
1
1
1
1
1
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
* -value(s) provided f r om TR-55 system routines
T IM E OF CONCENTRATIO N lL"t\JD TRAVEL TIME Version 2 .00
~ect : SPRINGRIDGE II ~ty : GARFIELD State: co
User: JEK
Checked:
Date:
Date:
Subtitle: DEVELOPED DRAINAGE
--------------------------------Subarea #1 -1
Flow Type 2 year Length Slope Surf ace n
rain (ft) (ft/ft) code
Sheet 2.98
Shallow Concent'd
Open Channel
Open Channel
50
200
3150
8800
.16
.16
J
u
Area
(sq/ft)
Wp
(ft)
Velocity
(ft/sec)
Time
(hr)
0.038
0.009
3 0. 292
4 0.611
Time of Concentration = 0.95*
=====
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -Subarea #2 - 2 - - --·-.~ --- - - - - - - - - - - - - - - - - - - - - - -
Flow Type 2 year Length Slope Surface n Area Wp Velocity Time
rain (ft) (ft/ft) code (sq/ft) (ft) (ft/sec) (hr)
Sheet 2.98
Shallow Concent'd
Open Channel
..
50
200
1700
.35
.35
J
u
3
Time of Concentration =
0.028
0.006
0.157
0.19*
=====
--------------------------------Subarea #3 - 3 -------------------------------
Flow Type 2 year Length Slope Surface n Area Wp Velocity Time
rain (ft) (ft/ft) code (sq/ft) (ft) (ft/sec) (hr)
Sheet 2.98
Shallow Concent'd
Open Channel
50
200
1620
.37
.37
J
u
3
0.027
0.006
0.150
Time of Concentration = 0.18*
----------
--------------------------------Subarea #4 -4 -------------------------------
Flow Type 2 year Length Slope Surface n Area Wp Velocity Time
rain (ft) (ft/ft) code (sq/ft) (ft) (ft/sec) (hr)
Sheet 2.98
Shallow Concent'd
Open Channel
50
200
1220
.38
.38
~Generated for use by TABULAR method
J
u
0.027
0.006
3 0.113
Time of Concentration = 0.15*
=====
TIME OF CONCENTRATION AND TRAVEL TIME Version 2.00
~ct : SPRINGRIDGE II ~y : GARFIELD
Suotitle: DEVELOPED DRAINAGE
State: CO
User: JEK
Checked:
Date:
Date:
--------------------------------Subarea #5 - 5 -------------------------------
Flow Type 2 year Length Slope Surface n Area Wp Velocity Time
rain (ft) (ft/ft) code (sq/ft) (ft) (ft/sec) (hr)
Sheet 2.98
Shallow Concent'd
Open Channel
50
200
1220
.39
.39
J
u
0.026
0.006
3 0.113
Time of Concentration= 0.1 4 *
=====
--------------------------------Subarea #6 - 6 -------------------------------
Flow Type 2 year Length Slope Surface n Area Wp Velocity Time
rain (ft) (ft/ft) code (sq/ft ) (ft) (ft/sec) (hr)
Sheet 2.98
Shallow Concent'd
Open Channel
Sheet 2.98
Shallow Concent'd
Open Channel
100
200
1150
100
200
1200
.03
.045
.08
.15
J
u
J
u
2
0.128
0.016
0.1 60
Time of Concentration= 0.30*
----------
0.087
0.009
2 0.167
Time of Concentration = 0.26*
----------
--------------------------------Subarea #8 -8 -------------------------------
Flow Type 2 year Length Slope Surface n Area Wp Velocity Time
rain (ft) (ft/ft) code (sq/ft) (ft) (ft/sec) (hr)
Sheet 2.98
Shallow Concent'd
Open Channel
100
200
900
.05
.095
J
u
2
0.105
0.011
0.125
Time o f Concentration =.0.24*
=====
--------------------------------Subarea #9 -9 -------------------------------
1 w Type 2 year Length Slope Surf ace n Area Wp Velocity Time
rain (ft) (ft/ft) code (sq/f t ) (ft) (ft/sec) (hr)
---------------------------------------------------------------------------
t 2.98 100 .04 J 0.114
Shallow Concent'd 200 .05 U 0.015
Open Channel 2100 2 0.292
Time of Concentration= 0.42*
=====
TIME OF CONCENTRATION AND TRAVEL TIME Version 2.00
State: co
User: JEK
Checked :
Date:
Date:
------------------------------Subarea #10 -10
Flow Type 2 year Length Slope Surf a c e n
rain (ft) (ft/ft) code
Sheet 2.98
Shallow Concent'd
Open Channel
100
200
950
---Sheet Flow Surface
A Smooth Surf ace
B Fallow (No Res.)
C Cultivated < 20 % Res.
D Cultivated > 20 % Res.
E Grass-Range, Short
.06
.06
Codes ---
J
u
F Grass, Den se
G Grass, Burmuda
H Woods, Lig ht
I Woods, Dense
J Range, Natural
* -Generated for use by TABULAR method
Area
(sq/ft)
Wp
(ft)
Velocity
(ft/ sec)
T i me
(hr)
0.097
0.014
2 0 .132
Time of Concentration = 0.2 4 *
=====
---Shallow Concentrated
Surf ace Codes
P Paved
U Unpaved
TIME OF CONCENTRATION AND TRAVEL TIME Version 2.00
..
ct : SPRINGRIDGE II
y : GARFIELD
Subtitle: DEVELOPED DRAINAGE
State: CO
User: J EK
Checked:
Date:
Date:
-------------------------------Subarea #1 -11 -------------------------------
Flow Type 2 year Length Slope Surface n Area Wp Velocity Time
rain (ft) (ft/ft) code (sq/ft) (ft) (ft/sec) (hr)
Sheet 2.98
Shallow Concent'd
Open Channel
100
200
1600
.08
.08
J
u
0.087
0.012
2 0.222
Time of Concentration = 0.32*
=====
-------------------------------Subarea #2 -12 -------------------------------
Flow Type 2 year Length Slope Surface n Ar ea Wp Velocity Time
rain (ft) (ft/ft) code (sq/ft) (ft) (ft/sec) (h r)
Sheet 2.98
Shallow Concent'd
Open Channel
100
200
50
.10
.08
J
u
2
0.079
0.012
0.007
Time of Concentration= 0.10*
=====
111---------------------------Subarea #3 -13 ---------------~---------------Flow Type 2 year Length Slope Surface n Area Wp Velocity Time
rain (ft) (ft/ft) code (sq/ft) (ft) (ft/sec) (hr)
Sheet 2.98
Shallow Concent'd
Open Channel
100
200
200
.08
.06
J
u
2
0.087
0.014
0.028
Time of Concentration = 0.13*
=====
-------------------------------Subarea #4 -14 -------------------------------
Flow Type 2 year Length Slope Surf ace n Area Wp Velocity Time
rain (ft) (ft/ft) code (sq/ft) (ft) (ft/sec) (hr)
Sheet 2.98
Shallow Concent'd
Open Channel
100
100
700
.08
.08
* -Generated for use by TABULAR method -
J
u
0.087
0.006
2 0.097
Time of Concentration = 0 .19*
=====
.. PIPE CULVERT ANALYSI S
COMPUTATION OF CULVERT PERFORMANCE CURVE
June 16, 2004
================================================================================
PROGRAM INPUT DATA
DESCRIPTION
Culvert Diameter (ft) ...................................... .
FHWA Chart Number ....•.........•.....•......................
FHWA Scale Number (Type of Culvert Entrance) ............... .
Manning's Roughness Coefficient (n-value) .................. .
Entrance Loss Coefficient of Culvert Opening ............... .
Culvert Length (ft) ............•......•......................
Invert Elevation at Downstream end of Culvert (ft ) ......... .
Invert Elevation at Upstream end of Culvert (ft) ........... .
Culvert Slope (ft/ft) ...................................... .
Starting Flow Rate (cfs) .•..•..•.....•......•...............
Incremental Flow Rate (cfs) .........•.......................
Ending Flow Rate (cfs) ..............••....................•.
Starting Tailwater Depth (ft) ........•...•..................
Incremental Tailwater Depth (ft) .....•...•....•.•...•.......
Ending Tailwater Depth (ft) ................................ .
VALUE
3.0
1
3
0.012
0.5
100.0
100.0
100.25
0.0025
1.0
2.0
61. 0
0.0
0.0
o.o
================================================================================
COMPUTATION RESULTS .. Flow Tail water Headwater (ft) Normal Critical Depth at Outlet
Rate Depth Inlet Outlet Depth Depth Outlet Velocity
(cfs) (ft) Control Control (ft ) (ft) (ft) (fps)
--------------------------------------------------------------------------------
1.0 o.o 0.41 0. 4 6 0.34 0.31 0.31 2.6
3.0 0.0 0. 72 0.81 0.58 0.54 0.54 3.47
5.0 0.0 0.95 1.05 0.75 0.7 0.7 3.99
7.0 0.0 1.13 1.26 0.9 0.83 0.83 4.38
9.0 0.0 1.29 1.44 1. 02 0.95 0.95 4.7
11. 0 0.0 1. 44 1. 6 1.14 1.05 1.05 4.98
13.0 o.o 1.58 1. 76 1.24 1.15 1.15 5.24
15.0 0.0 1. 72 1.9 1.35 1.24 1.24 5.47
17.0 0.0 1. 84 2.04 1. 45 1.32 1. 32 5.68
19.0 0.0 1. 96 2.17 1.5 5 1. 4 1. 4 5.89
21.0 0.0 2.08 2.3 1. 64 1.47 1. 47 6.08
23.0 0.0 2.2 2.42 1. 74 1.54 1.54 6.27
25.0 0.0 2.31 2.54 1. 84 1. 61 1. 61 6.45
27.0 0.0 2.42 2.66 1. 93 1. 68 1. 68 6.63
29.0 0.0 2.54 2.78 2.03 1. 74 1. 74 6~81
31.0 0.0 2.64 2.9 2.14 1.81 1. 81 6.98
33.0 0.0 2.75 3.01 2.25 1.86 1. 86 7.15
35.0 0.0 2.86 3.13 2.38 1.92 1.92 7.31
37.0 0.0 2.97 3.24 2.53 1.98 1.98 7.48
39.0 0.0 3.08 3.36 3.0 2.03 2.03 7.65
41. 0 0.0 3.18 3.48 3.0 2.09 2.09 7.82
43.0 0.0 3.3 3.6 3.0 2.14 2 .14 7.99
45.0 0.0 3.45 3. 72 3.0 2.19 2.19 8.16
47.0 0.0 3.55 3.85 3.0 2.23 2.23 8.33
49.0 0.0 3.59 3.98 3.0 2.28 2.28 8.5
51. 0 0.0 3. 72 4 .11 3.0 2.32 2.32 8.68 .. 53.0 0.0 3.85 4.26 3.0 2.37 2.37 8.86
55.0 0.0 3.99 3.48 3.0 2.41 3.0 7.78
57.0 0.0 4.13 3.6 3.0 2.45 3.0 8.06
59.0 0.0 4.27 3.69 3.0 2.48 3.0 8.35
61. 0 0.0 4.43 3.8 3.0 2.52 3.0 8.63
================================================================================
1-lw;. (u,_1e:R-t-014
.. PIPE CULVERT ANALYSI S
COMPUTATION OF CULVERT PERFORMANCE CURVE
June 16, 2004
============================================~===================================
PROGRAM INPUT DATA
DESCRIPTION
culvert Diameter (ft) ......................•................
FHWA Chart Number .......................................... .
FHWA Scale Number (Type of Culvert Entrance) ........•.......
Manning's Roughness Coefficient (n-value) .................. .
Entrance Loss Coefficient of Culvert Opening ............... .
Culvert Length (ft) ........................•........•.......
Invert Elevation at Downstream end of Culvert (ft ) ..•.......
Invert Elevation at Upstream end of Culvert (ft) ...••...•...
Culvert Slope (ft/ft) ...................................... .
Starting Flow Rate (cf s) ...........................•........
Incremental Flow Rate (cfs) ................................ .
Ending Flow Rate (cfs) ..•..................•...........•....
Starting Tailwater Depth (ft) .............................. .
Incremental Tailwater Depth (ft) ...................•...•....
Ending Tailwater Depth (ft) ............................••..•
VALUE
2.5
1
3
0.012
0.5
100.0
100.0
100.25
0.0025
1. 0
2.0
41. 0
0.0
0.0
0.0
================================================================================
COMPUTATION RESULTS .. Flow Tailwater Headwater (ft) Normal Critical Depth at Outlet
Rate Depth Inlet Outlet Depth Depth Outlet Velocity
(cfs) (ft) Control Control (ft) (ft) (ft) (fps) --------------------------------------------------------------------------------
1. 0 0.0 0.43 0.48 0.3 6 0.32 0.32 2. 68
3.0 0.0 0.77 0.85 0 . 62 0.57 0.57 3.59
5.0 0.0 1.0 1.12 0.8 1 0.74 0.74 4.13
7.0 0.0 1.21 1. 34 0.96 0.88 0.88 4.55
9.0 o.o 1.39 1. 54 1.11 1.0 1. 0 4.91
11. 0 0.0 1.55 1. 72 1. 24 1.11 1.11 5.22
13.0 0.0 1. 71 1. 89 1.37 1.21 1.21 5.51
15.0 0.0 1. 86 2.05 1. 5 1 1.31 1.31 5.78
17.0 0.0 2.01 2.21 1. 6 4 1.39 1.39 6.04
19.0 0.0 2 .16 2.37 1. 78 1. 48 1. 48 6.29
21.0 0.0 2.3 2.52 1. 9 4 1.56 1.56 6.53
23.0 o.o 2.44 2.68 2.14 1.63 1. 63 6.77
25.0 0.0 2.58 2.83 2.5 1. 7 1. 7 7.02
27.0 0.0 2. 72 3.0 2.5 1. 77 1. 77 7.26
29.0 0.0 2 .91 3.16 2.5 1.84 1.84 7.5
31. 0 o.o 2.99 3.34 2.5 1.9 1.9 7.76
33.0 0.0 3.15 2.86 2.5 1. 96 2.5 6.72
35.0 0.0 3.33 3.0 2.5 2.01 2.5 7.13
37.0 0.0 3.52 3.17 2.5 2.06 2.5 7.54
39.0 0.0 3. 72 3.32 2.5 2.11 2.5 7.95
41. 0 0.0 3.93 3.49 2.5 2.15 2.5 8.35
================================================================================
HYDROCALC Hydraulics for Windows, Version l.2a Copyright (c) 1996
Dodson & Associates, Inc., 5629 FM 1960 West, Suit e 314, Houston, TX 77069
Phone: (281)440-3787, Fax: (281)440-4742, Email:sof t ware@dodson-hydro .com
~All Rights Reserved.
fli.1J: Clfl-V@?:f OJ A
PIPE CULVERT ANALYSIS
COMPUTATION OF CULVERT PERFORMANCE CURVE
April 21, 2004
================================================================================
PROGRAM INPUT DATA
DESCRIPTION
Culvert Diameter (ft) .......•..............•................
FHWA Chart Number .......................................... .
FHWA Scale Number (Type of Culvert Entrance) ....•...•.......
Manning's Roughness Coefficient (n-value) .................. .
Entrance Loss Coefficient of Culvert Opening ............... .
Culvert Length (ft) .........•...............................
Invert Elevation at Downstream end of Culvert (ft) ......... .
Invert Elevation at Upstream end of Culvert (ft) •...........
Culvert Slope (ft/ft) ......•...••.•..•....•......•..........
Starting Flow Rate (cfs) ...•..•.•••..•...•...•........•.....
Incremental Flow Rate (cfs) .•............•.•.•........•.....
Ending Flow Rate (cfs) .........••....•......................
Starting Tailwater Depth (ft) ..•.....•...•......•...........
Incremental Tailwater Depth (ft) .........•..................
Ending Tailwater Depth (ft) ••..•..••.•..•.•.•.........•.....
VALUE
2.0
1
3
0 .0 12
0.5
50.0
100.0
100.25
0.005
1.0
2.0
21.0
0.0
0.0
0.0
================================================================================
1. 0
3.0
5.0
7.0
9.0
11.0
13.0
15.0
11.0
19.0
21.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.46
0.82
1.09
1.32
1.53
1. 74
1.93
2.13
2 .36
2.53
2.79
COMPUTATION RESULTS
0.0
0.0
0.0
o.o
0.0
0.0
0.0
2.34
2.53
2.74
2.98
0.33
0.56
0.74
0.88
1. 02
1.16
1. 29
1. 44
1. 61
2.0
2.0
0.34
0.6
0.79
0.94
1.07
1.19
1.3
1. 4
1. 49
1.57
1. 64
0.33
0.56
0.74
0.88
1.02
1.16
1.29
1. 4
1. 49
1.57
1. 64
3.01
4.13
4.77
5.23
5.57
5.84
6.05
6.41
6.79
7.19
7.61
================================================================================
HYDROCALC Hydraulics for Windows, Version 1.2a Copyright (c) 1996
Dodson & Associates, Inc., 5629 FM 1960 West, Suite 314, Houston, TX 77069
Phone: (281)440-3787, Fax: (281)440-4742, Email:software@dodson-hydro.com
All Rights Reserved.
..
PIPE CULVERT ANALYSI S
COMPUTATION OF CULVERT PERFORMANCE CURVE
April 21, 2004
================================================================================
PROGRAM INPUT DATA
DESCRIPTION
Culvert Diameter (ft) ...................................... .
FHWA Chart Number .......................................... .
FHWA Scale Number (Type of Culvert Entrance) ......•.........
Manning's Roughness Coefficient (n-value) .................. .
Entrance Loss Coefficient of Culvert Opening .•..•.•.......•.
Culvert Length (ft) ..............•................•.........
Invert Elevation at Downstream end of Culvert (ft) ......... .
Invert Elevation at Upstream end of Culvert (ft) .•.•........
Culvert Slope (ft/ft) ......•.............•........•.......•.
Starting Flow Rate (cfs) .................•........•.........
Incremental Flow Rate (cfs) ...•..•............•.......•.....
Ending Flow Rate (cfs) .....•..........•.....................
Starting Tailwater Depth (ft) .•..........•....•....•......•.
Incremental Tailwater Depth (ft) ..............•...•...•.....
Ending Tailwater Depth (ft) .......................•.........
VALUE
1.5
1
3
0.012
0.5
50.0
ioo.o
100.25
0.005
1.0
2.0
21.0
0.0
0.0
0.0
================================================================================
COMPUTATION RESULTS
Flow Tail water Headwater (ft) Nonnal Critical Depth at outlet
Rate Depth Inlet Outlet Depth Depth Outlet Velocity
(cfs) (ft) Control Control (ft ) (ft) (ft) (fps)
--------------------------------------------------------------------------------
1. 0 o.o 0.5 0.0 0.36 0.37 0.36 3.11
3.0 0.0 0.92 0.0 0.63 0.66 0. 63 4.22
5.0 0.0 1.25 0.0 0.86 0.86 0.86 4.79
7.0 0.0 1.55 1. 7 1.08 1.02 1.02 5.44
9.0 0.0 1.85 2.02 1.5 1.16 1.16 6.13
11. 0 0.0 2.26 1. 9 1.5 1.27 1.5 6.22
13.0 0.0 2.75 2.26 1.5 1.35 1.5 7.36
15.0 0.0 3.32 2.64 1.5 1.41 1.5 8.49
17.0 0.0 3.96 3.06 1.5 1. 44 1.5 9.62
19.0 0.0 4.7 3.53 1.5 1. 46 1.5 10.75
21. 0 0.0 5.51 4.05 1.5 1. 47 1.5 11. 88
================================================================================
HYDROCALC Hydraulics for Windows, Version 1.2a Copyright (c) 1996
Dodson & Associates, Inc., 5629 FM 1960 West, Suite 314, Houston, TX 77069
Phone: (281)440-3787, Fax: (281)440-4742, Email:software@dodson-hydro.com
All Rights Reserved.
/IP-) = C.1-ra:r [1A
.. PIPE CULVERT ANALYSI S
COMPUTATION OF CULVERT PERFORMANCE CURVE
April 21, 2004
================================================================================
PROGRAM INPUT DATA
DESCRIPTION
Culvert Diameter (ft) ........•..............................
FHWA Chart Number .......................................... .
FHWA Scale Number (Type of Culvert Entrance) ............... .
Manning's Roughness Coefficient (n-value) .................. .
Entrance Loss Coefficient of Culvert Opening ............... .
Culvert Length (ft) ..•......••..............................
Invert Elevation at Downstream end of Culvert (ft ) ......... .
Invert Elevation at Upstream end of Culvert (ft) ........... .
Culvert Slope (ft/ft) •......•...............................
Starting Flow Rate (cfs) .•.•..••..........................•.
Incremental Flow Rate (cfs) ..•..• , ..............•...........
Ending Flow Rate (cfs) ...•..•...............................
Starting Tailwater Depth (ft) ....•..........•...............
Incremental Tailwater Depth (ft) ........................... .
Ending Tailwater Depth (ft) •••.••...•...............•.....•.
VALUE
1. 25
1
3
0.012
0.5
50.0
100.0
100.25
0.005
1.0
2.0
21. 0
0.0
0.0
0.0
================================================================================
COMPUTATION RESULTS .. Flow Tailwater Headwater (ft) Normal Critical Depth at Outlet
Rate Depth Inlet outlet Depth Depth Outlet Velocity
(cfs) (ft) Control Control (ft ) (ft) (ft) (fps)
--------------------------------------------------------------------------------
1. 0 0.0 0.54 0.0 0.3 8 0.39 0.38 3.16
3.0 0.0 1.0 1.12 0.7 0.7 0.7 4.27
5.0 0.0 1.43 1.53 1.04 0.91 0.91 5.24
7.0 0.0 1.89 1. 6~---:r:-2 5 1. 06 1.25 5.7
9.0 0.0 2.56 2.21 1. 2 5 1.16 1.25 7.33
11. 0 0.0 3.41 2.85 1.25 1.2 1.25 8.96
13.0 0.0 4.42 3.59 1.25 1.23 1.25 10.59
15.0 0.0 5.6 4.46 1.25 1.24 1.25 12.22
17.0 0.0 6.94 5.44 1.25 1.24 1. 25 13.85
19.0 0.0 8.46 6.55 1.25 1.24 1.25 15.48
21. 0 0.0 10.14 7.78 1.25 1.25 1. 25 17.11
================================================================================
HYDROCALC Hydraulics for Windows, Version 1.2a Copyright (c) 1996
Dodson & Associates, Inc., 5629 FM 1960 West, Suite 314, Houston, TX 77069
Phone: (281)440-3787, Fax:(281)440-4742, Email:soft ware@dodson-hydro.com
All Rights Reserved .
..
11-jl.1 :. a11 .. Y£L7 u1A
---The Selected Return Period is 25 years.
*** End of Command File
..
Duration
***** HYDRO ***** (Version 6.0) ***** Date 12-03-**
25 Yr
Page No 2
IDF CURVEDDDDODODDDODDDOOOOODDODODDDOOOOO
IDF Curve for Various Return Periods
Intensities (in/h)
2 Yr 5 Yr 10 Yr 50 Yr 100 Yr
-----------------------------------------------------------------------------
5
10
15
30
60
120
4
8
16
24
..
min
min
min
min
min
min
h
h
h
h
4.960 3.179 3.917 4 .372 5.387 5.794
3.869 2.339 2.961 3.353 4.251 4.618
3.112 1. 756 2.297 2.645 3.461 3.801
2.119 1.111 1.504 1. 764 2.389 2.656
1.327 • 658 .915 1.087 1.511 1.695
.856 .425 .590 . 702 .975 1. 093
.500 .248 .345 .410 .569 .638
.273 .135 .188 .224 .311 .349
.143 .071 .099 .117 .163 .183
.097 .048 .067 .079 .no .124
GARFIELD COUNTY, COLORADOOODOOOOOOOO[][](]OOOODDDDOD
Intensity Curve for 25 Year Return Period
Rainfall Intensity (in/h) versus Duration (h)
4. 96* ........••••.....•...........••.•........•.•.........•.....•........
PEAK STAGE
+ (FEET)
6424.87
TIME
(HR)
16 .75
6-HR
6424.74
CUMULATIVE AREA =
,
MAXIMUM AVERAGE STAGE
24-HR 72-HR 24.92-HR
6423.15 6423.11 6423.11
1. 88 SQ MI
*** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** ***
147 KK
150 KO
151 RS
152 SA
153 SE
154 SQ
155 SE
156 SS
**************
* *
* DETENT * ION C
*
*""************
OUTPUT CONTROL VARIABLES
IPRNT 3
!PLOT 0
QSCAL 0.
HYDROGRAPH ROUTING DATA
PRINT CONTROL
PLOT CONTROL
HYDROGRAPH PLOT SCALE
STORAGE ROUTING
NSTPS
ITYP
RSVRIC
1 NUMBER OF SUBREACHES
x
AREA
ELEVATION
DISCHARGE
ELEVATION
SPILLWAY
CREL
SPWID
COQW
EXPW
ELEV TYPE OF INITIAL CONDITION
.00 INITIAL CONDITION
.00 WORKING R AND D COEFFICIENT
. 7 1.6 2 .8
6396.00 6398.00 6400.00
o. 4. 5. 14.
6396.00 6397.00 6398.00 6399.00
6399 .80 SPILLWAY CREST ELEVATION
10.00 SPILLWAY WIDTH
3.09 WEIR COE FFICIENT
1.50 EXPONENT OF HEAD
***
27.
6400.00
COMPUTED STORAGE-ELEVATION DATA
STORAGE .00 2.21 6.61
ELEVATION 6396.00 6398.00 6400.00
COMPUTED STORAGE-OUTFLOW-ELEVATION
STORAGE .00 .86 2.21 4.10 6.61
OUTFLOW .00 3. 78 5.34 14.42 27.45
DATA
+
+
+
+
, I
ELEVATION 6396.00 6397.00 6398.00 6399.00 6400.00
*** *** *** *** ***
HYDROGRAPH AT STATION DETENT
PEAK FLOW TIME MAXIMUM AVERAGE FLOW
6-HR 24-HR 72-HR 24.92-HR
(CFS) (HR)
(CFS)
23. 19.00 21. 8. 8. 8.
(INCHES) .089 .138 .138 .138
(AC-FT) 10. 16. 16. 16.
PEAK STORAGE TIME MAXIMUM AVERAGE STORAGE
6-HR 24-HR 72-HR 24.92-HR
(AC-FT) (HR)
6. 19.00 5. 2. 2. 2.
PEAK STAGE TIME MAXIMUM AVERAGE STAGE
6-HR 24-HR 72-HR 24.92-HR
(FEE.Tl (HR)
6399.65 19. 00 6399.52 6397.53 6397.48 6397. 48
CUMULATIVE AREA = 2.20 SQ MI
*** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** ***
163 KK
166 KO
167 RS
168 SA
169 SE
170 SQ
171 SE
************"'*
* *
* DE.TE.NT *
* *
**************
OUTPUT CONTROL
IPRNT
I PLOT
QSCAL
ION D
VARIABLE.S
3
0
0.
HYDROGRAPH ROUTING DATA
STORAGE ROUTING
NSTPS 1
ITYP E.LEV
RSVRIC .00
x .00
ARE.A • 4
ELEVATION 6388.00
DISCHARGE 0.
ELEVATION 6388.00
PRINT CONTROL
PLOT CONTROL
HYDROGRAPH PLOT SCALE
NUMBER OF SUBREACHES
TYPE. OF INITIAL CONDITION
INITIAL CONDITION
WORKING RAND D COEFFICIENT
1.2 2.2
6390.00 6392.00
2. 2 .• 11.
6389.00 6390.00 6391.00
23.
6392.00
+
+
+
+
1
+
+
+
172 SS
***
SPILLWAY
CREL
SPWID
COQW
EXPW
STORAGE
ELEVATION
STORAGE
OUTFLOW
ELEVATION
.00
6388.00
.oo
.00
6300.00
***
6391.90
20.00
3.09
1.50
1. 50
6390.00
.56
1. 69
6309.00
***
SPILLWAY CREST ELEVATION
SPILLWAY WIDTH
WEIR COEFFICIENT
EXPONENT OF HEAD
***
I
COMPUTED STORAGE-ELEVATION DATA
4. 76
6392.00
COMPUTED STORAGE-OUTFLOW-ELEVATION DATA
1. 50
2.37
6390.00
2.88
10.77
6391.00
***
4. 7 6
23.24
6392. 00
***
HYDROGRAPH AT STATION DE: TENT
PEAK FLOW TIME: MAXIMUM AVERAGE FLOW
6-HR 24-HR 72-HR 24.92-HR
(CFS) (HR)
(CFS)
21. 21.17 19. 7. 6. 6.
(INCHES) .090 .109 .108 .1 0 8
(AC-FT) 1 0. 13 . 13 . 13.
PEAK STORAGE TIME MAXIMUM AVE:RAGE STORAGE:
6-HR 24-HR 72-HR 24 .92-HR
(AC-FT) (HR)
4. 21. 08 4. 2. 1. 1.
PE:AK STAGE TIME: MAXIMUM AVERAGE: STAGE:
6-HR 24-HR 72-HR 24.92-HR
(FEET) (HR)
6391.81 21. 08 6391.70 6389. 49 6389 .4 3 6399. 43
CUMULATIVE ARE:A -2.27 SQ MI
RUNOFF SUM MARY
FLOW IN CUBIC FE:E:T PER SECOND
TIME IN HOURS, AREA IN SQUARE MILES
PEAK TIME: OF AVE:RAGE: FLOW FOR MAXIMUM PE:RIOD
OPERATION STATION FLOW PEAK
6-HOUR 24-HOUR 72-HOUR
HYDROGRAPH AT
AREAlA 74. 13.42 28. 0. 8.
ROUTED TO
DETENT 68. 13.67 20. 0. 9.
BASIN MAXIMU M TIME OF
AREA STAGE MAX STAGE
1. 58
1. 5 0
. '
.. TABLE OF CONT ENTS
PURP O SE AND SCO P E OF STUDY ........................................................................................................ -1 -
PROPOSED CO N STRU CTJO N ................................................................................................................ -l -
SITE CONDITJ ONS ................................................................................................................................... -2 -
GEOLOGJC CONDJTIONS ....................................................................................................................... -2 -
FORMATJON ROC K ............................................................................................................................ - 3 -
SURFICIAL SOILS ............................................................................................................................... -4 -
SUBSURFACE EXPLORATION .............................................................................................................. -4 -·•
SUBSURFACE CONDITIONS .................................................................................................................. - 5 -
GEOLOGIC SITE ASSESSMENT ............................................................................................................ -5 -
ROCKFALL ........................................................................................................................................... -5 -
STREAM FLOODING ........... : ................................... : .......................................................................... -6 -
ALLUVIAL FAN FLOODING ............................................................................................................. -6 -
MOISTURE SENSITIVE SOILS .......................................................................................................... -7 -
CONSTRUCTION RELATED SLOP E INSTABILI T Y ....................................................................... -7 -
REGIONAL EVAPORITE DEFORMATIONS .................................................................................... -7 -.. EARTHQUAKE CON SIDERATIONS ................................................................................................. -8 -
RADIATION POTENTIAL ........................................................................................................................ - 8 -
ENGINEERING ANALYSIS ..................................................................................................................... - 8 -
PRELIMINARY DESIGN RECOMMENDATIONS ................................................................................ - 9 --
FOUNDATIONS ................................................................................................................................... - 9 -
FLOOR SLAB ....................................................................................................................................... - 9 -
BELOW GRADE CONSTRUCTION ................................................................................................. -10-
ROADWAY GRADING ...................................................................................................................... -10 -
SURF ACE DRAINAGE ...................................................................................................................... -10 -
WATER TANK SITE .......................................................................................................................... -11-
LIMITATIONS ......................................................................................................................................... -11 -
REFERENCES ......................................................................................................................................... -13 -
FIGURE 1 -VICINITY MAP
FIGURE 2-PRELIMINARY GEOLOGY MAP AND EXPLORATORY P IT LOCATIONS
FIGURE 3 -LOGS OF EXPLORATORY PITS
FIGURES 4 - 6 -SWELL-CONSOLIDATION TEST RESULTS
TABLE 1-SUMMARY OF LABORATORY TEST RE SULTS
' .
..
..
..
PURPOSE AND SCOPE OF STUDY
This report presents the results of a preliminary geotechnical study fo r the propo se d
Springridge Place Phase II to be located along County Road 125, about five miles south
of Glenwood Springs , Garfield County, Colorado. The project site is shown on Figures l
and 2. The purpose of the study was to evaluate potential geologic hazard impacts , and to
develop recommendations for preliminary design of the building foundation and site
grading . The study was conducted in accordance with our agreement fo r professional . . .
engineering services to The Greenwald Children's Trust, dated Apri l 6, 1994 and
subsequent proposal to Glenwood Brokers , Ltd. dated May 28; 2004 . This report is an
update of our previous stlidy for the proposed d_evelopment (Hepworth -Pawlak
Geotechnical, 2001 ).
A field exploration program consisting of a geologic reconnaissance and exploratory pits
was conducted to obtain information on the site and subsurface conditions. Samples
obtained during the field exploration were tested in the laboratory to detennine their
compressibility, classification and other engineering characteristics. The results of the
field exploration and laboratory testing were analyzed to develop recommendations for
planning and preliminary design for building foundation and site grading. This report
summarizes the data obtained during this study and presents our conclusions,
recommendations and other geotechnical engineering considerations based on the
proposed development and the subsurface conditions encountered.
PROPOSED CONSTRUCTION
Development plans for the Phase II part of the property consist of 81 single family
residential lots having sizes between about 1 acre to greater than 4 acres . Six of the lots
will be located uphill of County Road 125 and the rest of the lots will be located in the
valley bottom to eastern valley side. All of the building areas will be on slopes less than
40%. A private roadway system will provide access to the east of County Road 125 . The
development plan is shown on Figure 2. Water and sewer services will be from central
lnh Nn . IOI 126
..
..
..
-2 -
systems. The ro adway grading is as sumed to be minor \Vith c uts and fill s up to ab out 1 O
feet deep. The Atkinson Ditch \Vill be piped t hrough the de velopm ent.
SITE CO NDITIONS
The development is situated on an upland surfa ce adj ac en t t o the ea st Dank of the Grand
Hogback, a large northwest trending ridge. The elevations v ar y from about 6400 f eet at
the nmih end to 7200 feet on top of the ridge at the southwest boundary . Building site s
only extend to about elevation 6,550 feet on th e east flank o f the hogback (west side of
the development). Two smaller hogbacks occ ur to the east. A Jew bedrock outcrop s
occur on the hogbacks . An ephemeral stream drains toward the no1ih . A tributary joins
the main drainage near the c~nter of the site . A rro yo cutting is occurring at the south end
of these drainages . Several irrigation ditches are located on the development. The central
portion of the site is mostly a fairly flat valley floor. The south, west and east sides h av e
steep slopes.
County Road 125 runs through the development from northwest to southeast, parallel ing
the lower slope of the Grand Hogback. A ranch house and out buildings are located n ear -
the center of the development. The existing development is locat ed to the north. The
valley bottoms have been used for hay and pasture. Some trash was noted adjacent to the
east drainage at one location. Otherwise , the d evelopment area is t ypically natural.
Vegetation on the slopes consisted of sage, pin on, j uniper and other brush. The valley
bottoms have grass and sage. An existing above ground, steel water tank is located west
of Lot 6.
GEOLOGIC CONDITIONS
The project site is located on the limb of the Grand Hogback monocline. This first order
regional structure defines the boundary between the Pieance basin that lies to the west and
the Carbondale evaporite collapse center that li es to the east (Kirkham and Widmann,
1997). The monocline was fonned during the Laramide orogeny about 40 to 70 million
HP
.., -.) -
years ago as a result ofregional compressional stresses. The sedimentary rocks on the
monocline limb in the project area have an average strike of about N 30° W. The average
dip of the monocline limb in this area is about 45° to the southwest. but dips in the proj ect
area vary from 9° to 78 ° because of secondary folding (Kirklrnm and Others, 19 96 ).
Locally the bedding is ove1iurned and the bedding dips are as much as 28° to th e
northeast in the eastern part of the project area. Faults have not been mapped at the
project site, but regional mapping has identified several n01ihwest trending , down to the
southwest normal faults to the west of the project area (Kirkham and Other s, 1996).
These faults appear to be bedding plane fault s fri the Mancos Shale and Mesa Verde
Group that result from shallow crustal strains associated with ~vapori te solution and flow
in the Carbondale evaporite collapse center. The faults displace and form scarps in
. .
Pleistocene and possibly Holocene age debris flow deposits (Kirkham and Others , 1996).
This indicates that some of the faults may have movements that are younger than 10,000
years.
FORMATION ROCK
Fonnation rock at the project site includes the Cretaceous Dakota Sandstone (Kd), the
Jurassic Morrison Fonnation (Jm) and Entrada Sandstone (Je), the Triassic and Permian
Chinle and State Bridge Formations (TRPcs) and the Permian and Pem1sylvanian Maroon
Formation (PPm), see Figure 2. The project site is located in a strike valley between two
hogback ridges. The resistant Entrada Sandstone forms the crest of the hogback along the
western side of the project area and resistant beds in the Maroon Formation fom1s the
hogback along the eastern side of the project area. All of the proposed development will
be in areas underlain by the Maroon Formation. The Maroon Formation is made up of
red interbedded sandstone, siltstone, rnudstone and shale with some minor, thin gray
limestone beds. The rock is usually hard and cemented. The rock mass is cut by joints
that parallel the bedding and at high angles to the bedding.
lnh Nn 101 1?6
..
..
-4 -
SURFICIAL SOILS
Formation rock in the project area is usually covered by surficial soi l s . Relatively
shallovl colluvium (Qc) and local rock outcrops are present on the boundary hogbacks
and upland ridg es on the valley floor. Small alluvial fans (Qaf) have developed at the
mouths of several ephemeral drainages on the eastern hogback. Alluvial aprons (Qaa)
have developed along the lower part of the western hogback and lower slopes of the
·• upland ridges on the valley floor. The relatively flat valley floo r at the project site is
underlain by alluvium (Qal) that grades to a low terrace level _along Four Mile Creek to
the north of the project area. This terrace lies about 10 to 20 feet above the modern creek
channel and most of the valley floor alluvium in th e project area was probably deposited
during the late Pleistocene .
The exploratory pits show that the surficial soils at the project site are typically sanely
clay and silty sand with angular rock fragments fr om gravel-to boulder-size . Formation
rock was less that five feet deep in several of the pits located on the lower parts of the
boundary hogbacks and upland ridges on the valley floor.
SUBSURFACE EXPLORATION
The subsurface exploration for the project was conducted on April 13, 22 and 29, 1994.
Eleven exploratory pits were excavated at the approximate locati ons shown on Figure 2 to
evaluate the subsurface conditions. The pits were dug with a rubber tired backhoe and
logged by a representative of Hepworth-Pawlak Geotechnical, Jnc.
Samples of the subsoils were taken with relatively undisturbed and disturbed sampling
methods. Depths at which the samples were taken are shown on the Logs of Exploratory
Pits, Figure 3. The samples were returned to our laboratory for review by the project
engineer and testing.
lnh Nn 101 126
..
..
..
-) -
SUBSURFACE CONDITIONS
Graphic logs of the subsurface conditions encountered at the site are shown on Figure 3.
The subsoils encountered in the valley bottom areas consist of about 1 to 1 Y:> feet of
topsoil above sandy silty clay and silty sand with rock fragments. On the valley side
slope areas, sandstone bedrock was encountered between deptbs of 12 to 6 feet below
rocky, silty sand and clay colluvial soils. The bedrock is generally hard to very hard and
·• could not be effectively dug with the backhoe. The soil moisture was relatively lmv and
no free water was encountered to the pit depths of 8 to 11 feet.-The central field area was
being flood irrigated at the time of our April 29, 1994 site visit.
Laboratory testing performed on samples obtained from the pits included natural moisture
content and density, gradation analyses, and liquid and plastic limits . Results of
consolidation testing performed on relatively undisturbed liner samples of the sandy clay
and silt soils, presented on Figures 4, 5 and 6, indicate low compress ibility under initial
low moisture conditions and moderate to high compressibility when wetted and loaded.
The samples generally showed a low to moderate collapse potential. The liquid and
plastic limits testing i11dicates the soils are generally low plasticity. The laboratory testing
is summaTized in Table 1.
GEOLOGIC SITE ASSESSMENT
There are several conditions of a geologic nature that should be considered in project
planning and design. These conditions and their expect influence on the proposed
development are discussed below.
ROCKFALL
In some places outcrops of Entrada Sandstone along the western hogback crest are
potential start areas for rockfall that could potentially reach building sites on Lots 1
..
..
..
-8 -
EARTHQUAKE CONSIDERATIONS
The project are a could e xperience m oderat ely s trong earihquake rel at ed gro und shakin g .
Modified Mercalli Int ensity VI ground shaking sh o uld be ex p ected d ur ing a reaso nab le
service life for the development but the prob ability for stron ger ground shakin g is lo w.
Intensity VI ground shaking is felt by most peo ple and causes general alarm, but result s in
negligible damage to structures of good desi gn and construction. Occupied structures
should be designed to withstand moderately st rong ground shaking with little or no
·• damage and not to collapse under stronger ground shaking. Considering the nature of the
faults to the west of the project area , in our opinion, these fault s although geologicall y
young do not increase the earthquake potenti al at the project site . The region is in the
1997 Uniform Building Cod~, Seismic Risk Zorie I . Based on our cmTent understanding
of the earthquake hazard in this part of Colo rado, we see no reason to increase the
commonly accepted seismic risk zone for th e area .
RADIATION POTENTIAL
The project site is not located in an area where geologic deposits are expected to have
unusually high concentrations of radioactive minerals. However, there is a potential that
radon gas could be present in the area. It is di fficult to assess the potential for future
radon gas concentrations in buildings before the buildings are constructed. Testing for
radon gas can be done when the residences and other occupied structures have been
completed . New building are often designed w ith provisions for ventilation of lower
enclosed spaces should post construction test ing show unacceptable radon gas
concentrations.
ENGINEERING ANALYSIS
The subsurface conditions encountered throu ghout the project are a are variable but should
be suitable for suppo1i of spread footing foun d ations. The colluvium in the steeper slop e
areas and the fine-grained soils in the non-irr igated valley bottom areas tend to be
' 1 °"" T _ 1 ru 1 ""I t.:"
'.
..
..
..
-9 -
bydrocompressive. \Ve expect that the soils in the historically irrigated fields have been
wetted and should be less prone to hydrocompression . The bedrock ""ill provide
excellent support for buildings. Ground,:vater \.Vas not encountered and basement level
construction appears feasible in most areas of the property. The bedrock is very hard and
may limit the practical use of basements, especially where the rock is cemented and
requires blasting to dig. The soils and bedrock should be suitable for typical roachvay
grading with the expected relatively minor cut and fill sections.
PRELIMINARY DESIGN JIBCOMMENDATIONS
Development of the property should be feasible based on geotechnical considerations.
The following recomrnendations are made for p°Ianning and preliminary design of the
buildings and site grading .
FOUNDATIONS
Spread footings placed on the natural soils below the topsoil should be suitable for
support of typical light residential building loads. Allowable soil bearing pressures in the-
. range of 1,000 psf to 2,000 psf should be acceptable. The hydrocompression potential
can probably be mitigated by engineered foundation design and should be evaluated on a
site specific basis. Compaction of the subgrade can help reduce the settlement potential.
Footings placed on the bedrock materials should have allowable bearing pressures in the
range of 3,000 psf to 6,000 psf. Additional subsurface exploration should be performed
by the individual lot owner when the building location, grading and loading conditions
have been determined to provide the site specific bearing recommendations.
FLOOR SLAB
The natural soils below the topsoil should be suitable for support of lightly loaded slabs-
on-grade. The upper soils may be compressible and result in some slab movement.
Removal and recornpaction can reduce the potential for movement. Separating the slab
. '
..
..
-10 -
from the bearing walls and colunms is usu ally ad eq ua te to allow for slight mo ve me nt and
limit potential distress. Backfi!J p laced beneath slabs should consist of properly placed
and compacted soil excluding vegetation, topsoil and oversized rock.
BELOW GR.t\DE CONSTRUCTJON
Basement level construction should not enc o unter shallo\v groundwater but seasonal
perched water could occur from springtime runoff and local iITigation. We unders t and
that the Atkinson Ditch will be lined with a s ofiC! pipe. Subsurface drainage is
recommended to protect below grade construction. Typically_,_ this consists of foundation
drains and underslab free draining gravel connected to a gravity outlet. The bedrock is
shallow or outcrops in most ·of the valley side siopes and could make building excavations
very difficult to dig .
ROAD\V A Y GRADING
We assume grading for the roadway development will be relatively minor. Existing
topsoil ; vegetation and debris should be removed from the cut and embankment fill areas..
Slopes greater than 20% should be benched beneath fill areas. The exposed surface
should be moistened to optimum and compact ed to at least 95% of st andard Proctor
density. Structural fill should then be placed and compacted to the project specifications
and elevations. Cut and fill slopes should be graded at 2 horizontal to 1 ve1iical or flatter.
Embankment fill should be compacted to at least 95% of standard Proctor density near
optimum moisture content. The on-site soils devoid of vegetation, topsoil , debris and ·
oversized rock should be suitable for use as structural fill. Positive drainage away from
the road surface and subgrade should be provided.
SURF ACE DRAINAGE
Positive smface drainage should be provided around the buildings and throughout the site
to prevent ponding adjacent to structures and roadways. The Atkins on Ditch through the
Job No. IOI 126
I I
..
..
-11 -
building area should be lined to prevent seepage impact on adjacent sites. The natural
drainages from the upper valley areas and the v alley side slopes can probably be used to
provide positive drainage through the prope1iy. The soils are susceptible to erosion,
particularly after the vegetation is stripped. G ullying can be expected on unprotected
slopes unless properly protected.
WATER TANK SITE
An above ground steel water tank is proposed r:i.~ar the southeast end of the project above
County Road 125 (see Figure 2). The tank will be similar to the existing tank located
..
uphill of County Road 125 west of Lot 6. The proposed tank site is located on a northeast
sloping hillside that consists·of relatively stable· colluvial depos its above Maroon
Formation. We assume that the tank pad will be developed mainly by cutting and could
transition the colluvial soils and fo rmation rock .
The site should be suitable for the proposed tank based on geotechnical considerations.
The bearing conditions could be variable and have differential settlement potential
between soil and rock areas. The site specific subsurface conditions should be evaluated
for the tank and grading designs.
LIMITATIONS
This report has been prepared in accordance with generally accepted geotechnical
engineering principles and practices in this a rea at this time. We make no warranty either
express or implied. The conclusions and recommendations submitted in this report are
based upon the data obtained from our site reconnaissance, the exploratory pits dug at the
location indicated on Figure 2, the assumed type of construction and our experience in the
area. Our findings include interpolation and extrapolation of the subsurface conditions
identified at the exploratory pits. Additional exploration and analysis is recommended for
the individual building foundatio n design.
JobNo. 101126
I'
..
..
..
-12 -
This report has been prepared fo r the exclusive use by our client for planning and
preliminary design purposes. We are not re sponsible for technical interpretations by
others of our information. As th e project evolves . 've should provide continued
consultation to verify that the recommendations have been appropriately interpreted. We
recommend observation of excavations for bearing conditions and testing of structural fill
by a representative of our office.
If you have any questions or if we can be of further assistance, please let us know.
·•
Sincerely,
HEPWORTH-PAV/LAK GEOTE CHNICAL, INC .
Steven L. Pawlak, P.
and By:
Ralph G. Mock
Engineering Geologist
SLP/ksw
cc: Sopris Engineering -Attn : Yancy Nichol
Job No. 101 126
101 126 HEPWORTH-PAWLAK
GEOTECHNICAL, INC. VICINITY MAP Fig. 1
''
..
Qc/Kd
0 1000 ft .
I
Scale : 1 in. = 1000 ft .
Contour Interval : 10 ft.
June 2004
Explanation:
Qc/PPm
Qa1 Valley Floor Alluvium
Qaa Alluvial Apron
Qaf Alluvial Fan
Qc Colluvium
Kd Dakota Sandstone
Jm Morrison Formation
Je Entrada Sandstone
TRPcs Chinle & State Bridge Formations
PPm Maroon Formation
101 126
HEPWORTH-PAWLAK
GEOTECHNICAL, Inc.
•
Contact:
Approximate boundary of map
units .
Exploratory Pit:
Approximate location of
exploratory pit .
Potential Rockfall Start Area:
Approximate location of potential
rockfall start zone .
Springridge Place Phase II
Preliminary Geology Map and Exploratory Pit Locations
Figure 2