Loading...
HomeMy WebLinkAboutEngineer's Report 09.14.20161-11 IC:111 BUILDING SYSTEMS GROUP 1050 North Watery Lane Brigham City, UT 84302 Roaring cork Animal llospital 17 Cheyenne Ave. Carbondale, CO 81623 Attn.: Ph (43°) 919.3100 Fax (435)919-3101 Project Name: fuse Architecture & Construction Buildines: A->50'-0"N92'-0"x18'-0"(RCG,20.12) Version 2016.8.31 (8,31:16) September 14, 2016 Project Location_ Glenwood Springs, CO 81601 NIS Project 11: U 1600586A This Letter of -Design Certification ensures that the materials supplied by Nucor Buildings Group are designed in accordance with the information specified to NBG on the order documents and summarized by the loading information listed below. The Project Engineer of Record (not Nucor Buildings Group) is responsible for verifying that the building code and design Toads meet any and all applicable local requirements. The Professional Engineer whose seal appears on this Letter of Certification is employed by Nucor Buildings Group. a Member of MBMA, and does not serve as or represent the Engineer of Record lor this project and shall not be construed as such. DESIGN LOAD CRITERIA: Structural Loads Applied in General Accordance with: Risk Category: PROJECT -WIDE LOADING INFORMATION: Ground Snow Load: 60.0 psf Roof Live Load: 50.0 psi. Ultimate Design Wind Velocity: 115 mph Is Roof to meet UL 90 Requirements?: No Seismic Criteria: Ss: 0.330 S I : 0.083 Design Sds 1 Sd l : 0.338.0.133 Scis. Imp. Factor, lc: 1.00 Scis. Design Category: C BUILDING -SPECIFIC LOADING INFORMATION: Roof Dead Collateral Dead 131dg (psl)- A 3.50 IBC 2015 1I - Standard Buildings Snow Exposure Factor.Cc: 1.00 Snow Imp. Factor. Is: 1.00 Not Reducible Per Code. Wind Exposure: C • 20% of flat roof snow included in seismic calc's. Analysis Procedure: Equiv. Lat. Force Procedure Basic SI -RS: Not Detailed for Seismic Site Class: D Snow Wind Pri (Esf) Sec (ps1) Ct Cs I's (psi) l nclosure GCpi 1.0 0.93 42.00 Enclosed # 0.18 3.0 3.0 Meraanine Information: Floor Dead Load: MA Crane Information: (I) 5 I on ISDG. and (1) 1 Ton Chain I foist Mono Crane Floor Collateral Load: NIA Roof -fop Unit Information No roof -top units on building. Seismic R Cs V (kips) 3.00 0.113 14.59 'PrunarhStructural Not Included Floor 1..ive 1,oad: N/A The design of structural members supporting roof gravity Toads is controlled by the more critical effect of roof live Toad or roof snow applied in accordance with the goveming building code. DESIGN STANDARDS REFERENCED: • AISC Specification for Structural Steel Buildings - Steel Construction Manual. 14th Edition. ( 2010. • AISI North -American Specification for the Design of Cold -formed Steel Structures, 0 2007 Edition. • IBC codes are designed in accordance with ASCE7-I0 Edition. • MBMA Low Rise Building Systems Manual. Latest Edition. • No buyout structural components provided on this project. MBMR • AWS Latest Edition of'Structural Welding Code. Excellence from the ground up ACattrinto AC472