PROJECT INFORMATION AND STAFF COMMENTS
PROJECT: Rose Ranch Metropolitan District Service Plan.
LOCATION: The proposed district is located in portions of Sections I, and 12, T7S.,
R89W, and portions of Sections 2, and 35, T6S, R89W; more practically
described as an area approximately 3.5 miles south of Glenwood Springs
along Highway 82, adjacent to and west of the Roaring Fork River, and
adjacent to County Road 109 (Rose Ranch PUD).
I. PROJECT DESCRIPTION
The applicant is proposing the formation of a Service District to serve a portion of the approved
Rose Ranch PUD. This includes 292 single-family residential attached and detached units with
an estimated population of 730, but does not include the 30 affordable housing units included in
the approved Rose Ranch PUD. The 30 affordable housing units are not to be included in the
District to avoid the increased costs to the affordable units which would result, should they be
included . The District is proposed to include parks and recreational facilities, within and
without the boundaries of the district; street improvements, both on-site and off-site; a complete
potable and non -potable local water supply, storage, transmission, and distribution system; and,
a complete local sanitary sewage collection and transmission system.
The parks, recreational facilities, and street improvements will be maintained by the proposed
District or the Homeowners Association. The golf course which will be within the proposed
District is to be developed and operated by a private party, and is not anticipated to be owned or
maintained by the proposed District. The potable and non -potable water supply as stated by the
applicant in their submittal, is to be dedicated to and maintained by the Roaring Fork Water and
Sanitation District pursuant to an Intergovernmental Agreement. This can only occur if the
RFWSD amends its service plan to allow for service. The sanitary sewage system except for
storm and drainage facilities is to be dedicated to and maintained by the Roaring Fork Water and
Sanitation District. This will need to be done as per the "Roaring Fork Water & Sanitation
District Roaring Fork Investments, LLC Pre -Inclusion Agreement which was a condition of the
approval of the Rose Ranch PUD. The storm and drainage facilities will be dedicated to and
maintained by the proposed District or Homeowners Association.
Construction costs for necessary improvements are to be advanced by the developer(s) within the
proposed District, subject to subsequent acquisition by the proposed District of the completed
improvements and reimbursement to the developer(s) of such advanced construction costs. The
-1-
total estimated cost of capital improvements to be constructed is not projected to exceed Eight
Million Seven Hundred Fifty Thousand Dollars ($8,750,000). This figure breaks down into
$3,151,890 for street and safety system, $2,292,393 for water facilities, $1,560,279 for sewer
facilities, $1,245,438 for drainage facilities, and $500,000 for parks and recreation. The
applicant also notes that any additional facilities required (not included in this plan), will be
designed, constructed and paid for by the Developer.
The provision of facilities by the proposed District will be primarily financed by the issuance of
several series of general obligation bonds, secured by the ad valorem taxing authority of the
proposed District with limitations as discussed in the submitted application. Prior to the issuance
of bonds, the first issuance anticipated in 2000, the construction cost for necessary
improvements will be advanced by the developer(s) within the proposed District, subject to
subsequent acquisition by the proposed District of the completed improvements and
reimbursement to the developer(s) of such advanced construction costs. Any obligations issued
or otherwise contracted for to reimburse the developer(s) for advanced construction costs shall
be included within the debt limits described in the submitted application. The proposed District
may also issue notes, certificates, debentures, or other evidences of indebtedness, which
issuances shall be subject to the limitations set forth in the Service Plan.
The proposed District will have a mill levy assessed on all taxable property in the proposed
District as a primary source of revenue repayment of debt service and for operations and
maintenance. Interest income through the reinvestment of construction funds, capitalized interest
and annual tax receipts will provide additional funds. In addition to property taxes, the District
may also rely upon various other revenue sources authorized by law and this Service Plan to
offset the expenses of capital construction and District management, operations and
maintenance. These will include the power to assess fees, rates, tolls, penalties, or charges as
provided in Title 32, as amended. A Facilities Fee in the amount of nine thousand five hundred
dollars ($9,500) will be imposed on each lot within the District to be collected at the time of sale
of each lot.
II. ISSUES AND COMMENTS
A. Colorado Revised Statutes - C.R.S. 32-1-101, et. seq.
Within 30 days of the filing of a service plan with the County Clerk and Recorder, the Clerk and
Recorder is required to deliver the service plan to the Planning Commission for review and
recommendation. The Planning Commission is required to make a recommendation to the
Board of County Commissioners to take one of the following actions:
1. Approve, without condition or modification, the service plan.
2. Disapprove the service plan.
3. Conditionally approve the service plan subject to additional information being submitted
or the modification of the proposed service plan.
-2-
The applicant agreed to wave the 30 day requirement and allow for the application to be heard
before the Garfield County Planning Commission on February 9, 2000 (See letter p. 9).
The Board of County Commissioners "shall disapprove the service plan unless evidence
satisfactory to the Board of each of the following is presented":
1. There is sufficient existing and projected need for organized service in the area to be
serviced by the proposed special district.
2. The existing service in the area to be served by the proposed special district is inadequate
for present and projected needs.
3. The proposed special district is capable of providing economical and sufficient service to
the area within its proposed boundaries.
4. The area to be included in the proposed special district has, or will have, the financial
ability to discharge the proposed indebtedness on a reasonable basis.
The Board of County Commissioners may disapprove the plan if evidence satisfactory to the
Board of any of the following, at the discretion of the Board, is not presented:
1. Adequate service is not, or will not be, available to the area through the County or other
existing municipal or quasi -municipal corporations, including existing special districts,
within a reasonable time and on a comparable basis.
2. The facility and service standards of the proposed special district are compatible with the
facility and service standards of each County within which the proposed special district is
to be located and each municipality which is an interested party under Section 32-1-
204(1).
3. The proposal is in substantial compliance with a master plan adopted pursuant to Section
30-28-108, C.R.S..
4. The proposal is in compliance with any duly adopted county, regional or state long-range
water quality management plan for the area.
5. The creation of the proposed special district will be in the best interests of the area
proposed to be served.
The following are responses to the statutory criteria:
1. There is sufficient existing and projected need for organized service in the area to be
serviced by the proposed special district.
At this time, the Rose Ranch PUD Final Plat and accompanying documents have not
been recorded. However, with approval of the Preliminary Plan for the Rose Ranch PUD
from the Board of County Commissioners it is assumed that the Final Plat and
accompanying documents will be recorded and therefore there is sufficient existing and
projected need for the District. To ensure that this existing need will be in place, as a
-3-
condition of approval of this District, the Final Plat and accompanying documents of the
Rose Ranch PUD must be recorded before this District is approved.
Given that the potable and non -potable water supply and sanitary sewage system is to be
dedicated to and maintained by the RFWSD, the golf course is anticipated to be
developed and operated by a private party other than the proposed District, and the parks,
recreational facilities, street improvements, and the storm and drainage facilities for the
sanitary sewage system are to be dedicated to and maintained by the District or the Home
Owners Association, there are no facilities which are absolutely going to be dedicated to
and maintained by the proposed District. Since the above requirement states "to be
serviced by the proposed district" the proposed district must have facilities dedicated to it
to be serviced by it. Therefore, to satisfy this requirement, all facilities proposed to be
dedicated to and maintained either by the District or the Home Owner's Association as
outlined in the submitted application and above, will have to be dedicated to the
proposed District and not to the Home Owner's Association.
Further, if no facilities were dedicated to the proposed District, the District would be
proposed solely for the purposes of financing infrastructure for the Rose Ranch PUD.
The formation of a District should not be meant to be solely for the financial benefit of a
developer.
The Subdivision Improvements Agreement which is part of the Rose Ranch PUD states
that "the homeowners association shall be solely responsible for the maintenance, repair
and upkeep of those roads." This will have to be amended to dedicate the roads to the
proposed District and not the homeowners association. Other sections within the SIA
which do not expressly dedicate improvements to the proposed District other than those
improvements to be dedicated to the RFWSD must be amended to dedicate
improvements to the proposed District. Further, the Rose Ranch PUD Preliminary Plan
may need to be amended to reflect the need to dedicate improvements not dedicated to
the RFWSD to the proposed District.
2. The existing service in the area to be served by the proposed special district is
inadequate for present and projected needs.
At this time, neither the Roaring Fork Water and Sanitation District nor the County
intend to expand services at their own expense to accommodate the Rose Ranch PUD.
However, as the applicant states, the water and sanitation services to be constructed will
be dedicated to the RFWSD upon completion.
To dedicate the potable and non -potable water supply to the Roaring Fork Water and
Sanitation District, for them to maintain, as proposed by the applicant, would require an
amendment to the Roaring Fork Water and Sanitation District Service Plan, to allow for
such an undertaking. Until such time as such an amendment to the Roaring Fork Water
-4-
and Sanitation District Service Plan is completed, the potable and non -potable water
supply proposed as part of the Service Plan for the Rose Ranch Metropolitan District
must be maintained by the proposed District. Further, no Intergovernmental Agreement
pertaining to this has been entered into at this time, since the RFWSD does not have the
authority at this time to enter into an agreement for water.
To dedicate the sanitary sewage system except for storm and drainage facilities as
proposed by the applicant, the "Roaring Fork Water & Sanitation District Roaring Fork
Investments, LLC Pre -Inclusion Agreement" which was a condition of approval of the
Rose Ranch PUD, must be recorded along with the Rose Ranch PUD.
3. The proposed special district is capable of providing economical and sufficient service
to the area within its proposed boundaries.
With the approval of the Rose Ranch PUD, evidence that sufficient service to the area
would be provided was accomplished in general terms. This is now being specifically
proposed to be provided by the creation of this District. With the creation of this District
sufficient service will be provided.
The proposed District facilities will cost an estimated eight million seven hundred fifty
thousand dollars ($8,750,000), with any additional facilities (not currently included in the
Service Plan) to be designed, constructed and paid for by the Developer. A uniform mill
levy and "reasonable tax burden" on all property within the development is to be
maintained through managed financing and coordinated completion of infrastructure
improvements. "Through the coordination of services and financing of public
infrastructure improvements by the District, the District will be capable of providing
economical and sufficient services to the area served by the District."
Ultimately, the homeowners living in the district will be responsible for paying off the
debt. To provide for the homeowners to be protected from the possible increase in mill
levies beyond the maximum of 50 mills as proposed by the applicant, the Service Plan
needs to be amended so that the mill levy cannot be increased above 50 mills without the
approval of the Garfield County Board of County Commissioners.
4. The area to be included in the proposed special district has, or will have, the financial
ability to discharge the proposed indebtedness on a reasonable basis.
The District proposes to issue general obligation bonds to assist in financing of the
improvements, impose a mill levy with a cap of 50 mills, and impose a Facilities Fee in
the amount of nine thousand five hundred dollars ($9,500) on each lot within the District
to be collected at the time of sale of each lot. As discussed previously, to protect the
homeowners living within the District, the Service Plan must be amended so that the mill
levy cannot be increased above 50 mills without the approval of the Garfield County
-5-
Board of County Commissioners.
This, along with a detailed financial plan submitted by the applicant demonstrates that
the District will be capable of discharging the proposed bonds (debt) on a reasonable
basis.
The following discussion addresses the reasons the Board of County Commissioners may
deny a service plan, if the following is not presented:
1. Adequate service is not, or will not be, available to the area through the County or
other existing municipal or quasi -municipal corporations, including existing special
districts, within a reasonable time and on a comparable basis.
As discussed above, neither the County nor the RFWSD intend to extend services at their
own expense to the Rose Ranch PUD now or in the near future. With the approval of the
Rose Ranch PUD, services are needed.
2. The facility and service standards of the proposed special district are compatible with
the facility and service standards of each County within which the proposed special
district is to be located and each municipality which is an interested party under
Section 32-1-204(1).
The applicant has stated in their submitted report that all facilities will be constructed to
the standards of all applicable local, state or federal regulations. This will be a
requirement of any approval of this District.
3. The proposal is in substantial compliance with a master plan adopted pursuant to
Section 30-28-106, C.R.S..
With the approval of the Rose Ranch PUD, the PUD has been found to be in general
conformity with the Comprehensive Plan.
With regard to this District, the following is offered:
The Water and Sewer Services Goal states the following:
To ensure the provision of legal, adequate, dependable, cost effective and
environmentally sound sewer and water services for new development
The following objectives are relevant to the proposed service plan :
7.2 Development located adjacent to municipalities or sanitation districts with
available capacity in their central water/sewer systems will be strongly
-6-
encouraged W tie into these systems.
The proposed District proposes to dedicate the water and sanitary sewer systems to the
RFWSD. At this time, the RFWSD is capable of accepting the sanitary sewer system,
however, as discussed previously, to accept the water system, the RFWSD Service Plan
will have to be amended. This means that the proposed District will have to be prepared
to accept and maintain the water system until such time as the RFWSD has amended its
Service Plan to accept it for maintenance.
With the above in mind, the proposed District is in conformance with this policy.
7.4 Development will be required to mitigate the impact of the proposed project on
existing water and sewer systems.
Mitigation in this sense means paying a fare share of costs. Given that this District is
being created, the applicant through the creation and financing of the infrastructure will
be adequately mitigating any and all impacts.
The following policies are relevant to the proposed service plan :
7.2 Where logical, legal and economic extension of service lines from an existing
water and/or sewage system can occur, the County will require development
adjacent to or within a reasonable distance, to enter into the appropriate
agreements to receive service. The burden of proof regarding logical, legal and
economic constraints will be on the developer.
The proposed District is proposing to dedicate the water and sanitary sewer systems to
RFWSD which will comply with this policy. However, as stated above the RFWSD
Service Plan must be amended to allow for the RFWSD to accept the water facilities for
maintenance. This means the proposed District will have to maintain the water facilities
until such time as the RFWSD has amended its Service Plan. Further, an
Intergovernmental Agreement between the Roaring Fork Water & Sanitation District and
Roaring Fork Investments, LLC, will have to entered into.
4. The proposal is in compliance with any duly adopted county, regional or state long-
range water quality management plan for the area.
At this time, there is a Water Quality Management Plan (208 Plan) for the Region which
was adopted in 1984. The County Engineer has been working on an updated 208 Plan for
the County for the last few months, but there is no new document available yet that
would support or oppose the development of the proposed District. The existing
document and proposed document recommends the consolidation of facilities. The
proposed combined water and sewer service with the RFWSD is consistent with the plan.
-7-
5. The creation of the proposed special district will be in the best interests of the area
proposed to be served.
Providing central water and sewer to the Rose Ranch PUD is preferable to individual
water and sewer systems. Further, as the applicant states in their submitted report, future
expansion of the District to other future development in the area is possible.
B. Other Comments:
This submitted Service Plan has been forwarded to the Bond Council for the County to
review. To date no comments have been received. However, upon receipt of comments
from the County's Bond Council, any changes to the Service Plan as recommended by
council will have to be completed by the applicant.
III. RECOMMENDATION:
Staff recommends APPROVAL of the Service Plan for Rose Ranch Metropolitan District
with the following conditions:
1. The Service Plan must be amended so that all facilities/improvements not
dedicated to the RFWSD will be expressly dedicated to the proposed District and
not the Homeowners Association. Further, the administrative costs within the
Service Plan must be amended to reflect the cost of these improvements being
dedicated to the District.
2. The Subdivision Improvements Agreement which is part of the Rose Ranch PUD
must be amended to dedicate all facilities/improvements not dedicated to the
RFWSD to the proposed District. The Rose Ranch PUD Preliminary Plan may
also need to be amended to reflect the dedication of these facilities/improvements
to the proposed District.
3. The Service Plan must be amended so that the proposed maximum mill levy of 50
mills cannot be raised above 50 mills without the approval of the Garfield County
Board of County Commissioners.
4. The Service Plan must be amended to reflect any changes recommended by the
Bond Council for the County.
5. The Final Plat and accompanying documents including but not limited to the
"Roaring Fork Water and Sanitation District Roaring Fork Investments, LLC Pre -
Inclusion Agreement" of the Rose Ranch PUD must be recorded before approval
of this District.
-8-
JOHN A. THULSON
EDWARD MULHALL, JR.
SCOTT BALCOMB
LAWRENCE R. GREEN
TIMOTHY A. THULSON
LORI J. M. SATTERFIELD
EDWARD B. OLSZEWSKI
DAVID SANDOVAL
DENDY M. HEISEL
JEFFERSON J. CHENEY
BALCOMB & GREEN, P.C.
ATTORNEYS AT LAW
P. 0. DRAWER 790
818 COLORADO AVENUE
GLENWOOD SPRINGS, COLORADO 81602
Telephone: 970.945.6546
Facsimile: 970.945.8902
January 18, 2000
Jeff Laurien, Senior' Planner
Garfield County Department of Building & Planning
109 8th Street, 3rd Floor
Glenwood Springs, CO 81601
Re: Rose Ranch Metropolitan Service Plan
Dear Mr. Laurien:
OF COUNSEL:
KENNETH BALCOMB
On December 13, 1999, the Application for Metropolitan District for the Rose
Ranch was referred by the Garfield County Commissioners to the Garfield County Planning
Commission. I was present at this meeting of the Commissioners and represented to the
Board at this time, as attorney for the Applicants, that the Applicants would be willing to
waive the thirty (30) day processing time requirement to enable the Planning Commission's
consideration of this Application on February 9, 2000. I have since confirmed this waiver
with Mr. Ron Heggmeier who is the manager for Roaring Fork Investments, LLC, the
present owner of the Rose Ranch Planned Unit Development, which PUD incorporates the
entire boundaries of the proposed Metropolitan District.
Should you have any questions or concerns regarding any of the above, please feel
free to contact me at your convenience.
Very truly yours,
By
TAT:kjk
/%4//i
`%'�mo by A. T ulson