Loading...
HomeMy WebLinkAbout1.0 ApplicationATTORNEYS DAN KERST dan@dankerstpc.com KELLY CAVE kelly@dankerstpc.com Fred Jarman Garfield County DAN KERST, P.C. A PROFESSIONAL CORPORATION ATTORNEYS AT LAW 823 BLAKE AVENUE, SUITE 202 GLENWOOD SPRINGS, COLORADO 81601 TELEPHONE: (970) 945-2447 FACSIMILE: (970) 945-2440 October 2, 2008 Building & Planning Department 108 8th Street, Suite 201 Glenwood Springs, CO 81601 Re: Doug Coffman Subdivision File #: 113282 Dear Fred: PARALEGAL ELISABETH GETZEN egetzen@dankerstpc.com Via Hand Delivery Our firm represents Rex Coffman and JoAnn Coffinan who own Lot 4 of the Coffman Ranch Subdivision Exemption which contains approximately 149.763 acres of real property primarily located in Section 36, Township 7 South, Range 88 West of the Sixth Principal Meridian as more particularly described on the attached Exhibit "A" (the "Property"). Mr. and Mrs. Coffman wish to subdivide the Property for estate planning purposes to gift Parcel A 1 to their son, Doug Coffman. As you may recall, the Coffmans were granted a subdivision exemption in 2004 whereby thr<:!e (3) lots and a remainder parcel were created. Since the Coffmans have exercised their exemption rights, they are proceeding with this subdivision application on Lot 4 (the remainder parcel) to create one (1) 9.127 acre lot for their son thereby reducing Lot 4 to 140.636 acres. Several exhibits are being re-utilized from the exemption application for this subdivision application. Additionally, there is a conservation easement encumbering a portion of the Property recorded as Reception No. 643445 in the Garfield County Clerk and Recorder's Office. The Conservation Easement allows the applicant to separate one (1) lot not to exceed four and one-half (4 Yz ) acres in size and to erect one (1) single-family homesite. Aspen Valley Land Trust ("A VL T") has approved of amending the conservation easement to expand the permitted size of the ~Uowable lot (see attached letter from Suzanne Stephens at Exhibit "G"). Exhibit "B" is the attachment from the conservation easement displaying the general location of the easement on a portion ofthe Property. *Please note that building envelope and access roads are inaccurate since the easement was created prior to the Coffman Ranch Subdivision Exemption. In compliance with Garfield County's submittal requirements, the applicants provide the following information for your review: I. Exhibit "A" is the Sketch Plan for the Doug Coffinan Subdivision prepared by Scarrow and Walker, Inc. showing the legal description of the Property and proposed lots. Access is gained from County Road 100. October 2, 200S Page 2-Fred Jarman, Doug Coffman Subdivision 2. Water for the proposed lot will be provided via a well. A well permit application has been filed with the Colorado Division of Water Resources (see Exhibit "C"). 3. Sewage disposal is proposed to be handled by an on-site wastewater treatment system, as no central sewage system is available at this time. The applicant is researching a Wisconsin Mound System or similarly engineered septic system appropriate for high water table areas. 4. The proposed subdivision creates one (1) lot for one (1) single-family dwelling. The applicant intends to build the residence with minimal disturbance to the topography and surrounding waterways ofthe site. 5. The Doug Coffman Subdivision is located in an area where there is no known radiation hazard. 6. Exhibit "D" contains excerpts from the USDA Soil Conservation Service for the Aspen-Gypsum Area showing the Property with the soil types identified and interpretation tables attached. 7. The Property is adjacent to County Road 1 00 right-of-way. The Applicant is proposing a drive to access Parcel AI. Exhibit "E" contains Driveway Permit Number GRBOS-D-SO approved by the Garfield County Road and Bridge Department. S. The anticipated electric service will be provided by Holy Cross Electric. Exhibit "A" details the electric easement that currently serves Lots 1-3 of the Coffman Ranch Subdivision Exemption and runs over the proposed Parcel AI. SourceGas anticipates that it will provide natural gas (see Exhibit "F" -a letter from SourceGas dated April 11, 200S). The applicant has contacted Qwest for telephone services and DirectTV for cable T.V. 9. A check in the amount of $325.00 for the base fee. Please contact me if you have any questions in regards to the application or need any additional information. xc: Rex and JoAnn Coffman (wlo exhibits) Doug and Julie Coffman (wlo exhibits) GARFIELD COUNTY Building & Planning Department 108 8'h Street , Suite 401 Glenwood Springs , Colorado 81601 Telephone : 970 .945 .8212 Facsimile : 970 .384.3470 www .garfield-county .com RECEIVE D OCT 02 2008 GARFIELD COUNTY BUILDING & PLANNING SUBDIVISION APPLICATION FORM Doc. # S~ P \~l-O 0 SUBDIVISION NAME : Doug Coffman Subdivi s i o n Type (Choose only one): ---XX-Sk etch Plan Preliminary Plan Final Plat GENERAL INFO RMATI ON (Please print leg ib ly) ~ Name of Prollerty Owner: Rex Coffman ang .:!QllnD CQffman ~ Mailing Address: 1 837 Co unty Road 1QQ Telephone: ~) 963-2375 ~ City: Carbondale State :9L-Zip Code: 8 1 623 Cell : ~) ~ E-mail address: FAX: (_) ~ Name of Owner's Rellresentative, if any, (Attorney, Planner, Consultant, etc): ~ Kelly Ca v e , Esg. , Dan Ker::;:\;. E.C. ~ Mailing Address : 823 Blake 8~e . Snjte 2 02 Telephone: (S20.J >'45 -.44 7 ~ City: Gl en wood SJ2ring~ State:~ Zip Code : 8 1 6Dl Cell : (_) ~ E-mail address: kelly@dankerstpc com FAX: C21.Q.J 945 -2440 ~ Name of Engineer: Michael Erion , Resource Engineering ~ Mailing Address : 9 09 Colorado Ave nu ~ Telephone: Ua.o....) 945 -6777 ~ City : G l ~llliQQQ, S12;(j ngs State :~ Zip Code: 81601 Cell :~) ~ E-mail address : FAX : ~a45 -1137 - ~ Name of Surveyor: Don Bagent , Scarrow & Walker ~ Mailing Address:8J8 Co ] cn:adc ~:uez:m e Telephone: <.920_J 945 -866 4 ~ City: Gl enwood SEring s State :c~ Zip Code: B J 60 ] Cell: (_) ~ E-mail address: FAX :(_) ~ Name of Planner: ~ Mailing Address : NL/\ Telephone: (~ ~ City: State: _ Zip Code : Cell : (_) ~ E-mail address: FAX: ( ) . Las t Rev ise d 711108 GENERAL INFORMATION continued ... l' Location of Property: Section 36 Township 7S Range-<s"'s"'w'--__ l' Assessor's Parcel Number: -1...L.2......l. -L.§....l -L....Q. -L l.J.. l' Practical Location I Address of Property: 1837 County Road lOa. Carbondale. CO l' Current Size of Property to be Subdivided (in acres): ..:1:.,:4""9.:...7""6"'3'---______ _ l' Number of Tracts I Lots Created within the Proposed Subdivision: _2"--____ _ l' Property Current Land Use Designation: 1. Property's Current Zone District: _AA~R",D,,-____________ _ 2. Comprehensive Plan Map Designation: Residential Low Density Proposed Utility Service: l' Proposed Water Source: _---'W"'eu.J .... J __________________ _ l' (See "Attachment C" to be completed with Preliminary Plan Application) l' Proposed Method of Sewage Disposal: Wisconsin Mound System l' Proposed Public Access VIA: ---'C""o"-'u"'nlbtC/.y_R"'O"'il"'a ....... J.l.!Ou.O ____________ _ l' Easements: Utility: __________________ _ Ditch: _________________ _ l' Total Development Area (fill in the appropriate boxes below): l' Base Fee: Sketch Plan -$325.00; Preliminary Plan -$675.00; Final Plat- l' Plat Review Fee (see attached fee schedule) I. THE SUBDIVISION PROCESS In order to subdivide land in Garfield County, an Applicant is required to complete the following land use processes in the following order: 1) Sketch Plan Review Process, 2) Preliminary Plan Review Process, and 3) Final Plat Review Process. This section will briefly describe the nature of each process and provide general direction including subdivision regulation citations to a potential applicant requesting subdivision approval in Garfield County. All of the Garfield County Zoning and Subdivision Regulations are located for purchase at the Planning Department and can also be found on the World Wide Web at the following address: http://www.garfield-county.com/buildingandplanninglindex.htm A) The Sketch Plan Review (Section 3:00 of the Subdivision Regulations) 1. Purpose The purpose of the Sketch Plan process is to allow an individual an opportunity to propose a subdivision in a "sketch" format to the Planning Department and the Garfield County Planning Commission in order to obtain a cursory review for compliance with the County's land use review documents, regulations, and policies to identify any issues that would need to be addressed if the proposed subdivision were to be pursued. 2. Applicability Any individual proposing a subdivision in Garfield County is required to complete the Sketch Plan review process as the first step in Garfield County's Subdivision process. More specifically, Garfield County defines a subdivision (Section 2:20.48) as the division of a lot, tract or parcel of land into two (2) or more lots, tracts, parcels or separate interests, or the use of any parcel of land for condominiums, apartments or other multiple-dwelling units, as further defined by Colorado state law. 3. Application I Submittal Requirements In order to apply for a Sketch Plan Review an Applicant is responsible for reviewing Section 3:00 of the Subdivision Regulations and providing enough information to the Planning Department in the application to conduct a thorough review and provide the resulting comments to the Planning Commission for their review and comments. Specifically, Section 3:30, 3:32, and 3:40 of the Subdivision Regulations contain the specific information required to be submitted to the Planning Department in order to satisfy the application requirements in addition to the information requested on this application form. 4. Process I Public Meeting The Sketch Plan review process is considered a 1-step process because the application is reviewed only by the Planning Commission at a public meeting. In order to appear before the Planning Commission, an applicant will have submitted all required application submittal requirements mentioned above to the Planning Department Staff. Once submitted, Staff will have 15 working days to review the application to determine if all the required submittal information has been submitted as required. If Staff determines that all the required information has been submitted, a letter will be sent to the applicant indicating the application has been deemed "technically complete." 3 It is at this point Staff will also indicate when the application has been scheduled to be reviewed before the Planning Commission and will request the applicant supply additional copies to provide the Commission for their review. If Staff determines that all the required information has not been submitted, a letter will be sent to the applicant indicating the application does not comply with the submittal requirements and therefore has determined the application to be "technically incomplete." The letter will also outline the applications deficiencies so that the applicant knows what additional information needs to be submitted. At this point, the applicant has 6 months (180 days) to provide the necessary information to the Planning Department to remedy the application so that it may be deemed technically complete. If the application has not been deemed technically complete within this time, the application will be terminated. Once the application has been deemed technically complete and a date has been established as to when the Planning Commission will review the application, Staff will conduct a land use review of the application using the County's land use regulatory documents including the Zoning Resolution, Subdivision Regulations, and the Comprehensive Plan of 2000. In addition, Staff will also consider referral comments provided from a variety of state and local agencies who may also review the application. As a result, Staff will write a Memorandum on the proposed subdivision to the Planning Commission containing the results on the land use analysis. This Memorandum will also be furnished in advance to the applicant. At the date and time set for the public meeting before the Planning Commission, Staff will present the findings in the Memorandum and the applicant will be required to present the proposed subdivision and respond to comments and questions provided by the or,; Planning Commission. The comments provided to the Applicant by the Planning Department and the Planning Commission as a result of the Sketch Plan Process will be kept on file in the Planning Department for 1-year from the meeting date before the Planning Commission. If an Applicant does not submit a Preliminary Plan application to the Planning Department within the 1-year timeframe, the Sketch Plan file will be closed and the Applicant will need to reapply for a Sketch Plan review prior to a Preliminary Plan review. B) Preliminarv Plan Review (Section 4:00 of the Subdivision Regulations) 1. Purpose The purpose of the Preliminary Plan review process is to conduct a thorough review of the many aspects that are associated with dividing land in Garfield County for the purposes of residential, commercial, and industrial development. This is the most intensive review step where the Building and Planning Staff, the Planning Commission, and the Board of County Commissioners (BOCC) will conduct a thorough review of all the issues associated with the proposed subdivision against the County's regulatory requirements. Ultimately, the purpose of this process is to identify all the major issues in the proposed subdivision by using the County's Zoning Resolution, Subdivision Regulations, Comprehensive Plan of 2000, as well as other state and local referral 4 agencies that will provide comments on any issues raised in their review. This is the process that will either approve or deny the application request. 2. Applicability Any individual proposing a subdivision in Garfield County is required to complete the Preliminary Plan review process as the second and most intensive step in Garfield County's Subdivision process. More specifically, Garfield County defines a subdivision as the division of a lot, tract or parcel of land into two (2) or more lots, tracts, parcels or separate interests, or the use of any parcel of land for condominiums, apartments or other multiple-dwelling units, as further defined by Colorado state law. 3. Application I Submittal Requirements In order to apply for a Preliminary Plan Review, an Applicant must have already completed the Sketch Plan review process addressed in Section 3:00 of the Subdivision Regulations. An applicant requesting Preliminary Plan review will be required to submit this application form, all the required submittal information contained in Sections 4:40 to 4:94 of the Subdivision Regulations as well as address all of the applicable Desiqn and Improvement Standards in Section 9:00 of the Subdivision Regulations. In addition to the substantive submittal information related to the proposed subdivision project itself, an applicant is required to complete all the public notice requirements so that legal public hearings can be held before the Planning Commission and the SOCC which is addressed in Sections 4:20 -4:31 of the Subdivision Regulations. 4. Process I Public Hearings The Preliminary Plan review process is considered a 2-step process because the application is ultimately reviewed by two County decision-making entities during public hearings: the Planning Commission who makes a recommendation to the SOCC. In order to obtain dates for the public hearings before the Planning Commission and the SOCC, an applicant will have submitted all required application submittal requirements mentioned above to the Planning Department Staff. Once submitted, Staff will have 30 working days to review the application to determine if all the required submittal information has been submitted as required. If Staff determines that all the required information has been submitted, a letter will be sent to the applicant indicating the application has been deemed "technically complete." It is at this point Staff will also indicate when the application has been scheduled to be reviewed before the Planning Commission I SOCC. Additionally, Staff will provide the applicant with the notice forms to be mailed, published, and posted. If Staff determines that all the required information has not been submitted, a letter will be sent to the applicant indicating the application does not comply with the submittal 5 requirements and therefore has determined the application to be "technically incomplete." The letter will also outline the applications deficiencies so that the applicant knows what additional information needs to be submitted. At this point, the applicant has 6 months (180 days) to provide the necessary information to the Planning Department to remedy the application so that it may be deemed technically complete. If the application has not been deemed technically complete within this time, the application will be terminated. Once the application has been deemed technically complete and a date has been established as to when the Planning Commission I BOCC will review the application, Staff will conduct a land use review of the application using the County's land use regulatory documents including the Zoning Resolution, Subdivision Regulations, and the Comprehensive Plan of 2000. In addition, Staff will also consider referral comments provided from a variety of state and local agencies who may also review the application. As a result, Staff will write a Memorandum on the proposed subdivision to the Planning Commission I BOCC containing the results on the land use analysis. This Memorandum will also be furnished in advance to the applicant prior to the public hearings. As mentioned above, Staff makes a recommendation to the Planning Commission and the BOCC regarding the issues raised in the analysis of the proposed subdivision. The Applicant will first propose the subdivision to the Planning Commission who is responsible for making a recommendation of approval, approval with conditions, or denial to the BOCC. Next, the application will be reviewed by the BOCC during a regular public hearing. The BOCC will consider the recommendations from the Planning Staff and the Planning Commission, the information presented by the applicant, and the public. As a result, the BOCC is the final decision-making entity regarding the proposed subdivision and will either approve, approve with conditions, or deny the application. If the BOCC approves the subdivision application at the public hearing, the approval shall be valid for a period not to exceed one (1) year from the date of Board approval, or conditional approval, unless an extension of not more than one (1) year is granted by the Soard prior to the expiration of the period of approval. (See the specific information provided in Section 4:34 of the Subdivision Regulations.) Following the hearing, Staff will provide a resolution signed by the SOCC which memorializes the action taken by the Soard with any I all conditions which will be recorded in the Clerk and Recorder's Office. Once an applicant has Preliminary Plan approval, they are required to complete the third and final step in the County's Subdivision Process: Final Plat Review. C) Final Plat Review (Section 5:00 of the Subdivision Regulations) 1. Purpose The purpose of the Final Plat review process is to provide the applicant with a mechanism to prove to the County that all the conditions of approval required during the Preliminary Plan review process have been met I addressed to the satisfaction of the Planning Staff and the SOCC. This being the case, the chairman of the soce will sign the Final Plat and have it recorded memorializing the subdivision approval granted by the SOCC. This is the last step in the County's subdivision process. 6 2. Applicability Any individual proposing a subdivision in Garfield County is required to complete the Final Plat review process as the third and last step in Garfield County's Subdivision process. More specifically, Garfield County defines a subdivision as the division of a lot, tract or parcel of land into two (2) or more lots, tracts, parcels or separate interests, or the use of any parcel of land for condominiums, apartments or other multiple-dwelling units, as further defined by Colorado state law. 3. Application I Submittal Requirements In order to apply for a Final Plat review, an Applicant must have already completed the Preliminary Plan review process addressed in Section 4:00 of the Subdivision Regulations. An applicant requesting Final Plat review will be required to submit this application form, all the required submittal information contained in Section 5:00 of the Subdivision Regulations and responses to all the conditions of approval required as part of the Preliminary Plan review process. 4. Process The Final Plat review process is considered a 1-step process because the application is ultimately reviewed by the Building and Planning Staff and presented to the BOCC for their signature if the application satisfies all the required submittal information to the satisfaction of the Building and Planning Department. If Staff determines that all the required information has been submitted, a letter will be sent to the applicant indicating the application has been deemed "technically complete." It is at this point Staff will also indicate when the application has been scheduled to be presented to the BOCC for signature. (This is not a public hearing or meeting and therefore does not require public notice.) If Staff determines that all the required information has not been submitted, a letter will be sent to the applicant indicating the application does not comply with the submittal requirements and therefore has determined the application to be "technically incomplete." The letter will also outline the applications deficiencies so that the applicant knows what additional information needs to be submitted. Once the application has been deemed technically complete and a date has been established as to when the BOCC will review the Final Plat, Staff will review the application I Final Plat in terms of adequacy to determine if all the submittal information satisfies the Final plat requirements as well as the responses to the conditions of approval. During this review, Staff will forward the Final Plat the County Surveyor for review and a signature. In the event there are additional questions or clarification issues to be addressed, the County Surveyor will generally contact the applicant to have the plat adjusted as necessary. Once, Staff has completed the review and all required information has been submitted to the satisfaction of the Planning Department and the County Surveyor has signed the Final Plat in Mylar form, it will be scheduled at the next 7 BOCC meeting to be placed on the consent agenda with a request to authorize the Chairman of the BOCC to sign the plat. . Once the Final Plat is signed, it is then recorded by the County Clerk in the Clerk and Recorder's Office for a fee of $11 for the first sheet and $10 for each additional sheet thereafter. This fee shall be paid by the applicant. This act of recording the signed Final Plat represents the completion of the Garfield County Subdivision Process. Please refer to the specific language in the Final Plat portion (Section 5:00) of the Subdivision Regulations for specific timelines and additional responsibilities required of the applicant to complete the Final Plat process. Please Note: This information presented above is to be used as a general guide for an applicant considering a subdivision in Garfield County. It is highly recommended that an applicant either purchase the Garfield County Zoning Resolution and Subdivision Regulations or access them on-line at: http://www.garfield-county.com/buildingandplanning/index.htm in order to ascertain all the necessary requirements for each of the three steps including Sketch Plan Review, Preliminary Plan Review, and Final Plat Review. I have read the statements above and have provided the required attached information whO is correct and accurate to the best of my knowledge. a. '" If 8 GARFIELD COUNTY BUILDING AND PLANNING DEPARTMENT FEE SCHEDULE Garfield County, pursuant to Board of County Commissioners ("Board") Resolution No. 98-09, has established a fee structure ("Base Fee") for the processing of each type of subdivision and land use applications. The Base Fee is an estimate of the average number of hours of staff time devoted to an application, multiplied by an hourly rate for the personnel involved. The Board recognized that the subdivision and land use application processing time will vary and that an applicant should pay for the total cost of the review which may require additional billing. Hourly rates based on the hourly salary, and fringe benefits costs of the respective positions combined with an hourly overhead cost for the office will be used to establish the actual cost of County staff time devoted to the review ofa particular project. Actual staff time spent will be charged against the Base Fee. After the Base Fee has been expended, the applicant will be billed based on actual staff hours accrued. Any billing shall be paid in full prior to final consideration of any land use permit, zoning amendment or subdivision plan. If an applicant has previously failed to pay application fees as required, no new or additional applications will be accepted for processing until the outstanding fees are paid. Checks, including the appropriate Base Fee set forth below, must be submitted with each land use application, and made payable to the Garfield County Treasurer. Applications will not be accepted without the required application fee. Base Fees are non-refundable in full, unless a written request for withdraw from the applicant is submitted prior the initial review of the application materials. Applications must include an Agreement for Payment Form ("Agreement") set forth below. The Agreement establishes the applicant as being responsible for payment of all costs associated with processing the application. The Agreement must be signed by the party responsible for payment and submitted with the application in order for it to be accepted. The complete fee schedule for subdivision and land use applications is attached. GARFIED COUNTY BUILDING AND PLANNING DEPARTMENT BASE FEES The following Base Fees shall be received by the County at the time of submittal of any procedural application to which such fees relate. Such Base Fees shall be in addition to and exclusive of any cost for pUblication or cost of consulting service determined necessary by the Board for the consideration of any application or additional County staff time or expense not covered by the Base Fee, which have not otherwise been paid by the applicant to the County prior to final action upon the application tendered to the County. TYPE OF PROCEDURE Vacating Public Roads & Rights-of-Way Sketch Plan Preliminary Plan Final Plat Amended Plat Exemption from the Definition of Subdivision (SB-35) Land Use Permits (Special Use/Conditional Use Permits) • Administrative/no public hearing • Board Public Hearing only • Planning Commission and Board review & hearing Zoning Amendments • Zone District map amendment • Zone District text amendment • Zone District map & text amendment • PUD Zone District & Text Amendment • PUD Zone District Text Amendment Comprehensive Plan Amendment Board of Adjustment • Variance • Interpretation Administrative Permits • Floodplain Development • Pipeline Development Planning Staff Hourly Rate • Planning Director • Senior Planner • Planning Technician • Secretary County Surveyor Review Fee (includes review of Amended Plats, Final Plats, Exemption Plats) Mylar Recording Fee Page 2 BASE FEE $400 $325 $675 + application agency review fees and outside consultant review fees, as authorized pursuant to the Regulations, such as the Colorado Geologic Survey $200 $100 $300 $250 $400 $525 $450 $300 $500 $500 $500 $450 $250 $250 $400 $400 $50.50 $40.50 $33.75 $30 Determined by Surveyor$ $11 -1 st page $10 each additional page The following guidelines shall be used for the administration of the fee structure set forth above: I. All applications shall be submitted with a signed Agreement for Payment form set forth below. 2. County staff shall keep accurate record of actual time required for the processing of each land use application, zoning amendment, or subdivision application. Any additional billing will occur commensurate with the additional costs incurred by the County as a result of having to take more time that that covered by the base fee. 3. Any billings shall be paid prior to final consideration of any land use permit, zoning amendment, or subdivision plan. All additional costs shall be paid to the execution of the written resolution confirming action on the application. 4. Final Plats, Amended or Corrected Plats, Exemption Plats or Permits will not be recorded or issued until all fees have been paid. 5. In the event that the Board determines that special expertise is needed to assist them in the review of a land use permit, zoning amendment, or subdivision application, such costs will be borne by the applicant and paid prior to the final consideration of the application. All additional costs shall be paid prior to the execution of the written resolution confirming action on the application. 6. If an application involves multiple reviews, the Applicant shall be charged the highest Base Fee listed above. 7. Types of "Procedures" not listed in the above chart will be charged at an hourly rate based on the pertinent planning staff rate listed above. 8. The Planning Director shall establish appropriate guidelines for the collection of Additional Billings as required. 9. This fee structure shall be revised annually as part of the County budget hearing process. Page 3 GARFIELD COUNTY BUILDING AND PLANNING DEPARTMENT AGREEMENT FOR PAYMENT FORM (Shall be submitted with application) GARFIELD COUNTY (hereinafter COUNTY) and CZe" G:. K-mtHcl c<.J :To th,,, 6 ~FvntM-... (hereinafter APPLICANT) agree as follows: 1. APPLICANT has submitted to COUNTY an application for J)cu-& Co t£MtW\ ,Mbd".\(!~ j'!0." (hereinafter, THE PROJE ). 2. APPLICANT understands and agrees that Garfield County Resolution No. 98-09, as amended, establishes a fee schedule for each type of subdivision or land use review applications, and the guidelines for the administration of the fee structure. 3. APPLICANT and COUNTY agree that because of the size, nature or scope of the proposed project, it is not possible at this time to ascertain the full extent of the costs involved in processing the application. APPLICANT agrees to make payment of the Base Fee, established for the PROJECT, and to thereafter permit additional costs to be billed to APPLICANT. APPLICANT agrees to make additional payments upon notification by the COUNTY when they are necessary as costs are incurred. 4. The Base Fee shall be in addition to and exclusive of any cost for publication or cost of consulting service determined necessary by the Board of County Commissioners for the consideration of an application or additional COUNTY staff time or expense not covered by the Base Fee. If actual recorded costs exceed the initial Base Fee, APPLICANT shall pay additional billings to COUNTY to reimburse the COUNTY for the processing of the PROJECT mentioned above. APPLICANT acknowledges that all billing shall be paid prior to the final consideration by the COUNTY of any land use permit, zoning amendment, or subdivision plan. APPLICANT Date: /() /-z.! 0 2' Print Name Mailing Address: 1 ~ 3:r U IQO Cu-\nJJA t c:.., ? I b /) \ 10/2004 Page 4 COLORADO GEOLOGICAL SURVEY SUBMITTAL FORM FOR LAND-USE REVIEWS County ~<vvbM Oate ______ _ Project Name 'Q~ Co\!!"rod\ ,S:Jo4iV\),!'h APPLICANT (or Applicant's Authorized Representative responsible for paying CGS·review fee) I I I I 14,12, or 14/4 __ _ Section(s) __ _ Township, ___ _ Range Fax No. FEE SCHEDULE Reviews for Counties Small Subdivision (> 3 dwellings and < 100 acres) ......................................... $700 Large Subdivision (:': 100 acres and < 500 acres) ... _ ................................... $1,550 Very Large Subdivision (500 acres or more) ............................................... $2,500 Very small residential subdivisions (1-3 dwellings and < 100 acres) ...•............... $590 Reviews for Municipalities .................. .' ...................... At hourly rate of reviewer Special Reviews ....................................................... At hourly rate of reviewer School Site Reviews ...........•............................................. $855 CGS LAND USE REVIEWS Geological studies are required by Colorado counties for all subdivisions of unincorpo- rated land into parcels of less than 35 acres, under State statute c.R.S. 30-28-101 et seq. (Senate Bill 35, 1972). Some Colorado municipalities require geological studies for sub- division of incorporat~d land. In addition, local governments are empowered to regu- late development activities in hazardous or mineral-resource areas under c.R.S. 24-65.1- 101 et seq. (House Bill 1041, 1974) and c.R.S. 34-1-301 et seq. (House Bill 1529, 1973), respectively. Local-government agencies submit proposed subdivision applications and supporting technical reports to the Colorado Geological Survey" .. .for evaluation of those geologic factors which would have significant impact on the proposed use of the land," in accor- dance with State statutes. The CGS reviews the submitted documents and serves as a technical advisor to local-government planning agencies during the planning process. Since 1984, the CGS has been required by law to recover the full direct cost of perform- ing such reviews. The adequate knowledge of a site's geology is essential for any development project. It is needed at the start of the project in order to plan, design, and construct a safe devel- opment. Proper planning for geological conditions can help developers and future owners/ users reduce unnecessary maintenance and/or repair costs. COlorado Geological Survey 1313 Sherman Sireel. Room 115, Denver, CO 80203 Ph: 303·866·2611, Fax: 303·866·2461 hltp:ffgeosurvey.slale.co.us White copy to CGS Yellow copy to Planning Agency Pink copy to Applicant Cleated 3116198, revIsed 5/25107 2 3 4 5 6 Frequently Asked Questions and Answers Regarding the eGS Land Use Review Process Why am I required to have a CGS review when I already hired and paid for my own consultant? In 1972, Senate Bill 35 was passed stating that any person or entity subdividing a property into parcels of 35 acres or Jess on unincorporated land must submit geologic or geotechnic.11 reports to the County as part of the preliminary plat application process. Municipalities or public agencies may request that eGS review a site, although these reviews are not governed by the statute. Why is a CGS review necessanJ when I already l!ired Iny own geologist? The eGS review is an independent third-party review that is done for the County, similar to the service a building inspector provides for construction review. The purpose of the CGS review is to ensure that all geologic concerns have been adequa~ely identified and addressed in the geologic reports and that the proposed development is feasible. Why does CGS c1large for land lise reviews? Docsn't taxpayer money pay for this service? eGS land use reviews are!lQ! subsidized through the general fundi although some other review agencies are supported by taxpayer money. In 1984 the state legislature decided that CGS reviews should be paid for with fees paid by the applicant 01 the proposed development so that taxpayers are not viewed as subsidizing development. Did the CGS geologist make afield visit to the site? A eGS geologist visits each site being reviewed. If the review is a re...submittal for a site that has been visited previously, a second sIte visit may not be necessary. If significant changes have occurred since the initial review, the site may be visited again. Why is the CGS review letter so short atld simple? What is my fee paying/or? The CGS letter is a review of the geologic material submitted and reflects the level of detaJi contained in those docwnents. eGS does not offer designs, but rather ensures that the work that has been done is meaningful and adequate for the site conditions and proposed development. A site review that adequately addresses all the geologic conditions present at the site may be a short confinuation letter. If more work needs to be done or if difficult site conditions are present, the letter l"!lay be longer. WJmt trjpe of infortnatlotl do 1 need to submit to CGS for a lemd lise review? The more geolo~c information that is submitted to CGS, the easier it is for eGS to evaluate the property. The required documents may vary based on county requirements and the potential problems that may impact the proposed development. A topographic map is essential. Also, infonnation regarding slope, surficial materials, subsurface materials and bedrock, presence of groundwater and depth, and specific geologic hazards should be induded, where applicable. Grading plans l drainage plan~, and geotechnical testing results are also very helpful for the review. The presence of geologic hazards should be evaluated with respect to the development plan. Also, the effect of development on geologic conditions should be discussed. The evaluation should include alternatives such as avoidance and mitigation techniques. 7 8 9 10 11 12 13 The subdivision dow1t the road was approved, why wasn't mine? There could be several reasons: geolOgiC conditions can change over short distances; subdivisions made prior to 1972 were not required to undergo a CGS review and may have not been evaluated for geolOgiC suitability at all; the area down the road may be incorporated as part of a municipality, wroch exempts it from the eGS review process. Another consideration is that geologic reviews are continually evolving and site conditions that have been judged acceptable in the past may no longer be considered as such, based on the current understanding of the geologic processes and adverse impacts associated with them. Why are CGS reviews required even on low~density properties? Senate Bil135 pertains to subdivisions of less than 35 acres. Geoiob"ric hazards can occur on' large-scales or small-scales; relying on low-density subdivision can not mitigate all geologic hazards. For instance, entire hillsides might be prone to rockfall or landslide hazards. Large tracts of land may be subject to groundwater problems. Why call't 1 just use the soil conservation maps for a geologic report? The USDA soil conservation maps are a. good start for geolOgiC investigations, but do not contain sufficient detail on the possible geologic problems that may occur at any site. Aren't some of your review comments beyond the scope of geologic hazards on my site? Technically other agencies have regulatory authority regarding issues such as flood plains, groWldwater availability and wildfire, but these issues are also important factors in the overall geologic context of the site and may affect geologic hazards on the site. The mention of a condition in the CGS review letter is not intended to influence the statutory authority of any other agency, but rather to ensure that all parties are aware of a potentially problematic geologic condition. For instance, mention of a situation involving a major drainage is a flag that the U.S. Anny Corps of Engineers or the Colorado Water Conservation Board should be reviewing development plans. When I bOltght this properltJ, no one told me abollt auy geologic hazards on the site; can 1 go back to the previous owners somehow? CGS can not give legal advice. If the seller was aware of adverse conditions with respect to the proposed use, this should have been disclosed. A legal opinion should be sought. Can 1 get a waiver from havin.g ,the CGS do a review? The discretion to grant waivers is vested by law with the counties. Once an application for review is submitted to eGS, we are under a statutory responsibility to respond. I am willin.g to accept the risk associated with my property - wIly is itanyolle's business.whatl do with my own laud? The preswnption associated with a subdivision is that portions of the property will be sold to others. This then assigns any risk to future buyers, and the county is required to protect their interests. Senate Bill 35 addresses a wide variety of land use issues as welt as geologic suitability in an attempt to provide information so that the overall appropriateness of fue subdivision proposal can be eva1uated. EXHIBIT ~ CotTman Ranch/Site PlanlI'~oiiith :Parcel Rex and Joaan Coffman 1837100Road . Caroondale, Colorado 81623 . .. .,. .. It: ~i~~ ... o ..... N Se P 03 08 09:33a EXHIBIT COLORADO DIVISION OF WATER RESOURCES Office Use Only l ~ C DEPARTMENT OF NATURAL RESOURCES REClEij~l?[ti, , 1313 SHERMAN ST., RM 818, DENVER, CO 80203 phone -info: (303) 866·3587 main: (303) 866·3581 fax: (303) 866·3589 htlp:flwww.water.slale.co.us RES 10 ENTIAL NOle:. Also use Ihis form to apply for livestock w,terlng AUG 14 '08 Water Well Permit Application Review instructions on reverse side prior to completing form. WAlt:.f\ ,,~;;;.~,-,..;~..,~b The form must be completed in black or blue Ink or typed. STATE ENGIIII~F" 1. Applicant Information 6. Use Of Well (check applicable boxes) -Name of applicant See instructions to determine use(s) for which you may qualify Rex Coffman 0 A Ordina~ household use in one single~family dwelling (no au side use) --Mailing address I8l B. Ordinary household use In 1 to 3 single-family dwellings: 1837 County Road 100 Number 01 dwellings: 2 CliY------T~~ I Zip code ._.- Carbondale I 81623 t8I Home garden/lawn irrigation, not to exceed one acre: Telephone # I E-mail (op6onai)"" --,--area irrigated 1 o sq. ft. 121 acre (970) 945-1013 (gI Domestic animal watering -(non-commercial) 2. Type Of Application (I;:~eck applicable boxes) .. [8] C. Livestock watering (on farmfranch/rangeJpasture) 121 Construct new well o Use existing well o Replace existing well o Change or increase use 7. Well Data (proposed) -------o Change source (aquifer) o Reapplication (expired permit) Mal'lrnum pumping ra:e AMual amounllo be wllhdrawn o Other; 15 gpm 3 acre-feet Tllla! (jepth Aquifer ---_._--- 3. Refer To (if applicable) 100 feet Alluvial Wellpermilll I Waler Court case t; 8. Water Supplier Oesi!Jnated BaSin Daterminalion # Wellnameor# Is thiS parcel within boundaries of a water service area? DYES f.8l NO'-----I Dougs Wen If yes, provide name of supplier: 4. Location Of Proposed Well 9. Type Of Sewage System County ._,. ~-.' ----- Garfield ]'!}V ______ 1140fiM SW. 114 I8l Septic tank I absorption leach field ... Sec6an I ;QM1Shi P NorS Range Or~ I ~r~~pal MeriOian 0 Central system: District name: 31 0121 87 0 Vault: Location sewage to be hauled to: Distance of well from secUorilines (section lines are !~plcally nol property lines) 1650 F1. Irom 0 N IZI s 250 Fl. from 0 E [8] W 0 Other (attach copy of engineering design and report) For repl;cemenl wells \lilly -dTslanie and dlrecllon from old well to neY/well 10. Proposed Well Driller License #(optional):Licensed feel direction 11. Signature Of Applicant(s) Or Authorized Agent Welilacalion address (Indude City, Slate, Zip) t8J Check if well address is same as in Ilem 1. The making of false statements herein constitutes perjury in the second New address to be detenllined degree, which is punishable as a class 1 misdemeanor pursuant to C.R.S. 24~4.1 04 (13)(a). I have read the statements herein, know the contents --.~ .. -----. thereof and state that they are true to m:t knowled,ge. Optlollal: GPS well location inrormatlon In UTM format. GPS J..nil.seIUngs are as foUaws: Sign here (Must be original signature) I Date ... Format must be UTM tjlYL:..! a Zone 12 or 0 Zone 13 Easting: ___ K!'::f.;_ a.:._~ , ... _ .. __ .. _._. __ .. _ .. ---_. .... _- Unlls must be Meter.; f -. Northing.: Print name &. tiUe Datum must be NADa3 ... _._--_ .. __ ... Unit must bo sel to true north Was GPS uni! cneeked for above? DYES Remember to set Datum to NAD83 Office Use Only 5. Parcel On Which Well Will Be Located USGS map name I DWRmap no. I Surlace elev: .. (pLEASE ATTACH A CURRENT DEED FOR THE SUBJECT PARCE~l_ ------------_. A. You must check and complete one of the following: -I Receipt.area only _ .... - 0 Subdivision: Name ! _._ .. . .. . --- Lot -----.... _ .. _-.... -. _ . Black -.----.~-, .... -Filing/Unit ; .. 0 County exemption (aUach copy of county approval & survey): Namel# Lot # .. . ... _ .. _ ... ... _ . 0 Parcel less than 35 acres, not in a subdivision, attach a deed with metes and bounds description recorded prior to June 1, 1972, and a current deed i 0 Mining cl~im. ~~!!~.c~_~.t;:O~yo!t_h~d.~ed or surveYrNa~.~j"# 0 Square 40 acre parcel as described in Item 4 WE 121 Parcel of 35 or more acres (auac)) a metes and bounds desCription or survey) WR 0 Other (aLlach metes &. bounds description or survey and supporting documents) eWeB B. 71 01 acres in parcel : C. Are you the owner cf this parcel? _}.!I_s~e."ttachedlna)l. . (8)VES 0 NO (if no -see Instruc~on5) TOPO . -_ .. .~ ~ES-[] -;;O·((f~~-~Ii~i-~Ih-e-r ~~"~.) .. -_.-------_.- D. Will this be tho only welt on this parcel? MYLAR . E--;;a~' ;;;;,;;~~ ;~;,;,~~;-_.,-_ ... . __ ... _. __ ._-----_ .. _.-------------._ .. _ ... -SB' DIV --WD --BA --MD -- I I I I I I I I II II II Coffman Ranch/North Parcel AppliCallt: Rex & JoAnn Coffman 1837100Road Carbond'llle, Colorado 111613 Represelltative: TG Malloy Consulting. LLC 181 Onhtrd Lant Glcnwwod Springs, Colorado 81601 Ph: 94.5-01131 Fax: 94.5-0BJJ North Date: January, 32004 Soils Types Map Aerial $our"ce: Sheet No. 20 Soil Survey oP Aspen-Gyps .... n Area. (Corboncl'o.te Quo.drongte) US Dept. of Inter-ior. Resource COr'lservo. tion Ser"vice USDA-Res Soils Designations Map Numerical. Soil Map Unit Svmbol 13 Atencio-AzcItine comolex, 3-6% 42 Fluvaouents, 0-10% 92 Redrob Loam, 1-6% Cofhnan Ranch/North Parcel Area, Colorado 13--Aten,ciol-Azeltine complex, 3 to 6 percent This map unit is on alluvial fans and terraces. . native vegetation is mainly grasses and shrubs. is 5,900 to 6,500 feet. The average annual pipil.aticln is 15 to 18 inches, the average annual air Inor.otlllrA is 44 to 46 degrees F, and the average period is 105 to 120 days. unit is about 60 percent Atencio sandy loam and Azeltine gravelly sandy loam. ""'UU~U in this unit are small areas of soils that are to the Atencio and Azeltine soils but are finer Also included are small areas of gravel bars. areas make up about 10 percent of the total Atencio soil is deep and well drained. It formed derived dominantly from sandstone and . Typically, the surface layer is reddish gray sandy about 6 inches thick. The next layer is sandy loam 4 inches thick. The subsoil is about 10 inches of clay loam over about 4 inches of gravelly sandy The upper 6 inches of the substratum is gravelly loam. The lower part to a depth of 60 inches is gravelly sand. The soil is noncalcareous to a depth inches and calcareous below that depth. In some the surface layer is gravelly or cobbly. 'ern1ealbilii ty is moderate to a depth of 30 inches in Ate,nciio soil and rapid below this depth. Available capacity is low. The effective rooting depth is 60 or more. Runoff is slow, and the hazard of water is slight. Azeltine soil is deep and well drained. It formed derived dominantly from sandstone and Typically, the surface layer is reddish gray sandy loam about 9 inches thick. The upper 7 of the substratum is gravelly loam. The lower loa depth of 60 inches is extremely gravelly sand. soil is calcareous throughout. In some areas the layer is cobbly loam or sandy loam. !ernleabilli tv is rapid or very rapid below a depth of in the Azeltine soil. Available water capacity The effective rooting depth is 60 inches or more. is slow, and the hazard of water erosion is unit is used mainly for irrigated hay or pasture. It , is used for crops, urban development, wildlife or rangeland, 'Ihis unit is used for hay and pasture, the main i are the low available water capacity and I stones. Grasses and legumes grow well if fertilizer is used. Good management helps to optimum vigor and quality of forage plants. these soils are droughty, applications of water should be light and frequent. Irrigation can be applied by corrugation, sprinkler, and 23 flooding methods. If properly managed, the unit can produce 4 tons of irrigated grass hay per acre annually . This unit is moderately well suited to irrigated crops. If furrow or corrugation irrigation systems are used, runs should be on the contour or across the slope. If properly managed, the unit can produce 70 bushels of barley per acre annually. The potential plant community on this unit is mainly western wheatgrass, Indian ricegrass, needleandthread, big sagebrush, and Douglas rabbitbrush. Nevada bluegrass, prairie junegrass, and bottlebrush squirreltail also are included. The average annual production of air- dry vegetation is about 800 pounds per acre. Suitable management practices include proper grazing use and a planned grazing system. If the quality of range vegetation has seriously deteriorated, seeding is needed. The main limitations are cobbles and stones. For successful seeding, a seedbed should be prepared and the seed drilled. Brush management improves deteriorated areas of range that are producing more woody shrubs than were present in the potential plant community. If this unit is used for homesite development, the main limitation is small stones. Population growth has resulted in increased construction of homes in areas of this unit. Topsoil can be stockpiled and used to reclaim areas disturbed during construction. The gravel and cobbles in disturbed areas should be removed if the site is landscaped, particularly in areas used for law'ns. If the density of housing is moderate or high, community sewage systems are needed to prevent the contamination of water supplies resulting from seepage from onsite sewage disposal systems. This map unit is in capability subclass IVe, irrigated, and Vie, nonirrigated. It is in the Rolling Loam range site. Callings-Yeljack complex, 25 to 65 perce slopes. This map unit is on ridgetops, benche ,and mountain . es. Elevation is 7,500 to 9,500 et. The average ann I precipitation is .18 to 20' ches, the average annua ir temperature is 3 0 41 degrees F, and the average fr t-free period' 70 to 80 days. This unit is about allings soil and 40 percent Yeljack soil. Included in this unit ar s all areas of Mine, Arle, Ansari, Jerry, Millerla ,Uracc and Mergel soils. Included areas m up about 10 ercent of the totill acreage. The Calli soil is deep and well dr . ed. It formed in alluviu and co.lluvium derived dominan from sandst e. Typically, the surface layer is dar brown loa bout 5 inches thick. The next 6 inches is ravelly m. The subsurface layer is very cobbly clay 10 I m-(3y~)sulm Area, Colorado gitaiQle management practices include proper '* and a planned grazing system. The this soil for range seeding is poor. imitatil>ln is the slope. The slope limits acpess limitp.n accessibility results in Der'cel,t slopes. This terraces, and m. Elevation is 'Bv,era.oe "rw,ua,1 precipitation is the surface The subsoil is substratum to a air temperature is ~V<,,~'" frost-free period is ISJtlrOVvn loam about 12 loam about 13 inches of 60' inches or more is sl)'1lalrianeas of Tridell soils, th.,tlh~"b slopes of less than 45 Rn,r.k~'"t,r.rnn Included rarloelan,eJ,. It also is used is mainly !n.,np.mAnt practices include nrnnA~ a planned grazingsystem. soil for range seeding is poor. the slope. The slope limits acc:ess, IImlltp.CI accessibility results in nv,.rnr"zinn areas. 'Dn,,,lv suited to homesite de'veloPlllent\ is the slope. '. is in capability subclass Vile, in the Deep Loam range site. 39 42-Fluvaquents, 0 to 10 percent slopes. This broadly defined unit consists of deep, somewhat poorly drained, nearly level soils on flood plains and alluvial valley floors. These soils formed in alluvium. Fluvaquents are stratified and vary widely in texture and in depth to sand, gravel, and cobbles. Typically, the surface layer ranges from loamy sand to fine sandy loam or from silt loam to clay loam. The underlying layers are generally sandy loam or loam stratified with sand, gravel; and cobbles. In some areas gravel and cobbles are on or near the surface. The water table fluctuates between depths of 0.5 fo.ot and 2.0 feet during spring and summer. These soils are occasionally flooded for brief periods in late spring and early summer. Included in this unit are smalt, isolated areas of Redrob soils. Also included are small, isolated areas where water stands at or near the surface all year. These water areas are identified by a special symbol on the soil maps. Included areas make up about 15 percent of the total acreage. These soils are used for wildlife habitat, recreational development, or grazing. The native vegetation is mainly cottonwood, willow, water-tolerant grasses, sedges, and rushes. Mule deer, cottontail rabbit, coyote, and bobcat and ducks, geese, and other native birds find food and shelter on these soils. Where feasible, planting small grain, trees, and shrubs improves the habitat for upland Wildlife. This unit is poorly suited to homesite development. The main limitations are the flooding and the seasonal high water table. This map unit is in capability subclass Vlw, nonirrigated: It generally is in the Riverbottom range site. At the higher elevations, however, it is in the Mountain Meadow range site. 3-Forelle-Brownsto complex, 6 to 12 percen slope This map unit is on mountains and benc s. Elevation' 6,500 to 7,500 feet. The average nual precipitation 12 to 14 inches, the avera annual air temperature is 0 44 degrees F, and e average frost-free period is 0 105 days. This unit is about 55 rcent F elle soil and 30 percent Brownsto soil. Included in this unit are s reas of Tridell soils on knolls, Mussel and Morv soils in ales, and basalt Rock outcrop. Also in ded are sma eas of solis that are similar to Forelle and Browns soils but have soft bedro below a depth of 40 inche . ncluded areas make about 15 percent of the total acr e. The F elle soil is deep and well drained. It forme lIuvium derived dominantly from sedimentary ,yps!um Area, Colorado loam, 6 to 12 percent slopes. This drained soil is on terraces, fans, and In,me,r! in alluvium. Elevation is 6,500 ave,racle annual precipitation is 13 to 1 average annual air temperature is and the average frost-free period the surface layer is light gray The upper 34 inches of the sulbstr'atum is The lower part to a 60 inches clay loam. unit are small areas up about 1 0 Der'cel~t i'tln,r\AraIA in the MUISf,191 soil. Available The effective depth is 60 is slow, and hazard of water or for and pasture. The fertility and the well if adequate propelrIY'Q1arfa,()ed, the unit can per acre' annually. on this unit is mainly neEldle,a~'~hl'ea,j, Nevada big sagebrush. The "i,-I\I,v vegetation is about undesirable chlemical\or mechanical range v~;;~~t~~n has '{,,,,r!irln is I homesite de've'ODlnelnt in the steepEl~alreals. 'MiIlA,nA,nl concern if ~refinstalled. Absorption I'UlllU'Jr. Access roads surface runoff and help in capability subclass IVe, irri(latEld is in the Rolling Loam range 12 to 25 percent slopes. is on fans and foot slopes. EIA,/alilm is 6,500 to 7 i 500 feet. iP~t;~~~~~i:S;e13 to 14 inches, the In is 42 to 44 degrees F, period is 75 to 90 days. layer is light gray loam about 8 34 inches of the substratum is part to a depth of 60 inches Included in this unit are small areas of Yamo soi a d soils that are similar to the Mussel soil but he· slo es of 6 to 12 percent. Included areas make p abo 10 percent of the total acreage. 63 Per eability is moderate in the Mussel s I. Available water ca city is high; The effective rooti depth is 60 inches or are. Runoff is medium, and e hazard of water erosio is moderate. This unit is sed as rangeland or r urban. development. e potential plant mmunity is mainly western wheatgr s, Nevada bl grass, Sandberg bluegrass, needlea thread, (j big sagebrush. The average annual prod tion 0 air-dry vegetation is about 800 pounds per acre. . Range seeding may b needed if the range is in poor condition. The main Ii . ati s are the slope and the limited availability of' igatio water. In areas where brush is removed b prescribe burning or by chemical or mechanical m ods, the haz d of erosion may increase. I! this unit' used for homesite de lopment, the main limita' n is the slope. The slope also a manage nt concern if septic tank abso tion fields are installe . Absorption lines should be install on the canto . Access roads should be designed to ontrol surf ce runoff and help stabilize cut slopes. his map unit is in capability subclass Vie, onirrigaled. It is in the Rolling Loam range site. * 92-Redrob loam, 1 to 6 percent slopes. This deep, somewhat poorly drained soil is on alluvial valley floors, low terraces, and flood plains. It formed in mixed alluvium derived dominantly from sandstone and shale. Elevation is 5,800 to 7,200 feet. The average annual precipitation is 16 to 18 inches, the average annual air temperature is40 to 44 degrees F, and the average frost-free period is 85 t01 05 days. Typically, the surface layer Is dark grayish brown loam about 14 inches thick. The next layer is stratified stony loam about 6 inches thick. The substratum to a depth of 60. inches is stony and very cobbly loamy sand and sand. '.. ..... .. ,. Included in this unit are small areas of Fluvaquents and Atencio, Azeltine, Showalter, and Morval soils. Included areas make up about 15 percent of the total acreage. Permeability is moderate in the surface layer of the Redrob soil and rapid in the rest of the profile. Available water capacity is low. The effective rooting depth is 60 inches for water-tolerant plants but is 20 to 40 inches for other plants. Runoff is slow, and the hazard of water erosion is slight or moderate on the steeper slopes. A high water table is at a depth of 18 to 48 inches 64 throughout the year. This soil is subject to rare flooding of brief duration. Ice jams may cause flooding during prolonged cold periods in winter. This unit is used for irrigated hay and pasture or as wildlife habitat. It is well suited to hay and pasture. The main limitations are the restricted rooting depth for plants that are not water-tolerant and a short growing season. The wetness limits the choice of suitable forage plants and the period of cutting or grazing and increases the risk of winterkilL Irrigation water can be applied by furrow, border, corrugation, and sprinkler methods. This unit provides food and cover for waterfowl and other wetland wildlife. This unit is poorly suited to homesite development. The main limitations are the wetness and the hazard of flooding. This map unit is in capability subclass IVw, irrigated and nonirrigated. It is in the Riverbottom range site. 93-'-Rogert very stony sandy loam, 25 to 65 p cent slopes. This shallow, well drained soit is mo tainsides. It formed in residuum derived doml antlyfrom granite. Elevation is 7,500 to ,00 feet. e' average annual preCipitation is 18 t 20 inches, e average annual air temperature' 36 to 38 degrees and the average frost-free peri (j is 35 to 60 days. Typically, he upper part of the surfa layer is dark grayish brow very stony sandy loam bout 6 inches thick. The lowe part is brown very avelly sandy loam about 11 inches ick. Hard granit IS at a depth of 10 to 20 inches. The oil is non calc eous throughout. Included in this u it are sma areas of soils that are similar to the Rogert oil but e finer textured and deeper over granite be roc Also included are small areas of soils that are sir to the Rogert soil but have a lighter colored su ce layer. Included areas make up about 15 perc t f the total acreage .. PermealJility is mo ratel apid or rapid in the Rogert soil. Availabl' water ca acity is very low. The effective rooting de h is 10 to inches. Runoff is medium, and the zard of water rosion is moderate. This unit is us for livestock gr ing or wildlife habitat. The pot ntial plant communit is mainly western wheatgrass, b ebunch wheatgrass, pr 'rie junegrass, and mountai big sagebrush. Other plan that characteriz this site are needleandthread, ndian ricegrass, (jaho fescue, and small numbers many forbs. S e areas of aspen are also included. he ave rag annual production of air-dry vegetation I about 1,000 ounds per acre. T suitability of this unit for range seeding is poo Th main limitations are the slope and the surface Soil Survey Suitable management practices' M"UC>, range use, deferred grazing, and rotation n\0,7inn Aerial spraying is suitable for brush unit is poorly suited to homesite de'/A~~nnnp.rlt limitations are the slope and the ,i,,',mo,n unit is in capability subclass nOl,irrio~,ted. It is in the Rocky Loam average average and the ave rag 15 percent high terraces, ,UUIJ,-O 8,500 feet. The 16 inches, the 42 to 44 degrees F, _n.,~.1 is 80 to 90 days. This unit is pel'celnYl,hc,wa.lter very stony loam and 35 OAr'''~'nt in convex areas, concave areas. The Showalter soil MOjrval soil is in the more I ocluded in this areas of soils that are similar to the Morval have a thicker surface layer. Also included arEi~nnall areas of soits that are similar to the Morval have 30 to 40 percent cobbles in the Included areas make up about 20 percent of acreage. The Showalter and well drained. It formed in from basalt. About 10 to 15 is covllred with stones, 5 oelrceln(~vith colobles, 5 percent with gravel. is brown very stony . loam about 8 I 3 inches of the subsoil is velrv/<)ob,bly clay loam. lower 28 inches very cobbly The substratum depth of 60 inches or very cobbly clay PA,'m""nlJltv is slow in the Show:alt€'\ soil. water is moderate. The i is.60 more. Runoff is medium, of water is slight. The soil is deep and well rir"in",rl I dominantly from TYIP/c:ally is brown loam about 7 indh",:'lhMk inr.lh"" of the subsoil is clay loam. inctle!iis loam. The substratum to a depth of 6~Jnclhes The soil is noncalcareous to a depth of inClnolS and calcareous below that depth. FlblrmElab,ility is moderate in the Morval soil, AY1~1\.ablel capacity also js moderate, The effective ronlli"" is 60 inches or more. Runoff is medium, hli2:ard of water erosion is slight. This unit is used as hay land or rangeland, for crops, for homesite development. It is moderately suited to and crops. The main limitations are the surface stoniness, the slope, and the slow permeability. 5"" 08 08 01:15" Bill To: Garfield County Road and Bridge Department P.O. Box 426 Rifle, co 81650 Phone-(970)625-8601 Fax-(970)625-8627 Invoice Driveway Permit Number: GRB08-D-80 Invoice Date: Rex A. Coffman 1837CR 100 Carbondale 8/13/2008 ,co 81623 $75.00 per Driveway Permit. $75.00. $75.00 ".2 EXHIBIT E Sep 08 08 01:15p Garfielcj County I Application for Driveway Permit Persall Obtaining Permit: Rex A. Coffman Application Date: 8/13/2008 County Road Number: 100 District: Glenwood Permit Number: GRB08-D-80 Termination Date: 9/13/2008 Inspector: Wyatt Keesbery p.3 hereby requests pennission and authority from the Board of County Commissioners to construct a driveway approach (es) on the right-of-way off of County Road. 100, 50ft West of 2575 CR 100, located on the i'iorth side ofroad for the purpose of obtaining access to property. Applicant submits herewith for the consideration and approval ofthc Board of County Commissioners, a sketch of the proposed installation showing all the necessary specification detail including: I. Frontage of lot along road. 2. Distance from centerline of road to property line. 3. Number of driveways requested 4. Width of proposed driveways and angle of approach. 5. Distance from driveway to road intersection, if any. : 6. Size and shape of area separating driveways if more than one approach. 7. Setback distance ofbuilding(s) and other structure improvements. 8. No unloading of equipment on county road, any damage caused to county road will be repaired at subdivision . expense. 9. Responsible for two years from the date of completion. General Provisions 1) The applicant represents all parties in interest, and aflinns that the driveway approach (es) is to be constructed by him for the bona fide purpose of securing access to his property and not for the purpose of doing business or servicing vehicles on the road right of way. 2) The applicant shall furnish all labor and materials, perfonn all work, and pay all costs in connection with the construction of the driveway(s). All work shall be completed within thirty (30) days of the permit date. 3) The type of construction shall be as designated and/or approved by the Board of County Commissioners or their representative and all materials used shall be of satisfactory quality and subject to inspection and approval of the Board of County Commissioners or their representative. 4) The traveling public shall be protected during the installation with proper warning signs and signals and the Board of County Commissioners and their duly appointed agents and employee shall be held hannless against any action for personal injury or property damage sustained by any reason of the exercise of the Permit. 5) The Applicant shall assume responsibility for the removal or clearance of snow, ice, or sleet upon any portion of the drivcway approach (es) even though deposited on the driveway(s) in the course ofthc COllnty snow removal operations. Sep 08 08 01:15p p.4 6) In the event it becomes necessary to remove any right-of-way fence, the posts on either side of the entrance shall be surely braced before the fence is·cut to prevent nny slacking of the remaining fence and all posts and wire removed shall be turned over to the District Road Supervisor of the Board of County Commissioners. 7) No revisions or additions shall be made to the driveway(s) or its appurtenances on the right-of-way without written permission of the Board of County Commissioners. 8) Provisions and specifications outlined herein shall apply on all roads under the jurisdiction of the Board of County Commissioners of Garfield County, Colorado, and the Specifications, set forth on the attached hereof and incorporated herein as conditions hereof. 9) Final inspection of driveway will be required upon completion and must be approved by person issuing permit or representative of person issuing permit. The inspection and sign off must be done prior to any CO from the Building and Planning Department being issued. 10) Contractor agrees to all Provisions in Exhibit A. Special Conditions: I. Driveway Width-30ft 2. Culvert required? True Size: 18 inch by 40ft 3. Asphalt or concrete pad required? True Size of pad: 30ft Wide x 10ft long x 4in thiel( 4.· Gravel portion required? True Length: 40ft 5. Trees, brush andlor fence need to be removed for visibility? True 6. Distance and Directiou:west 150ft to 200ft 7. Certified Traffic Control Required? False-· 8. Work zone signs required? True 9. Start date contingent on completion of subdivision process Telephone Number: _____________ _ Permit granted 8113/2008, subject to the provisions, specifications and conditions stipulated herein. For Board 0 County Commissioners' of Garfield County, Colorado: Representative of Garfield County Road and Bridge Signature Sep 08 08 01:151" 1".5 Specifications I. A driveway approach is understood to be that portion of the county road right·of way between the pavement edge and the property line that is designed and used for the interchange of traffic between the roadway and abutting property. 2. At any intersection, a driveway shall be restricted for a sufficient distance from the intersection to preserve the normal and safe movement of traffic. (It is recommended for rural residence entrances that a minimum intersection clearance of 50 feet be provided and for rural commercial entrances a minimum of 100 feet be provided.) 3. All entrances and exits shall be so located and constructed that vehicles approaching or using them will be able to obtain adequate sight distance in both directions along the county road in order to maneuver safely and without interfering with county road traffic. 4. The Applicant shall not be permittcd to erect any sign or display material, either fixed or movable, on or extending over any portion of the county road right-of-way. 5. Generally, no more than one approach shall be allowed any parcel or property the frontage of which is less than one hundred (100) feet. Additional entrances or exits for parcels having a frontage in:excess Of one hundred 100) feet shall be penni tted only after showing of actual convenience and necessity. 6. All driveways shall be so located that the flared portion adjacent to tbe traveled way.will not encroach upon ·adjoining property. 7. No commercial driveway shall have a width greater than thirty (30) feet measured at rightangles to the centerline. of the driveway except as increased by·permissible radii. No noncommercial driveway shall have awidth greater than twenty (20) feet measured at rightangles to the' centerline of the driveway, except as increased by permissible radii. 8. The axis of an approach to the road may be at a right angle to the centerline of the county road and of any angle between ninety (90) degrees and sixty (60) degrees but shall not be less than sixty (60) degrees. Adjustment will be made according to the type of traffic to be served and other physical conditions. 9. The construction of parking or servicing areas on the county road right-of-way is specifically prohibited. Commercial establishments for customer vehicles should provide off-the-road parking facilities. 10. The grade of entrance and exit shall slope downward and away from the road surface at the same rate as the normal shoulder slope and for a distance equal to the width afthe shoulder but in no case less than twenty (20) feet from the pavement edge. Approach grades are restricted to not more than ten percent (10%). 11. All driveways and approaches shaJl be so constructed that they shaJl not interfere with the drainage system ofthe street or county road. The Applicant will be required to provide, at his Own expense, drainage structures at entrances and exits, which will become an integral part of the existing drainage system. The Board of County Commissioners or their representative, prior to installation, must approve the dimensions and types of all drainage stTuctures. Note: This permit sball be made available at the site where and when work is being done. A work sketch or drawing of the proposed driveway(s) must accompany application. No permit will be issued without drawing, blueprint, or sketch. Sep 08 08 01:15p Driveway Permit Check Off Form I. Pennit Owner: 1 (2.e 7"-f+ . L b ++ 'tv, Q V\ 6. Nearest Intersection or address: ~57S-C2~£... 100 7. Distance from Int. or address: 50' 8. Direction from Int. or address: N D E D S D 9. Side of road: N !X! ED S D w0 wD 10. Width of driveway: 3D-foot 0 40-foot D 100-foot D other:IL-__________ -' 11. Culvert required: Yes ~ No D 12. Sizeofculve11required: l2-inch DIS-inch D l8-inch ~ Other: ! 13. Length of culvert required: 30-foot D 40-foot 1RJ0theq I 14. Asphalt or concrete pad required: Yes ~ No D 15. Size of pad: 30-foot wide X 10-foot long X 4 inches thick: Yes Ix I 40-foot wide X 10-foot long X 4-inches thick: Yes D 100-foot wide X 20-foot long X 4-inches thick: Yes D Other: '-1 ______________ ----' p.s Sep DB DB 01:16p 16. Gravel portion required: Y es ~ No D 17. Length of gravel portion: 40-foot G 50-foot 0 100-foot 0 18. Trees or brush removed for visibility: Yes [K] 19. Distance and direction from driveway to be removed: [ W -\'50' -'"2.00' 20. Driveway must be no more than 3 % slope away from County road. 21. Drive must be constructed so no drainage accesses County road from driveway. 22. Certified traffic control required: YesD No [!] 23. Work zone signage only required: Yes I2J No D 24. Stop sign required at entrance to County Rd. YesD No [2J 25. Inspection of driveway will required upon completion and must be approved by person issuing permit or representative of person issuing permit. r) r J} 26. Person Requesting Permit: .~ e"f It. C i) IT Vl\.lVV\. 27. Person issuing permit: A-/7""*~; Z 28. District permit issued in: I ~ 2 D 3 D 29. Date checklist completed: L [ _______________ --' p.7 Sep 08 08 01:16p BOARD OF COUNTY COMMISSIONERS OF GARFIELD COUNTY CERTIFICATION AND AFFIDAVIT REGARDING ILLEGAL ALIENS p.8 The Contractor, whose name and signature appears below, certifies and agrees as follows: 1. The Contractor shall comply with the provisions of C.R.S. 8-17.5-101 et seq. The Contractor shall not knowingly employ or contract with an illegal alien to perform work for the Board of County Commissioners of Garfield County, Colorado ("BCCe") or enter into a contract with a subcontractor that knowingly employs or contracts with an illegal alien. 2. The Contractor represents, warrants, and agrees that it has verified that it does not employ any illegal aliens; that it has participated or attempted to participate in the Basic Pilot Employment Verification Program administered by the Social Security Administration and Department of Homeland Security; and otherwise shall comply with the requirements of C.R.S. 8-17.5-102(2) (b). 3. The Contractor shall comply with all reasonable requests made in the course of an investigation under C.R.S. 8-17.5-102 by the Colorado Department of Labor and Employment. If the Contractor fails to comply with any requirement of this provision or C.R.S. 8-17.5-101 et seq., the BOCC may terminate work for breach and the Contractor shall be liable for actual and consequential damages to the State. 4. If the Contractor is a sale proprietor, the undersigned hereby swears or affirms under penalty of perjury under the laws of the State of Colorado that (check one); ~ I am a United States citizen, or I am a Permanent Resident of the United States, or I am lawfully present in the United States pursuant to Federal law. I understand that this sworn statement is required by law because I am a sole proprietor entering into a contract to perform work for the BOCC. I understand that state law requires me to provide proof that I am lawfully present in the United States prior to starting work for the BOCC. I further acknowledge that I will comply with the requirements of C.R.S. 24-76.5-101 et seq. and will produce the required form of ident~fication prior to starting work. I acknowledge that making a false, fictitious, or fraudulent statement or representation in this sworn affidavit is punishable under the criminal laws of Colorado as perjury in the second degree under C.R.S. 18-8-503. CONTRACTOR: f 3> day of -,a~./.""U1'1:::-___ ' 200~. 0- CERTIFIED and AGREED to this (Contractor Full Legal Name) FEIN or Social Security Number By: ized Rep Immigration Affidnvit 106/06) Final EXHIBIT Sep 09 08 02:07p p.2 EXHIBIT sourcJhas April II, 2008 From: Carla Westerman SourceGas 0096 County Rd. 160 Glenwood Springs, CO 81601 970-928-0407 To: Douglas Coffman 1837 COlUlty Rd. 100 Carbondale, CO 81623 970-963-1013 RE: 1837 County Rd. 100 Lot subdivision Dear Doug: It was nice talking to you this morning! The above mentioned property is within the certificated service area of SourceGas. Source Gas has existing natural gas facilities located on or near the above mentioned project. At this time it appears that these existing facilities have adequate capacity to provide natural gas service to your project, subject to the tariffs, rules and regulations on file. Any upgrading of our facilities necessary to deliver adequate service to and within the development will be undertaken by SourceGas upon completion of appropriate contractual agreements and subject to necessary governmental approvals. Please contact us with any questions regarding this project, and with a timeline of when you would like to proceed with your project. Sincerely, Carla Westerman Field Coordinator SourceGas Y EXHIBIT Board of DIrectors · Wally Obermeyer Pfasldenf Louis Meyer Vice..pres/dent ·Cathy Porter Sec(eiEi(Y Sandy Ja<;kson T.ressurer . 'Jim Aresty , D~ve' 8~IIBck . . Sue Edels te!n ", I,.ee AnI) Eustis · 'Ho~emary Patterson " Staff · Martha CoctYai1 Executive Dtector Suzanne-StePhens Assoc!a~~ DirectQs: Belhany Collins Project St?Bda~/st Melissa Surnera · Omes Manager October 2, 2008 Rex and JoAnn Coffman 1837 County Road. 100 Carbondale, CO 8162:3 Dear Ml;. and Mrs. Coffman: . -Permanen11ipreserving ope~ lands' for agriculture. wildlife .and recreation On July29, 2008, the Board ofDitectors of Aspen Valley Land Trust voted to .. approve your request to. amend the Amended ood Restated CoffmariRanch .' Conservation Easement, recorded in Garfield County on December '16, 2004 as ReceptionNo. 665189 (the "Easement Deed"), to expa:nd the size of Lot A; as '.·permitted by Section 6.A ofthe EaSement beecl, from 4.5 acres to approximately 10 . acres, more or less, proVided the size ·of the building envelope ,within: this Lot A (ioes not exceed 2 acres in size, with a bui).ding footprint, inclusive of all structures, riot to exCeed 6,500 square feet, as also permitted by Section 6.Aof the Easement Deed. ". "-,' . . , . . . The. exact size and boundaries of theametided Lot'A will be determined' by a survey to be slibmittedto the Trust pnorto amenclinent ofthe Easement. Deed. ., -:' . ". . . '-. .. . -. Please do not hesitate, to contact us should youh!lye any questi?ns. . . Sincerely, ..... ) . "S~h . uzanne Step ens Associate Director Aspen Valley Lond TrUsl 320 Main Sireel,. Suile 204. Corbondale, Cobrodo 81623.970.963.8440 phone. 970.963,8441 fa, WWIAI.avlt.ora 1%9diS939&&&X ."'6U'Y'Y "Yi'Yi'WW4'4@ U YiWiSY69&9*j&&MYiSY6ii69&&4SV6W&MiW@S",,@?&%%9M&6%%yiS 9 6~&.:asi ... ;r;Y;W iSY696j@M Y;S'U&J DOUGLAS A COFFMAN 1164 COUN TY RO AD 113 CARBONDALE , CO 81623 ·9649 Stilel PRESIlGE"-'o"'AC::cc"'O'--UNTS- Dare I III "2. / 0 ~ I I- 1015 53-2921113 $ 3)StJL A $o <~,". I M~ ~ 'W'>'kUd ~ ~ a..,...-d/ lie ;) nollars l.!J i:!:r,~·:. Boston Safe Deposit and Trust Co., Boston, M Expense 0 Monitor For~ O~ ~4~- 21, OJ 0 2 j I' ~ RECEIVED OCT 022008 GARF IELD COUNTY BUILD IN G & PLANNING