Loading...
HomeMy WebLinkAboutBattlement Mesa.;-' -------1 . ''------------1 ·~· --~~~\\... l _ ------, !.AA I \. . ...... ··l . ·--.. ___ . ..--. I ·--------·-·--·~·-·-_________ j BOOK 610 PAGE48Q EXHIBIT C ~MESA PLJ\NNED UNIT re\IEWPMEm' PU\N 1.00E DISTRICT MAP ~, '- SUMM.J\RY OF ZOOE DISTRICTS zalE DISTRICT'S Rural Density Residential Low Density Residential Medium Density Residential Central Area Residential l'obile Heme Residential Neighbormod O:mrercial Office Park Business Center 'llloroughfare R.o.w. PUblic, Semi-PLilllc, & Recreational (RDR) (LOR) (MOR) (CAR) (MHR) ( NC) ( OP) ( BC) (In-I) (PSR) 389 557 151 103 250 33 0 156 128 1551 3398 BATTLEMENT MESA DEVELOPER INFORMATION THE BATTLEMENT MESA COMPANY &,., BATTLEMEN T MESA COMPA N Y BATTLEMENT MESA COMPANY DESIGN\VORK ST ror Des ign Work sh op, In c 120 East Main Street Aspen , CO 816 11 Tel: 970/925-835 4 Fa x: 970 /92 0 -1387 www.designworkshop .com P.O . Box 6000 Battlement Mesa, CO 81636 Tel: 970/285 -9740 Fax : 970/285 -9035 www.battlementm esa .com Contact Eric Schmela 970/379 -7943 eschmela@battlemen t mesa.com 6 SC H MUESER GOR D ON M EYER ~tech HEPWORTH·PAWLAK GEOTECHNICAL Environmental So lution s 600 CR 216 Rifle , CO 81650 Tel: 970/618-6841 Fax : 970/625 -1673 ENG N EERS SURVEYO R S Sc hmu eser Gord o n Meyer 118 W. Sixth Street Glenwood Springs . CO 81601 Tel: 970/945 -1004 Fax: 970/945 -59 48 www.sgm -in c.co m HP Geotech 50 20 County Road 15 4 Glenwood Spr in gs , CO 81601 Tel : 970/945-7988 Fax: 970/945-8454 www.hpgeotech .com Amo-mrrmc. inc. Aero -M etri c, In c 4708 South Coll ege Avenue Fort Col lin s. CO 80525 Tel: 970/2 26-2883 Fax : 970/226 -2 965 www.aerometr ic.co m Table of Contents Local Context Maps ....................................................................................................................................................... 8 Original Land Use Plan ................................................................................................................................................ 10 Existing P.U .D. Buildout ................................................................................................................................................ 11 Zoning ............................................................................................................................................................................. 12 Land Available for Purchase ....................................................................................................................................... 13 Background , Executive Summary, and Development Oppo rtunities ................................................................. 16 Public Facilities .............................................................................................................................................................. 18 Existing Infrastructure .................................................................................................................................................. 21 Existing Amenities ........................................................................................................................................................ 23 Master Utility Plan ........................................................................................................................................................ 27 Environmental Conditions Summary ........................................................................................................................ 28 Entitlement Process ..................................................................................................................................................... 33 Parcel Information ........................................................................................................................................................ 35 Core Area Contex t. ................................................................................................................................................... 3 6 Core Area Ma ster Plan ............................................................................................................................................. 37 Parc el 7 ................................................................................................................................................................... 38 Parce l 2 ................................................................................................................................................................... 44 Parc el 3 .................................................................................................................................................................. 50 Parc el 7 ................................................................................................................................................................... 5 6 Parc el JA ................................................................................................................................................................. 61 Parce l 5 , Block s 3&4 ............................................................................................................................................... 65 Parc el 6 ................................................................................................................................................................... 69 Old Hi gh Sch ool Parce l ............................................................................................................................................ 74 Ston e Quarry Common s Parce l 5 -1, Tract s 2&3 ..................................................................................................... .79 Ston e Quarry Comm ons Parc el 5-2, Tract s 1 &2 ...................................................................................................... 88 Old El ementary Sc hool Sit e ...................................................................................................................................... 9 6 Th e Fairway s ............................................................................................................................................................ 99 Parce l 2-2 ............................................................................................................................................................. 70 2 Outlying Parcels .......................................................................................................................................................... 106 Parce l 5 -4 ............................................................................................................................................................. 107 Parc el 4-3 ............................................................................................................................................................. 110 Parcel 4 -4 .............................................................................................................................................................. 11 3 Parce l BC-1 ............................................................................................................................................................ 116 Parcel BC-2 ........................................................................................................................................................... 11 9 Parcel 5-5 ............................................................................................................................................................. 122 Parcel 4-5 ............................................................................................................................................................. 123 Parc el 4-6 ............................................................................................................................................................. 124 Parc el 6 -1 ............................................................................................................................................................. 125 Parc el 6-2 ............................................................................................................................................................. 12 6 Parc el 6-3 ............................................................................................................................................................. 127 Parc el 6 -4 ............................................................................................................................................................. 128 Parc el 6-5 ............................................................................................................................................................. 129 LOCAL CONTEXT MAPS 8 -,-- ~ .. CQNTEXT MAP,, 1-70 -·~- COLORADO RIVER BURLINGTON NORTHERN RAIL ROAD .- BATTLEMENT MESA ENTRANCE _ SIPPRELLE DRIVE ~ f' ~ ~ ~)' . ~'' • 1_~{\"'''-"!. /_ -~···~·~ , -'. ·-·-::..,;,:· .~!ft! TOWN CENTER »ii--·· -~ "l '\lt -',,. ... ' • • .•. -.. -·. ~ ~~ _,':":'"'' --. .. --· ~ r BATTL EMENT MESA PUD BOUNDARY ORIGINAL LAND USE PLAN Original Land Use Master Plan 10 Central Area Residential - Mobile Home Residential Medium Density Residential [===:J Low Density Resident ial i:::::::==:J Rural Density Residential c==J LEGEND Pub li c Buildings & Sc hoo ls Recreation Areas - PSRLand - Commercia l Areas i:::::::==:J Churches - Water EXISTING PUD BU ILD OUT .• +,,, The areas highlighted are built out in full as designated per the Land Us e Lege nd Central Area Residentia l - Mobile Hom e Residentia l M edium Density Residentia l Low Density Residentia l C=:::J Rural Density Residentia l ~ Mi xe d Use , General Sa les or Se rvice - LEGEND Public Buildings & Sc hool s Recreati o n Areas - PSR Land - Co mm ercia l Areas C--l Churc hes - Water 1 -Saddleback Village 2-Sanitation District 3-Monument Creek Village 4 -Middle School 5-Willow Creek Village 6-Willow Ridge Apartments 7 -Eagle 's Point 8-Town Center 9-Recreation Center 10 -Mesa Ridge 11 -Battlement Creek Village 11 ZONING Battlement Mesa Zoning as of March 2008 12 Rural Density Residential Low Density Residential Medium Density Residential Central Area Residential - LEGEND Mobile Home Residential - Neighborhood Commercial - Business Park Public, Semi -Public and Recreational LAND AVAILABLE FOR PURCHASE Central Area Res id ential M obil e Home Res id enti al M edium Den sity Res id ential Lo w D ensity Res id ential Rural Den sity Res id ential M ixe d Use , General Sa les or Se rvice - c::::o c:::==:J - LEGEND Publi c Buil dings & Sc hool s Rec rea t ion Areas -PSR Land -Comm erc ial Areas c:=._1 Church es -Wat er 1 -Parcel 2 -2 2 -The Fairways 3 -Outlying Parcels -North 4 -Core Area 5-Outlying Parcels -South 6 -Old Elementary School Site 13 BACKGROUND, EXECUTIVE SUMMARY AND DEVELOPMENT OPPORTUNITIES Battlement Mesa is a 3,800-acre master-planned community with not only staggering views -from the Rocky Mountain Mesas to the Colorado River -but also a prime location just one mile from 1-70 , midway between Grand Junction and Glenwood Springs in Garfield County, Colorado. Battlement Mesa is at the heart of an area experiencing unprecedented growth , and expansion will be fueled by the influx of baby boomers and a long history of oil and gas exploration in the region . Battlement Mesa was first developed by Exxon in the early 1980s as a place for field workers , scientists , corporate leaders, and their families to reside in close proximity to the oil shale mines of Western Colorado. This massive mobilization and development effort was brought on by the consistently high price of crude oil in the 1970s and escalated prices due to the Persian Golf conflicts between Iran and Iraq. Banking on prices soaring even higher, in May 1980 Exxon purchased the Colony Oil Shale Project from Arco and started the master-planning process for a Town of 25 ,000 people . Exxon programmed this community to be self-sufficient, with a broad range of residential options to meet the needs of all employee types and income levels . In addition , Exxon intended the res idents to have a full suite of amenities and public services to keep them entertained and educated. To this end , a Town Center, schools , churches , recreation facilities and a golf course were constructed by Exxon. A vast amount of infrastructure was constructed including roads , utilities , and a water treatment plant -all in anticipation of the lavish returns to be made on oil shale . 16 Executive Summary Oil prices plummeted in 1982 and so did the economic feasibility of oil shale exploration. On May 2, 1982 Exxon ceased development of Battlement Mesa and stopped the Colony Oil Shale Project. Today, Battlement Mesa is a community that has quietly grown in size and population . The majority of homes in the southern end of the Planned Unit Development (PUD) are fully built out and realized per the original PUD Master Plan . Taking advantage of the proximity to the golf course , the majority of the far western side of the PUD is also constructed, including Battlement Creek and Willow Creek Villages . More recently, development of the Eagle 's Point neighborhood near Town Center -primarily single-family homes , with many overlooking the golf course -has been predictably successful with strong lot sales . Opportunity exists to purchase the remaining areas of the Battlement Mesa PUD . This booklet is designed to give interested parties the opportunity to learn more about one of the largest Planned Unit Development opportunities in Colorado. The Battlement Mesa Company, a privately-owned and controlled entity, has controlled the entire 3 ,800 acres of the PUD on a fee simple basis for the past twenty years . The Company has managed the PUD estate through two decades weathering national economic trends . Recently, an upturn in local economy has brought enormous growth and capital influx to Garfield County. The towns surrounding Battlement Mesa -Parachute , Rifle , and Silt -have in some cases more than doubled in size since the last economic downturn . Driven by strong housing markets in the Roa ring Fork and Eagle / Vail Valleys , the working middle class has moved to these areas of Garfield County utilizing a le ss expen- sive alternative for renting or purchasing property. Furthermore , these areas have grown to accommodate the increasing labor forces required to man and manage the area 's burgeoning drilling and exploration projects . Although some may argue that parts of the US - including Denver -are clearly in an economic downturn , Garfield County 's economy is far from slowing down or even leveling off. With the price of oil well above $100 per barrel , the arrival of major corporations (such as Shell) settling to the area , and the continued growth of Grand Junction , Rifle , Silt , New Castle , Gypsum , Eagle , Vail , Glenwood Springs , Carbondale , Basalt , and Aspen -Battlement Mesa is perfectly poised for eminent grow t h. An investment in Battlement Mesa , an established and master covenant-restricted Planned Unit Community, will bring both short-term and long-lasting financial returns and a steady revenue st ream to developers a nd investors alike . The opportunities presented in th is booklet are th e result of a five -year, multi-disciplinary collaborative process with the Battlement Mesa Company. Each parcel within the "core area " has been examined by a land planner and engineer: Density has been tested against zoning and land use . Product has been sub - je cted to market analysis . Layout has been determined fr om geotechnical and survey data gathered specifically for this project. Three of the parcels within the core a rea (Parcels 1 , 2 , and 3) and the Fairways have prelimi - nary plan drawings ready for submission. The remaining parcels within the core area are in progress, and by the e nd of 2008 , most of the parcels in the core area will likely be ready for submission . Although this collaborative process has resulted in re commended designs and layouts of the available parcels , there remain many alternative development op - tions . The Battlement Mesa Company looks forward to working with and providing assistance to any interested parties offering design directions and suggestions . In the same spir it, we look forward to hearing your fe edback and suggestions regarding this bookl et . Thank you for your interest in Battlement Mesa . I hope that the information provided herein will prompt you to invest in thi s remarkable place and community. Eric Schm e la Vice Pre s iden t Battlement Me sa Company Execu ti ve Summary 17 PUBLIC FACILITIES BATTLEMENT MESA SCHOOLS The Battlement Mesa PUD falls under the jurisdictio n of the Garfield County Re-16 School District. Re-16 cove rs West Rifle to the Western Border of Garfield County and currently has the highest enrollment growth rate in the County. The class sizes within the Re-16 district are generally smaller than average class size within the County. Battlement Mesa currently has two Schools within the PUD , with an additional Middle School under construction and ready for occupancy by 2009 . The Bea Underwood Elementary School (BUE) is located in Saddleback Village in the Southern area of Battlement Mesa and was constructed in 1982 . BUE covers grades 1 through 6 and currently has 578 students. For more information contact: Principal Corey Dos s 0741 Tamarisk Avenue Parachute , CO, 81635 Tel : 970.285.5703 E-Mail : cdoss@garcoschools .org Recreation Cent er 18 Publi c Faci liti es The LW St. John Middle School is located towards the middle of the Battlement Mesa PUD to the West of Monument Creek Village and was constructed in 1983. It currently has 188 students and covers grades 7 and 8 . Upon completion of the new middle school in the core area of Battlement Mesa , the L W St. John Middle School will become a second Elemen- tary School for the district and Battlement Mesa. For more information contact: Principal Scott Pankow 0460 Ston e Quarry Road Parachute , CO, 81635 Tel : 970.285.5704 E-Mail: spankow@garcoschools.org The Grand Valley High School is located a short distance from the Battlement Mesa PUD , on the South Side of 1-70 in Parachute. It was constructed in 2002 and currently has 335 students and 27 teachers . The school covers grades 9 through 12. For more information contact: Principal Ryan Frink 800 Cardinal Way, PO Box 68 Parachut e, CO, 81635 Tel : 970 .285 .5705 E-Mail : rfrink@garcoschools.org PLACES OF WORSHIP With four churches located in Battlement Mesa and two churches located in Parachute, a variety of worship choices are available to suit many Christian denominations . Grace Bible Church is located in the core area of Battlement Mesa off Spencer Parkway. For more information contact: 755 Spencer Parkway P.O. Box 6248 Battlement Mesa , CO, 81636 970.285 .9862 www.grace-bible-church .com Crown Peak Southern Baptist Church , is located next to the Bea Underwood Elementary School in Saddleback Village . For more information contact: 0707 West Battlement Parkway Parachute, CO, 81635 970 .285 .7946 www.crownpeakbaptist.com All Saints Episcopal Church is located directly behind the town center on Sipprelle Drive . For more information contact: 0750 Sipprell e Drive Parachute , CO, 81635 970 .285.7908 Light House Assembly of God Church, is located in the core area of Battlement Mesa within walking distance of the Town Center. For more information contact: 1833 South Battlement Parkway Parachut e, CO, 81635 970 .285.7236 Grand Valley Christian Church, is located on the west side of 1-70 in Parachute For more information contact: 776 West 2nd Parachute , CO 970.285.7597 Grand Vall ey Fire Stati on Head Quart ers Grand Valley United Methodist Church , is located on the west side of 1-70 in Parachute For more information contact: 132 Parachute Avenue Parachute , CO 970 .285.9892 For a complete li sting of all churches in the area, follow this web link: www. battleme ntm es acolorado . com /churches . asp x FIRE AND POLICE DEPARTMENTS Fire Department The fire protection for Battlement Mesa falls under the jurisdiction of the Grand Valley Fire Protection District, located on the south side of Battlement Parkway within the core area of the Battlement Mesa PUD . Due to the rapid growth of the district's popula - tion , a new fire district building is soon to be under construction and will be located South of the Kum 'n' Go Gas Station off Stone Quarry Road . David Blai r; Fire Chi ef 1777 Battl ement Parkway Battl ement Mes a, CO, 81635 970.285 .9119 www.grandvall eyfir e.org Police Department Publi c Fac ilities 19 EXISTING INFRASTRUCTURE SUMMARY In addition to the treatment plant, the existing wastewater infrastructure includes a 24-inch diameter interceptor sewer line that runs through the golf Course. The sewer line is designed to convey the entire development's wastewater flows to the treatment plant. The wastewater master plan anticipates construction of additional collector sewer lines as new areas within the central core are developed. The need for and timing of these improvements will correspond with the develop- ment of the property, and are dependent on phasing of various areas within the central core. Electrical Power -Holy Cross Energy is the power supplier for Battlement Mesa. Primary electrical infra- structure is in place within the roadways throughout the majority of the development. Holy Cross Energy will enter into contracts with proposed developers to ex- tend primary electric service within each development. For more information, contact: (970) 945-5491 Natural Gas -Xcel Energy supplies natural gas to Battlement Mesa. Existing infrastructure will be ex- tended from Spencer Parkway or Battlement Parkway to new development areas . Xcel Energy will enter into contracts with proposed developers for extensions into new areas. For more information , contact: (800) 895 -4999 Telephone -Qwest provides telephone service to Battlement Mesa . New service to residential areas will be e xtended under the terms of a contract between proposed developers and Qwest. For more information , contact: (800) 244-1111 Cable TV -Comcast provides cable television and broadband service in developed areas of Battlement Mesa . There is currently no Comcast infrastructure adjacent to S pencer Parkway. For more information , contact: (970) 285-9032 22 Existing Infras t ru cture EXISTING AMENITIES By design , Battlement Mesa is a self-contained , family - friendly development with abundant recreational and educational opportunities . Bordered by the Colorado River and surrounded by hundreds of acres of desig- nated open space , Battlement Mesa is rich in natural beauty. The natural features have been enhanced by parks , playgrounds, and tennis courts and is accessed by miles of paved walking and biking trails . At the commercial heart of Battlement Mesa is the Town Center, where you can conveniently s top in for a quick cup of coffee, drop off your dry cleaning, or pick up a week's worth of groceries. The neighborhoods at Battlement Mesa surround one of the finest 18-hole public championship golf courses in the western United States . It has been rated one of "Colorado 's Top Ten Public Courses (Golf Digest)." Thoughtfully designed by Joe Finger and Ken Dye to blend with the natural terrain and highlight the maj e sti c mounta in views , the course presents beautiful chal - lenges to both experts and beginners alike . Every year, the course is host to a number of local and state -wid e tournaments . Clinics for players of all levels are available at the Battlement Mesa Golf School. The Battlement Mesa Activities Center was designed to a ccommodate the needs of 25 ,000 residents. Inside the 53 ,000 -square-foot facility, you 'll find an Olympic- s ize swimming pool , a workout room with Univ e rsal e quipment, free we ight s and cardio machines , a hot tub a nd sauna , a racquetball court, a full-size gymnasium (for volleyball and basketball), exercise studios , indoor running track and e ven billiard tables. Th e Battlement Mesa Activities center is also host to a ll manner of eve nts: from fitn e ss classes to classes on c ountry dancing, fly -tying and painting; to community b arbecues , card games and concerts; to Rotary, Kiwanis , Lions and VFW me etings. 23 ENVIRONMENTAL CONDITIONS SUMMARY SOILS AND GEOLOGY The soils and geology on this site were evaluated by HP Geotechnical in a report titled "Preliminary Geotechnical Study, Proposed Residential Development Areas A and B, Battlement Mesa Development, Garfield County, Colorado." The report includes an evaluation of all undeveloped land between East Battlement Parkway and the Battlement Mesa Golf Course. This report presents the general subsoil conditions, surficial geology, site grading and drainage consider- ations . Preliminary foundation recommendations are made based on the results of 43 soil borings within the project area. The full text of the report is available on the CD that accompanies this booklet. The site itself is located on the Battlement Creek/ Monument Gulch alluvial fan complex . The alluvial fan developed at the mouth of Battlement Creek and rocks from gravel-size to large boulder-size in a silty to clayey sand matrix . The subsoils -below about foot of topsoil -generally consist of stiff, sandy clay with occasional gravelly zones overlying relatively dense rock fragments of up to boulder size in a sandy clay matrix. The fan deposits to the east of the erosional escarpment are typically covered by a thin loess blanket ranging from 2 to 15 feet thick . The site's geologic conditions should not have a significant influence on project feasibility. Yet several geologic conditions need to be considered in project planning and design . The first is the potential for moisture-sensitivity in foundation soils ; second is possible construction -related slope instability if build- ings are located on (or close to) the steep erosional escarpment and incised drainages in the project site's western end . At the time of drilling, no free water was encountered in the borings and the subsoils were slightly moist to moist. The full text of the report includes preliminary design recommendations for foundations , floor slabs , under- drain systems, site grading, and surface drainage. GEOLOGIC HAZARDS Radon Potential Regional studies by the U.S . Geological Survey for the U.S . Environmental Protection Agency (EPA) indicate that the project site , not unlike much of Colorado, has a high radon gas potential. It is not possible to accurately assess future radon concentra- tions in buildings before they are constructed. New buildings in moderate to high radon areas are often designed with provisions for ventilation of the lower Monument Gulch during the middle-to late-Pleistocene enclosed areas should post construction testing show Era . Most of the fan complex is no longer active . The unacceptable radon concentrations. fan deposits consist of basalt and local sedimentary 28 En vironmental Co nditio ns • ENVIRONMENTAL CONDITIONS SUMMARY Earthquake Considerations The region is in the 1997 Uniform Building Code , Seismic Risk Zone 1. Historic ground shaking at the project site does not appear to have exceeded Modified Mercalli Intensity VI (Kirkham and Rogers , 1985) Modified Mercalli Intensity VI ground shaking should be expected during a reasonable exposure time , but the probability of stronger ground shaking is low. Intensity VI ground shaking is felt by most people and causes general alarm but results in negligible damage to structures of good design and construction . The residences and other occupied structures will be designed to withstand moderately strong ground shak- ing with little or no damage and not to collapse under stronger ground shaking. Construction-Related Slope Instability Construction related slope instability typically associated with grading for residential construc - tion should not be a problem over most of the site . Setbacks from the escarpment may be advisable depending on the specific locations of proposed development. Preliminary development and grading plans should undergo additional geotechnical evaluation to assess potential slope instability. HYDROLOGY T he Battlement Mesa PUD is geographically bo rdered by the Colorado River to the northwest, M onument Gulch to the south and Battlement Cree k to the northeast. The proposed core area de velopment ranges in elevation from approximately 52 00 ft to 5800 ft above sea level. T hi s portion of Colorado receives approximately 15 .76 inches of precipitation a year (bas ed on Parac hute , CO weather records). The precipitation is evenly d istributed throughout the year with average monthly precipitation ranging from a low of 0 .96 inches in Jun e, to a high of 1 .95 inches in October. T he major precipitation events in this area are generally the result of summertime thunderstorms which occur be tween May and October. For the period from May th rough October the 2 -year, 24-hour precipitation event is 1 .0 inches , the 25 -year, 24-hour precipitation event is 2 .0 inches, and the 100-year, 24-hour precipi- ta tion event is 2.4 inches. Parachute , Colorado Period of Record Monthly Climate Su mmary Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Annual Average Max Temperature (F) 38.5 46 56.4 64.3 76.1 88 .5 94 .3 93 .2 82 .3 65 .7 50.6 40.7 66.4 Average Min Temperature (F) 11.4 19 .5 29.5 33.2 42.6 50.3 57 .6 57.2 48 35.4 26 .7 18 .7 35 .8 Average Total Precipitation (in.) 0.73 0.67 1.77 1.66 1.18 0 .96 1.52 0 .9 1.45 1.95 1.74 1.23 15.76 Average Total Snowfall (in .) 9.8 2.4 3 1.1 0 0 0 0 0 0 .3 6 .6 10 .7 33.8 Average Snow Depth (in.) 4 1 0 0 0 0 0 0 0 0 0 2 1 Period of Record: 6 1 11 198 1 lo 5 /3 1 /1992 29 Env ironm ental Cond itions Wildlife Steve Dahmer of Environmental Solutions evaluated the site 's wildlife habitat in terms of usage by mule deer, elk, bald eagles, and great blue herons. The complete text of his report is included on the CD accompanying this booklet. The entire study area is mapped by CDOW as Severe Winter Range for mule deer and as a Winter Concentration Area . However, because of the extensive previous distur- bance to much of the property and its proximity to 1-70 , the report identifies only limited pockets of adequate avail- able habitat. Adequate habitat exists within the drainages and on the steep slopes located within the western portion of the report's study area. Elk prove to use the study area primarily from mid-fall through the winter months. However, like the deer, elk require areas of security cover as well as adequate travel corridors in order to fully utilize the site. Those conditions exist primarily in the drainage corridors within the western portion of the study area. Bald eagles and great blue herons frequent the areas immediately surrounding Battlement Mesa . The project area is , however, an unattractive location for bald eagles because of the scarcity of mature cottonwoods (or other tall tree species) suitable for bald eagle nest sites, the abundance of roads , the existing human activity in the area, and the distance from the Colorado. The lack of wetlands and aquatic sites on the property limits its potential as habitat for the great blue heron . 32 Environm ental Conditions ENTITLEMENT PROCESS BACKGROUND The Battlement Mesa PUD was originally approved by the Garfield County Board of County Commissioners in Resolution 82-121 on May 24 , 1982 and recorded at Reception No. 333476. The PUD approval estab- lished land-use categories ranging from Rural Density Residential at (one unit per acre) to Central Area Residential (at 20 units per acre). A large area of land in the center of the development was designated as the Business Center, and public uses such as church - es and schools, were also created. Large tracts of Open Space surround many of the residential neighborhoods. ENTITLEMENT PROCESS Development of properties in Battlement Mesa is g overned by Garfield County Land Use Regulations and Battlement Mesa PUD Zoning Regulations. The land-use patterns, zone district designations , and zone d istrict regulations for various properties within the PUD have been established by approval of the original Planned Unit Development and the subsequent amend - ment to the PUD . The entitlement and subdivision process for undevel - o ped properties in Battlement Mesa PUD is currently a two -step process governed by Garfield County Land The Garfield Board of County Commissioners approved Use Regulations . Garfield County is conducting an ex - an amendment to the PUD on February 11 , 2008 by tensive review and modification to the Land Use Code , resolution 2008 -33 and recorded March 12 , 2008 submittal requirements and review procedures are at Reception #744451 . The changes in zoning allow s ubject to change as soon as the new regulations take construction of a new Middle School and medical cl inic e ffect. Both the existing and proposed land use codes within the central core area of the PUD. The zoning was c an be found on the CD at the back of this booklet. changed from public use to allow residential develop - ment within specified areas. These new residential areas , adjoining the school and hospital , will provide proximal housing for teachers and medical staff. See the CD for the PUD zone district regulations. The new zoning will now permit a density and product type to allow single family and multi family developments to occur: Enabling a diversity of home ownership opportu - nities to a wide spectrum of the region 's demographics . The multi family homes in particular appeal to young singles and first time home owners. 33 Entitlement Process ENTITLEMENT PROCESS The current two-step entitlement process is required for all properties in Battlement. The initial step is the submission and approval of a Preliminary Plan that includes engineered design of roads , water, sewer, drainage , and shallow utilities . Documentation of legal and physical access, water supply, and wastewater disposal also must be provided. A draft form of the Homeowner 's Covenants, Conditions, and Restrictions must be supplied. The names and addresses of all property owners within 200 feet of the subject property in addition to all mineral owners and lessees of the property. The application is subject to a 45-day Technical Completeness review by Garfield County and the applicant is notified in writing of any deficiencies in the application . Once the applicat ion is deemed Technically Complete, it is scheduled for hearing before the Planning and Zoning Commission . This hearing requires a 30-day public notice by publication , posting and certified mail to all mineral rights holders and adjacent owners . The Planning Commission refers the application to the Board of County Commissioners with a recommenda- tion of Approval, Denial, or Approval with Conditions. A second hearing, requiring an additional 30-day public of the infrastructure based on estimated costs of con- struction. The financial guarantees are in the form of a Letter of Credit or other financing instrumentaccept- able to Garfield County. Final drafts of all Homeowner 's Association documents, and any permits from outside agencies are also required. The Final Plat application is subject to review by the County Planning Staff and the County Attorney for a determination of technical completeness. After the terms of the Subdivision Improvements Agreement have been finalized the Plat will be scheduled before the Board of County Commissioners for review. This hearing does not require public notice . If there are no outstanding issues regarding the Plat then the item will be placed on the consent agenda and will be approved by the Board without further discussion. Items that are controversial in nature, or that require further discussion , will be pulled from the consent agenda and will be discussed as part of the public meeting portion of the agenda . After the Final Plat is approved and the appropriate filing fees have been paid, the Final Plat and all accompanying docu - mentation will be recorded at the Garfield County Clerk and Recorder 's Office. notice, is held by the Board of County Commissioners. The Battlement Mesa Company's relationship with If the application receives approval , a Resolution of Garfield County is currently very positive with the Preliminary Plan approval along with a list of conditions , planners, staff and commissioners repeatedly citing is signed by the Board . the PUD as the most logical place for continued future The next step is the Final Plat application which includes construction plans for roads, utilities , grading , and drainage . This plan must be signed and stamped by a licensed engineer, and must address any cond i- tions of Preliminary Plan approval consistent with the Preliminary Plan . A Subdivision Improvements Agreement provides financial guarantees for completion 34 Entitlem e nt Pro cess growth in the County. I EXISTING GOLF C LUBHOUSE EXISTING GOLF COURSE WILLOW CREEK VILLAGE SALE S O FFI CE RE CREAT IO N CE NTER COUNTY RO AD 30 2 BATTLEMENT MESA CORE AREA MASTER PLAN T H E BATTLEMENT ME S A CO MPAN Y OLD ELE ME NTARY SCH O O L SIT E LE G END OpenSpoce • ProoosoCI Otfice!Roto11/Commerc10l/lnst11u11onol • M ulT• Fom11y Town1'ouse/Duplf'w. • M ulti rom1ly Apnr1monr/Condom1n1um Sing1e Fam+ly Lots COUNTY RO AD 308 w IUl 0 100 200 400 OE SIGN\\(lllh.-.l H>I' June 2007 1 -Battlement Parkway 2 -Grace Bible Church 3 -Spencer Parkway 4 -Episcopal Church 5 -Future Location of Fire Station 6-Eagle 's Point 7-Kum 'n ' Go Gas Station 8 -Fire Station 9-Town Center 10 -Assembly of God Church 11 -Recreation Center 12 -Mesa Ridge 13 -Real Estate Office 15 -Sipprelle Drive 16-The Fairways 17 -Parcel 2-2 t I .. CORE AREA MASTER PLAN 1 -Parcel 1 A 2-Parcel 1 3-Parcel 2 4-Parcel 3 Stone Quarry Commons : 5-Parcel 5 -1 Tract 2 6 -Parcel 5-1 Tract 3 7 -Parcel 5-2 Tract 1 8-Parcel 5 -2 Tract 2 9-Parcel 5 Block 4 10-Parcel 5 Block 3 11 -Parcel 6 12 -Old High Schoo l Parcel 13 -Parcel 7 37 Core Area Master Plan PARCEL 1 BOUNDARY Parcel 1 is 57.68 acres situated on the west side of the northern end of Spencer Parkway and is well served by existing utilities . The sewer lines will need to be extended to tie in with the existing main sewer line through the golf course. The Parcel was rezoned in 2008 to both low density residential on the upper area of the Parcel and medium density residential on the lower area . The low density area totals 7.5 acres of net devel - opable area (steep slopes, major drainages and easements removed) and the medium density area totals 7.58 acres. These zoning categories will allow a maximum density of 5 dwelling units pe r gross acre for low density and 12 dwelling units per acre for medium dens ity. This Parcel has gone through extensive examination by the Planners and Engineers to the degree that preliminary plan lev el drawings are available for thi s Parcel. The preliminary plan ap pl ication con - siders having 50 sin g le family units located on the top o f the bluff and multi family density t ownhome units at the bottom o f the bluff taking advantage of t he adjacency to the golf course , cl ub house and associated amenities. This Parcel like all p a rcels other than Parcel 5 , Block s 3 and 4 , The Old Elementary Sc h o ol parcel and the Fairways will ne e d to be taken through the subdivi s ion process or preliminary and fin al plat through Garfield County befo re develop - ment can occur. M ulti Fa mily Area wi t hin Parce l 1 Parcel 1 -57.68 Acres PARCEL 1 Gross Slope Analysis 40 PARCEL 2 30-40% 4.6AC 20 -30% ----- 6. 1 AC 15-203 _....,_~ 5 .8 AC •• •• Parcel 1 40% 3.1 AC ~--0-5% 1.2 AC 5-103 28.1 AC PARCEL 1 Developable Area Slope Ana lysis PARCEL 2 15 -2 0 % 0.3 AC Area A 10-15 % 0.6 AC 15 -20 % 0 .1 AC 5 -10% J.4 AC Area D 0-5 % 0.3 AC 5 -10% 6.9 AC Area B 15 -20 % 0.SAC 10 -15 % 2 .0AC Area E 20 -30 % 0.2 AC Area C 30-40% .1 AC 4 1 Pa rce l 1 EXISTING UTILITIES 42 Parce l 1 -, Ex istin g Sewer Line Existi ng Water Line Existi ng Telephone Line Existing Gas Line Ex istin g Overhea d Power Ex isting Power Exist ing Storm Sewer Ex ist in g Conduit (no wire) TABLE OF IMPROVEMENTS DEVELOPMENT PARCEL NO. 1 BATTLEMENT MESA PUD TOTAL PARCEL AREA 57.68 ACRES NUMBER OF LOTS 50 SINGLE FAMILY AVERAGE LOT SIZE 0.35 ACRES OPEN SPACE 33.26 ACRES TOTAL MULTI -FAMILY ACREAGE 6.81 ACR ES MAXIMUM MULTI-FAMILY 81 UNITS Construct 2 left turn pockets in Spencer Parkway 30 in Payment of Garfield County Traffic Impact Fee at $4.00 /ADT Storm Drain 1106 LF 18 in No on-site detention required. Developer will be required to 160 LF 30in participate in construction of regional detention facilities Storm Drain Inlets 17 EA Sanitary Sewer 4166 LF 8 in 684 LF 10-inch collector sewer line 32 EA 4 ' Dia Manholes 7 EA off-site manholes Potable Water 4487 LF 8 in Connection to 12 -inch water line in place on West side of 12 EA FH Assemblys PRV vaults will be required at connection points Electric I TBD by Holy Cross I I 3 -phase power in place on west side of Spencer Parkway Telephone I TBD by Qwest I 200 pr direct bury cable in place on east side of Spencer Parkway Gas TBD by Xcel 4 -inch gas in pl ace on north side Battlement Parkway 4 -inch gas in Spencer Parkway from Sipprelle to Grac e Bible Church Cable TV I TBD by Comcast I I No existing cable this area Note: Multi family area tabulations are not considered in th e table above. 44 Parcel 1 PARCEL 2 BOUNDARY Parcel 2 is 76.26 acres and is located to the south of Parcel 1 and is situated on both sides of Spencer Parkway, which is an easement through the Parcel. The Parcel was rezoned in 2008 to low density on the west of Spencer Parkway on the bluff and medium density residential on the east of Spencer Parkway. Low density developable area totals to 20.27 acres and the medium density area totals to 16 .11 acres of developable area. These zoning categories will allow a maximum density of 5 dwelling units per gross acre for low density and 12 dwelling units per gross acre for Like Parcels 1 and 3, t h is Parcel has gone through extensive examination by the Planners and Engineers to the degree that preliminary plan level drawings are available for the single family areas of this Parcel. Th e prelimi- nary plan application co nsiders having 36 single famil y units located on the top of t he bluff and a multi family den sity, townhome product on t he east side of Spencer Parkw ay to take advantage of the proposed 6 acre Community Park , Health Clinic and Middle Sch oo l. medium density. ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~---, Mul t i Family Area within Parcel 2 Parcel 2 -76.26 Acres PARCEL 2 Gross Slope Analysis 20 -30% ---+-----6 .7 AC 15-20% -+--~,..... 4 .0AC •• •• 46 Parce l 2 PARCEL 1 40+% 9 .9 AC ~--0 -5% 5 .8 AC 5-103 33.5 AC PARCEL 2 Developable Area Slop e An a lysis 15 -2 0 % 0.7 AC 10-15 % 5 -10% 1.3 AC Area D 15 -20% 0.7 AC AreaA 5 -10 % 0.8 AC PARCEL 1 20-30% 15 -20'7oD0.3 AC 0.3 AC 10 -15 % 1.2 AC ! Area E 0 -5 % 0 .3 AC 5 -10% Area B 0 -5 % 0.2 AC 2 0 -30% 30 -40% 0.1 AC Area F 10 -15 % 0 -5 % 5 -10% 0.4 AC 0.1 AC 5.8 AC ~:------ Area C 0 -5 % 1.0AC 15 -20% 0.7 AC 10 -15% 0.3 AC l Pa rce l 2 Area G 47 0 -5 % 0.1 AC 5 -10% 0.4 AC EXISTING UTILITIES Note : Spencer Parkway is an easement through Parcel 2. v 48 Parce l 2 Existing Sewer Lin e Exist ing Water Line Existing Telephone Line Existing Gas Line Existing Overhead Power Ex isting Power Ex isting Storm Sewer Existing Conduit (no wire) TABLE OF IMPROVEMENTS DEVELOPMENT PARCEL NO. 2 BATTLEMENT MESA PUD TOTAL PARCEL AREA 76 .26 ACRES NUMBER OF LOTS 36 SINGLE FAMILY AVERAGE LOT SIZE 0.36 ACRES OPEN SPACE 40.07 ACRES TOTAL MULTI-FAMILY ACREAGE 19.13ACRES MAXIMUM MULTI-FAMILY 229 UNITS Storm Drain Sanitary Sewer Potable Water Electric Telephone Gas 729 LF 220 LF 160 LF 3338 LF 172 LF 36 EA 4125 LF 140 LF TBD by Holy Cross TBD by Qwest TBD by Xcel 18 in 36 in 42 in 8 in 10 in 4 ' Dia Manholes 8 in 6 in On -site detention required in multi-family area. Developer will be required to participate in construction of regional detention facilities 718 LF 10-inch collector sewer line 7 EA off-site manholes 16 -inch water line in place on west side Spencer Parkway 3-phase power in place on west side of Spencer Parkway to Church. Conduit and Vaults only in place from Church south to Sipprelle Drive. 200 pr direct bury cable in place on east side of Spencer Parkway 4 -inch gas in place on north side Battlement Parkway 4 -inch gas in Spencer Parkway from Sipprelle to Grace Bible Church Cable TV I TBD by Comcast I No existing cable this area Note: Multi family area tabulations are not considered in the table above. 50 Parcel 2 PARCEL3 Parcel 3 is 52.8 acres and is located to the south of Parcel 2 surrounding the successful Eagle 's Point Development. The Parcel was rezoned in 2008 to low density residential on the bluff and medium density res i- dential at the southern end of the Parcel. These zoning catego - ries will allow a maximum density of 5 dwelling units per gross acre for low density and 12 dwelling units per gross acre for medium density. The total developable area for the single family, low density area is 9.59 acres and the muti-family, medium den sity area is 4 .9 acres . Like Parcels 1 and 3 , t his Parcel has gone through exte nsive examinat ion by the Pl a nners and Engineers to the degree that preliminary plan level d rawings are available for the single fami ly areas of the Pa rc el. The preliminary plan appli cation considers having 36 sin gle family units located on the t o p of the bluff and a multi famil y density, townhome product in the south end of the Parcel. Th e Par cel is well served by utilit ie s off Spencer Parkway and Battlement Mesa Parkway and lik e Parcels 1 and 2 , will require se we r exten - sions to the main line t hrough the golf course . Multi Family A rea wit hin Parce l 3 Parcel 3 -52 .8 Acres PARCEL 3 Gross Slope Analysis •• 52 Parce l 3 40% 6.9 AC •• ,...-----0 -5% 3.7 AC 15-20% 3.2 AC 5-10% 12.2 AC 5-10% 1.9 AC PARCEL 3 De velopable Area Slope An alys is 10-15 % 0 .6 AC 0 -5 % 0 .5 AC AreaA 15 -2 0 % 0 .2A C 10 -15 % 0.5 AC 0 -5 % 0 .5 AC Area B 5 -10% 3 .1 AC 15 -20% 0.1 AC 0 -5 % 0.2 AC 5 -10% 1.5 AC Area C 10 -15% 1.4AC 20-30% 0.3 A C 15 -20% Area D 53 Parce l 3 30-40% 0.1 AC 0 -5 % 0.3 AC EXISTING UTILITIES 54 Parcel 3 Ex ist in g Sewer Line Ex ist in g Wate r Line Exist in g Te lephone Line Ex ist ing Gas Line Exist ing Overhead Power Exist ing Power Exist ing Storm Sewer Existing Conduit (no w ire) TABLE OF IMPROVEMENTS DEVELOPMENT PARCEL NO. 3 BATTLEMENT MESA PUD TOTAL PARCEL AREA 52 .8 ACRES NUMBER OF LOTS 23 SINGLE FAMILY AVERAGE LOT SIZE 0 .30 ACRES OPEN SPACE 46 .88 ACRES TOTAL MULTI-FAMILY ACREAGE 4.5 ACRES MAXIMUM MULTI-FAMILY Curb and Gutter Storm Drain Storm Drain Inlets Sanitary Sewer Potable Water Electric Telephone Gas 54 UNITS 273 LF 5 EA 1940 LF 15 EA 2011 LF 78 LF 4 EA TBD by Holy Cross TBD by Qwest TBD by Xcel 18 in 8 in 4 ' Dia Manholes 8 in 6 in FH Assemblys Construct 1 left turn pockets in Spencer Parkway Payment of Garfield County Traffic Impact Fee at $4 .00/ADT On -site detention required in multi-family area . Developer will be required to participate in construction of regional detention facilities 8 -inch collector sewer line in place through property 1 16-inch water line in place on west side Spencer Parkway PRV vaults will be required at connection points Conduit and Vaults only in place from Church south to Sipprelle Drive 200 pr direct bury cable in place on east side of Spencer Parkway 4 -inch gas in Spencer Parkway from Sipprelle to Grace Bible Church Cable TV TBD by Comcast No existing cable this area Note: Multi family area tabulations are not considered in the table above . 56 Parcel 3 PARCEL 7 Parcel 7 is 56 .17 acres and is located to the east of Parcel 1 and is bounded by Battlement Mesa Parkway to the north and east and Spencer Parkway to the west. Given its proximity to these roads, Parcel 7 is well served all utilities except sewer. The Parcel was rezoned in 2008 to low density residential. This zoning category will allow a maximum density of 5 dwell - ing units per gross acre which equates to a maximum of 280 units. Like almost all the Parcels in the core area , the majority of the Parcel is on a slope between 5 and 103. Parcel 7 has two ephemeral drainages running east-west thro ugh the Parcel that can b e used for stormwater collectio n and conveyance. These dra inages also divide the Parcel in to two developable land units . This Parcel is currently u nder the process of being d e veloped into preliminary plan dra wings ready for submission by the Planners and Engineers . The preliminary plan drawi ngs assume 114 single fam ily lots for this Parcel. Parcel 7 -56.17 Acres PARCEL 7 Gross Slope Analysis 58 20 -30% 2.5 AC 15 -20% 2.3 AC •• Parcel 7 20 -30% 2.5 AC •• 20-30% 2.5 AC 0 -5% 3.7 AC 5-103 37.6 AC _J w u 0:::: ~ -I 0 0 I u V') I l) I 0 -I 0 • • PARCEL 7 Developable Area Slope An a lysis 20 -30% 1.3 AC 30 -40% 0.1 AC Area A _J w u Ci'.:'. ~ _J 0 0 I u V) J: u I 0 _J 0 Area B 5 -10% 22.7 AC Pa rce l 7 59 EXISTING UTILITIES 60 Parce l 7 PARCEL 7 Existing Sewer Line Existing Water Line Exist ing Telephone Line Exist ing Gas Line Existing Overhead Power Existing Power Existing Storm Sewer Existing Conduit (no wire) _J UJ ~ ~ _J 0 0 I u l/) I l.J I 0 _J 0 PARCEL 1 A BOUNDARY Parcel 1 a is 8.33 acres and is are in the process of prepa r- •' c located adjacent to Parcel 1 ing a preliminary plan set ~ and the Golf Club House and of drawings for this Parce l. Driving Range. The majority It is expected that these of the major utilities can be drawings will be ready by t he ~ found in Battlement Mesa end of the summer 2008 . ~ Parkway, the main sewer is The concept plan assum ed located in the golf course. a townhome/duplex prod u ct The Parcel was rezoned in that totaled 65 units . 2008 to medium density residential. This zoning cat- egory will allow a maximum density of 12 dwelling units per gross acre which equates to a maximum of 100 units . The Planners and Engineers Parcel 1 A -8.33 Acres PARCEL 1 A Gross Slope Analysis 64 PARCEL 1 A 20-30% ??AC ----- ~--30 -40 % ?? AC 15 -20% ----~ ?? AC •• •• Parce l 1 A ~--40+% ?? AC 0 -5 % EXISTING UTILITIES PARCEL 1 A Ex ist in g Sewer Line Exi sting W ater Lin e Exi sting Te leph o ne Lin e Ex isting Ga s Lin e Exi sting Ove rhead Power Ex isting Power Exi sti ng Storm Sew er Ex isti ng C o nduit (no wire) Parce l 1 A 65 PARCEL 5 , BLOCKS 3 -4 Parcel 5, Blocks 3 and 4 are 3 .15 and 5 .85 acres respec- tively. The Parcel Blocks would be accessed off Sipprelle Drive located very close to the Town Center, Recreation Center and the Middle School. Both blocks are very close to all major utilities found ei t her in Sipprelle Drive or Battlement Mesa Parkway. In 2008 , the Parcel was re- zoned to Medium Density Residential , which allows a maximum gross density of 12 dwelling units per acre . This allows Block 3 to have a maximum density of 38 units and 67 units for Block 4 , totaling 105 units for Parcel 5 . It is expected that these drawings will be ready for summer 2008 . The concept plan developed by the Land Planners and Engineers assumed a town - home/ duplex product that totaled 82 units for both Blocks 3 and 4 . Since these two block s have a recorded plat and e sta b - lished legal boundarie s, they will not be subject to t he subdivis ion applicatio n pro- cess as long as they re main under a single owners hi p. Should the Blocks be d ivided into individual condom iniums or townhomes , the ow ne r would b e required to s ubmit a new subdivi s ion app li cation to Ga rfield County. 0 c.o ~l 0 p -_ Pa rcel 5 Block 3 -3 .14 Acres Pa rcel 5 Block 4 -5.85 Acres PARCEL 5 BLOCKS 3 .. 4 Gross Slope Analysis 20 -30%---- 5.7 AC 15 -20 % --+-"<---- 5.6 AC •• 68 Parce l 5 , Blocks 3 -4 3 0 -40% 3.9 AC •• 40% 7.9 AC 0 -5% 0 .5 AC PARCEL 5 BLOCKS 3 ... 4 Developable Area Slope Analysis Not e: Deve lopab le Area accounts for removal of ease ment s. 20-30% 40+% 0-5% 0.3 AC 0.1 AC 0.2 AC 30-40% 0-5 % 15-20% 15 -20% 0.1 AC 0.9 AC 0.1 AC 0 .7 AC 5 -10% 2.0AC 5 -10% 1015 3 \ ~ 3 .8 AC 2 .0A C ~ ~ Block 3 Block 4 69 Parcel 5, Blocks 3 -4 PARCEL6 Parcel 6 is 35 .67 acres and is located north of Parcel 7 directly north of the new Middle School and the six acre community park . Like Parcel 7, Parcel 6 is well located for all utili t ies except sewer, which will require the construction of a new line to run west through the parcel to Spencer Parkway. If necessary an additional line to the main sewer line in the Golf Course , if no development has occurred in the upper, single family areas or either Parcels 2 or 3 . In 2008 the Parcel was re-zoned to Medium Density Residential , which allows a ma ximum gross density of 12 dwelling units per acre . This allows Parcel 6 to have a maximum gross density of 428 units . Parcel 6 has three eph e meral drainages running eas t-west through the Parcel th at divide the Parcel into three developable land units . The draina ge s can be used to convey an d collect stormwater. It is expe cte d that these drawings will be re ady by the end of the summ er 2008 . The concept plan ass umed a townhome /duplex produ ct that totaled 317 units for thi s Parcel. Parcel 6 -35 .67 Acres PARCEL 6 Gross Slope Analysis 72 N _J w u 0:::: ~ 20 -30% 0.6AC 15 -20% 0.8 AC 10 -15% ---~ 3.6AC •• •• Parc el 6 30-40% 0.2 AC 0-5% 0 .8 AC 5 -103 29 .5 AC 0 ' 0 I [) I V1 () I 0 0 ' ~ ;;:o () rn ' PARCEL 6 Developable Area Slope Analysis 10-15 % 0.5 AC A 0 -5 % 0.1 AC N _J w u c::: ~ 5 -10% 10.3 AC 15 -20% 0.1 AC B 0 -5 % 0.1 AC 0 r 0 I () I Vl () I 0 0 r ~ ;:o () rn r 15 -20% 0. 1 AC 0 -5 % ~;'~ I /''~5103 ~~ 55AC c 73 Pa rce l 6 EXISTING UTILITIES (I J ff ~ 74 Parc e l 6 P4f?Ct, l/ N _J w PARCEL 6 u a::: ~ Existing Sewer Line Ex isting Water Line Existing Telephone Line Existing Gas Line Existing Overhead Power Existing Power Existing Storm Sewer Existing Conduit (no wire) 0 .- 0 I () I Vl (} I 0 0 .- ~ ;;:o (} rri .- OLD HIGH SCHOOL PARCEL The Old High School Parcel is 41 .35 acres and is located on the east side of Battlement Mesa Parkway. In 2008 the Parcel was re-zoned to Medium Density Residential , which allows a maxi - mum density of 12 dwelling unit s per gross acre . The slope for th e majority of the site is between 5 and 103 with the slope increa s- ing towards the eastern edge of the Parcel's boundary. The Land Planners and Engineers took advantage of the flatter land closest to Battlement Parkway for Muti family townhomes , and transitioned it into a core of smaller single family lots to larger single family lot s on the periphery of the Parcel. The maximum gross density for this Parcel is 496 units . The proposed concept plan proposes 221 units. The water tank in the south eastern corner of the Parcel will be used to serve the new Parcel s in the core area and up to the 5616 contour line on the Old High School Parcel. The remain - de r of the lots on thi s Parcel will need an expansio n of the Battlement Mesa water system in cooperation with the Battlement Mesa Metropolitan District to provide enough wate r pressure . This entails provid ing a n ad - ditional water tank t o be located higher up and furth er e ast of thi s Parcel. This addition al water tank has always been conte mplated for the overall Battlem e nt Mesa water system master plan . Old Hig h School Parcel -41 .35 Acres OLD HIGH SCHOOL PARCEL Gross Slope Analysis 7 8 40+% 0.3 AC 30-40% 1.1 AC 20 -30%---~ 3.8 AC 15 -2 0 % -...-<---~ 4.1 AC 10-153 •• •• O ld High Schoo l Parce l 0-5% 1.0AC 5-103 22.3 AC OLD HIGH SCHOOL PARCEL Developable Area Slope Analysis 15-20% 0.4 AC 5 -10 % 1 .5 AC A 20 -30% 1.6 AC 15 -20% 1.4 AC OLD HIGH SCHOOL PARCEL 3 0 -40% 0 .4 AC 40%+ 0. 7 AC 0 -5 % 0.2 AC B 40+% 0. 7 AC 30-40 % 0.3 AC 0 -5 % 20 -30% 0 . 7 AC 1.0AC 5-10% 1.4 AC 15 -20% 1.7 AC 10 -15 % 1.8 AC c 7 9 O ld High School Parce l EXISTING UTILITIES 80 I'-. .....J w u a::: ~ Old High Schoo l Parc el OLD HIGH SCHOOL PARCEL Existing Sewer Line Existing Water Line Ex isting Telephone Line Existing Gas Line Ex isting Overhead Power Existing Power Ex isting Storm Sewer Ex isting Condu it (no wire) PARCEL 5 ~ 1 STONE QUARRY COMMONS ~ TRAC T 2 Stone Quarry Commons Tract 2, Parcel 5 -1 , is 17.29 acres and is located to the South of Battlement Mesa Parkway and north of County Road 302 . Access for this Parcel would be from Battlement Mesa Parkway between the existing Fire Station Parcel and the Light House Church . The Fire Station will be moving to the land adjacent and west of this tract in 2009 . To the north of this tract is a gas station that uses part of the six acres that makes up tract 1 of the Stone Quarry Commons Pa rcel 5-1 . The tract is well situated for utilities that are located in the Parkway or through the proposed Fire Station property that is adjacent to this tract. The zoning for this tract is Medium Density Residential which allows a maximum of 12 units per gross acre , this would equate to a maximum of 207 units for this tract. An amended plat to establish and legalize t he amended boundaries fo r this and the other three tracts in the Stone Quarry Commons Parcels would be necessary prior to a ny preliminary or final pl at application . The Land Planners and Engineers proposed 148 units fo r this tract with a mixtu re of condominium units and small single family lots. Parcel 5 -1 Tract 2 -17.29 Acres ( \ EXISTING UTILITIES 90 N I- ~ er:: I- .-- I LI'\ ......J w u er:: ~ PARCEL 5-1 TRACT 3 -----Ex istin g Sewer Line Existing Water Line Existing Telep hone Lin e -----Existing Gas Line -----Existing Overhead Power -----Existing Power -----Existing Storm Sewer -----Existing Conduit (no wire) Parcel 5-1 . Tract 3 I -- I \ • • • • • • • • • ' l I ~ ..... PARCEL 5-2 STONE 1'-11111 QUARRY COMMONS -TRACT 1 -4 ....... ~ Stone Quarry Commons, situated for utilities that are ~ Parcel 5 -2, Tract 1 is 11 .77 located in the Parkway. acres and is located to the The zoning for this tract South of Battlement Mesa is Low Density Residential Parkway and north of County which allows a maximum o f Road 302 and east of 5-1 5 units per gross acre, t h is Tract 3 . Access for this tract would equate to a maximu m would be from Battlement of 59 units for this tract. ~ Mesa Parkway, either The Land Planners and .-.ij between the existing Fire Engineers propo s ed 49 ...... Station Parcel and the Light single family lots, some ,._ ~ House Church or slightly of which were orientated @r ~ further west. around a central park spa ce ~ that is part of a larger ch a in Like the other tracts in the of parks that would be us e d Stone Quarry Commons for stormwater detention as area, this tract is well well as active recreation . Parcel 5-2 Tract 1 -11.77 Acres PARCEL 5-2 STONE QUARRY COMMONS .. TRACT 1 Gross Slope Analysis 94 l'r') 1-u <( er::: I- .-- 1 LI) _J l.J.J u er::: ~ PARCEL 5-2 TRACT 1 15 -20 % -----, 0.2 AC 10 -15 % ------, 1.2 AC •• •• Parcel 5 -2 , Tract 1 0 -5 % 0.1 AC 5-103 EXISTING UTILITIES l"i 1-u <( Ct:'. I- PARCEL 5-2 TR AC T 1 Ex ist in g Sew e r Lin e Ex isting W ater Li ne Ex ist ing Telep hone Lin e Ex ist in g G as Line Ex ist in g O ve rh ea d Power Exist in g Power Ex isti ng St orm Sewer Ex ist in g C o nd uit (no w ir e) Parce l 5 -2 . Tract 1 95 PARCEL 5-2 STONE QUARRY COMMONS -TRACT 2 Stone Quarry Commons , Parcel 5-2 , Tract 2 is 15.46 acres and is located to the south of Battlement Mesa Parkway and north of County Road 302 and east of 5 -2 Tract 1 . Access for this tract would be from Battlement Mesa Parkway slightly The zoning for this tra ct is Low Density Residential which al- lows a maximum of 5 units per gross acre , this wou ld equate to a maximum of 77 units for this tract. further west of the access between The Land Planners a nd the existing Fire Station Parcel and Engineers proposed 3 7 larger the Light House Church. single fam ily lots , th e major- ity of which were orie ntated Like the other tracts in the Stone around a central pa rk space Quarry Commons area , this tract that is part of a large r chain of is well situated for utilities that are parks in the Stone Q uarry located in the Parkway. Commons develop me nt that In order to meet necessary water would be used for stormwater pressure needs for this tract an detention as well a s a ctive recre- expansion of the Battlement Me s a ation . This tra ct is als o in close water system , in cooperation with proximity to a pedestrian unde r- the Battlement Mesa Consolidated pass that leads to t he Recreation Water District, would be necessary. Center and Town C e nter. This expansion has been contemplated as a part of the overall Battlement Mesa water system master plan . Parcel S-2 Tract 2 -15.46 Ac res PARCEL 5-2 STONE QUARRY COMMONS .. TRACT 2 Gross Slope Analysis 98 N 1-u <( a::: I- N I LI) ......J LU ~ ~ PARCEL 5-2 TRACT 2 20-30 % ---- 0 .5 AC 15 -20%---- J.3 AC •• Parcel 5 -2 , Tract 2 10-15% 4 .9 AC •• 0 -5 % 0.4 AC 5-10% 8.2AC EXISTING UTILITIES N 1-u <( 0:::: I- N I LI') _J L.J.J ~ ~ PARCEL 5 -2 TRAC T 2 Ex istin g Sewer Line Exist in g Water Line Exist in g Telep hone Line Exist in g Gas Line Exist ing Overhead Power Exist in g Power Ex istin g Storm Sewer Exist ing Co nd uit (no wire) Parcel 5 -2, Tract 2 99 - OLD ELEMENTARY SCHOOL PARCEL The Old Elementary School Parcel is 8.37 acres and is located off Northstar Trail Road in Monument Creek Village. It was re-zoned in 2008 to Medium Density Residential and since it is a recorded plat with the Monument Creek Village filing and has an established legal boundary, it will not be subject to the subdivision application process, that many of the other parcels will need to establish a recorded, platted boundary. Like Parcel 5 however, this Parcel will not be subject to the sub- division application process so long as the Parcel remains under single ownership. Should the Parcel be divided into individual condominiums or townhomes, the owner would be required to submit a new subdivision applica- tion to Garfield County. Given the maximum density of 12 dwelling units per gross acre, this Parcel can have a maximum of 100 units. The Land Planners and Engineers proposed 66 multi-family townhome units, some of which were orientated around courtyards and mesa views. Northstar Trail has all the necessary utilities to serve this Parcel. It is expected that these drawings will be ready by the middle of summer 2008. Old Elementary School Parcel -8.37 Acres 101 Old Elementary School Parcel OLD ELEMENTARY SCHOOL PARCEL Gross Slope Analysis •• 10 2 OLD ELEMENTARY SCHOOL PARCEL 10-153 0.5 AC 5-103 •• Old El e me ntary Sc hool Pa rce l 0 -53 2.0AC FAIRWAYS The Fairways Parcel-Phases 2 ,3 and 4 is 15 .89 acres and is located between Battlement Parkway West and the golf course. The zoning for the parcel is medium density resi- dential permitting a maximum of 12 dwelling units per acre, this equates to a maximum of 190 units . The Engineers have designed this Parcel as a continuation of the phase one single family development that was constructed in 1997. The Engineers have prepared and had the preliminary plan application approved for 53 single family lots for this Parcel that includes Phases 2 , 3 and 4 . Like the Old Elementary School Parcel , this Parcel is recorded with the Willow Creek filing and does not require a subdivision approval process to establish the boundary. Development can occur on this Parcel upon approval of a final plat by Garfield County, so long as the plan remains the same. Should the design and development concept change , a new preliminary and final plat will need to be reviewed and approved by Garfield County. The Parcel has an ephemeral drainage running south to north through the Parcel that creates two gently sloping land units to develop. F Al RWA YS Gross Slope Analysis •• 106 Fairways 40%+ 0.2 AC 3 0 -40% ------, 0 .3 AC •• 0 -5 % 4.0 AC F Al RWAYS Developable Area Slope Ana lysis 30-40% 0 .1 AC 20-30% 0.3 AC 40+% 0.1 AC 15 -2 00% ----------, 0.2 AC 10-15 % --------::?~ 1. 1 AC F--------"' A 0 -5% 2.8 AC 30-40% 0. 7 AC 20 -3 0 % ----~ 0 .3 AC 1 5 -20%--~ 0.5 AC B 0 -5% 0.7 AC 107 Fa irway s PARCEL 2 .. 2 Parcel 2-2 is 58.47 acres and is located north and across a major drainage from the Old Elementary School Parcel. It is zoned LDR , which permits a maximum of 5 dwelling units per acre equating to a maximum gross build out of 292 units . The average slope across the site is between 5 and 73 and is bounded by significant vegetated drainage corridors on the north and south of the parcel. A sewer line and easement runs along the north side of the Parcel that would serve the development needs for the northern half of the parcel. An additional sewer line would be needed to serve any development needs for the southern side of the Parcel. No conceptual planning or engineering studies have been completed for this parcel at this time . Area outs ide of Aero metric Sur vey Parcel 2-2 -58.47 Acres PARCEL 2-2 Gross Slope Analysis 110 10 -15 % 6.2 AC •• Par ce l 2 -2 PARCEL 2-2 15 -2 0 % 1.2 AC 20 -30 % O.SAC ----- •• 3 0 -40% 0 .1 AC 0 -5 % 3.6 AC 5-103 35.7 AC PARCEL 2 -2 Developable Area Slo pe Analysis 15-20% 1.1 AC 10 -15% 4 .9 AC PARCEL 2-2 20-30% 0.6AC A 30 -40% ~-0 .1A C .----0-5 % 1.6 AC A 15 -20 % 0.1 AC 10 -15% 1.0AC B 20 -30% 0.2 AC B --0 -5 % 1.7 AC ~----5 -10 % 6.8 AC 111 Parcel 2 -2 PARCEL5--4 Parcel 5-4 is 104.7 acres and is zoned low density residential. The maximum density permitted for this zoning is 5 dwelling units per acre . This equates to 524 single family units for this Parcel. No conceptual planning or engineering studies have been completed for this parcel at this time. This parcel has approximately 953 digital survey, two foot contour coverage . Parcel 5-4 -104.7 Acres J ' -----___ _, '1 ' •' I. ..__~-~~-, ,,: ·j I [ 1 / . -~~ ~"'~ D Area out sid e of Aerom etri c Surv ey PARCEL5--4 •• 116 Parce l 5 -4 2 0 -3 0 % 0.5 AC 15 -20 % 2 .5 AC •• 40+% 0.1 AC 3 0-40% 0.1 AC 0 -5 % 6 .4 AC 5-10% 67.0AC Area outsi de of Aerom et ric Sur vey .. PARCEL4~3 Parcel 4-3 is 12 .60 acres and is zoned medium density residential. The maximum density permitted for this zoning is 12 dwelling units per acre . This equates to 151 multi family units for this Pa rcel. No conceptual planning or engineering studies have been completed for this parcel at this time. This parcel has approximately 903 digital survey, two foot contour coverage. Area out sid e of Aerometri c Surv ey Parcel 4-3 -12 .60 Acres PARCEL4--4 Parcel 4-4 is 21 .11 acres and is zoned medium density residential. The maximum density permitted for this zoning is 12 dwelling units per acre . This equates to 253 multi family units for this Parcel. No conceptual planning or engineering studies have been completed for this parcel at this time . This parcel has complete digital survey, two foot contour coverage . Parcel 4 -4 -21 .11 Acres PARCEL 4 .. 4 Gross Slope Analysis 20 -30%--~ 3.4 AC 15 -20 % -~.""----, 2.3 AC •• 124 Parce l 4 -4 •• 30-40% 1.7 AC 40+% 1.3 AC ---0-5% 0 .1 AC 10-15% 4 .8 AC 5-103 7.8 AC PARCEL BC-1 Parcel BC-1 is 14 .62 acres , and is zoned business commercial. No conceptual planning or engineering studies have been completed for this parcel at this time. This parcel has complete digital survey, two foot contour coverage . Parcel BC-1 -14.62 Acres PARCEL sc .. 1 Gross Slop e Analysis 128 •• 15-20 % 0.9 AC Parcel BC -1 3 0 -40 % 0 .1 AC 2 0 -3 0 % l.J AC •• 40+% 0 .1 AC 0 -5% 0.6A C 5-10% 7.8 AC PARCEL BC-2 Parcel BC-2 is 23 .38 acre s and is zoned business commercial. No conceptual planning or engineering studies have been completed for this parcel at this time . This parcel has complete digital survey, two foot contour coverage . Parcel BC -1 -14 .62 Ac res PARCEL BC--2 Gross Slope Analysis 132 •• 30-40% 0.3 AC 20 -30% 1 .1 AC 15 -20%-- 1.2 AC •• Parce l BC -2 40+% 0.2 AC 0 -5% 0 .8 AC 5-103 16.4 AC PARCEL 5 .. 5 Parcel 5-5 is 132 acres and is zoned low density residential. The maximum density permitted for this zoning is 5 dwelling units per acre. This equates to 616 single family units for this Parcel. No conceptual planning or engineering studies have been com- pleted for this parcel at this time . This parcel has approximately 15% digital survey, two foot contour coverage . 13 5 PARCEL4--5 Parcel 4-5 is 42 .57 acres and is zoned low density residential. The maximum density permitted for this zoning is 5 dwelling units per acre . This equates to 213 single family units for this Parcel. It is estimated that there are 40 acres of developable land on this parcel. No conceptual plan- ning or engineering studies have been completed for this parcel at this time. 40 developable. Digital survey and topographic information for this Parcel would require coordination with Aerometric in Fort Collins, Colorado , who flew the site in 2005 but did not interpolate the data for this area at that time . 137 PARCEL4-6 Parcel 4-6 is 21 .82 acres and is zoned medium density residential. The maximum density permitted for this zoning is 12 dwelling units per acre . This equates to 261 multi family units for this Parcel. No conceptual planning or engineering studies have been completed for this parcel at this time . Digital survey and topographic information for this Parcel would require coordination with Aerometric in Fort Collins, Colorado , who flew the site in 2005 but did not interpolate the data for this area at that time . 139 PARCEL 6--1 Parcel 6-1 is 25 .3 acres and is zoned medium density residential. The maximum density permitted for this zoning is 12 dwelling units per acre . This equates to 240 multi family units for this Parcel. No conceptual planning or engineering studies have been completed for this parcel at this time . Digital survey and topographic information for this Parcel would require coordination with Aerometric in Fort Collins , Colorado , who flew the site in 2005 but did not interpolate the data for this area at that time. 14 1 PARCEL 6-2 Parcel 6-2 is 31 .10 acres and is zoned low density residential. The maximum density permitted for thi s zoning is 5 dwelling units per acre . This equates to 156 single family units for this Parcel. No conceptual planning or engineering studies have been completed for this parcel at this time. Digital survey and topographic information for this Parcel would require coordination with Aerometric in Fort Collins , Colorado , who flew the site in 2005 but did not interpolate the data for this area at that time . 143 ~ ~ ~ ~ ..... ~ ~ ~ 1111'4 ~ 1111'4 .... .... ~ ~ .-II llllllj .... .... .-I 11111111 11111111 PARCEL 6--3 Parcel 6-3 is 174 .6 acres and is zoned rural density residential. The maximum density permitted for this zoning is 1 dwell ing units per acre . This equates to 175 single family units for this Parcel. No conceptual planning or engineering studies have been completed for this parcel at this time . Digital survey and topographic information for this Parcel would require coordination with Aerometric in Fort Collins , Colorado , who flew t he site in 2005 but did not interpolate the data for this area at that tim e . 14 5 PARCEL 6 -4 Parcel 6-4 is 37 acres and is zoned rural densit y residential. T he maximum density pe r mitted for this zoning is 1 dwelling units per acre. This equates to 37 single famil y units for this Parcel. No conceptua l planning or engineering studies hav e been completed for this parcel at this time. Digital survey and topogra p hic infor- mation for this Parcel wou ld require coordination with Aerome t ric in Fort Collins, Colorado, who fle w the site in 2005 but did not interpolate the data for this area at that time . 147 PARCEL 6--5 Parcel 6 -5 is 78.2 acres and is zoned rural density residential. The maximum density permitted for this zoning is 1 dwelling units per acre . This equates to 78 single fam i ly units for this Parcel. No conceptual planning or engineering studies have been completed for this parcel at this time . Digital survey and topographic info r- mation for this Parcel wou ld requ ire coordination with Aerometric in Fort Collins, Colorado , who flew the site in 2005 but did not interpo late the data for this area at that time. 149