Loading...
HomeMy WebLinkAbout1.04 Pond Outlet Structure Calculations• • • POND/OUTLET STRUCTURE CALCULATIONS MINIMUM POND VOLUME rgleat a ITKO ENRI D rM FILE: PONDVOLUME.XLS HCE Job Number: 2051019.00 CALCS BY: ALA CHECKED BY: REW Date: 7-15-05 PROPOSED WATER QUALITY / DETENTION POND A ELEVATION AREA VOLUME (Ft3) CUMULATIVE VOLUME (Ft3) 5937.00 0.00 0 0 5938.00 447.34 223.67 223.67 5939.00 2183.85 1,315.60 1,539.27 5940.00 5238.79 3,711.32 5,250.59 5941.00 6,433.83 5,836.31 11,086.90 5942.00 7,256.10 6,844.97 17,931.86 TOTAL 2 -YR VOLUME (ft3) = 1,811.7 WSEL = 5939.07 • • Design Procedure Form: Extended Detention Basin (EDB) - Sedimentation Facility Sheet 1 of 3 Designer: Amber Appel Company: High Country Engineering, Inc. Date: June 22, 2005 Project: Location: Ironbridge POND A-2YR 1. Basin Storage Volume A) Tributary Area's Imperviousness Ratio (i = la / 100) B) Contributing Watershed Area (Area) C) Water Quality Capture Volume (WQCV) (WQCV =1.0 * (0.91 *13 - 1.19 * 12 + 0.78 * I)) D) Design Volume: Vol = (WQCV / 12) * Area * 1.2 la = i = Area = WQCV = Vol = 45.70 0.46 7.86 acres 0.19 watershed inches 0.153 acre-feet 2. Outlet Works A) Outlet Type (Check One) B) Depth at Outlet Above Lowest Perforation (H) C) Required Maximum Outlet Area per Row, (A°) D) Perforation Dimensions (enter one only): i) Circular Perforation Diameter OR ii) 2" Height Rectangular Perforation Width E) Number of Columns (nc, See Table 6a-1 For Maximum) F) Actual Design Outlet Area per Row (Ao) G) Number of Rows (nr) H) Total Outlet Area (Aot) X Orifice Plate Perforated Riser Pipe Other: H = A° = D = W = nc = A. = nr = /Not = 2.50 feet 0.24 square inches 0.3750 inches, OR inches 2 number 0.22 square inches 8 number 1.66 square inches 3. Trash Rack A) Needed Open Area: At = 0.5 * (Figure 7 Value) * Aot B) Type of Outlet Opening (Check One) C) For 2", or Smaller, Round Opening (Ref.: Figure 6a): At = X 61 square inches < 2" Diameter Round 2" High Rectangular Other: Wconc = HTR = i) Width of Trash Rack and Concrete Opening (\A/cam) from Table 6a-1 ii) Height of Trash Rack Screen (HTR) 6 inches 54 inches POND a-2YR, EDB IRONBRIDGE HOMES 2051019.00 6-28-05 BY: ALA • • • POND A,2YR Basin Output Pond Name Distribution Type Type II Frequency Type 2 years Area 482800.0100 ft2 Peak Inflow 2.1809 cfs Peak outflow 0.2181 cfs Runoff 0.0812 in Runoff Volume 3266.7424 ft3 Storage volume 1811.7054 ft3 Maximum Storage Elevation 0.0000 ft Page 1 LB ROSE RANCH, LLC 2051019.00 16;15-05 : ALA Weir Calculator OUTLETPONDA Given Input Data: Weir Type Rectangular Equation Suppressed Solving for Flowrate Depth of Flow 18.0000 in Coefficient 0.6500 Height 18.0000 in Computed Results: Flowrate 89.4035 cfs Full Flow 89.4035 cfs Velocity 4.2573 fps width 168.0000 in Area 21.0000 ft2 Perimeter 204.0000 in Wet Perimeter 204.0000 in wet Area 21.0000 ft2 Percent Full 100.0000 % • Page 1 LB ROSE RANCH, LLC 2051019.00 4615-05 : ALA POND A,100YRSPILLWAY Weir Calculator Given Input Data: Weir Type Rectangular Equation Suppressed solving for Depth of Flow Flowrate 8.9257 cfs coefficient 0.6500 Height 12.0000 in Computed Results: Depth of Flow 10.8177 in Full Flow 10.4282 cfs Velocity 3.3004 fps width 36.0000 in Area 3.0000 ft2 Perimeter 60.0000 in wet Perimeter 57.6354 in wet Area 2.7044 ft2 Percent Full 90.1476 % • • Page 1 • • • POND A INLET RIPRAP SIZE Pd = (V2 + gd)i12 V = design flow velocity at pipe outlet (ft/sec) 9= acceleration due to gravity = 32.2 ft/sec2 d = design depth of flow at pipe outlet (ft) D = Storm Sewer Diameter V= 9= d= 1.31 32.2 0.6833 D= 1.5 Pd = * USE FIGURE HS -20 TO DETERMINE RIPRAP DESIGN SIZE. TYPE L Max Pd for each Rip Rap Type 13.1 M 17.3 H 21.25 D50= T = 1.75D50 T= TABLE HS -9 Median (i.e., D50) Size of Districts Riprap Riprap Type D50 -Median Rock Size (inches) L 9 M 12 H 18 B18 18 (grouted) BASIN LENGTH Basin Length is the greater of the following L=4D or L=(D)112x(V/2) L = Basin Length D = Storm Sewer Diameter V = design flow velocity at pipe outlet (ft/sec) L = 4D L= 6 L = (D)1 x (V/2) L= 0.80 L= 6 BASIN WIDTH W=4D W = Basin Width D = Storm Sewer Diameter W=4D W= • • • POND A OUTLET RIPRAP SIZE Pd = (VT+ 9d)trr V = desi9n flow velocity at pipe outlet (ft/sec) 9 = acceleration due to gravity = 32.2 ft/sec2 d = design depth of flow at pipe outlet (ft) D = Storm Sewer Diameter V= 9= d= h 0.4135 32.2 0.41574 D= 1.5 Pd = 3.7' * USE FIGURE HS -20 TO DETERMINE RIPRAP DESIGN SIZE. TYPE L Max Pd for each Rip Rap Type 13.1 M 17.3 H 21.25 T =r'15.75 TABLE HS -9 Median (i.e., 050) Size of District's Riprap Riprap Type D50 -Median Rock Size (inches) L 9 M 12 H 18 B18 18 (grouted) BASIN LENGTH Basin Length is the greater of the following L = 4D or L = (D)1)2x (V/2) L = Basin Length D = Storm Sewer Diameter V = desi9n flow velocity at pipe outlet (ft/sec) L=4D L= 6 L = (D)ir2 x (V/2) L= 0.25 L= 6 BASIN WIDTH W = 4D W = Basin Width D = Storrn Sewer Diameter W=4D W= ee s6 • • • ,,.'.'Y POND A SPILLWAY RIPRAP SIZE µ 4 Pd _ (V2 + ger2 V = design flow velocity at pipe outlet (ft/sec) V = , 3.3004 8 = acceleration due to gravity = 32.2 ft/sec2 9 = 32.2 d = design depth of flow at pipe outlet (ft) d = 0.90475 H = Channel Height D = 1 w = Width of Channel (ft) a w = 3 b Pd = µ63 ., * USE FIGURE HS -20 TO DETERMINE RIPRAP DESIGN SIZE. TYPE Max Pd for each Rip Rap Type L 12.0 s M 16.0 9 1 H Dso_ 20 t s a T = 1.75D TABLE HS -9 Median (i.e., Dom) Size of District's Riprap Riprap Type D50 -Median Rock Size (inches) L 9 M 12 8 H 18 _ B18 18 (grouted) BASIN LENGTH • I Basin Length is the greater of the following L=4H or L=(H)12x(V/2) L = Basin Length A D = Channel Height V = design flow velocity at pipe outlet (ft/sec) i 9 d L=4H L= S 4 L = (H)1/ x (V/2) L = 1.65 • L = .,�*W ':n4 �� .. L'�'$�,vkiu �Na .n �}�� .s�'�'r". :r��'+c ����' £� BASIN WIDTH W = w+4H . W = Basin Width ' ' w = Width of Rectangle H= Channel Height W = w+4H W _ �.._., . 7 MINIMUM POND VOLUME PVo 0..)c�t t IrR,O NTERIDQE FILE: PONDVOLUME.XLS HCE Job Number: 2051019.00 CALCS BY: ALA CHECKED BY: REW Date: 7-15-05 PROPOSED WATER QUALITY / DETENTION POND B ELEVATION AREA VOLUME (Ft3) CUMULATIVE VOLUME (Ft3) 5925.60 0.00 0 0 5926.00 87.13 17.43 17.43 5927.00 816.16 451.65 469.07 5928.00 2120.71 1,468.44 1,937.51 5929.00 3005.83 2,563.27 4,500.78 5930.00 3,965.95 3,485.89 7,986.67 5931.00 4,996.30 4,481.13 12,467.79 TOTAL 2 -YR VOLUME (ft3) = 1,915.9 WSEL = '5927.99= • • Design Procedure Form: Extended Detention Basin (EDB) - Sedimentation Facility Sheet 1 of 3 Designer: Amber Appel Company: High Country Engineering, Inc. Date: June 10, 2005 Project: Ironbridge Location: POND B-2YR 1. Basin Storage Volume A) Tributary Area's Imperviousness Ratio (i = la/ 100) B) Contributing Watershed Area (Area) C) Water Quality Capture Volume (WQCV) (WQCV =1.0 * (0.91 *13 - 1.19 *12 + 0.78 * I)) D) Design Volume: Vol = (WQCV / 12) * Area * 1.2 la = i = Area = WQCV = Vol = 49.00 0.49 7.00 acres 0.20 watershed inches 0.142 acre-feet 2. Outlet Works A) Outlet Type (Check One) B) Depth at Outlet Above Lowest Perforation (H) C) Required Maximum Outlet Area per Row, (A0) D) Perforation Dimensions (enter one only): i) Circular Perforation Diameter OR ii) 2" Height Rectangular Perforation Width E) Number of Columns (nc, See Table 6a-1 For Maximum) F) Actual Design Outlet Area per Row (Ao) G) Number of Rows (nr) H) Total Outlet Area (A0,) X Orifice Plate Perforated Riser Pipe Other: H = Ao = D = W = nc = A0 = nr = Ao = 2.50 feet 0.22 square inches 0.3750 inches, OR inches 2 number 0.22 square inches 8 number 1.66 square inches 3. Trash Rack A) Needed Open Area: A, = 0.5 * (Figure 7 Value) *A, B) Type of Outlet Opening (Check One) C) For 2", or Smaller Round Opening (Ref.: Figure 6a): At = X 61 square inches < 2" Diameter Round 2" High Rectangular Other: Wconc = HTR = i) Width of Trash Rack and Concrete Opening (W�o„�1 from Table 6a-1 ii) Height of Trash Rack Screen (HTR) 6 inches 54 inches POND B, EDB IRONBRIDGE HOMES 2051019.00 *28-05 : ALA • • POND B,2YR Basin Output Pond Name POND B Distribution Type Type II Frequency Type 2 years Area 296780.2300 ft2 Peak Inflow 1.0966 cfs Peak Outflow 0.1097 cfs Runoff 0.1397 in Runoff Volume 3454.8005 ft3 Storage volume 1915.8766 ft3 Maximum Storage Elevation 0.0000 ft Page 1 LB ROSE RANCH, LLC 2051019.00 615-05 : ALA weir Calculator OUTLETPONDB Given Input Data: weir Type Rectangular Equation suppressed Solving for Flowrate Depth of Flow 22.8000 in coefficient 0.6500 Height 34.8000 in Computed Results: Flowrate 127.4524 cfs Full Flow 240.3337 cfs velocity 4.7914 fps width 168.0000 in Area 40.6000 ft2 Perimeter 237.6000 in wet Perimeter 213.6000 in wet Area 26.6000 ft2 Percent Full 65.5172 % • • Page 1 LB ROSE RANCH, LLC 2051019.00 7-15-05 •Y: ALA Given Input Data: Weir Type Rectangular Equation Suppressed Solving for Depth of Flow Flowrate 5.7129 cfs Coefficient 0.6500 Height 12.0000 in Computed Results: Depth of Flow 10.5278 in Full Flow 6.9522 cfs velocity 3.2559 fps Width 24.0000 in Area 2.0000 ft2 Perimeter 48.0000 in Wet Perimeter 45.0557 in Wet Area 1.7546 ft2 Percent Full 87.7320 POND B,100YRSPILLWAY weir Calculator • • Page 1 CURB CUT,B7,25YR LB ROSE RANCH, LLC 2051019.00 411L15-05 : ALA URB CUT FOR NORTH VILLAS (BASIN B7) Weir Calculator Given Input Data: Weir Type Rectangular Equation Suppressed solving for Depth of Flow Flowrate 0.2223 cfs Coefficient 0.6500 Height 4.0000 in Computed Results: Depth of Flow 1.9190 in Full Flow 0.6690 cfs velocity 1.3901 fps width 12.0000 in Area 0.3333 ft2 Perimeter 20.0000 in wet Perimeter 15.8381 in wet Area 0.1599 ft2 Percent Full 47.9757 • • Page 1 • • • POND B INLET RIPRAP SIZE Pd = (V2 + gd)trr V = design flow velocity at pipe outlet (ft/sec) 9 = acceleration due to gravity = 32.2 ft/sec2 d = design depth of flow at pipe outlet (ft) D = Storm Sewer Diameter v= 9= d= 2.29 32.2 0.3822 D= 1.5 Pd = 4.2 USE FIGURE HS -20 TO DETERMINE RIPRAP DESIGN SIZE. TYPE L Max Pd for each Rip Rap Type 13.1 M 17.3 H 21.25 D50= T = 1.75D T= TABLE HS -9 Median (i.e., D50) Size of District's Riprap Riprap Type D50 -Median Rock Size (inches) L 9 M 12 H 18 B18 18 (grouted) BASIN LENGTH Basin Length is the greater of the following L=4D or L=(D)1 x(V/2) L = Basin Length D = Storm Sewer Diameter V = design flow velocity at pipe outlet (ft/sec) L=4D L= 6 L = (D)ir2 x (V/2) L= 1.40 L= BASIN WIDTH W=4D W = Basin Width D = Storm Sewer Diameter W=4D W= • COMBRED POND B OUTLET RIPRAP SIZE Fd --;.672; ge V = desi9n flow velocity at pipe outlet (ft/sec) V = _ 4.48 9 = acceleration due to gravity = 32.2 ft/sec2 9 = 32.2 d = design depth of flow at pipe outlet (ft) d = € ,. 0.4211 D = Storm Sewer Diameter D = 1.5 Pd = Ew_ 5.8 * USE FIGURE HS -20 TO DETERMINE RIPRAP DESIGN SIZE. TYPE Max Pd for each Rip Rap Type L 13.1 M 17.3 H so 21.25 h T = 1.75D� T = i7 ,. TABLE HS -9 Median (i.e., Dom) Size of District's Riprap Riprap Type D50 -Median Rock Size (inches) L 9 M 12 H 18 B18 18 (grouted) BASIN LENGTH Basin Length is the greater of the following L = 4D or L = (D)'J x (V/2) ,- L = Basin Length L D = Storm Sewer Diameter V = design flow velocity at pipe outlet (ft/sec) h - L=4D L= 6 L = (D)1 x (V/2) L = 2.74 L= i 6 BASIN WIDTH W=4D W = Basin Width h - - D = Storm Sewer Diameter W=4D W= 6 • • • POND B SPILLWAY RIPRAP SIZE Pd = (V2 + gd)tr2 V = design flow velocity at pipe outlet (ft/sec) g = acceleration due to gravity = 32.2 ft/sec2 d = design depth of flow at pipe outlet (ft) H = Channel Height w = Width of Channel (ft) V = 6.9522 9= d= 32.2 0.8773 D= 1 w= 2 Pd = 8.8 * USE FIGURE HS -20 TO DETERMINE RIPRAP DESIGN SIZE. TYPE L Max Pd for each Rip Rap Type 12.0 M 16.0 H 20 TABLE HS -9 Median (i.e., Dom) Size of District's Riprap Riprap Type L D50 -Median Rock Size (inches) 9 M 12 H 18 B18 18 (grouted) BASIN LENGTH Basin Length is the greater of the following L = 4H or L = (H)'"2 x (V/2) L = Basin Length D = Channel Height V = design flow velocity at pipe outlet (ft/sec) L = 4H L = (H)x (V/2) L= L= 4 3.48 L= BASIN WIDTH W=w+4H W = Basin Width w = Width of Rectangle H = Channel Height W=w+4H W= 7 MINIMUM POND VOLUME Pro40%A% N FAZDG1E FILE: PONDVOLUME.XLS HCE Job Number: 2051019.00 CALCS BY: ALA CHECKED BY: REW Date: 7-15-05 PROPOSED WATER QUALITY / DETENTION POND C ELEVATION AREA VOLUME (Ft3) CUMULATIVE VOLUME (Ft3) 5940.00 0.00 0 0 5941.00 498.20 249.10 249.10 5942.00 1375.91 937.06 1,186.16 5943.00 2105.53 1,740.72 2,926.88 5944.00 2,875.83 2,490.68 5,417.56 5945.00 3,708.90 3,292.37 8,709.92 5946.00 4,603.94 4,156.42 12,866.34 5947.00 6,250.07 5,427.01 18,293.35 TOTAL 2 -YR VOLUME (ft3) = 894.5 WSEL = 5941.69 • • Design Procedure Form: Extended Detention Basin (EDB) - Sedimentation Facility Sheet 1 of 3 Designer: Amber Appel Company: High Country Engineering, Inc. Date: June 10, 2005 Project: Ironbridge Location: POND C-2YR 1. Basin Storage Volume A) Tributary Area's Imperviousness Ratio (i = I,/ 100) B) Contributing Watershed Area (Area) C) Water Quality Capture Volume (WQCV) (WQCV=1.0*(0.91 *13- 1.19 * 12 + 0.78 * I)) D) Design Volume: Vol = (WQCV / 12) * Area * 1.2 la = i = Area = WQCV = Vol = 71.40 % 0.71 4.00 acres 0.28 watershed inches 0.113 acre-feet 2. Outlet Works A) Outlet Type (Check One) B) Depth at Outlet Above Lowest Perforation (H) C) Required Maximum Outlet Area per Row, (A0) D) Perforation Dimensions (enter one only): i) Circular Perforation Diameter OR ii) 2" Height Rectangular Perforation Width E) Number of Columns (nc, See Table 6a-1 For Maximum) F) Actual Design Outlet Area per Row (A0) G) Number of Rows (nr) H) Total Outlet Area (A.) _ X Orifice Plate Perforated Riser Pipe Other: H = Ao = D = W = nc = A0 = nr = A01= 2.50 feet 0.18 square inches 0.4750 inches, OR inches 1 number 0.18 square inches 8 number 1.33 square inches 3. Trash Rack A) Needed Open Area: At = 0.5 * (Figure 7 Value) * A0t B) Type of Outlet Opening (Check One) C) For 2", or Smaller Round Opening (Ref.: Figure 6a): At = X 48 square inches < 2" Diameter Round 2" High Rectangular Other: Wcnc = HTR = i) Width of Trash Rack and Concrete Opening (Wcanc) from Table 6a-1 ii) Height of Trash Rack Screen (HTR) 3 inches 54 inches POND C, EDB IRONBRIDGE HOMES 2051019.00 40-28-05 Y: ALA • • POND C,2YR Basin Output Pond Name POND C Distribution Type Type II Frequency Type 2 years Area 276493.0359 ft2 Peak Inflow 0.3732 cfs Peak outflow 0.0425 cfs Runoff 0.0720 in Runoff volume 1658.8545 ft3 Storage volume 894.5088 ft3 Maximum Storage Elevation 0.0000 ft Page 1 LB ROSE RANCH, LLC 2051019.00 7-15-05 •Y: ALA Given Input Data: Weir Type Rectangular Equation Suppressed solving for Flowrate Depth of Flow 42.0000 in coefficient 0.6500 Height 54.0000 in Computed Results: Flowrate 318.6543 cfs Full Flow 464.5542 cfs velocity 6.5031 fps width 168.0000 in Area 63.0000 ft2 Perimeter 276.0000 in wet Perimeter 252.0000 in wet Area 49.0000 ft2 Percent Full 77.7778 % weir Calculator OUTLETPONDC • • Page 1 LB ROSE RANCH, LLC 2051019.00 415-05 : ALA POND C,100YRSPILLWAY Weir Calculator Given Input Data: weir Type Rectangular Equation suppressed Solving for Depth of Flow Flowrate 4.1664 cfs Coefficient 0.6500 Height 12.0000 in Computed Results: Depth of Flow 10.3332 in Full Flow 5.2141 cfs velocity 3.2256 fps width 18.0000 in Area 1.5000 ft2 Perimeter 42.0000 in wet Perimeter 38.6664 in Wet Area 1.2916 ft2 Percent Full 86.1100 • • Page 1 CURB CUT,C9,25YR LB ROSE RANCH, LLC 2051019.00 �15_05 : ALA URB CUT FOR ROUNDABOUT weir Calculator Given Input Data: Weir Type Rectangular Equation Suppressed solving for Depth of Flow Flowrate 0.1506 cfs Coefficient 0.6500 Height 4.0000 in Computed Results: Depth of Flow 1.4803 in Full Flow 0.6690 cfs velocity 1.2209 fps width 12.0000 in Area 0.3333 ft2 Perimeter 20.0000 in Wet Perimeter 14.9605 in Wet Area 0.1234 ft2 Percent Full 37.0065 % • Page 1 • • POND C INLET RIPRAP SIZE Pd = (V2 gd)1r2 V = design flow velocity at pipe outlet (ft/sec) 9 = acceleration due to gravity = 32.2 ft/sec2 d = design depth of flow at pipe outlet (ft) D = Storm Sewer Diameter V= d= D= 1.473 32.2 0.408 1.5 Pd = USE FIGURE HS -20 TO DETERMINE RIPRAP DESIGN SIZE. TYPE L Max Pd for each Rip Rap Type 13.1 M 17.3 H 21.25 D50= T = 1.75D5o T TABLE HS -9 Median (i.e., D50) Size of District's Riprap Riprap Type D50 -Median Rock Size (inches) L 9 M 12 H 18 B18 18 (grouted) BASIN LENGTH Basin Length is the greater of the following L = 4D or L = (D)'1 x (V/2) L = Basin Length D = Storm Sewer Diameter V = design flow veloci at pipe outlet (ft/sec) L=4D L = (D)1/2 x (V/2) L= 6 L= 0.90 L= • BASIN WIDTH W=4D W = Basin Width D = Storm Sewer Diameter W=4D W = 6 • • • POND C OUTLET 1' SES RIPRAP SIZE Pd = (V2 + gd)irr V = design flow velocity at pipe outlet (ft/sec) g.= acceleration due to gravity = 32.2 ft/sec2 d = design depth of flow at pipe outlet (ft) D = Storm Sewer Diameter V= 9= d= 2.08 32.2 0.292 D = 1.5 Pd = USE FIGURE HS -20 TO DETERMINE RIPRAP DESIGN SIZE. TYPE L Max Pd for each Rip Rap Type 13.1 M 17.3 H 21.25 D5= T = 1.75D50 T= X15.75= TABLE HS -9 Median (i.e., D50) Size of District's Riprap Riprap Type D50 -Median Rock Size (inches) L 9 M 12 H 18 B18 18 (grouted) BASIN LENGTH Basin Length is the greater of the following L=4D or L= (D)1/2x (V/2) L = Basin Length D = Storm Sewer Diameter V = design flow velocity at pipe outlet (ft/sec) L=4D L= 6 L=(D)1' x(V/2) L= 1.27 L= BASIN WIDTH W=4D W = Basin Width D = Storm Sewer Diameter W=4D W= • • t EtrEA Reel �. ^3r,:.�ta. aaks%da¢'i"s^F�^`.,oG ,.✓'a,.r .,'; � ffi Qs ? POND C SPILLWAY RIPRAP SIZE ... 4 4 72 Pd _ (V2 + gd)1 V = design flow velocity at pipe outlet (ft/sec) V = , 3.2256 g = acceleration due to gravity = 32.2 ft/sec2 R 9 = , 32.2 d = design depth of flow at pipe outlet (ft) d = 0.861 H = Channel Height s D = 1 w = Width of Channel (ft)w = 1.5 Pd = 62 " USE FIGURE HS -20 TO DETERMINE RIPRAP DESIGN SIZE. TYPE Max Pd for each Rip Rap Type L 12.0 4 M 16.0 4 H 20 s T = 1.75D50 T = .., ( a 4 4 TABLE HS -9 Median (i.e., Dom) Size of District's Riprap Riprap Type D50 -Median Rock Size (inches) L 9 M 12 4 H 18 B18 18 (grouted) BASIN LENGTH Basin Length is the greater of the following 4 L = 4H or L = (H)' x (V/2) L =Basin Length . D = Channel Height V= design flow velocity, at pipe outlet (ft/sec) O e L=4H €L= 4 SL L = (H)1 x (V/2) = 1.61 I a L = 4 • BASIN WIDTH W = w+4H s - W = Basin Width w = Width of Rectangle '• H = Channel Height W=w+4H W= 7 MINIMUM POND VOLUME P ,01)%c�tr IrR?O N BjEVEIDOCiE-' FILE: PONDVOLUME.XLS HCE Job Number: 2051019.00 CALCS BY: ALA CHECKED BY: REW Date: 7-5-05 PROPOSED WATER QUALITY / DETENTION POND D1 ELEVATION AREA VOLUME (Ft3) CUMULATIVE VOLUME (Ft3) 5936.30 0.00 0 0 5937.00 136.96 47.94 47.94 5938.00 548.26 342.61 390.55 5939.00 1368.64 958.45 1,349.00 5940.00 2,365.00 1,866.82 3,215.82 TOTAL 2 -YR VOLUME (ft3) = 10.0 WSEL = 5936.45 TOTAL 25 -YR VOLUME (ft3) = 3,161.3 WSEL = 5939.97.1R • • Design Procedure Form: Extended Detention Basin (EDB) - Sedimentation Facility Sheet 1 of 3 Designer: Amber Appel Company: High Country Engineering, Inc. Date: June 24, 2005 Project: Ironbridge Location: POND D1-25YR 1. Basin Storage Volume A) Tributary Area's Imperviousness Ratio (i = la / 100) B) Contributing Watershed Area (Area) C) Water Quality Capture Volume (WQCV) (WQCV =1.0 * (0.91 *13 - 1.19 *12 + 0.78 *1)) D) Design Volume: Vol = (WQCV / 12) * Area * 1.2 la = i = Area = WQCV = Vol = 10.70 0.11 11.00 acres 0.07 watershed inches 0.078 acre-feet 2. Outlet Works A) Outlet Type (Check One) B) Depth at Outlet Above Lowest Perforation (H) C) Required Maximum Outlet Area per Row, (A0) D) Perforation Dimensions (enter one only): i) Circular Perforation Diameter OR ii) 2" Height Rectangular Perforation Width E) Number of Columns (nc, See Table 6a-1 For Maximum) F) Actual Design Outlet Area per Row (A°) G) Number of Rows (nr) H) Total Outlet Area (A°f) X Orifice Plate Perforated Riser Pipe Other: H = Ao = D = W = nc = Ao = nr = A°t = 3.67 feet 0.07 square inches 0.3130 inches, OR inches 1 number 0.08 square inches 11 number 0.85 square inches 3. Trash Rack A) Needed Open Area: At = 0.5 * (Figure 7 Value) * Ao1 B) Type of Outlet Opening (Check One) C) For 2", or Smaller, Round Opening (Ref.: Figure 6a): At = X 31 square inches < 2" Diameter Round 2" High Rectangular Other: Wcont = HTR = i) Width of Trash Rack and Concrete Opening (Wconc) from Table 6a-1 ii) Height of Trash Rack Screen (HTR) 3 inches 68 inches POND D1, EDB IRONBRIDGE HOMES 2051019.00 6-28-05 BY: ALA • • • POND D1,2YR Basin output Pond Name Distribution Type Type II Frequency Type 2 years Area 475870.0000 ft2 Peak Inflow 0.0063 cfs Peak outflow 0.0036 cfs Runoff 0.0010 in Runoff volume 39.6534 ft3 Storage volume 9.9272 ft3 Maximum Storage Elevation 0.0000 ft Page 1 IRONBRIDGE HOMES 2051019.00 6-28-05 BY: ALA • • • POND D1,25YR Basin Output Pond Name Distribution Type Type II Frequency Type 25 years Area 475870.0000 ft2 Peak Inflow 0.2915 cfs Peak outflow 0.0292 cfs Runoff 0.1438 in Runoff volume 5702.1522 ft3 storage volume 3161.2896 ft3 Maximum Storage Elevation 0.0000 ft Page 1 LB ROSE RANCH, LLC 2051019.00 -15-05 IlliY: ALA weir Calculator OUTLETPONDD1 Given Input Data: weir Type Rectangular Equation Suppressed solving for Flowrate Depth of Flow 0.3600 in coefficient 0.6500 Height 12.0000 in Computed Results: Flowrate 0.2529 cfs Full Flow 48.6651 cfs Velocity 0.6021 fps width 168.0000 in Area 14.0000 ft2 Perimeter 192.0000 in wet Perimeter 168.7200 in wet Area 0.4200 ft2 Percent Full 3.0000 • • Page 1 LB ROSE RANCH, LLC 2051019.00 7-15-05 BY: ALA 0iven Input Data: Weir Type Rectangular Equation Suppressed Solving for Depth of Flow Flowrate 0.8413 cfs Coefficient 0.6500 Height 6.0000 in Computed Results: Depth of Flow 5.2627 in Full Flow 1.0241 cfs velocity 2.3020 fps width 10.0000 in Area 0.4167 ft2 Perimeter 22.0000 in Wet Perimeter 20.5254 in Wet Area 0.3655 ft2 Percent Full 87.7119 POND D1,100YRPSILLWAY weir calculator • • Page 1 • POND DI INLET RIPRAP SIZE Pd = (V7 + gd)r� V = design flow velocity at pipe outlet (ft/sec) 9= acceleration due to gravity = 32.2 ft/sec2 d = design depth of flow at pipe outlet (ft) • D = Storm Sewer Diameter V= 9= 0.1365 32.2 0.098 D= 1.5 Pd = * USE FIGURE HS -20 TO DETERMINE RIPRAP DESIGN SIZE. TYPE L Max Pd for each Rip Rap Type 13.1 M 17.3 H 21.25 TABLE HS -9 Median (i.e., D50) Size of District's Riprap Riprap Type D50 -Median Rock Size (inches) L 9 M 12 H 18 B18 18 (grouted) BASIN LENGTH Basin Length is the greater of the following L=4D or L=(D)112x(V/2) L = Basin Length D = Storm Sewer Diameter V = design flow velocity at pipe outlet (ft/sec) L=4D L= 6 L = (D)1' x (V/2) L= 0.08 L= 6 BASIN WIDTH W = 4D W = Basin Width D = Storm Sewer Diameter W=4D W= • POND D1 OUTLET RIPRAP SIZE Pa_ (Vz + gd)1/2 V = design flow velocity at pipe outlet (ft/sec) 9_= acceleration due to gravity = 32.2 ft/sec2 d = design depth of flow at pipe outlet (ft) V= d= D = Storm Sewer Diameter D= 0.123 32.2 0.058 1.5 Pd = USE FIGURE HS -20 TO DETERMINE RIPRAP DESIGN SIZE. TYPE L Max Pd for each Rip Rap Type 13.1 M 17.3 H Dom= T = 1.75D50 T= 21.25 TABLE HS -9 Median (i.e., Dom) Size of District's Riprap Riprap Type L D50 -Median Rock Size (inches) 9 M 12 H 18 B18 18 (grouted) BASIN LENGTH Basin Length is the greater of the following L=4D or L = (D)1r2 x (V/2) L = Basin Length D = Storm Sewer Diameter V = design flow velocity at pipe outlet (ft/sec) L = 4D L= L = (D) x (V/2) L= 6 0.08 L= BASIN WIDTH W=4D W = Basin Width D = Storm Sewer Diameter W= 4D W= • • POND DI SPILLWAY RIPRAP SIZE Pd_(V7+gd402 V = design flow g = acceleration d = design depth H = Channel w = Width of velocity at due to gravity of flow Height- Channel (ft) pipe outlet = 32.2 at pipe outlet (ft/sec) V = , ft/sec2 4 g = y (ft) d = D = . w = a Pd= 2.302 32.2 0.4388 0.5 0.833 ...._...1 * USE FIGURE HS -20 TO DETERMINE RIPRAP DESIGN SIZE. TYPE Max Pd for each Rip Rap Type Ls 10.9 M 14.8 9 4 H 18.75 T = 1.75D50 --: T 1 41, 4 4 .7 e .......... TABLE HS -9 Median (i.e., Dom) Size of District's Riprap Riprap Type D50 -Median Rock Size (inches) , L 9 s M 12 4 4 H 18 B18 18 (grouted) BASIN LENGTH Basin Length is the greater of the following i L = 4H or L = (H)112 x (V/2) d 4 L = Basin Length . D = Channel Height V = design flow velocity at pipe outlet (ft/sec) € 4 4 L=4H €L= sL 2 L = (H)1 x (V/2) = 0.81 4L = BASIN WIDTH W = w+4H O . W = Basin Width w = Width of Rectangle s H = Channel Height 4 4 W = w+4H W = MINIMUM POND VOLUME Pri,91)e 11 ON RIIME FILE: PONDVOLUME.XLS HCE Job Number: 2051019.00 CALCS BY: ALA CHECKED BY: REW Date: 7-15-05 PROPOSED WATER QUALITY / DETENTION POND D2 ELEVATION AREA VOLUME (Ft3) CUMULATIVE VOLUME (Ft3) 5932.00 0.00 0 0 5933.00 531.21 265.61 265.61 5934.00 1413.60 972.41 1,238.01 5935.00 2570.51 1,992.06 3,230.07 5936.00 3850.23 3,210.37 6,440.44 5937.00 5244.29 4,547.26 10,987.70 5938.00 6740.12 5,992.21 16,979.90 5939.00 8293.78 7,516.95 24,496.85 5940.00 9901.81 9,097.80 33,594.65 TOTAL 2 -YR VOLUME (ft3) = 12,201.7 WSEL = 5937.20 • • Design Procedure Form: Extended Detention Basin (EDB) - Sedimentation Facility Sheet 1 of 3 Designer: Amber Appel Company: High Country Engineering, Inc. Date: June 10, 2005 Project: Location: Ironbridge POND D2-2YR 1. Basin Storage Volume A) Tributary Area's Imperviousness Ratio (i = la/ 100) B) Contributing Watershed Area (Area) C) Water Quality Capture Volume (WQCV) (WQCV =1.0*(0.91'13-1.19*12+0.78* I)) D) Design Volume: Vol = (WQCV / 12) * Area * 1.2 la = i = Area = WQCV = Vol = 9.90 % 0.10 85.00 acres 0.07 watershed inches 0.565 acre-feet 2. Outlet Works A) Outlet Type (Check One) B) Depth at Outlet Above Lowest Perforation (H) C) Required Maximum Outlet Area per Row, (A0) D) Perforation Dimensions (enter one only): i) Circular Perforation Diameter OR ii) 2" Height Rectangular Perforation Width E) Number of Columns (nc, See Table 6a-1 For Maximum) F) Actual Design Outlet Area per Row (A0) G) Number of Rows (nr) H) Total Outlet Area (Aot) X Orifice Plate Perforated Riser Pipe Other: H = A. = D = W = nc = A. = nr = Apt = 5.20 feet 0.34 square inches 0.3750 inches, OR inches 3 number 0.33 square inches 16 number 5.17 square inches 3. Trash Rack A) Needed Open Area: At = 0.5 * (Figure 7 Value) * A01 B) Type of Outlet Opening (Check One) C) For 2", or Smaller, Round Opening (Ref.: Figure 6a): At = X 190 square inches < 2" Diameter Round 2" High Rectangular Other: Wconc = HTR = i) Width of Trash Rack and Concrete Opening (Ww„) from Table 6a-1 ii) Height of Trash Rack Screen (HTR) 9 inches 86 inches POND D2, EDB IRONBRIDGE HOMES 2051019.00 6-28-05 BY: ALA Basin Output Pond Name Distribution Type Frequency Type Area Peak Inflow Peak Outflow Runoff Runoff Volume Storage Volume Maximum Storage Elevation • • POND D2,2YR Type 11 2 years 3713496.3300 ft2 6.3469 cfs 0.6347 cfs 0.0711 in 22001.0899 ft3 12201.6774 ft3 0.0000 ft Page 1 LB ROSE RANCH, LLC 2051019.00 415-05 : ALA Weir calculator OUTLETPONDD2 Given Input Data: Weir Type Rectangular Equation Suppressed Solving for Flowrate Depth of Flow 21.6000 in Coefficient 0.6500 Height 33.6000 in Computed Results: Flowrate 117.5240 cfs Full Flow 228.0104 cfs velocity 4.6636 fps width 168.0000 in Area 39.2000 ft2 Perimeter 235.2000 in wet Perimeter 211.2000 in wet Area 25.2000 ft2 Percent Full 64.2857 • • Page 1 LB ROSE RANCH, LLC 2051019.00 7-15-05 SY: ALA Given Input Data: Weir Type Rectangular Equation Suppressed Solving for Depth of Flow Flowrate 59.5479 cfs Coefficient 0.6500 Height 18.0000 in Computed Results: Depth of Flow 17.1804 in Full Flow 63.8596 cfs Velocity 4.1593 fps width 120.0000 in Area 15.0000 ft2 Perimeter 156.0000 in Wet Perimeter 154.3607 in wet Area 14.3170 ft2 Percent Full 95.4465 % POND D2,100YRSPILLWAY Weir Calculator • • Page 1 • • POND D2 INLET RIPRAP SIZE Pd=(Vz+gd)1r2. V = design flow 9 = acceleration d = design depth D = Storm Sewer velocity at due to gravity of flow at Diameter pipe outlet = 32.2 pipe outlet (ft/sec). ft/sec2 (ft) V = H d = D = Pd = 7.706 32.2 1.560 3 •�.. 705 * USE FIGURE HS -20 TO DETERMINE RIPRAP DESIGN SIZE. TYPE ... Max Pd for each Rip Rap Type ,- L L 16.6 M 21.0 M H 25 _ Deo., T = 1.75D50 T=- .. ,. TABLE HS -9 Median (i.e., D50) Size of District's Riprap Riprap Type D50 -Median Rock Size (inches) L 9 i i. M 12 H 18 B18 18 (grouted) BASIN LENGTH i. Basin Length is the greater of the following L = 4D or L = (D)1/2 x (V/2) h ••••••••— L = Basin Length D = Storm Sewer Diameter V = design flow velocity at pipe outlet (ft/sec) .- L=4D L= 12 L = (D)1 2x (V/2) - L = 6.67 L = ,. 12 • BASIN WIDTH W=4D W = Basin Width D = Storm Sewer Diameter W = 4D _......._.._.._. e. W _ , . • • ,0,11 -AP SIZEN'Ei. POND D2 OUTLET RIPRAP SIZE Pd = (V2 + gd)/2. V = design flow velocity at pipe outlet (ft/sec) V = 5.67 9 = acceleration due to gravity = 32.2 ft/sec2 9= 32.2 d = design depth of flow at pipe outlet (ft) d = 0.857 D = Storm Sewer Diameter D = 1.5 Pd = ._., 7.7 " USE FIGURE HS -20 TO DETERMINE RIPRAP DESIGN SIZE. TYPE Max Pd for each Rip Rap Type L 13.1 M 17.3 H 21.25 T = 1.75D50 T TABLE HS -9 Median (i.e., Dom) Size of Districts Riprap Riprap Type D50 -Median Rock Size (inches) L 9 M 12 H 18 B18 18 (grouted) BASIN LENGTH Basin Length is the greater of the following L = 4D or L = (D)112 x (V/2) L = Basin Length D = Storm Sewer Diameter V = design flow velocity at pipe outlet (ft/sec) L=4D L= 6 L = (D)1x (V/2) L = 3.47 L= 6 BASIN WIDTH W=4D W = Basin Width D = Storm Sewer Diameter W=4D W= 6 • • • 9!!1 r yR�sTO POND D2 SPILLWAY RIPRAP SIZE • o a Pd _ 0V2 + gd)t12 V = design flow velocity at pipe outlet (ft/sec) V = 4.1593 g = acceleration due to gravity = 32.2 ft/sec2 9 = "32.2 d = design depth of flow at pipe outlet (ft) d = 1.43 H = Channel Height D= 1.5 w = Width of Channel (ft) w = 10 9 7 s Pd = .' .. * USE FIGURE HS -20 TO DETERMINE RIPRAP DESIGN SIZE. TYPE Max Pd for each Rip Rap Type . L 13.1 M 17.3 H 21.25 D50 T = 1.75D50 T = Et. fit',5 s .: TABLE HS -9 Median (i.e., Dom) Size of District's Riprap Riprap Type D50 -Median Rock Size (inches) L 9 M 12 H 18 B18 18 (grouted) BASIN LENGTH Basin Length is the greater of the following L = 4H or L = (H)112 x (V/2) L = Basin Length D = Channel Height V = design flow velocity at pipe outlet (ft/sec) 9 L=4H L= 3 6 L = (H)112 x (V/2) L = 2.55 L = 6 BASIN WIDTH W = w+4H W = Basin Width w = Width of Rectangle H = Channel Height a 9 ,