Loading...
HomeMy WebLinkAbout4.04 South Access Driveway1 BEGIN BRIDGE APPROACH ROAD, SEE SHEET 8 � TURNOUT #1 11 >> CUT BACK SLOPE TO GENERATE FILL AS NEEDED _It U$ t'IJV II i OF 15" CSP 20' OF 15" , i i LVERT OFIk CULVERT I TLS KOUT '' 3 FIL IN LAVIIVLIDE AREA: AP OX. 2 \,EEP, 80' LONG, 0' WIDE. REM VE EXI IN TREES, COMCT FILL TO 9 % MAX. IFIED PROM? DENSITY NORTH SCALE: 1"= 100' PLAJ - SOUTH ACCESS \ TURNOUT #4 SCALE: 1"= 100' N • • i EXISTING POWER POLE TO BE RELOCATED BY POWER COMPANY WIDEN ROAD FOR DRIVEWAY 20' OF 15" CSP CULVERT PROPOSED DRIVEWAY, SEE DETAIL WESTBANK RANCH SUBDIVISION 12' MINIMUM (20'-24' AT TURNOUTS) 2% OUTSLOPE 3" OF 3/4" GRAVEL ON 6" OF 3" GRAVEL ON PREPARED SUBBASE, ALL COMPACTED TO 90% OF MAXIMUM MODIFIED PROCTOR DENSITY TYPICAL CRC SS-SECTflON - SOUTH ACCESS DRIVEWAY \ DRAINAGE DITCH : GRADE TO DRAIN INTO CULVERT 0 0 \ 20' OF 15" CSP CULVERT 0 0 0 \ NEW GRAVEL DRIVE 0 0 PREHM RANCH PROPERTY WI li. N N Sf NOT TO SCALE N EXISTINGOWER POLES TO REMAIN .\ N EXISTING TrAJVSF OR)VICF TO OL. RCLOC,t' I ED OY rON;ER CO. 14'-16' WIDE APRON PAVED WITH 3" ASPHALT N NORTH SCALE: 1 "= 20' \BOO N11/))_ N/P O', DRIVEWAY DETAIL AT OAK LANE SCALE: 1"= 20' N CONSULTING ENGINEERS AND HYDROLOGISTS N O o (0 Co 00 UU 0 0 N Wi U .a_ O z z� ono a) 0 0 ` 0 :< z zJ 1.0 vN _O0) N000 N � .0) Q I 0 Z E •:( CC Cc2'Cm; = ca) Wa l- a - N N REVISIONS DATE BY DATE 1/2/01 SCALE 1"= 100' ENGINEER P. BELAU DWG FILE 439-SROAD JOB 439-02 SHEET 7 B OF 24 SHEETS