Loading...
HomeMy WebLinkAboutFoundation Design4 REMOVE (E) 2x BEARING WALL AT NEW OPENING PER PLAN (E) P.T. SILL PL-V.J.F. (E) FLOOR SHTG (E) FLOOR JOIST T.O. PLY~ PER PLAN I RE: 1 &2/S2.1 FOR MORE INFORMATION I (E) 8" CONC WALL-V.l.F. TRUCTURA DESI N llWW.evcMslructaim 11140 Main Street Camondale, co 81623 [970) 510-0173 (E)CONC FTG 0 FOUNDATION SECTION SCALE: ~· = 1'-0" MCLEAN ADDITION 68 BALD EAGLE WAY CARBONDALE, CO 81623 DATE: 10115115 PROJECT#: 15.012C DRAWN BY: HLH CHECKED BY: SM 3/S2.1 REV 1 (E) 2x6@ 16°0.c. ·VI F. ~ _ (E)CONTP.T.SILL ~ (E> STONE VENEER PL & CONN • V.l.F. (E) GARAGE S O.G. OVERFRAME PER ARCH ~ T.O.SLAB PER PLAN -.evdvestruc:t.ccm 1040 Marl Street Cartmlale, co 81623 (970 j 51G-0773 Jl .. <t .. 4 .. ., .. 0 .:1 '1, .. ~· EXP JOINT MATL • TYP S.O.G. PER PLAN (E) 8" CONC WALL· VJ F . T.O.CONC ~ PER PLAN FOUNDATION SECTION SCALE : ~· = 1'~" MCLEAN ADDITION 68 BALD EAGLE WAY CARBONDALE, CO 81623 DRAWN BY: HLH CHECKED BY: SM DATE: 10/15115 PROJECT#: 15.012C 2/S2.1 REV 1 i ' , OVERFRAME(E)SLAB ~LH \:2.1 , --~... --vrv~ -D I " DRILL & EPOXY ALL r ,_Ii' HORIZ RE INF 6" IN (E) r CONC WALL -EA StDE - < E) (3) 2x10 -DROP P "'=- SLAB ON GRADE 4" CONC RETE SLAB ON 6" DRAINAGE GRAVEL & COMPACTED STRUCTURAL FILL PER GEOTECH . REINFORCE SLAB w/ #3@ 18"o.c. ~ ,1 EA WAY OR 6x6-W2.1xW2.1 WWF, CENTERED 11 ~----------~~ 3 r --~-I T.O.CONC =99'-11WV l.F.I J ) - Ao. T.0 . WALL /,, 15·4%• 17 '1 V 99'-11.Y.°V.l.F. 11+----------------+r; • -+-1--~ -·-r- ~ 1 DEN ' R ~ (E)(2) 11%° LVL .-T"'<--1-t-IH-lf-----------------' I DROPPED '~,~-+~.r--t-HL.L.+-------....,----~..--,---------t 1 II __ _......._......_ _____ __,,,___,__ ________ ,.,_ .. H +-t-----f--+-1 I ---..... y I ---- ------- -- ~O .WALL ..,_ • / 99'-9"1 'I' (E) 8.0 . WALL ..,_ /~.~ "' ~PARTIAL FOUNDATION & A MAIN FLOOR FRAMING PLAN I SCAL E. )'.• = 1'-0" I --+---~--I I DRAWN BY: HLH MCLEAN ADDITION CHECKED BY: SM 68 BALD EAGLE WAY CARBONDALE, CO 81623 A/ s 1 .1 ~ .,. . ~ TRUCTURA OESl1.JN www.e~a.n 1~Mainsmt CartJondiOO. co 81623 19ro1s10-0m DATE : 10/15/15 I PROJECT#: 15 .012C REV 1 - EXTERIOR SHEATHING PER BRACED WALL PANEL NOTES ON SO.O 2x BEAR ING WALL PER PLAN E N. PER SCHED EXT CONC PATIO PER ARCH CONC WALL wt #4 VERT & __/ ~ HORIZ@ 18"o.c., CNTRD, w/ ~ (2) #5 CONT TOP (") CONC FTG wt (2) #5 BOT , o FNDDRAIN& GRAVEL AS REC'D ' • 4 ., . 16" l b ...... CONT P.T. 2x6 SILL PL w/ Y,-0 A.B.@ 48"o.c. w/ 7" MIN EMBED IN CONC Yi° EXP JO INT MATL-TYP S.O.G. PER Pl.AN T.O.CONC ~ PER PLAN FOUNDATION SECTION TRUCTURA DE SI N -··~gJTI 1040 Mafl Street Cartmlale , co 81623 (970) 51o.-077J SCALE : ~· = 1'-0" MCLEAN ADDITION 68 BALD EAG LE WAY CARBONDALE, CO 8162 3 DATE : 10/15/15 PROJECT # : 15 .012C DRAWN BY: HLH CHECKED BY: SM 1/S2 .1 REV 1 NEW 4" REINFORCED CONCRETE STEP. VERIFY CONDITIONS IN FIELD PRIOR TO FORMING. SAW CUT EXISTING SLAB AT NEW WALL (PROVIDE BOND BREAK) T.EXSTG.SLAB SEE PLAN T. WALL= 99'r11" T. WALL AT DOOR= gg•:s· (SHOWN) T. LEDGE= 99•.3• i;)CTERllR F1 (New Main Floor System-Interior Slab on Grade~ 4" reinforced concrete slab on 6-mil, or 3-mll cross laminated polyethylene flexible sheethlng material (per AF103.3 IRC 2009) soll-gas-retarder on 4" washed gravel (RE: Soils Report for backfill, compacting, and gravel requirements) (RE: Structural drawings for slab reinforcing requirements). Caulk al penetrations to the slab, Including joints, with a polyurethane caulk or equivalent sealant applled In accordance to manufacturer's recommendations (PER AF103.4). RE: Appendix F: Radon Control Methods, IN IRC 2009 for all other potential floor penetrations. Floor finish to be ceramic or natural stone tile on anti-crack tile underlayment mat. See drawings for location of floor finishes. Total estimated floor build-up above plywood to top of finished floor= 1•. W2 (Exterior Wall System, Below Grade Crawl Space): 2 3/8" (R-10) Warm and Drl Insulation, or equivalent, protection, drainage board on exterior foundation dampproofing on 8 11 concrete foundation wall. JOBI: -llRA'MI: ~ QiEQl(E): MJll l'RIHTEl: ID.l&~ SHECTTm.E: co 1.0 Mclean Addition 611 Bald Eegle Wfl'/ Clrbolldaie, Colcndo 816Zl OiANGE ORDER 11. REVISED R.OOR SYSTEM AT MAlN LEl/B. DEN SILL SEAL FOR CAPILLARY BREAK -TREATED SILL PLATES T.SLAB 99•_,,.s POLYETHYLENE RUNS UP WALLAT EDGES AND IS --TO BE SEALED AT SLAB DETAIL 1/A5.0 REVISED 10.16.15 . ,,.. F1 REVISED 10.16.15 W2 REVISED 10.16.15