HomeMy WebLinkAboutEngineer's Report 09.27.2016"%-x�z , �� pRT� ,r *Lli i ram• CIVCO Engineering, Inc. Vernal, Utah CIVCO Engineering, Inc. Civil Engineering Consultants PO Box 1758 * 1256 W 400 5, Suite 1 Vernal, Utah 84078 September 27, 2016 RE: Resource Engineering Inc. Comment letter and Staff Report, both dated August 16, 2016 Resource Comment 1 The anchoring system is listed as an over the top tie clown in the CIVCO report, but the design drawings show a foundation system with tie straps to the floor joists. Both systems are acceptable, but the Applicant should clarifi' the design so that the floodplain permil and building permit are consistent for the project. Response The text of the flood plain report has been revised to say "the structure VI, i I I be anchored using tie straps on the chassis frame anchored to the exterior concrete foundation". Resource Comment 2 The grading plan on Street 2 of the CIVCO drawings calls out a high point on the gyres! fence line with half the drainage flowing north and liar f flotit'ing to the south. The existing topography does not appear to support this label. RESOURCE agrees with this approach so as to not impact the property to the gest. 11 is recommended that the drawings indicate specific elevations al the high point and at the northwest and southwest corners for the contractor to provide the intended drainage concept. Response The grading plan has been revised to include the spot elevations at the high point and the corners of the lot. Resource Comment 3 The plans indicate a crawl space for the foundation system. The Applicant should address location, elevation and size of openings and address compliance with enclosure openings if appropriate. Specifically, the east side of the structure foundation could be subject to flooding in the crawl space. Response The foundation plan has been revised to show the flood openings. Phone (435)789-5448 * Fax (435)789-4485 Email: civcoia civcoengineering.com Staff Comment 4 a Confirmation that all utility connections are designed and protected front infiltration by flood waters and confirmation that all utilityfacilities and equipment such as air conditioning units will be elevated al least one foot above the FEU/1 anticipated level offlood waters. This information ormation shall be provided with the building permit application. Response Utility Note 5 has been added to Sheet No. 1 - Site Layout and Utility. Plan addressing this comment. Staff Comment 4 b Plans for landscaping or re -vegetation of disturbed areas to minimize the potential for soil erosion in the event of a flood Evidence of initial re -seeding shall be required prior to issuance of a certificate of occupancy. Ste, P+�&) ►JotL `fi' . ! Response Staff Comment -1 c A determination that the proposed grading plan will not adversely affect any adjacent property owners. Response The site plan has been designed to eliminate adverse impacts to adjacent Tots and it is the opinion ofCIVCO Engineering, Inc. that if constructed according to plans, the grading will not adversely affect any adjacent property owners. Page 12 CIVCO Engineering, Inc. Vernal, Utah CIVCO Engineering, Inc. Civil Engineering Consultants PO Box 1758 * 1256 W 400 5, Suite 1 Vernal, Utah 84078 May 4, 2016 Amended September 27, 2016 RE: CMH Flood Plain Development Permit (File No. FDPA-04-16-8445) 1.0 Summary The Chavez residence will be located on Lots 8 & 9 Rifle Village South; on Remington Ave. in Garfield County. This property is situated within a Zone AO Special Flood Hazard Area (SFHA) subject to inundation by the 100 annual chance flood. Zone AO is defined as "Flood depths of I to 3 feet (usually sheet flow on sloping terrain); average depths determined. For areas of alluvial fan flooding, velocities also determined." The flood zone is associated with alluvial fan flooding from Helmer Gulch, and the 100 year discharge is defined as 760 cubic feet per second (cfs). The flood depth in this area is defined as 1 foot with a velocity of 4 feet per second (fps). The entire parcel is located within the flood zone. The proposed residence will be a single story manufactured home with treated lumber framed perimeter foundation walls on concrete footings and chassis supports on spot footings throughout the crawl space. The structure will be anchored to resist flotation using tie straps on the chassis frame anchored to the exterior foundation. The finished floor elevation (FFE) will be 2 feet higher (5365.37) than the highest adjacent ground elevation (5363.37). The lot will be graded to provide positive drainage away from the structure in all directions. 2.0 County Floodplain Overlay Regulations The Garfield County Land Use and Development Code specifies general standards for development within a floodplain and specific standards that apply to the different types of SFHA zones that have been defined. The sections of that code that apply to the proposed project are 3- 301 B -G, 4-109, and 4-203. These sections are discussed in sections 2.1, 2.2 and 2.3 of this report. 2.1 Garfield County Land Use and Development Code 3-301 3-301 B. General Standards. In the Floodplain Overlay, the fallowing provisions are required for all New Construction and Substantial Improvements: 1. All New Construction or Substantial Improvements shall be designed (or modified) and adequately anchored to prevent flotation, collapse, or lateral movement of the structure resulting from hydrod}mantic and hydrostatic loads, including the effects of buoyancy. Phone (435)789-5448 * Fax (435)789-4485 Email: civco@civcoengineering.com The proposed residence will be a single story manufactured home with treated lumber framed perimeter foundation walls on concrete footings and chassis supports on spot footings throughout the craw I space. The structure will be anchored to resist Flotation and lateral movement using tie straps on the chassis frame anchored to the exterior concrete foundation. Refer to attached foundation plans. 2. All New Construction or Substantial Improvements shall be constructed by methods and practices that minimize food damage. The proposed project site has been designed to minimize the probability for floodwaters to impact the proposed structure. Refer to sections 4.0 Site Grading and 5.0 Flood Damage Protection. Construction materials have been specified according to the International Residential Code Section R401. Refer to attached foundation plan. 3. All New Construction or Substantial Improvements shall be constructed with materials resistant to flood damage. Foundation materials have been specified per the International Residential Code Section R401. Refer to section 4 Site Grading and to the attached foundation plan. 4. All New Construction or Substantial Improvements shall be constructed with electrical, heating, ventilation, plumbing, and air conditioning equipment, and other service facilities that are designed annd`or located so as to prevent water from entering into or accumulating within the components during conditions of flooding. The finished floor elevation of the structure swill be 5365.37 feet which is 1 foot higher than the reported flood water depth. A concrete slab for the air conditioning unit will be constructed with a finished top of slab elevation of 5364.37 feet. All electrical, heating, ventilation, plumbing. and air conditioning equipment, and other service facilities have been designed to keep those systems higher than the 100 -year floodwater elevation. Refer to section 5.0 Flood Damage Protection. 5.1111 Manufactured Homes shall be installed using methods and practices which minimize flood damage. For the purposes of this requirement, Manufactured Homes must be elevated and anchored to resist floatation, collapse, or lateral movement. Methods of anchoring may include, but are not limited to, use glover -the -top or frame ties to ground anchors. This requirement is in addition to applicable State and local anchoring requirements for resisting wind forces. The structure will be anchored to resist flotation and lateral movement using tie straps on the chassis frame anchored to the exterior concrete foundation. The foundation has been designed according to the International Residential Code section R401. Refer to section 5.0 Flood Damage Protection and to the attached foundation plans. Page 2 6. All new and replacement water supply systems shall be designed to minimize or eliminate infiltration offload waters into the system. The proposed project w ill connect to the Rifle City culinary water system. The water service lateral will be water tight and will terminate above the finished floor. 7. New and replacement sanitary,, sewage systems shall he designed to minilnize or eliminate infiltration of flood waters into the system and discharge from the systems into flood waters. The proposed project will connect to the Rifle City sanitary sewer system. The sewer service lateral will be water tight and will terminate at or above the finished Floor. 8. On-site ~taste disposal systems shall be located to avoid impairment to them or contamination from them duringflooding. Does not apply. There is no on-site waste disposal system. 3-301 C. Specific Standards. In the Floodplain Overlay, where BFE data hav been provided. Does not apply. Base flood elevation has not been provided on FIRM. 3-301 D. Floodiray. The proposed structure is not located within the floodway. The floodway will not be altered in any way by this project. Refer to attached FIRM. 3-301 E. Standards for Areas of Shallow Flooding. Areas designated as shallow flooding are located within the SFHAs. These areas have special flood hazards associated with Base Flood depths of 1 10 3 feet where a clearly defined channel does not exist and where the path of flooding is unpredictable and where velocityflow may be evident. Such flooding is characterized by' ponding or sheet flow; therefore, the following pro visions apply: 1. A11 New Construction and Substantial Improvements of residential structures have the Lowest Floor (including Basement) elevated above the highest adjacent Natural Grade at least 1 foot above the depth number specified in feet on the community's FIRM (at least 3 feet if no depth number is specified). The high point of the lot around the perimeter of the proposed structure has an elevation of 5363.37 feet and is located at the south east corner of the proposed structure. The finished floor elevation of the structure will be 5365.37 feet which is 1 foot higher than the reported flood water depth of I foot. Page j 3 2. All New Corn.struction and Substantial Improvements of nonresidential structures: Does not apply. This is a residential structure. 3. Adequate drainage paths around structures are required to guide flood waters around and aii cn from proposed structures_ Drainage shall not adversely impact adjacent properties. The lot will be graded to provide positive drainage away from the structure in all directions. The existing site is crowned and approximately one quarter of the lot drains northerly toward Remington Avenue. The remaining three quarters of the lot drains to the alley on the northern side of the lot. Proposed site grading will maintain the same general grading pattern. Refer to section 4.0 Site Grading and the grading and drainage plan attached to this document. 3-301 F. Properties Removed from the Floodplain bt' Fill. Does not apply. 3-301 G. Alteration of a Watercourse. Does not apply. 2.2 Garfield County Land Use and Development Code 4-109 4-109. DEVELOPMENT IN THE 100 -}EAR FLOODPLAIN. 4-109A. Overview. Applications for development within the 100 -year Floodplain must receive a Floodplain Development Permit prior to any development. A floodplain development permit has been applied for. 4-10913. Review Process. Development in the 100 -)'ear Floodplain shall be processed pursuant to section 4-103, Administrative Review. A Floodplain Development Perrllit shall be issued upon approval of the application. Pending review by county. 4-109C. Review Criteria. A Floodplain Development Permit may be issued by the Director or designated Floodplain Administrator if it is found that the application is in conformance with section 3-301, Floodplain Overlay Regulations, and upon weighing the following relevant factors: 1. The danger to life and property due to flooding or erosion damage; Refer to section 3.0 Flood Plain Analysis. Page 14 2. The susceptibility of the proposed facility and itv contents to flood damage and the effect of such damage on the individual owner; Refer to sections 3.0 Flood Plain Analysis, 4.0 Site Grading and 5.0 Flood Damage Protection and the attached site plan drawings. 3. The danger that materials may be swept onto other lands to the injury of others; Refer to sections 3.0 Flood Plain Analysis, 4.0 Site Grading and 5.0 Flood Damage Protection and the attached site plan drawings. 4. The compatibility of the proposed use with existing and anticipated development; The proposed single family dwelling is located within a residential subdivision. 5. The safety of access to the property in tines of flood for ordinary and emergency vehicles; The proposed project will have no effect on the safety of access to the property by ordinary or emergency vehicles. 6. The costs of providing governmental services during and after flood conditions, including maintenance and repair of streets and bridges, and public utilities and facilities such as sewer, gas, electrical, and water systems; The proposed project will not increase the costs of providing governmental services during and after flood conditions. 7. The expected heights, velocity, duration, rate of rise, and sediment transport of the flood waters and the cif -eels ofwave action, if applicable, expected al the site; Refer to section 3.0 Flood Plain Analysis. 8. The necessity to the facility of a waterfront location, where applicable; Does not apply. 9. The availability of alternative locations, not subject to flooding or erosion damage, for the proposed use; Does not apply. 10. The relationship of the proposed use to the Comprehensive Mania,- that area. The proposed single family dwelling is located within a residential subdivision. Page 1 5 2.3 Garfield County Land Use and Development Code 4-203 4-203 4. Floodplain Analysis. When a project is located within a Special Flood Ha_ard Area, if there is an indication or suggestion that a project is located in a SFHA, or if a project is a division of land or a PUD over 5 acres in size or proposes 50 lots or greater, the application mast include a Floodplain Analysis. L Floodplain Specific Site Plan. The Applicant shall submit a Site Plan ii'ith specific information pertaining to the SFHA and shall include the following elements. The Floodplain Administrator may require, or the Applicant may choose to submit, a more detailed version of till or part of the Site Plan. Any elevation information shall be provided in the North American Vertical Datum of 1988. a. Base Flood hoiindary and water surface elevations; Refer to attached FIRM. b. Floodway boundary; Refer to attached FIRM. c. Channel of water course; Refer to attached FIRM. d. Existing and proposed topographic contours shown al vertical intervals of no greater than ? feet; Refer to the attached site plan draw ings. e. Elevation of the Lowes! Floor, including Basement and garage, or each existing and proposed structure; Refer to the attached site plan drawings. f. Proposed elevations to which structures will be flood -proofed; Refer to the attached site plan drawings. g. Existing and proposed location, dimension, and elevation of proposed landscape alterations, structures, streets, water supply and any sanitation facilities; Refer to the attached site plan drawings. Page ; 6 h. Boundaries and total land area of existing and proposed impervious surfaces, including structures; and Refer to the attached site plan drawings. i. Location of existing crater supply ditches, irrigation ditches and laterals. Refer to the attached site plan drawings. 2. A certificate from a qualified professional engineer or architect that the nonresidential flood -proofed structure shall Inca the flood -proofing criteria in section 3-301.C.2., Specific Standards for Nonresidential Construction. Does not apply. This is a residential structure. 3. An elevation certificatefrom a qualified professional surveyor, engineer or architect that certifies that all residential construction and mechanical equipment will be at least 1 foot above BFE. Refer to the attached elevation certificate, prepared by Kipp Land Surveying. 4. Description of the extent to which any watercourse or natural drainage ti, i11 be altered or relocated as a result of proposed development. No watercourse or natural drainage will be altered or relocated as a result of the proposed development. Refer to the attached grading and drainage plan and FIRM. 5. An engineer's report completed by a qualified professional engineer experienced in hydrology or hydraulics, using a methodology acceptable to FERIA or the CWCB, that address the standards in section 3-301. B -G. of this Code. This report has been prepared to specifically address the requirements of the Garfield County Land Use and Development Code 3-301.8-G and standard level of care for development within an SFHA. 3.0 Flood Plain Analysis The Zone AO SFHA is an alluvial fan shallow flood plain. In an alluvial flood plain, the entire plain is not inundated during every flood event. An alluvial flood plain is formed over thousands of years. High velocity, sediment laden flood waters enter the flatter flood plain and gradually slims until the waters no longer have the energy required to transport the sediment they contain. When the waters slow sufficiently, the sediment settles out of the water creating deposits on the flood plain. As this process occurs over many years the alluvial fan changes shape topographically and flow paths are changed for each succeeding flood event. Page 7 The 100 year flood discharge at the mouth of Helmer Gulch is 760 cfs with a flood depth defined at a depth of 1 foot with a velocity of 4 fps. The width of the flood plain at the project. scaled from the firm map, is approximately 3500 feet. Using the continuity equation (Q ® vA) we can solve for the width of flow of the 100 year flood, which will be approximately 190 feet. From this, in the event of a 100 year flood (0.1% chance) the percent chance for this property to be inundated is approximately 5% (190ft/3500ft). Other factors influencing flooding in this area include roads, grading due to land development and farming activities and the development of 1 Telmer Gulch itself. The alluvial fan has been developed significantly over the past 40 years. The roads in the Rifle Village South Subdivision alone will do much to channelize and potentially split the flow of flood waters through this area. This report does not include the analysis of these impacts, but merely mentions them to show that by following the standards specified in the Garfield County Land Use and Development Code, the proposed residence will be reasonably protected from damage caused by flooding. A flood plain report prepared by Jerome Gamba & Associates in May of 1996 was referenced in the preparation of this report. A copy of that report has been attached to this document. 4.0 Site Grading The project site is currently vacant. Remington Avenue drains generally from east to west. The existing site is crowned and approximately one quarter of the lot drains northerly toward Remington Avenue. The remaining three quarters of the lot drains to the alley on the northern side of the lot. Proposed site grading will maintain the same general grading pattern. The high point of the lot around the perimeter of the proposed structure has an elevation of 5363.37 feet and is located at the south east corner of the proposed structure. The finished floor elevation of the structure will be 5365.37 feet w hick is l foot higher than the reported flood water depth of 1 foot. Finished grade eleNations around the structure will be 18 inches below the FFE or 6 inches above the existing grade. A concrete slab for the air conditioning unit will be constructed with a finished top of slab elevation of 5364.37 feet. The lot will be graded to provide positive drainage away from the structure in all directions. Refer to the grading and drainage plan attached to this document. 5.0 Flood Damage Protection The proposed project will connect to the Rifle City culinary water and sanitary sewer systems. Service laterals will be water tight and will terminate at or above the finished floor, thereby minimizing or eliminating the infiltration of potential flood waters into either system. To protect the proposed structure from flotation, collapse or lateral movement. the structure will be anchored using tie straps on the chassis frame anchored to the exterior concrete foundation at regular intervals along the north and south sides. Openings in the foundation wall have been designed to automatically equalize hydrostatic flood forces on exterior walls by allowing for the entry and exit of flood waters. Openings have been Page ! 8 designed using guidance found in FEMA Technical Bulletin 1-08 Openings in Foundation Walls and Walls of Enclosures. Refer to foundation plan. 6.0 Conclusion The proposed project has been designed with flood protection in mind. The Garfield County Land Use and Development Code and FEMA Technical Bulletin 1-08 have been used as for guidance in the selection of measures used to protect the proposed structure from flood damage. By constructing the site according to the proposed site plan and the Development Code, and following FEMA guidelines, the home will be reasonably protected from damage caused by flooding. Prey red by: hn B. Barras Approved by: Vance V. King, P.E. Page 1 9