Loading...
HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT BLMF-8-16-4350 — SEPT -8-16-4351 Shaw Residence MF Home @ TBD CR 259 Rifle, CO 1) SEE PLAN ATTACHMENTS FOR BUILDING REQUIREMENTS. Z) OPEN -HOLE SOILS REPORT REQUIRED AT FOOTING INSPECTION, 1500 PSF. 3) PLANS APPROVED FOR GARAGE FOUNDATION/SLAB ONLY. SEPARATE BUILDING PERMIT REQUIRED FOR GARAGE STRUCTURE. 4) DUE TO WATER QUALITY, IT IS REQUIRED THAT TREATMENT BE ACHIEVED BY A REVERSE OSMOSIS (RO) TYPE SYSTEM. 5) ENGINEERED SYPTIC SYSTEM MUST ACCOMMODATE REVERSE OSMOSIS (RO) IN THE DESIGN. FINAL APPROVAL REPORT REQUIRED FOR FINAL/CO INSPECTION. 6) LOCAL FIRE DISTRICT SHALL REVIEW AND INSPECT THE FIRE SPRINKLER SYSTEM. FINAL APPROVAL REPORT IS REQUIRED FOR FINAL/CO INSPECTION. 7) ALL PLUMBING AND GAS PIPING CONNECTIONS MUST BE PERFORMED BY A COLORADO LICENSED PLUMBER. ALL ELECTRICAL CONNECTIONS MUST BE PERFORMED BY A COLORADO LICENSED ELECTRICIAN. 8) ELECTRICAL PERMITTING AND INSPECTIONS BY THE COLORADO STATE ELECTRICAL BOARD. ELECTRICAL FINAL APPROVAL IS REQUIRED FOR FINAL/CO INSPECTION. 9) C.D.O.H. INSTALLATION INSIGNIA MUST BE AFFIXED PRIOR TO FINAL/CO INSPECTION. 10) GARFIELD COUNTY FINAL/CO INSPECTION REQUIRED.