Loading...
HomeMy WebLinkAboutOWTS Design 5-20-16/ T r� ! % ,r1� N Ev / U 1 Ji fiN, zi{ Yn+ AR 51 I / r t i l ' ///''' / � r rt e �F'{ k r �f• r`tY.x` rs'3!+ J i 1 {it 't i"2222 r� 1 I J cr, tiI 1 PROPOSED STOR WATER DRYWELL A (J ( PROPOSED I / { lt�t*i I JI �{ � f j I`Ij1) ff(I 7 f 1 (// I ' EGf S IAA/PNC I 0 7 0 1 J 3 BEDROOM 1 F P/ a o I \ RESIDENCE, { ' I I V• 7 i I ! : 7 5.5 I I q l I P TIO _ 2 LF 6 ®% I n. N E N _ \ I V: 7 �7 0 O m ;u m K r I / 1 \ lI It I 1 1 \ ROPOSED 1,000 GALLON TOP OF BANK I t / \ p J ALLEY PRE -CAST SEPTIC TANK AND PUMP, ITH 2 COMPARTMENTS, EFFLUENT FILTER J AND N ! BUOYANCY ANCHORING. ' J EDGE OF CREEK M N 24" HIGH RISER 1 n / 63' J "� lI f TOP RISER ELEV: 7321.76 �± I PROPERTY LINE � .I I �• N , ST PIT 1 ( i �N N �ti 1N! f 2 EFFLUENT DISCHARGE LINE INV OUT: 7320.18 I� 1 II 3 - 1 • TEST PIT 3 / 18 LF 2" PVC 0 2.0% J/ SWALE J J J 366 S.F. MOUND ABORPTION FIELD TEST PIT 2 / RAIDED SWALE / / / / / / / , / , , , / , , , o , , , , , / , , , , , , , , , , , , , , , 25' REAR YARD SETBACK , ------------------------------------------------------------------------------------------------------------------------------------------------ 2"0 PVC 90' TEE 2'Ox 90' ELBOW (TYP.) 2"G1 SCHEDULE 40 PVC EFFLUENT LINE SLOPED DRILL F/ALL PIPES FOR, ON ENTIRE LENGAT TH (TYPICAL) GOWN TOWARDS TANK L2" Ox 90- ELBOW (TYP.) TYPICAL LATERAL PIPE LAYOU NOTE: ALL PERFORATED DISTRIBUTION (FOR PRESSURE DOSING OF MOUND) PIPES SHALL BE LEVEL N.T.S. BASE OF SAND AREA: 360 A4n A 4 TYPICAL PLAN VIEW OF MOUND N.T.S. REMOVABLE SCREW OR SLIP CAP FINISH GRADE AT TOP OF 4" PVC SOLID PIPE (LENGTH VARIES) TOP SOIL 4" MIN. 0 O 0 0-00 (4) 1/4- X 4" LONG SLOTS 0 90' APART , o ROCK 4" PVC FLANGED SUPPORT FITTIN AGGREGATE AGGREGATE/SAND INTERFACE o o°o SAND BED:: 4" MIN. 1/4- WIDE SLOT (TYPICAL OBSERVATION WELL DETAI N.T.S. FINI 4" COU 4" SEWER I " RISER " 45' SWEEP BEND L- ) p� 4 x 4" x 4 CLEAN OUT PVC WYE ASSEMBLY SEWER CLEAN OUT DETAIL N.T.S. tQQ 4j. a11on Top Seanrn 1ltenc� #; �: T�wa Compartment OOOT-ZCP-LH with..Head4 Pump sir (B&W on Wnbn• T") WATHITAME -,LL w -p. r -Ir V.w s.a' 7 -Cr 8-C' DRY -1/, . - CIa.rAme. 1-TANt--f DESItIN NOTt 0 IL z z 'n boot Vern >00 aw4� � a a Per ASTM C122T Pr�M :. . „+ 00 N • TOP $ulfe= wu 4825 ffmRubber z0 N z °5>~;2 �. fC�28dmp;mme=6.0WP. MI I"- twn]ao w00z z 00 Inst+flado� UIBIN! • Tank to be est on 5' min. yard bed, orpea jm6a 0 be e*1W onl#m Ta k l , :.; as Mda in oft im ton 24' and 6U 7 ' 'Exon tredtor. Inlet and Out kjet ttW above pipe ttpletis;inetalleHtm (wlrin9, Pend, ;baddi, pmAdmd Ielpdebonellare �alnat"d dalNl�frd tenlc 0 IL z z z ¢p/ on >00 aw4� � a a • E)OCYVBIIOn stnuld be Yt1d r: :. . „+ 00 N Q0=w z0 N z °5>~;2 }ie{dw�i�fh�wrt�bryP!� mG{�P.iniefYllo�4',', twn]ao w00z z 00 Nw alw-O UIBIN! %f kretalell0n Wih rval iabir iYai then jm6a 0 a below anode :.; 0 M1,00,1644019 far resJW caxlecfoa ZzZ` Inlet and Out kjet ttW above pipe ttpletis;inetalleHtm (wlrin9, Pend, w .: Deitverod orxxi±pfels +±IAF+ Intsrtial dphG • asoonaml►eeu64raan en ava>fe�ie'►�t, motudinQ end et9rt{lp Prim Ia inea) ' i..I0 j Z : PVC drier . s ConiPl110. tran�jt 'bee oobtfoin Oulde on ourwebelye Service contracts nva+leble.. for maitHananae r l�J INA 5-20-16 l v PROPOSED FINISH 12" THICK BED OF OF WASHED COURSE SCREENED GRAVEL OR CRUSHED STONE PASSING 2 1/2" SCREEN AND RETAINED ON 3/4" SCR EN 2 PERFORATED RIGID PVC DISTRIBUTION LATERALS 12" MIN. SLOPEL TOPSOIL � FILTER FABRIC-,,"'COVERlIzz 20 0 GRAPHIC SCALE 10 20 40 ( M FEET ) 1 inch = 20 fE GENERAL NOTES 80 1, ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE GARFIELD COUNTY PUBLIC HEALTH AGENCY ON-SITE WASTEWATER TREATMENT SYSTEM REGULATIONS, EVEN THOUGH ALL SUCH REQUIREMENTS ARE NOT SPECIFICALLY NOTED ON THIS DRAWING. THE CONTRACTOR SHALL BE RESPONSIBLE FOR SUCH SPECIFIC DETAILS AS ARE REFERRED TO IN THE ABOVE MENTIONED REGULATIONS. 2. SYSTEM DESIGN FLOW: 3 BEDROOMS *2 PERSONS/BEDROOM *75 GALLONS/PERSON/DAY IS 450 GPD = AVERAGE DAILY FLOW SEPTIC TANK: MINIMUM PRE -CAST CONCRETE TANK SIZE IS 1,000 GALLONS. PROPOSED TREATMENT SYSTEM: MOUNDED UNLINED OPEN BOTTOM SAND FILTER PROPOSED THICKNESS OF SAND BED: 2 FEET, MINIMUM TREATMENT LEVEL: TL2 METHOD OF EFFLUENT APPLICATION: PRESSURE DOSED SIZE ADJUSTMENT FACTOR FOR PRESSURE DOSED BED: 1.0 RECEIVING SOIL PERCOLATION RATE: 8 MINUTES PER INCH LONG TERM ACCEPTANCE RATE TL2: 1.25 GAL/DAY/SQ. FT. REQUIRED SOIL TREATMENT AREA: A= 450 GIRD = 360 SQ. FT, 1.25 GPD/S.F. 3, TOPSOIL: SOIL EXCAVATED FROM SITE ACCEPTABLE IF NO CLAY IS PRESENT. 4. VEHICULAR TRAFFIC IS PROHIBITED ON THE FIELD. 5, CLEANOUTS ARE REQUIRED AT ALL BENDS AND AT LEAST EVERY 150 FEET ALONG THE EFFLUENT LINE. 6. INSTALL RISERS AS NECESSARY TO BRING ALL ACCESS POINTS AT OR ABOVE THE FINAL GRADE. 7. LOCATIONS OF ALL COMPONENTS MAY BE VARIED AS NECESSARY AS LONG AS ALL MINIMUM DISTANCES AND SLOPES MEET THOSE REQUIRED. 8. PROVIDE POSITIVE DRAINAGE OF SURFACE WATER AWAY FROM ABSORPTION AREA USING DRAINAGE SWALES AS NECESSARY. 9. THE CONTRACTOR SHALL VERIFY ALL DEPTHS, SLOPES AND CLEARANCES FROM THE PROPOSED HOME, WELLS AND STRUCTURES, PRIOR TO CONSTRUCTION. 10, THIS DRAWING DOES NOT CONSTITUTE AN OWTS PERMIT. PERMIT MUST BE OBTAINED FROM APPROPRIATE COUNTY OFFICIALS. 11. THIS SYSTEM IS SIZED FOR TYPICAL DOMESTIC WASTES ONLY, BACKWASH OR FLUSHING FLOWS FOR REVERSE OSMOSIS UNITS OR WATER SOFTENERS OR FILTERS SHOULD NOT BE INTRODUCED INTO THIS SYSTEM. 12. THE SAND MUST BE THOROUGHLY SETTLED BY FLOODING OR OTHER MEANS BEFORE THE DISTRIBUTION IS PLACED AT THE FINAL GRADE. 13, SAND USED SHALL BE AS FOLLOWS: SIEVE SIE % PASSING 4 100 40 50-55% 200 <1 EFFECTIVE SAND SIZE MUST BE BETWEEN 0.25 mm AND 0.60 mm TYPICALLY CONCRETE OR MASONRY SAND IS ACCEPTABLE, 14, PERCOLATION TESTS PERFORMED BY CRIS SHAW ON SEPTEMBER 1 2015. 15. DESIGN OF MOUND SYSTEM BASED ON THE "OBSERVATION OF PARTIAL EXCAVATION FOR PROPOSED RESIDENCE AND DETACHED GARAGE, 8102 FOURMILE ROAD, GARFIELD COUNTY, BY HP GEOTECH, DATED AUGUST 26, 2014, 16. THE SEPTIC TANK SHALL BE ANCHORED TO PREVENT FLOTATION CAUSED BY HIGH GROUND WATER LEVELS, 17. SEPTIC TANK SHALL HAVE RISES OVER EACH ACCESS MANHOLE AND ALL RISERS SHALL EXTEND TO OR ABOVE FINAL GRADE, 18. THE OWNER SHALL VERIFY ADEQUATE SEPARATION DISTANCES FROM THE SYSTEM, PRIOR TO DRILLING ANY WELLS ON THE SITE, 19. THE APPLICANT OR LICENSED INSTALLER SHALL NOTIFY THE COUNTY AND THE ENGINEER NO LESS THAN TWO BUSINESS DAYS IN ADVANCE TO SCHEDULE A FINAL FIELD INSPECTION OF THE SYSTEM, PRIOR TO BACKFILLING THE SYSTEM. 20. THE APPLICANT OR LICENSED INSTALLER SHALL PROVIDE A SURVEYED AS -BUILT DRAWING OF THE SYSTEM TO THE COUNTY AND ENGINEER, UPON COMPLETION. a 0 IL z z z r, Lu � >00 aw4� � a a j�.,. �� EO Lu °° „+ 00 N Q0=w z0 N z °5>~;2 JO 0) o x U 0 twn]ao w00z z 00 Nw alw-O .�: (D c� X jm6a 0 a • U z r w � � N N .�: (D w~°o� 0 z_ °R s :.; 0 • U z w z04 .�: (D w~°o� 0 z_ °R s ZzZ` m W w IL r1.I i..I0 j Z � Oot O rr ~�z V jO 0 x a 0 x MOUND SYSTEM SPECIFICATIONem S 1. GRASS, SHRUBS AND TREES SHALL BE CUT CLOSE TO THE GROUND SURFACE AND REMOVED FROM THE SITE. 2. THE MOUND SITE SHALL BE TILLED TO A DEPTH OF 8 INCHES TO ROUGHEN THE SURFACE AND INCORPORATE THE VEGETATION. THIS CAN BE DONE WITH A PLOW OR CHISEL TEETH MOUNTED ON A TOOL BAR ATTACHED TO THE BUCKET OF A BACKHOE. 3_ A LAYER OF SAND SHOULD BE PLACED ON THE TILLED AREA_ PLACEMENT OF THE SAND SHOULD BE SUCH AS NOT TO RUT OR COMPACT THE TILLED AREA. ALL WORK SHOULD BE PERFORMED FROM THE SIDE SO AS NOT TO COMPACT THE TILLED AREA. 4. PLACE THE PROPER DEPTH OF SAND, THEN FORM THE SAND/GRAVEL INTERFACE AREA WITH THE AREA BOTTOM BEING LEVEL. 5. PLACE THE SCREENED ROCK (AGGREGATE) TO THE SPECIFIED DEPTH AND AREA, 6. PLACE THE PRESSURE DISTRIBUTION PIPE, CONNECT IT TO THE SEWER AND �y COVER WITH AGGREGATE. w 7. COVER THE AGGREGATE WITH A GEOTEXTILE FILTER FABRIC. 0 8_ PLACE A MINIMUM OF 12 INCHES OF SUITABLE SOIL COVER ON THE SIDES OF THE Ld MOUND AND TO THE NECESSARY DEPTH ON THE TOP OF THE MOUND. 9. FINAL GRADE THE MOUND AND SURROUNDING AREA WITH LIGHT WEIGHT EQUIPMENT Z Z w SO SURFACE WATER MOVES AWAY FROM THE MOUND AND DOES NOT ACCUMULATE W = O NEAR THE MOUND. 10. SEED AND MULCH THE ENTIRE EXPOSED AREA TO AVOID EROSION, LANDSCAPE w 0 X WITH GROUND COVER AS DESIRED. Q w w W DOSING NOTES 2: [Z 0 1. MINIMUM DOSING SHALL BE 100 GALLONS. 20 GPM PUMP AT 25 TOTAL d DYNAMIC HEAD. � 2. EFFLUENT FILTER IS NEEDED BETWEEN COMPARTMENTS 1 AND 2 OF SEPTIC TANK. Go O 1 v 2"0 SCHEDULE 40 PVC �/\� FROM DOSING TANK :..::.: _ :.:,.1 .:.::.:';:: .:...::::..::; 3 :...:..........S..AND.. 1 ` GRADED DRAINAGE SWALE 24" MIN. AROUND PERIMETER OF MOUND \ \\/ � `...... ::::::::........:...........::::::......:::::.:. 12" MIN. �:.. • :. ..:. COVE EXISTING GROUND LINE BENEATH SAND BE MOUND CROSS SECTION A- A N.T.S. FOR AND ON BEHALF OF HIGH COUNTRY ENGINEERING, INC. PROJECT NO. 2141055.00 OVVTS-01 Dw`.