Loading...
HomeMy WebLinkAbout1.0 ApplicationGARFIELD COUNTY Building & Planning Department 108 8ih Street, Suite 201 Glenwood Springs, Colorado 81601 Telephone: 970.945.8 21 2 F acsimile: 970. 38 4.347 0 www. q a rfi e ld-cou ntv. co m Subdivision Application Form GENERAL INFORMATION (To be completed by the Subdivision Name: Srnf eilf VtAtA< Type of Subdivision (check one of the following types): Sketch Plan t/ Preliminary Plan _ Final Plat Name of Property Owner' \( e V in..t Address: Ot q 3 SV:OLT t,tlATZK Citv: GY Plurvt State: Cr-Zip code:8 /[37 FPx'52*/q{S Name of Aoplicant (if other than owner): Address:Telephone: City:State:Zip Code: F Name of Enqineer: F Address, ?,O box FAX: xlnicn lx/,me< E,te;7u66s9 Trlc. arq Telephone:q+s ^ -7) g{ ) City: Gler'lrucroD 9I2i nrds State: G . Zip code: B tuo r r px:1 4€-QZt o Name of survevor: \il h",4,2 € u nu t )ntC- Address: PO {lox I /e Tetephone , €2 y'' l lr Z j City: G,r osu,nn State:C,zip code: &t (,]f_ F px: € 2 I -?80 Z Fox + (om xl 1Z 310 - 4C 4z zip coae:B I b7 Z F Px: q&--2A89 A/ Slott Telephone'€24 - /E l'(' 6,tt,rli A I City: iJD. l'(-./, ,' {dvl*r-n> I. THE SUBDIVISION PROCESS ln order to subdivide land in Garfield County, an Applicant is required to complete the following land use processes in the following order: 1) Sketch Plan Review Process, 2) Preliminary Plan Review Process, and 3) Final Plat Review Process. This section will briefly describe the nature of each process and provide general direction including subdivision regulation citations to a potential applicant requesting subdivision approval in Garfield County. All of the Garfield County Zoning and Subdivision Regulations are located for purchase at the Planning Department and can also be found on the World Wide Web at the following address: http://www.qarfield-countv.com/buildinq and planninq/index.htm A) The Sketch Plan Review (Section 3:00 of the Subdivision Regulations) 1. Purpose The purpose of the Sketch Plan process is to allow an individual an opportunity to propose a subdivision in a "sketch" format to the Planning Department and the Garfield County Planning Commission in order to obtain a cursory review for compliance with the County's land use review documents, regulations, and policies to identify any issues that would need to be addressed if the proposed subdivision were to be pursued. 2. Aoplicabilitv Any individual proposing a subdivision in Garfield County is required to complete the Sketch Plan review process as the first step in Garfield County's Subdivision process. More specifically, Garfield County defines a subdivision (Section 2:20.48) as the division of a lot, tract or parcel of land into two (2) or more lots, tracts, parcels or separate interests, or the use of any parcel of land for condominiums, apartments or other multiple-dwelling units, as further defined by Colorado state law. 3. Application i Submittal Requirements ln order to apply for a Sketch Plan Review an Applicant is responsible for reviewing Section 3:00 of the Subdivision Regulations and providing enough information to the Planning Department in the application to conduct a thorough review and provide the resulting comments to the Planning Commission for their review and comments. Specifically, Section 3:30, 3:32, and 3:40 of the Subdivision Regulations contain the specific information required to be submitted to the Planning Department in order to satisfy the application requirements in addition to the information requested on this application form. 4. Process / Public Meetinq The Sketch Plan review process is considered a 1-step process because the application is reviewed only by the Planning Commission at a public meeting. ln order to appear before the Planning Commission, an applicant will have submitted all required application submittal requirements mentioned above to the Planning Department Staff. Once submitted, Staff will have 15 working days to review the application to determine if all the required submittal information has been submitted as required. lf Staff determines that all the required information has been submitted, a letter will be sent to the applicant indicating the application has been deemed "technically complete." lt is at this point Staff will also indicate when the application has been J scheduled to be reviewed before the Planning Commission and will request the applicant supply additional copies to provide the Commission for their review. lf Staff determines that all the required information has not been submitted, a letter will be sent to the applicant indicating the application does not comply with the submittal requirements and therefore has determined the application to be "technically incomplete." The letter will also outline the applications deficiencies so that the applicant knows what additional information needs to be submitted. At this point, the applicant has 6 months (180 days) to provide the necessary information to the Planning Department to remedy the application so that it may be deemed technically complete. !f the application has not been deemed technically complete within this time, the application will be terminated. Once the application has been deemed technically complete and a date has been established as to when the Planning Commission will review the application, Staff will conduct a land use review of the application using the County's land use regulatory documents including the Zoning Resolution, Subdivision Regulations, and the Comprehensive Plan of 2000. ln addition, Staff will also consider referra! comments provided from a variety of state and local agencies who may also review the application. As a result, Staff will write a Memorandum on the proposed subdivision to the Planning Commission containing the results on the land use analysis. This Memorandum will also be furnished in advance to the applicant. At the date and time set for the public meeting before the Planning Commission, Staff will present the findings in the Memorandum and the applicant will be required to present the proposed subdivision and respond to comments and questions provided by the Planning Commission. The comments provided to the Applicant by the Planning Department and the Planning Commission as a result of the Sketch Plan Process will be kept on file in the Planning Department for 1-year from the meeting date before the Planning Commission. lf an Applicant does not submit a Preliminary Plan application to the Planning Department within the 1-year timeframe, the Sketch Plan file will be closed and the Applicant will need to reapply for a Sketch Plan review prior to a Preliminary Plan review. B) Preliminarv Plan Review (Section 4:00 of the Subdivision Regulations)' 1. Puroose The purpose of the Preliminary Plan review process is to conduct a thorough review of the many aspects that are associated with dividing land in Garfield County for the purposes of residential, commercial, and industrial development. This is the most intensive review step where the Building and Planning Staff, the Planning Commission, and the Board of County Commissioners (BOCC) will conduct a thorough review of all the issues associated with the proposed subdivision against the County's regulatory requirements. Ultimately, the purpose of this process is to identify all the major issues in the proposed subdivision by using the County's Zoning Resolution, Subdivision Regulations, Comprehensive Plan of 2000, as well as other state and local referral agencies that will provide comments on any issues raised in their review. This is the process that will either approve or deny the application request. 4 2. Applicabilitv Any individual proposing a subdivision in Garfield County is required to complete the Preliminary Plan review process as the second and most intensive step in Garfield County's Subdivision process. More specifically, Garfield County defines a subdivision as the division of a lot, tract or parcel of land into two (2) or more lots, tracts, parcels or separate interests, or the use of any parcel of land for condominiums, apartments or other multiple-dwelling units, as further defined by Colorado state law. 3. Aoplication / Submittal Requirements In order to apply for a Preliminary Plan Review, an Applicant must have already completed the Sketch Plan review process addressed in Section 3:00 of the Subdivision Regulations. An applicant requesting Preliminary Plan review will be required to submit this application form, all the required submittal information contained in Sections 4:40 to 4:94 of the Subdivision Regulations as well as address all of the applicable Desiqn and lmprovement Standards in section 9:00 of the subdivision Regulations. ln addition to the substantive submittal information related to the proposed subdivision project itself, an applicant is required to complete all the public notice requirements so that legal public hearings can be held before the Planning Commission and the BOCC which is addressed in Sections 4:20 - 4:31of the Subdivision Regulations. 4. Process / Public Hearinqs The Preliminary Plan review process is considered a 2-step process because the application is ultimately reviewed by two County decision-making entities during public hearings: the Planning Commission who makes a recommendation to the BOCC. ln order to obtain dates for the public hearings before the Planning Commission and the BOCC, an applicant will have submitted all required application submittal requirements mentioned above to the Planning Department Staff. Once submitted, Staff will have 30 working days to review the application to determine if all the required submittal information has been submitted as required. lf Staff determines that all the required information has been submitted, a letter will be sent to the applicant indicating the application has been deemed "technically complete." lt is at this point Staff will also indicate when the application has been scheduled to be reviewed before the Planning Commission / BOCC. Additionally, Staff will provide the applicant with the notice forms to be mailed, published, and posted. lf Staff determines that all the required information has not been submitted, a letter will be sent to the applicant indicating the application does not comply with the submittal requirements and therefore has determined the application to be "technically incomplete." The letter will also outline the applications deficiencies so that the 5 applicant knows what additional information needs to be submitted. At this point, the applicant has 6 months (180 days) to provide the necessary information to the Planning Department to remedy the application so that it may be deemed technically complete. lf the application has not been deemed technically complete within this time, the application will be terminated. Once the application has been deemed technically complete and a date has been established as to when the Planning Commission / BOCC will review the application, Staff will conduct a land use review of the application using the County's land use regulatory documents including the Zoning Resolution, Subdivision Regulations, and the Comprehensive Plan of 2000. In addition, Staff will also consider referral comments provided from a variety of state and local agencies who may also review the application. As a result, Staff will write a Memorandum on the proposed subdivision to the Planning Commission / BOCC containing the results on the land use analysis. This Memorandum will also be furnished in advance to the applicant prior to the public hearings. As mentioned above, Staff makes a recommendation to the Planning Commission and the BOCC regarding the issues raised in the analysis of the proposed subdivision. The Applicant will first propose the subdivision to the Planning Commission who is responsible for making a recommendation of approval, approval with conditions, or denial to the BOCC. Next, the application will be reviewed by the BOCC during a regular public hearing. The BOCC will consider the recommendations from the Planning Staff and the Planning Commission, the information presented by the applicant, and the public. As a result, the BOCC is the final decision-making entity regarding the proposed subdivision and will either approve, approve with conditions, or deny the application. lf the BOCC approves the subdivision application at the public hearing, the approval shall be valid for a period not to exceed one (1) year from the date of Board approval, or conditional approval, unless an extension of not more than one (1) year is granted by the Board prior to the expiration of the period of approval. (See the specific information provided in Section 4:34 of the Subdivision Regulations.) Following the hearing, Staff will provide a resolution signed by the BOCC which memorializes the action taken by the Board with any / all conditions which will be recorded in the Clerk and Recorder's Office. Once an applicant has Preliminary Plan approval, they are required to complete the third and final step in the County's Subdivision Process: Final Plat Review. C) Final Plat Review (Section 5:00 of the Subdivision Regulations) 1. Purpose The purpose of the Final Plat review process is to provide the applicant with a mechanism to prove to the County that all the conditions of approval required during the Preliminary Plan review process have been met / addressed to the satisfaction of the Planning Staff and the BOCC. This being the case, the chairman of the BOCC will sign the Final Plat and have it recorded memorializing the subdivision approval granted by the BOCC. This is the last step in the County's subdivision process. 2. Applicabilitv Any individual proposing a subdivision in Garfield County is required to complete the Final Plat review process as the third and last step in Garfield County's Subdivision process. More specifically, Garfield County defines a subdivision as the division of a lot, tract or parcel of land into two (2) or more lots, tracts, parcels or separate interests, or the use of any parcel of land for condominiums, apartments or other multiple-dwelling units, as further defined by Colorado state law. 3. Application / Submittal Requirements ln order to apply for a Fina! Plat review, an Applicant must have already completed the Preliminary Plan review process addressed in Section 4:00 of the Subdivision Regulations. An applicant requesting Final Plat review will be required to submit this application form, all the required submittal information contained in Section 5:00 of the Subdivision Regulations and responses to all the conditions of approval required as part of the Preliminary Plan review process. 4. Process The Final Plat review process is considered a 1-step process because the application is ultimately reviewed by the Building and Planning Staff and presented to the BOCC for their signature if the application satisfies all the required submittal information to the satisfaction of the Building and Planning Department. lf Staff determines that all the required information has been submitted, a letter will be sent to the applicant indicating the application has been deemed "technically complete." lt is at this point Staff will also indicate when the application has been scheduled to be presented to the BOCC for signature. (This is not a public hearing or meeting and therefore does not require public notice.) lf Staff determines that all the required information has not been submitted, a letter will be sent to the applicant indicating the application does not comply with the submittal requirements and therefore has determined the application to be "technically incomplete." The letter will also outline the applications deficiencies so that the applicant knows what additional information needs to be submitted. Once the application has been deemed technically complete and a date has been established as to when the BOCC will review the Final Plat, Staff will review the application / Final Plat in terms of adequacy to determine if all the submittal information satisfies the Final plat requirements as well as the responses to the conditions of approval. During this review, Staff will forward the Final Plat the County Surveyor for review and a signature. ln the event there are additional questions or clarification issues to be addressed, the County Surveyor will generally contact the applicant to have the plat adjusted as necessary. Once, Staff has completed the review and all required information has been submitted to the satisfaction of the Planning Department 7 and the County Surveyor has signed the Final Plat in Mylar form, it will be scheduled at the next BOCC meeting to be placed on the consent agenda with a request to authorize the Chairman of the BOCC to sign the plat. Once the Final Plat is signed, it is then recorded by the County Clerk in the Clerk and Recorder's Office for a fee of $11 for the first sheet and $10 for each additional sheet thereafter. This fee shall be paid by the applicant. This act of recording the signed Final Plat represents the completion of the Garfield County Subdivision Process. Please refer to the specific language in the Final Plat portion (Section 5:00) of the Subdivision Regulations for specific timelines and additional responsibilities required of the applicant to complete the Final Plat process. Please Note: This information presented above is to be used as a general guide for an applicant considering a subdivision in Garfield Gounty. lt is highly recommended that an applicant either purchase the Garfield County Zoning Resolution and Subdivision Regulations or access them on-line at: http://www.qarfield-countv.com/buildinq and planninq/index. htm in order to ascertain all the necessary requirements for each of the three steps including Sketch Plan Review, Preliminary Plan Review, and Final Plat Review. which is correct and rrate to the best of my knowledge. :' "4-"- )-, of applicanUowner) Last Revised: 11 121 12002 I have read the statements above and have provided the required attached information Date FOX & COMPANY Land Use Planning\Zoning\Research Community Development Tel. (970) 39046,'[2 Fax (970) 926-2680 E-Mait: foxandco@vail.net April 1,2003 Tamara Pregl Garfield County Building & Planning Dept. 109 8t'st. Suite 201 Glenwood Springs, Co. 81601 RE: Sketch Plan, 0193 Sweetwater Road Dear Ms. Pregl: I have attached a completed Sketch Ptan application in accordance with Section 3:30 Sketch Plan Requirements, of the Garfield County Subdivision Regulations. The purpose of this proposed subdivision is to separate the residential interests from the agricultural\horticultural interest in order to obtain long term financing. The land use proposal includes residential and agriculturaluses such as gardens, greenhouses, nursery, orchards and customary accessory uses, including "accessory dwelling units.' The accessory dwelling units are proposed as a use by right as part of this new subdivision proposal. The accessory dvrelling unit criteria of Section 5.03.21will be specifically addressed as part of the Preliminary Plan application. 3:23 A. Garfield Co. Subdivision Regulations: The application has been prepared in accordance with the Sketch Plan regulations and will be further evaluated at the Preliminary Plan stage to determine conformance with the Preliminary Plan standards and to determine eligibility for Final Plat. B. Garfield Co. Zoning Regulations. The existing zoning is A\R\RD. A zone change is not proposed. The minimum lot size in the AIR\RD is 2 acres. The minimum lot size proposed is 4 acres in order to permit the accessory dwelling units. The Sketch Plan is in conformance with these basic criteria and will be further evaluated at Preliminary Plan. The proposed Agricultural\Residential \Rural Density development is consistent with the stated purpose to foster agricultural industry and further policies referred to in Section 1.08; Ranching, farming and all marrner of agricultural activities and operations within and throughout Garfield County are integralelements of, and necessary for, the mntinued vitality of the County's history, economy, landscape, tifestyte and culture. Given their importance to Garfield County, western Colorado, and the Sfafe of Colorado, agicultural lands and operations are worthy of remgnition and protection. C, Garfield Co. Comprehensive Plan: Svveetwater Perennials is located within Study Area 4, in the Svrreetwater Creek drainage. The Svreehaater area has Mailinq Address P.O. Box 1372 Edwards, CO 81532 Tamara Pregl Sweetwater Perennials Sketch Plan historically provided land area for ranching and related agricultural land use. The proposed subdivision will allow for development of agricultural\horticultural economic development and the proposed use is compatible with adjacent land uses and will not create significant impacts on adjacent properties. There are no wetlands, riparian areas, significant wildlife habitat or important visual conidors that will be impacted by the proposed Sketch Plan. ln summary, The proposed Sketch Plan is in the best interest of the health, safety and welfare of the County, does not adversely affect adjacent property rights, and is consistent with the general land use goals and policies of Garfield County. D. Road Standards and Policies: Access to the proposed lots will be from Garfield County Road 150, Sweetwater Lake Road. To minimize access points onto the county road, an access easement will be created across lot 2 to assure legal and physical access to Lots 1 and 3. E. Municipal Plans and Regulations Not Applicable F. Other applicable local, state and federal regulations, resolutions, plans and policies: At this time, we are not aware of any other applicable local, state and federal regulations, resolutions, plans and policies that are applicable. 3:30 See attached Sketch Plan, including vicinity map and adjacent landowners. 3:32 A.B.C.D.E.F.G.H. See attached application and Sketch Plan. 3:32 I Land Use Breakdown: 1. The existing zoning is A\R\RD. A zone change is not proposed. 2. The totaldevelopment area (lot area) is 18.203 acres. 3. The total number of lots proposed is (3) three. 4. The totat number of dwelling units proposed is pix. 5. The total area of proposed non-residential floor space. 0 6. The total number of individual dwelling units proposed for each structure two. 7. The total number of proposed off-street parking spaces: Residential: 1 space per 600 square feet of floor area or 1 space per dwelling unit, whichever is greater. 8. The total proposed density is .33 units per acre or 2 units per 6 acres or 1 unit per 3 acres. 2 Tamara Pregl Sweetwater Perennials Sketch Plan 0193 Sweetwater Road Land Use Program Existing Uses: Single family residence, outbuildings and greenhouse(s) Proposed Uses: Lot 1, Single family residence and an accessory dwelling unit. Lot 2, Existing single family residence. Proposed accessory dwelling unit. Lot 3, Single family residence and accessory dwelling unit. Accessory dwelling units to be in accordance with the standards of Section 5.03.21. And Uses, by right, in accordance with Section 3.02.01. ln accordance with Section 3:40 Supplernental lnformation A. The proposed source and arnount of water supply will be from wells and ditch rights as further described in the attached Water Resource Plan. Wright Water Engineers, lnc. and Balcomb & Green are in the process of preparing the formal water supply documents that will be submitted to the State Water Court and with the Preliminary Plan. B. The proposed type of sewage disposal will be permitted on-site sewage disposal systems. C. U.S.D.A. Soil Conservation Service soildesignations, with interpretation tables attached. D. Statement assessing the impact of the proposed subdivision on the lakes, streams and topography of the site. There are no takes or streams on the site. The existing Gannon ditch will remain in its existing location and will not be significantly impacted by the proposal. E. Statement assessing potential radiation hazards to the site. There are no known radiation hazards on the site. F. Evidence that all lots and parcel created by the subdivision will have access to a public right-of-way in conformance with the applicable Gounty Regulations. There is an existing access from Garfield County Road 150. An access easement wilt be platted from the existing access point to the proposed lot lines. 3 Sweetwater Perennials Garfield County Sketch Plan Water Resource Plan INTRODUCTION The purpose of this report is to outline the basic approach to developing a legal and physical water supply for the proposed Sweetwater Perennials Subdivision. This plan summarizes the water requirements, identifes the physical water supply and presents a water rights strategy to meet the ultimate needs of the development. Wright Water Engineers, lnc. and Balcomb & Green are in the process of preparing the formal documents to be submitted with the Preliminary Plan and for submittal to the State Water Court. BACKGROUND Sweetwater Perennials consist of three lots totaling approximately 18.2 acres located in the SW1/4 of the NW1/4 of Section 24, Township 3 South, Range 87 West of the 6th PM, Garfield County, Colorado. See Figure 1 for a vicinity Map of the area- The water resource plan anticipates maximum build out which includes the following: Two lots are to be developed as single.family lots with accessory dwelling units. The third lot will have a single family home, an accessory dwelling unit and a boarding\ rooming house for up to eight people. Additional will ired for the ing house and is included for ,term water resource . ln addition, Sweetwater Perennials will include a greenhouse\nursery, which may be located on any or all of the three lots. WATER SUPPLY SYSTEMS Sweetwater Perennials will have two basic water supply systems. Wells will provide potable water to serve the domestic\in-house needs, plus some limited inigation. Each of the three lots will have at least one well. The water source for the non-potable water system will be diversions from Sweetwater Creek via the Gannon Ditch. The Gannon Ditch will provide water for irrigation and filling ponds. lrrigation waterwill be used for the nursery operations and to irrigate the open space\pasture. DOMESTIC WATER REQU IREMENTS The existing well, permit no. 158441, located on proposed lot 2 is limited to "ordinary household purposes inside a single family dwelling and watering of the user's non- commercialdomestic animals." The maximum pumping rate is limited to 15 gallon per minute. The project will need to obtain three new well permits, including a new well permit for the well. The new permits can only be issued after the augmentation plan is decreed. Sweetwater Perennials Garfield County Sketch Plan \-yuter Resotrce Plan 'r Domestic water requirements for this project have been estimated on an equivalent residential unit (EQR) basis to allow for flexibility in the development of the property. One EQR represents the water requirements for a standard single-fiamily residence. lt is assumed that 1 EQR serves 3.5 persons and requires 350 gallons per day (gpd). ln addition, each EQR is assumed tghaye 2,000 square feet of associated irrigated land (lawn area). lndividualwells willbeg/the potable water needs for each lot. For purposes of this report, we haY6 assumed that Sweetwater Perennials will have a build-out demand of 7 EQR's. NEW WATER RIGHTS To meet the proposed irrigation needs, Sweetwater Perennials will use its historic Gannon Ditch water rights that are diverted from Sweetwater Creek. ln addition, new water rights are being appropriated for a Gannon Ditch enlargement to fillon-site ponds for operational needs and to augment out of priority Gannon Ditch and well rights. ln addition, a second augrnentation source will be obtained from Wolford Mountain Reservoir by contract with the Colorado River Water Conservation District. Wolford Mountair.r Reservoir releases can augment downstream calls coming from the Colorado River, such as Shoshone and Cameo. 2 'i ' ..;i ".";"f.\',il') :1 l. .. 1....- ) i,;". : I__l ':'-1 ll ', t,' I ,.r 'i " l :tr {., Jt: {},1t) GANNON DITCH HEADGATE 't WRIGHT WATER fNGINEERS, INC. 818 COLORADO AVE. GLENWOOD SPRINGS, CO 81602(s7o) s4s-7755 DRAWN EFIV CHECK WLL DArE 03/1O/O3 SCALE 1":2000' COUN IY GARFIELD IsrATE COLORApO-_l JOB NO. 031-o3e.ooo-l FIGURE 1 VICINITY MAP 87 W. lR 86W so 'vey rnap was comprled by the U. S. Deparlment of .u. , Soil Conservation Service, and cooperalrng agencte5, maps are orthophotographs prepared by the U. S. Depart- ol lnterior, Geological Survey lrom 7979 aerial photography dinate grid ttcks and land division corner5, tf shown. are rximalely positioned, i 34 ii o H H H _ T.a _ SC, ASPEN.GYP( (Jons shael 40 i44-Forelle-Brownsto complex, 12 to 25 percent slopes, This map unit is on mountain side slopes. Ebration is O5@ to 7,500 feet. The average annual precipitation is 12 to 14 inches, the average annual air temperature is 40 to 44 degrees F, and the average frost-free period is 85 to 105 days. This unit is about 50 percent Forelle soil and 35 percent Brownsb soil. Included in this unit are small areas of Tridell soils and basalt Rock outcrop on knolls. Also included are small areas of Mussel and Morval soils in the more gently sloping areas. Included areas make up about 15 percent of the total acreage. The Forelle soil is deep and well drained. It formed in mixed alluvium derived dominantly from sedimentary rocks. Typically, the surtace layer is brown loam about 6 inches thick. The subsoil is day loam about 24 inches thick The substratum to a depth of 60 inches is loam. Permeability is mderate in the Forelle soil. Available water capacity is high. The effective rooting depth is 60 inchc or more. Runoff is rapid. The hazard of water erosion generally is moderate, but it is severe in areas that contain rclcanic ash. The Brownsto soil is deep and well drained. It forrned in alluvium derived dominanUy from coarse textured, calcareous sandstone and basatt. Typically, the upper part of the surface layer is light brownish gray gravdly sandy loam about 4 inches thick. The lower part is light brownish gray gravelly loam about 7 inches thick. The upper 19 inches of the suHratum is very gravelly sandy loam. The next 12 inches is very gravelly loamy sand. The lower part to a depth of 60 inches is gravelly sandy loam. A thin layer of partialty decomposed needles, twigs, and leaves b on the surhce in many places. Permeability is moderate in the Brorvnsto soil. Available water capacity is low. The effective rooting depth ls 60 inches or more. Runoff is rapid, and the hazard of water erosion is moderate. This unit is used as rangeland or as wildlife habitat. The potential plant community on the Forelle soil is mainly wes'tern wheatgrass, bluebunch wheatgrass, Indian ricegrass, Douglas rabbitbrush, and Wyoming big sagebrush. Muttongrass, streambank wheatgrass, and winErfat also are included. The average annual production of airdry vegetation is about 800 pounds per acre. If the range condition deteriorates, Wyoming big sagebrush, Douglas rabbitbrush, and cheatgrass increase in abundance. The potential plant community on the Brownsto soil is mainly need leandthread, Indian ricegrass, western wheatgrass, and Wyoming big sagebrush. Euebunch wheatgrass, bottlebrush squirreltail, and scattered Utah juniper and pinyon pine also are included. The arrerage annual production of air{ry vegetation is about 600 pounds per acre. If the range condition deteriorates, Wloming big sagebrush, Douglas rabbitbrush, cheatgrass, and annual weeds increase in abundance. Suitable management practices include proper grazing use and a planned grazing system. If the quality of range vegetation has seriously deteriorated, seeding is needed. The main limitation is stoniness in areas of the Brownsto soil. For successful seeding, a seedbecl shouH be prepared and the seed drilled. In areas of the Forelle soil, brush management improves deteriorated areas of range that are producing rnore woody shrubs than were present in the potential plant mmmunity. The slope limits access by livesbck. The limited accessibility resutts in overgrazing of the less sloping areas. If this unit is used for homesite dwelopment, the main limitation is the slope. This map unit is in capability subclass Vie, noninigated. The Fordle soil is in the Rolling Loam range site, and the Brownsto soil is in the Stony Foothills range site. 194 SoilSurv ?ABLE :"0.**aUrtOING SI?E SeVEtOPHf,N?**Continued 5ol1 name and nap s5trnbol Shal loto sx6alrat,iong Dr+ollings nithout bagerngnt* DvelJ.lnga rllt.h baserosnt s Sma11 comrntrclal bulldtngs Local roads and strsebs Launs e landsca.p 3il rttllttt I sllghr---***--- I s11ght--------- | sllght--*------ llloderare; I I I Moderate: I dlolra. I I I Severe: I slop*. i i S*vere. I slope. I I I I Sevqre ; I slope' I i Scvere: cave, i floodlng, t.€lneas. I I I Modsrate; I s1ope. I I I Sevsre i I slope. I I Ssvere: I tlope. I I I I Severe : I slope. I I Severe i I flooding, weLnese - ItllodsraLr:I slope, I i ll{oderaie; rlope I Severe: I slope. I I Sevare: I s1ope. I I i $pderate : I large sLones. , I Seve ra : s lope. Savere: sbrink-s$ell. sltEhr*-**---- - Severe: s lape - I slope, I I Severe: I slope. I I I Severer I sIope, I I Sever€: I slope. I I I I Severe: i slape. I lS{rvere: f L codl ng, veLncts*. I severe i I slope, I I I Severe; I sl"ope. i I 1 I Srvere !I slope. I i Severe: I s1ope. I I i &lpdtr a[n ; i slope, i )argr slones. Severa: s lope . Severe: shrink-ane11. i4oderate: s lop*, Severe: s lcpe. I I llrloderate : { Severe ! I slope- I i Severe: I alope. i I t I Severe; i slopt. I I Severe: I wetness, floodlng, frost acllon. lldodef,ate i I slope. I I lltoderate: s lope " I S€v€rc: I slape. I I Sev€r€: I etrope. I I il'loderat"e ! I f,rost aclion, I large Btones. I I Seve;e I I slope. t I I Severe: I shrink-swell, i Lsu Btrength. I i S(}ve16: I rIope. I I I l!{ode.rate: l Set er€: I s.icpe. I I Severe: I slope. I I I I Severe: | *lope. I I Severe: }JL'tness - ll{odara t r : I large sto ls.lope. I I Moderate: $raall 6to droughty, s"l.ope. I Serrere ; i slope. I I Severe: I s1cpe. t i I G<;vere r large sta I Severe: i largs sta I siope" tI ll{oderate: I }arge sto 9npedrado I I35---*-*-***------ I lllod8ra t€ t Empadrad$I alope. I I36*-----**----*--- I Sevare. E npedradu I slope. I Eto€i rlope, I Bvanston I I39, {0, {1--------lSeve}ei SvansIoll I slope. I4?r---------*-**-* I Sev€re ; r'luYaqret:lAs I cutbanhs I vatne8s. I I{3*: I fore 11e******---- I ldoderate : I slope. I IBronnBto--- lSeYere! cutbanks cave. I frost, actlon. I large sto tl ll4oderate: I slope, I Moderate: I large sto I frost actlcn. I slope"lr Severe; .ulope " Seve!e: cutbanks cave, slope. Hoderata: larqe stones. Sevs!e: slopd. Btoderatc: too clayey. 511ght*******-* Ssvore: slopr. Moderat8: sJ.ope. !{oderar€ ! slopa, $evs16: slope, Sevare: s1ope. Modorale: large Bto$es. Seuere: s} ope " Severe i shrink-srre!1. Sllghu ----*---* Sever:e i slope. 5iighL--*--*--- i s).)qht, I I I Sevrre: I slope. I S€€ f,o{rtnot.€ at end of table . Soil Survr SolI name and naP symbol 29*,30*: Bock outcrop. Dotsero 32-------------- Dotsero 33*: Earsnan-------- EvansLon 39, 40, 91----------(Severe: Evanston Fluvaquents ?ABLE 11. --SANITARY FACILfTIES--Continued serrage lagoon areaS I I I I Severe: I seepager I slope. t '-- lSevere: I seepage. I I I Severe: I seepage, I depth to rock, I elope. I I I Severe s I seepage, I slope. I I severe: I Severe: I oeepagie, I flooding. I severe: I slope. I I I sever€: I seepage, I elope. I I I Severe: I slope, I I Severe: I soepage, I slope. I septlc tank absorptlon f lel,da 31 I S"r".", I seepage, I slope. I lSevere: I seepage. I I I severe: I depth to rock, slope. l.Severe: I seepage. I lSevere s I seepage. I I Scvere: aeepage, slope. Severe: slope, large stones. I Severe : I slope. I I severe: flooding, reepage, wstneaa. I(},@rate: I stope. I I (l"loderate: I sIope, Ito sandy. I I ( Severe: I slope. I ( Severe i I slope, I I I I Sovere: I seepage. I I Severe: I seepage. I I I Severe: I seepage, I slope. I I severe: I slope. I I I Severe: ( Poor 3 I slope. I I (Ebir: I ffiIL stones. I I (PG: I ana reclaim, I mll stones, I slqre. I I I ( tbir: I ffi1l stones. I ( Fair s I smlI stones, I slope. I (Pou; I lrlcpe. I I (Poor: I Iege stones, I slcpe- I I (Potr: I slope. I (P@r: I seepage, I t6 sndy. I ffi1l stones. I (Ebir: f slope. I I (Poor: I ffil1 stones. I r I (P@r: I slc,pe. I {PoEr I sm11 stones, f slope. Rock outcrop. erpedrado 35--------*--*---- (Moderate : tupedrado I s1otrre. I I 36 ----------- hrpedrado I deti to r@k, I slo1re- I I s lope . Ipscs s1ow1y. I I I slc4re. I I flooding, I retness, Ip@r filts. I I I 37 ------- fseyere: 38----------------- (Moderate :sllght----- lSltght-----'----- rcood. lI I I I Severa: I s1ope. I floodlng, seepage, uctsness - Forell--------- (Moderate; I pscs sIowly, I slope. Bromsto ----- (l,lodqate: I slope. II 44*: I Forelle----------- (Severe: I Bromsto----------- (Severe: I (I*loderate r I slope. I I (l,l"derate: I slope. I I I ( Severe: 1 slope. I ( Severe ! I slope, ( Daily covs for landfiLl Se footnote at end of tab'le. 204 I I I SoiI name and I Hydro- I map symbol.I logic I Preguency I Duratlon lMonthslgrouplll I 42* --------------- I Fluvaquents 43*, 44*: IForel.Ie---------- | IBrorrnsto--------- | I45, 46, 47--------l Forsey Pughes Gosl in Gothi c 54---------------- | Grotte 55*: Gypsum land. Gypsiorthids----- | I55, 5?------------ | Ipson I rrawaddy Iyers 55*,66*,67*: Jerry------------ I Millerlake------- I I Occasional-- I Brief----- I Mar-Sep Iltt-l tt I None--------; ll I None-------- 1tt I None-------- |ll ll I None--------; llll I None--------; ll ll I None-------- |lt I None-------- I I I None-------- |ll I None-------- |ll ll I None-------- |ttll I None-------- Illtt I None-------- I tt I None-------- Irl I None-------- ;rl I None-------- |lttt table " D B B B c B c B D B c c B B See footnote at end of TABLE 16.--SOIL AlfD WATER F-\r tS--Contlnued Hle;, Frl >6.0 >6.0 >5.0 >6.0 >6.0 >6.0 >6.0 >6.0 >6.0 >6.0 >5.0 >5.0 >6.0 >6.0 >6.0 !. -Jr table I tt 0. 6-2.0 I Apparent I rtDepth I Klnd lMonths lDeprhlHard- I ness I Rtsk of corrolloi- lUncoated lConcrete I steel I I Bedrock o!,o =Io Eo 3 a P ood o,o.o Potent lal frost actlon I Har-Sep I I >60 I --- I I I >60 I --- I >60 I --- I >50 I --- I I >60 I --- I I >60 I --- I I >60 l --- I I >60 I --- I I I I I ltt I High------- I Hiqh----- | Lo',,. I Low-------- I Htgh-----; 1ee.ttt I Los-------- I Hiqh----- | Low.ltt I Moderate--- I Htgh----- | Moderate.tltttt lModeEate--- | Moderate I Low.lttrtt I Low-------- I Hlgh----- I Low.tltttt I Moderate--- I High----- | Low.lttltt I Low-------- I High----- | Low. I Low-------- I High----- I High.ltt I Moderat.e--- I High----- | Moderate.tttltt I Modera!e--- I Hi gh----- | Lor,r.tltttt I lModerate---lModerate I Low.rtt tt I Moderate--- I High----- | Low.ltt I Moderate--- I High----- I Low.ltt I Moderate--- I High----- I Low.ttt I Moderare--- I High----- | Low. | 10-40 I Soft I >60 I --- I I | 20-40 | Hardtttt | 20-40 | soft >60 >60 >60 >60 N)(,l(n