Loading...
HomeMy WebLinkAboutEngineer's Report - Rebar 03.22.2016SEH Building a Better World for AI of Us' March 22, 2016 Barry White Denver Masonry Co P.O. Box 27581 Lakewood, CO 80227 Dear Mr. White: In response to RFI #3 — Vertical Rebar frequency: RE: Carbondale House 126 Ranch Creek Lane SEH No. 135018 WHIWM The contractor proposed increasing the spacing of the vertical foundation wall dowels, as shown on detail 1/S.4 of the construction documents, from 12 inches on center to 24 inches on center. After review of the proposed change, we find the foundation wall will continue to be structurally sufficient with the proposed change. Therefore, the increased spacing is acceptable. Sincerely, SHORT ELLIOTT HENDRICKSON INC. David Krell, P.E. Senior Structural Engineer c: R. Ekstrom, SEH; S. Kaye, SEH p Iunlw4whiwin513501B0D2 correspondencel2.05 Ietterel nl#3 response.docx Engineers 1 Architects 1 Planners 1 Scientists Short Elliott Hendrickson Inc., 2000 South Colorado Boulevard, Suite 6000, Colorado Center Tower One, Denver CO 80222-7938 SEH is 102.7. employee -owned 1 sehinc.com 1 720 540.6800 1 800 490.4966 1 888 908 8166 fax