Loading...
HomeMy WebLinkAboutApplicationGarfield County Community Development Department 1088 th Street, Suite 401 SEP 2 9 2016 Glenwood Springs, CO 81601 (970) 945-8212 www.earfield-county.com iUN,_ TYPE OF CONSTRUCTION ❑Commercial/Multi-Family _ ❑_ Manufactured Home (Single or Multi -Level) IF -Residential (SF, Duplex or Townhome) INVOLVED PARTIES Property Owner: Jonathon Whitman 0Demoiition T ❑ Reroof Mailing Address: PO Box 1236 Carbondale, Co 81623 Contractor: Crawford Design Build, LLC Mailing Address: PO Box 1236 Carbondale, Co 81623 Phone:( 970 927.5204 Phone: (-970 ) 963.3833 Architect: GRW ArchitecturePhone: 9( 70 1618.4346 Mailing Address: 4264 Carnwarth Road, Tallahassee,Fl. 32303 Engineer: Dale Kaup Phone:9( 70 ) 945.9613 Mailing Address: 1129 Grand Ave, Glenwood Springs, CO 81601 Manufactured Home Installer: Phone: Mailing Address: PROJECT NAME AND LOCATION Describe Work: New construction of Single family home and auxiliary buildings Job Address: 20 Silversprace Drive Assessor's Parcel Number. 239336219002 Sub. Roaring Fork Preserve Lot 2 Block Owner's Valuation of Work: $ 3,400,000.00 Property Size (sq. Ft. or Acres): 5.739 Sq. Ft. of Building: 6775 Height: 26' 10 3/4 # of Floors: 2 Class of Work: 0 New ❑ Alteration ❑ Addition ❑ Repair - ❑ Move/Relocation Garage: 0 Attached ❑ Detached Septic: 0 OWTS ❑ Community Type of Heat: 0 Natural Gas 13 Propane ❑ Electric ❑ Other Lriveway Permit: 0 Exempt 13Permit##: NOTICE Authority . This application for a Building Permit must be signed by the Owner of the property, described above, or an authorized agent. If the signature below is not that of the Owner, a separate letter of authority, signed by the Owner, must be provided with this Application. Legal Access. A Building Permit cannot be issued without proof of legal and adequate access to the property for purposes of inspections by the Building Division. Other Permits. Multiple separate permits may be required: (1) State Electrical Permit, (2) County OWTS Permit, (3) another permit required for use on the property identified above, e.g. State or County Highway/ Road Access or a State Wastewater Discharge Permit. Void Permit. A Building Permit becomes null and void if the work authorized is not commenced within 180 days of the date of issuance and if work is suspended or abandoned for a period of 180 days after commencement. CERTIFICATION I hereby certify that I have read this Application and that the information contained above is true and correct. I understand that the Building Division accepts the Application, along with the plans and specifications and other data submitted by me or on my behalf (submittals), based upon my certification as to accuracy. Assuming completeness of the submittals and approval of this Application, a Building Permit will be issued granting permission to me, as Owner, to construct the structure(s) and facilities detailed on the submittals reviewed by the Building Division. In consideration of the issuance of the Building Permit, I agree that I and my agents will comply with provisions of any federal, state or local law regulating the work and the Garfield County Building Code, OWTS regulations and applicable land use regulations (County Regulation(s)). I acknowledge that the Building Permit may be suspended or revoked, upon notice from the County, if the location, construction or use of the structure(s) and facility(ies), described above, are not in compliance with County Regulation(s) or any other applicable law. I hereby grant permission to the Building Division to enter the property, described above, to inspect the work. I further acknowledge that the issuance of the Building Permit does not prevent the Building Official from: (1) requiring the correction of errors in the submittals, if any, discovered after issuance; or (2) stopping construction or use of the structure(s) or facility(ies) if such is in violation of County Regulation(s) or any other applicable law. Review of this Application, including submittals, and inspections of the work by the Building Division do not constitute an acceptance of responsibility or liability by the County of errors, omissions or discrepancies. As the Owner, l acknowledge that responsibility for compliance with federal, state and local laws and County Regulations rest with me and my authorized agents, including without limitation my architect designer, engineer and/ or builder. I hereby acknowledge that I have read and understand the Notice and Certification above, as well as, have provided the squired ' ormation which is correct and accurate to the best of my knowledge. 9/28/2016 Property Owner Print and Sign Date OFFICIAL USE ONLY Special Conditions: (3.a- AAACO .ems U94. Adjusted Valuation: Plan Check Fee: Permit Fee: Manu home Fee: Misc Fees: J 1219) 105.1 G 31107. fi g (a, 012.26 Total Fees: Fees Paid:Balance Due: BP No: OWTS No; OR,Q20.?Z& 4521qy. *-7)725.70 _g - 99 wn Setbacks: OCC Group: onst Type: Zoning: 61 .C., C WYnBUILDING / PLANNING DIVISION ; I 1 V Signed A royal Date set, .(UtVti G ) P&M t aGarfrcld Caen;}, Building/ Zoning Plan Review Checklist Permit Number: rt,RC- - oq - It,, - 4441 SCeT- 01--1& - 4,44Z Building - Engineered Foundation P A Driveway Permit 1 Surveyed Site Plan Septic Permit and Setbacks / Grade/ Topography 30% Attach Residential Plan Review List Subdivision Plat Notes Fire Department Review Valuation Determination/ Fees Red Line Plans/ Stamps/ Sticker / Attach Conditions Application Signed / Plan Reviewer to Sign Application Parcel/ Schedule No. N A 40# Snowload Letter – Manu. Homes / Soils Report Planning/ Zonim Property Line Setbacks / 30 ft. Stream Setbacks / Flood Plain / Building Height —Zoning Sign -Off N/A Road Impact Fees Grade/ Topography 40% Planning Issues Subdivision Plat General Comments: 12G9rcLW ice+ N 3a Su{oTbtGc9 7) 027 31V -A 6 �� � :3)q 40 3 60 \&Wfow : 1111-20, I05.110 , VALUATION FEE DETERMINATION Applicant Jonathan Whitman Revocable Trust Subdivision Roaring Fork Address 20 Silver Spruce Drive, Carbondale _ Lot/Block Lot 4 Date Oct. 21, 2016 Contractor Crawford Design/Build Finished (Livable Area): Main Upper Studio #1 Studio #2 Total Square Feet Total Valuation Basement: Unfinished Conversion of Unfinished to Finished Other Total Valuation Garage/Storage (wood framed) Conversion of garage to finished living Carport Other Total Valuation Crawl Space Total Valuation Decks/Patios/Porches Covered Open Other Total Valuation Type of Construction: Occupancy: Total Valuation Total Valuation 3,164 sq fl 3,863 sq it 3,980 sq ft 2,380 sq ft X $74.68 13387 sq.ft sq it X $41.00 sq ft X $33.68 sgftX 928 sq ft X $18.00 sq ft X $56.68 sq it X $12.00 sq fl X Sq fl X $9.00 3,260 sq fl X $24.00 2,785 sq ft X $12.00 sgftX Commercial sf X sf X sf X sf X sf X sf X 999,741.16 0.00 16,704.00 0.00 111,660.00 0.00 ########## 111261 1 d 5. 4 Garfield County Community Development Department 1088 th Street, Suite 401 Glenwood Springs, CO 81601 (970) 945-8212 www.izatfield-county.com ' PE OF CONSTRUCFI_ON_ Gl New Installation ❑ Alteration WASTE TYPE N Dwelling l ❑ Transient Use ❑ Other Describe INVOLVED PARTIES ❑ Repair —i� ❑ Comm./Industrial ----Fd Non -Domestic Property Owner: Jonathon Whitman Phone: (970 Mailing Address: Po BoK 1236 Carbondale, Co 61623 Contractor: Crawbrd Design Build, LLC Phone: ( 979 ) 618.4343 Mailing Address: Pt] box 1236 Carbondale, co 6'623 Engineer: Dale Kaup Phone: (970 945.9613 Mailing Address: 4264 Ca— th Road Tallahessee,Ft 32303 PROJECT NAME AND LOCATION Job Address: 2Q SPyt:rSnrucc Dijy i Assessor's Parcel Number: 2393362t9002 Sub. Roaring Fork Preserve Lot 2 Block Building or Service Type: Residential #Bedrooms: 3 Garbage Grinder Y Distance to Nearest Community Sewer System; 5 Miles Was an effort made to connect to the Community Sewer System: No No Type of OWTS 17 Septic Tank ral Aeration Plant El vaultO Vault Privy 13 Composting Toilet D Recycling, Potable Use D Recycling ©Pit Privy C] Incineration Toilet �W-Chemical Toilet 13 Other Ground Conditions Depth to In Groundwater table 2 Feet Percent Ground Slope Final Disposal by 13 Absorption trench, Bed or Pit [3 Underground Dispersal I la@ Above Ground Dispersal E3 Evapotranspiration 0 Wastewater Pond --F-0-Sand Filter 0 Other Water Source & Type 0 Well 0 Spring O Stream or Creek 13 Cistern 13 Community Water System Name Effluent Will Effluent be discharged directly into waters of the State?� 13 Yes 0 No CERTIFICATION Applicant acknowledges that the completeness of the application is conditional upon such further mandatory and additional test and reports as may be required by the local health department to be made and furnished by the applicant or by the local health department for purposed of the evaluation of the application; and the issuance of the permit is subject to such terms and conditions as deemed necessary to insure compliance with rules and regulations made, information and reports submitted herewith and required to be submitted by the applicant are or will be represented to be true and correct to the best of my knowledge and belief and are designed to be relied on by the local department of health in evaluating the same for purposes of issuing the permit applied for herein. I further understand that any falsification or misrepresentation may result in the denial of the application or revocation of any permit granted based upon said application and legal action for perjury as provided by law. I hereby acknowledge that I have read and understand the Notice and Certification above as well as have provided the required information which -incorrect and accurate to the best of my knowledge. G.! % 9/28/2016 Property Owner Print and Sign Date OFFICIAL USE ONLY Special Conditions: Permit Fee: I'llPerk Fee: Total Fees: Fees Paid: �l234/2 O0 Building Permit Septic Permit: Issue Date: Balance Due: YLHi SE 12 00 I f r BLDG DIV: -aA*- APPROVAL DATE and/or plans for compliance, the application may be placed on hold until the required information is provided. Work may not proceed without the issuance of a permit. The Building Division will collect a Plan Review fee at time of application submittal. The permit fee, as well as any Road Impact fees will be collected when the permit is issued. The permit application must be signed by the owner or by person having written authority from the owner to act as their representative. Building cannot be occupied until a Certificate of Occupancy (CO) is issued. Using the building without a CO will be considered an illegal occupancy and may be grounds for vacating the premises. (Final1CO inspection requirements will be attached to your approved field set of plans.) I hereby acknowledge I have read checklist. / Property Owner Pri nd and will abide by the requirements of this 1. zs- Date Garfield County Community Development Department 108 Wh Street, Suite 401 Glenwood Springs, CO 81601 (970) 945-8212 www.garfield-county.com SINGLE FAMILY OR DUPLEX BUILDING PERMIT APPLICATION CHECKLIST In order to understand the scope of work intended and to expedite the issuance of a permit, it is important that complete information be provided. Please review this document to determine if you have adequate information to design your project and to facilitate a plan review. APPLICATION FORM: Please make sure the following information is provided on the application. • Parcel number obtained from the County Assessor's Office. • Job address (assigned physical address) • Legal Description: block, lot, tract, subdivision, filing, or section, township and range. • Owner's name, mailing address, phone, fax or cell. • Contactors name, mailing address, phone, fax, or cell. • Architect and/or Engineer's name, mailing address, phone, fax or cell. • Building size, height, number of stories and lot size. • Use of building (Residential). • Class of Work (New, Addition, Alteration, Repair, Demo, Move/ Relocation). • Detailed description of work. • Type of heating (natural gas, propane, electric, other). • Sewer system (Community or OWTS), also see other items below. • Garage (Attached or Detached). • Driveway permit (please see other items below). • Valuation (labor and materials), see attached worksheet. OTHER ITEMS: • If you anticipate obtaining a water -tap from the City of Rifle, please provide a letter indicating that the City will provide water service. Required to submit building permit application. • OWTS requires a septic permit application to be submitted with the building permit application. • A separate electrical permit must be obtained from the State of Colorado Electrical Board. • At the time of building permit submittal, you are required to show proof of legal and adequate access to the site. This may include proof of right to use a private easement, County Road & Bridge permit, or Colorado Department of Highway permit, including a Notice to Proceed. The County Road & Bridge Department can be reached at 970-625-8601. • If you anticipate excavating or grading prior to issuance of a building permit, you will be required to obtain a separate grading permit. • If you belong to a Homeowners Association (HOA) it is your responsibility to obtain written approval, if required. • Provide copies of any Resolutions and/or Land Use Permits associated with this property. • Additional Dwelling Units may require Administrative Review. • Minimum dwelling dimension is 20 ft. wide x 20 ft. long. • A Colorado State Licensed Electrician and Plumber must perform installation and hook-ups, unless the homeowner is performing the work. BUILDING PLANS: 2 sets of plans must be submitted. Plans must be 18"x24" minimum size, complete, identical, legible and to scale. All plans will be checked at the counter for completeness. If any of the required information is missing, the building permit application cannot be accepted. SITE PLAN: Please make sure the following information is provided on the site plan. • Property address/legal description. • North Arrow and Scale on each page. • Show all property lines, building envelopes, flood plain and easements. • Provide setback distances from boundaries, buildings, septic, well and waterways. • Location and direction of the county or private road and driveway accessing the property. • Proposed and existing structures. Include sheds, barns, decks, patios, and any other buildings. • Existing and proposed grade, positive drainage around structure (to be contained on site). • Streams, rivers, creeks, springs, ponds and ditches. • Existing and proposed wells, septic tanks, leach fields and other systems (if applicable). • Retaining walls (engineer stamped detail required for walls over 4 ft., measured from bottom of footing to top of wall). NOTE: Any site plan depicting the placement of any portion of the structure within 50 feet of a property line or not within an established building envelope shall be prepared, stamped and signed by a licensed surveyor. For structures to be built within a building envelope, provide a copy of the recorded subdivision final plat with the proposed structure located in the building envelope. ARCHITECTURAL PLANS: Please provide the following information on the architectural plans. • Minimum of four (4) elevations (N,S,E,W). Indicate height of building measured from existing grade to the midpoint between the ridge and eave of a gable or shed roof or to the top of a flat roof. • Floor plans for each level, including dimensions and scale noted. • Clearly label each room or space (bedroom, bath, kitchen, closet, etc). • Show the location of the mechanical equipment. • Building cross sections with construction details. • Window sizes, types and operation noted on the floor plans or elevations. • Specify roof slopelpitch, roof covering and siding materials. • Stair and guard details specifying rise, run, height and spacing. • Attic, roof and crawispace ventilation details. Indicate size and location of ventilation openings. • Minimum insulation shown for walls, floors, roofstceilings, stabs, basements and crawlspaces. • Provide stove and fireplace make, model, EPA or Colorado Phase II Certification. Masonry fireplaces shall be designed to the International Residential Code (IRC) requirements. STRUCTURAL PLANS: Please provide the following information on the structural plans. • Design specifications to include roof and deck snow load, wind and seismic design and frost depth. • Foundation plan showing complete footing and foundation dimensions. • Footing and foundation details specifying reinforcement and referenced on plans. • Framing plans for each floor level and roof. All beams, columns, joists, rafters and trusses specified. Pre -manufactured structures require the engineers stamp, signature and date. • Framing /connection details, braced wall lines, shear wall schedule, location and hold downs. NOTE: If any required information is missing, delays in issuing the permit are to be expected. If determined by the Building Official that additional information is necessary to review the application CONDITIONS OF PERMIT BLRE-0916-4441 and SEPT -09-16-4442 Jonathan Whitman — New SF Residence & Accessory Buildings Roaring Fork Preserve — Lot 2 Carbondale, Colorado 1) ALL WORK SHALL COMPLY WITH THE 2015 INTERNATIONAL RESIDENTIAL CODE (I.R.C.) AND 2009 INTERNATIONAL ENERGY CONSERVATION CODE (I.E.C.C.) 2) IMPROVEMENTS ARE SUBJECT TO ALL APPLICABLE ITEMS CONTAINED IN THE ATTACHED "GARFIELD COUNTY BUILDING REQUIREMENTS". NUMBERED REFERENCES NOTED ON PLANS REFER TO SPECIFIC ITEMS ON THIS LIST. 3) LIMITS OF 100 -YEAR FLOODPLAIN TO BE FIELD STAKED BY LICENSED SURVEYOR, AND CONTRACTOR TO ERECT A CONSTRUCTION FENCE ALONG THESE LIMITS TO PREVENT ALL CONSTRUCTION ACTIVITY WITHIN THE FLOODPLAIN AREA. DISTURBANCE IN THE FLOODPLAIN AREA IS STRICTLY PROHIBITED. 4) OPEN -HOLE SOILS REPORT REQUIRED AT FOOTING INSPECTION TO VERIFY 2500 PSF. 5) PROVIDE A LOT IMPROVEMENT SURVEY AT FRAMING INSPECTION FOR VERIFICATION OF THE FOLLOWING ITEMS: A) ALL STRUCTURES ARE FULLY CONTAINED WITHIN THE PLATTED BUILDING ENVELOPE INCLUDING ROOF OVERHANGS, DECKS & PROJECTIONS. B) PROVIDE BUILDING HEIGHT ELEVATION SURVEY TO VERIFY COMPLIANCE WITH MAXIMUM BUILDING HEIGHT OF 25 FEET. C) PROVIDE ELEVATION SURVEY TO VERIFY COMPLIANCE OF FLOOR HEIGHT ELEVATION WITH FLOOD CERTIFICATE. 6) ALL STRUCTURES REQUIRE INSTALLATION OF RESIDENTIAL FIRE -SPRINKLER SYSTEM. VERIFY REQUIREMENTS & COORDINATE INSPECTIONS WITH LOCAL FIRE DISTRICT, AND PROVIDE ROUGH -IN APPROVAL AT FRAMIING INSPECTION. FIRE DISTRICT SIGN -OFF & APPROVAL REQUIRED PRIOR TO FINAL BLDG. INSPECTION/CERTIFICATE OF OCCUPANCY. 7) VERIFY REQUIREMENTS & COORDINATE INSPECTIONS OF ELEVATOR WITH NORTHWEST COLORADO COUNCIL OF GOVERNMENTS (NWCCOG) ELEVATOR INSPECTION PROGRAM. PROVIDE FINAL SIGN-OFF/APPROVAL AT FINAL BUILDING INSPECTION & CERTIFICATE OF OCCUPANCY. 8) ON-SITE WASTEWATER TREATMENT SYSTEM TO BE INSPECTED BY A PROFESSIONAL ENGINEER LICENSED IN THE STATE OF COLORADO. PROVIDE ENGINEER'S FINAL REPORT PRIOR TO FINAL BUILDING INSPECTION & CERTIFICATE OF OCCUPANCY. 9) STUDIO OUTBUILDINGS ARE CONSIDERED RESIDENTIAL ACCESSORY -USE STRUCTURES AND SPECIFICALLY MAY NOT BE USED FOR COMMMERCIAL PURPOSES. 10) STUDIO OUTBUILDINGS AS SUBMITTED ARE NOTAPPROVED FOR CONSTRUCTION AND ARE EXEMPT FROM THIS PERMIT - PENDING SUBMISSION & APPROVAL OF STRUCTURAL DRAWINGS. 11) ELECTRICAL PERMITTING AND INSPECTIONS BY COLORADO STATE ELECTRICAL BOARD. ELECTRICAL ROUGH -IN APPROVAL 15 REQUIRED AT FRAME INSPECTION. ELECTRICAL FINAL APPROVAL 15 REQUIRED FOR FINAL INSPECTION & CERTIFICATE OF OCCUPANCY.