Loading...
HomeMy WebLinkAboutIronbridge_DET32.17' MOUNTAB CUF STRIP ALL TOPSOIL, SCARIFY AND RECOMPACT SUBGRADE TO A MINIMUM DEPTH OF 8" TO 95% STANDARD PROCTOR 60' R. 0. W, 12' LANE i 12' LANE 3" ASPHALT 2�Z 30' 2,17' MOUNTABLE CURB 8" CLASS 6 AGGREGATE BASE COURSE COMPACTED TO 95% STANDARD PROCTOR 40' R. 0. W. 2.17' MOUNTAB CUF STRIP ALL TOPSOIL, SCARIFY AND RECOMPACT SUBGRADE TO A MINIMUM DEPTH OF 8" TO 95% STANDARD PROCTOR 10' LANE 3" ASPHALT 2� 30' 2.17' MOUNTABLE CURB 8" CLASS 6 AGGREGATE BASE COURSE COMPACTED TO 95% STANDARD PROCTOR NOTE SURFACE AND ROAD BASE SECTION TO BE VERIFIED BY GEOTECHNICAL ENGINEER. NOTE YPI CAL 20' ROAD SECTION SURFACE AND ROAD BASE SECTION t TO BE VERIFIED BY GEOTECHNICAL FOX RUN! COURT AND RIVER BAN K LAN E ENGINEER. U N.T.S. 60' R,O.W. 13' 10' UTILITY EASEMENT :R TYPICAL UTILITY COVER & SEPARATION REQUIREMENTS N.T.S. EXACT LOCATION OF SEDIMENT FENCE STAKED IN THE FIELD BY THE ENGINEER. POST FENCE 2.5' 5 FEET 2' u SECURE TOP EDGE OF FILTER CLOTH TO FENCE WIRE FENCE FILTER CLOTH -�-- 10' (APPROX.) BURY TRAILING EDGE OF FILTER CLOTH IN TRENCH A MINIMUM OF 6". POST FILTER CLOTH U U MATERIALS FOR FILTER CLOTH FENCE SHALL CONSIST OF STANDARD WOVEN LIVE—STOCK WIRE, A MINIMUM OF 36" IN HEIGHT, A MINIMUM OF 14—GAGE WIRE, WITH A MAXIMUM MESH SPACING OF 6 "; POSTS SHALL BE EITHER WOOD OR STEEL, MINIMUM LENGTH OF 5'. SEDIMENT CONTROL FENCE N.T.S. UNDERDRAIN SYSTEM INSTALL 9" (d50) NOMINAL RIP—RAP, HAND PLACED 18" THICK OVER FILTER FABRIC. ROUNDED RIVER ROCK MAY NOT BE USED. (SEE GRADING AND DRAINAGE PLAN) POINT A ENTRENCH 13.5" (1.5d5o) RIP --RAP AT CULVERT OUTLET N.T.S. POINTS A MUST BE HIGHER THAN POINT B SECTION D—® EROSION LOG DETAIL DITCH INSTALLATION VT A IG CONCRETE HEADWALL 18" (200) —i L/2 A A EROSION LOG USE 2 PINE STAKES 1 1/2" x 1 1/2" x 12" AT ALL EROSION LOG ENDS OR JOINTS, OTHERWISE USE A STAKE EVERY 24 IN, AND CONTINUE TO ALTERNATE ORIENTATION THROUGHOUT THE LENGTH OF THE EROSION LOG. REVEGETATION PROCEDURES ALL AREAS DISTURBED DURING CONSTRUCTION WILL BE REVEGETATED ACCORDING TO THE FOLLOWING CRITERIA, DURING CONSTRUCTION, EROSION WHICH MAY POSE A THREAT TO SURROUNDING PROPERTIES OR WATERWAYS WILL BE CONTAINED THROUGH THE USE OF TEMPORARY EROSION CONTROL MEASURES AS DEEMED NECESSARY TO COMPLY WITH THE N.P.D.E.S. REVEGETATION OF DISTURBED AREAS SHALL COMMENCE IN THE FALL, PRIOR TO THE FIRST MAJOR SNOWFALL, OR EARLY SPRING IF SITE CONDITIONS ALLOW. EROSION CONTROL MEASURES ARE AIMED AT CONTROLLING/CONFINING SEDIMENT WITHIN OR NEAR THE AREA OF DISTURBANCE, THE LONG TERM STABILITY OF THESE AREAS WILL DEPEND ON THE ESTABLISHMENT OF APPROPRIATE GROUND COVER VEGETATION, THE PRIMARY GOAL OF THE REVEGETATION EFFORT IS TO PROTECT WATER QUALITY WHICH WILL REQUIRE A STURDY GROUND COVER AS SOON AS POSSIBLE. FOLLOWING ARE STANDARDS WHICH HAVE BEEN ESTABLISHED FOR REVEGETATION APPLICATION TECHNIQUES: 1. ALL TOPSOIL SHALL BE SALVAGED FROM DISTURBED AREAS, STOCKPILED AND RE—SPREAD PRIOR TO REVEGETATION. TOPSOIL SHOULD NOT BE RE—SPREAD ON AREAS OF THE SITE PROPOSED FOR FUTURE BUILDING, THE FINISHED SOIL SURFACE SHALL BE LEFT IN AN IRREGULAR, SCARIFIED CONDITION WHICH MAXIMIZES MOISTURE RETENTION ON THE SLOPE. 2. WHERE SLOPE ALLOWS, SEED SHALL BE DRILLED OR OTHERWISE MECHANICALLY INCORPORATED INTO THE SOIL ("FARMED"). WHERE STEEPNESS OF SLOPE RESTRICTS EQUIPMENT ACCESS, SEED SHALL BE HYDRAULICALLY APPLIED AND FOLLOWED BY APPLICATION OF HYDRAULICALLY APPLIED MULCH OR STRAW, STRAW MULCH SHALL BE SECURED IN PLACE WITH A HYDRAULICALLY APPLIED TACKIFIER, 3. SLOPES WITH GRADIENTS OF 2:1 OR STEEPER SHALL BE HYDRAULICALLY SEEDED, STRAW MULCHED AND PROTECTED BY PLACEMENT OF EROSION BLANKET (JUTE, EXCELSIOR OR SIMILAR ORGANIC PRODUCT), STRAW TACKIFIER IS NOT REQUIRED WHEN EROSION BLANKET IS USED. 4. THE EXPOSED SLOPE WOULD BE PREPARED WITH MINI BENCHES. TOPSOIL WOULD THEN BE SPREAD OVER THE SLOPE, SEEDED AND COVERED WITH STRAW. EROSION CONTROL BLANKET WOULD THEN BE TACKED INTO THE HILLSIDE COVERING ALL THE SEEDING, IF EXISTING MOISTURE CONDITIONS INDICATE THE REQUIREMENT FOR IRRIGATION, THEN EITHER DRIP IRRIGATION OR MINI—SPRAY IRRIGATION WOULD BE USED. 5. REVEGETATION WILL BE CONSIDERED SUCCESSFUL WHEN THE CONTRACTOR HAS ESTABLISHED A DESIRABLE PERENNIAL VEGETATION (SEED MIX) BY THE END OF THE SECOND GROWING SEASON SUFFICIENT IN COVER AND CAPABLE OF RENEWING ITSELF TO ADVANCE TO THE ACCEPTABLE STAGE OF REVEGETATION AND THE DISTURBED AREA IS CONSIDERED STABILIZED AND EROSION CONTROLLED. M11YE SEED MIX PLS LB/ACRE SCIENTIFIC NAME COMMON NAME �/ARIETY SEEDING RATE GRASSES AGROPYRON SMITHII WESTERN WHEATGRASS ARRIBA 4 AGROPYRON TRACHYCAULUM SLENDER WHEATGRASS PRIMAR 4 FESTUCA IDAHOENSIS IDAHO FESCUE JOSEPH 2 FESTUCA RUBRA RED FESCUE 2 KOELERIA MACRANTHA JUNEGRASS 1 ORYZOPSIS HYMENOIDES INDIAN RICEGRASS 1 POA SANDBERGII SANDBERG BLUEGRASS CANBAR 2 SITANION HYSTRIX SQUIRRELTAIL 1 STIPA VIRIDULA GREEN NEEDLEGRASS LODORM 2 FOREIS ACHILLEA IANULOSA WESTERN YARROW 1/8 BALSAMORHIZA SAGITTATA ARROWLEAF BALSAMROOT 1/4 LUPINUS ARGENTEUS BLUE LUPINE 1/4 SPHAERALCEA COCCINEA SCARLET GLOBEMALLOW 1/4 A A HE 0 0 0 0 EROSION LOG USE 2 PINE STAKES 1 1/2" x 1 1/2" x 12" AT ALL EROSION LOG ENDS OR JOINTS, OTHERWISE USE A STAKE EVERY 24 IN. AND CONTINUE TO ALTERNATE ORIENTATION THROUGHOUT THE LENGTH OF THE EROSION LOG. PLAN VIEW WETLANDS OR FEATURE T qAo� THAT NEEDS PROTECTION —1 O 0 ENTRENCH SECTION A—A 0 SEDIMENT REMOVAL SHALL BE PERFORMED CONTINUOUSLY FOR PROPER FUNCTION, TYPICAL STAKING PATTERN AND EROSION LOG APPLICATION - C Ln D U I F w 0'. 0' m' 0 L 0 N 0 Lli 0 m z 0 w� Z z z ao oQ CD Q �W U� 0) sFL 0 2� U7O ZO N z in- z Q � O , 0 cnZ) a 0 � z° Fw w a -Jw °° m0 LC ¢ O O � 0 J 0 w = O V U) Z m w LLJ o� Z x a a]_j J W W LL u tY PROJECT NO. 2051 O 19.00 DET 3 Ln u J r W r fl' 1 N W z ° � N 0 � w � , u. O � 0 J 0 w = O V U) Z m w LLJ o� Z x a a]_j J W W LL u tY PROJECT NO. 2051 O 19.00 DET 3 r ` r 1 • � w_ r , u. O � 0 J 0 w = O V U) Z m w LLJ o� Z x a a]_j J W W LL u tY PROJECT NO. 2051 O 19.00 DET 3