Loading...
HomeMy WebLinkAboutEngineer's Inspection Report 10.11.2016CIVCO Engineering, Inc. Civil Engineering Consultants P.O. Box 1758 365 West 50 North, Suite W-1 Vernal, Utah 84078 October 11. 2016 Gary Shaw PO Box 953 Silt, CO 81652 Dear Gary, Subject Wastewater Disposal System — TBD (lot 1) CR 259, Rifle, CO I am writing to certify that I have visually inspected the individual wastewater disposal system at TBD (lot 1) near Rifle, Colorado and find it to be in accordance with the calculations and construction drawings (dated 08/18/16) that I developed. The system is adequate to accommodate the additional waste water from a reverse osmosis filtration system servicing one drinking water fixture. If you have any questions or require additional assistance regarding this project, please let me know. Sincerely, Vance V. King, PE Engineer CIVCO Engineering, Inc. WK/vvk Cc: Project File Phone (435)789-5448 * Fax (435)789-4485 Email: vanceking@civcoengineering.com