Loading...
HomeMy WebLinkAbout4.0 Acknowledgment of Partial Satisfaction of SIA'sACKNOWLEDGMENT OF PARTIAL SATISFACTION SUBDIVISION IMPROVEMENTS AGREEMENT KNOW ALL MEN BY THESE PRESENT that: WHEREAS, Edward and Ida Lee Hoaglund (hereinafter "owner") and Darter, LLC (hereinafter "developer") , entered into a Subdivision Improvements Agreement with the Board of County Commissioners of Garfield County, Colorado (hereinafter "Board"), recorded in Book 1546 at Page 964 as Reception No. 643045 of the Garfield County records on December 16, 2003, for the improvements of the Valley View Village subdivision; and WHEREAS, the obligations of the Owner have been satisfied in part, as verified in attached statement from Ron Weidler, P.E., High Country Engineering, dated May 5, 2004, that work has been partially completed consistent with improvements described in the Subdivision Improvements Agreement. NOW THEREFORE, at the request of the Owner and in consideration of the premises and prior agreements, the Board hereby acknowledges the partial satisfaction of the Subdivision Improvements Agreement entered into by Owner and the Board for the release of security in the amount of $490,078.00 for the completion of improvements described in the Subdivision Improvements Agreement, and retaining $818,363.61 for the improvements remaining. STATE OF COLORADO ) )ss COUNTY OF GARFIELD ) By: Chair4in i., ) The foregoing instrument was acknowledged before me this • ay of , 2004, by John Martin, as Chairman of the Board of County Commissioners of Garfield C unty, Colorado. WITNESS my hand and official seal. My commission expires /04" di Gar ield County Clerk CIVIL. ENGINEER"NG` May 5, 2004 An Employee -Owned Company Garfield County Building and Planning Department 109 8th Street, Suite 303 Glenwood Springs, CO 81601 Attn: Mark Bean. illikAND SURVEYING RE: Valley View Village — Phase A - Partial Release HCE Project No. 2021056.0811 Gentlemen: I am writing this request for partial release on behalf of Darter, L.L.C., developer of Valley View Village. Please find the attached cost estimate of improvements completed to date. HCE certifies that all materials supplied and work performed is in accordance with the plans and specifications for those items inspected by HCE during periodic construction observations. Battlement Mesa Consolidated Metropolitan District performed inspectionof the water and sewer system installation separately. Inspection reports from thedistrict have been submitted to the County Engineer Jeff Nelson upon receipt. All costs for which the release is being requested have been incurred in connection with the construction of the Improvements. No funds are being requested for work not completed, or for materials not installed or stored on site. Please consider this letter certification by the Project Engineer, High Country Engineering, Inc. (HCE), that all of the foregoing requirements have been met. This statement of completion shall in no way relieve any other party from meeting requirements imposed by contract or other means. Ron Weidler, P.E. Construction Manager cc: Terry Lawrence, Darter, LLC 1517 Blake Avenue, Suite 101 Glenwood Springs, CO 81601 970.945.8676 phone 970.945.2555 fax www.hceng.com kfilY . 12 240 `Q,q GPNUoNIN� 14 Inverness Drive East, Suite F-120 Englewood, CO 80112 303.925.0544 phone 303.925.0547 fax 4 fey View Village Subdivision-Phas CONTRACT QUANTITIES May 13, 2004 HCE JOB NO: 2021056.00 ITEM NUMBER ITEM UNIT CONTRACT PERCENT UNIT COST COST QUANTITY COMPLETE ng and Earthwork Mobilization L.S. $24,000.00 $21,600.00 3 Earthwork L.S. 1 68 $125,500.00 4 5 Topsoil Stripping and Stockpile L.S. 1 74 $85,000.00 $24,300.00 $18,000.00 Drill seed and Hydromulch L.S. 1 6 Erosion and Sediment Control L.S. 1 0 $7,500.00 65 $3,500.00 $0.00 $2,275.00 Subtotal $126,875.00 Grading and Earthwork Sawcut, Remove and Dispose of Existing Asphalt S. 1592 01 $3.00 8 9 10 11 12 14 15 16 17 Sawcut, Remove and Dispose of Exsitng Curb & Gutter Rotomill and Dispose of Existing Asphalt L. 590 0 S.Y. 815 0 $0.00 $2.00 $0.00 $3.50' $0.00 Mirafi Weed Barrier S.Y. 1484 0 $1.50 $0.00 2.5" Asphalt S.Y. 1113 0 3" Asphalt S.Y. 3215 0 $12.00 $0.00 $9.90 $0.00 4" Asphalt S.Y. 5454 0 $11.57 $0.00 2" Asphalt at Battlement Mesa Parkway & Stone Quary Road S.Y. 810 0 19 4" Asphalt at Battlement Mesa Parkway & Stone Quarry Road 6" Class 6 ABC under pedestrian path 8" Class 6 ABC under Asphalt S.Y. 1608 0 $8.75 $11.57 $0.00 $0.00 C.Y. 186 0 C.Y. 1257 0 20 9" Class 6 ABC under Asphalt C.Y. 875 0 21 22 9" Class 6 ABC under Asphalt patch on BMP and SQR 2'-6" Mountable Curb & Gutter C.Y. 402 0 $34.00 $0.00 $34.50>':. $0.00 $34.50 $34.508 $0.00 $0.00 L.F. 985 0 $14.75 $0.00 23 2'-6" Mountable Curb & Gutter & 4' Sidewalk L.F. 2380 0 $24.50 $0.00 24 2'-0" Vertical Curb & Gutter L.F. 1515 0 $13.00. $0.00 25 2'-0" Vertical Curb & Gutter & 4' Sidewalk L.F. 245 0 $21.00 $0.00 26 6" Barrier Curb L.F. 550 0 $10.50 $0.00 28 29 Concrete Cross Pan with Aprons Handicap Ramp S.F. 4345 0 $4.50 $0.00 Each 16 0 $750.00 30 Curb Opening Each 1 0 $1,200.00 $0.00 $0.00 31 Curb Opening across Sidewalk Each 1 0 $1,344.00 32 33 Class 1 Ground Sip Each 28 0 Pedestrian Signs -Flashing Each 2 0 34 Remove/Replace Guardrail L.S. 1 0 35 Pedestrian Cross Walk 36 Traffic Control L.S. 1 0 $0.00 $200.00., $0.00 $1,900.00 $4,500.00; $3,200.00 $0.00 $0.00 $0.00 L.S. 1 29 $21,000.00 $6,000.00 37 Pavement Striping L.S. 1 0 $6,500.00 $0.00 Subtotal $6,000.00 Enage and Storm Sewer 38 18" ADS N-12 F. 177 46 $32.00 $2,600.00 39 40 54" CMP Culvert (2 Pipes) Concrete Headwall w/ Trash Rack for 2-54" CMP's L.F. 160 70 Each 1 41 Concrete Headwall for 2-54" CMP's Each 1 0 $78.00 $8,736.00 $0.00 $7,500.00 0 $7,500.00 42 43 Type 16 Combination Inlet Each 2 100 $2,900.00 $0.00 $5,800.00 ADS Pond Outflow Control Structure Each 2 0 $2,200.00 44 45 46 9" (d50) Grouted Riprap L.S. 1 0 $3,500.00 $0.00 $0.00 18" (d50) Grouted Riprap L.S. Raise Existing Storm Inlet Rim Each 1 0 $6,500.00 0 $1,500.00 $0.00 $0.00 47 ramat Geotextile Fabric S.Y. 135 0 48 Pipe Bollards L.S. 0 $22.00 $0.00 $450.00 $0.00 Subtotal $17,136.00 Ieinwaver1056.xls ey.View Village Subdivision-Phase"�4'� g_ CONTRACT QUANTITIES May 13, 2004 HCE JOB NO: 2021056.00 ITEM NUMBER ITEM UNIT CONTRACT PERCENT UNIT COST QUANTITY COMPLETE COST Sewer 49 8' SDR 35 Sewerline L.F. 2510 97 $29.50 50 8" Sewer Stub with Cap Each 5 90 $2,500.00 $72,000.00 $11,250.00 51 4' Dia. Manhole Each 18 95 $2,400.00 52 Remove and replace existing manhole Each 1 90 $3,900.00 $41,000.00 $3,510.00 53 4" Sewer Service Each 4 90 $550.00 54 Raise Existing Sewer Manhole Rim Each 90 $1,750.00 $26,730.00 $1,575.00 Subtotal $156,065.00 Dames 'e Water.' 55 " C900 Waterline 4550 $24.00 $70,000.00 56 12" C900 Waterline 115 $38.00 $0.00 57 8" Gate Valve Each 25 64 58 12" Gate Valve Each 1 0 $1,500.00 $2,900.00' $24,000.00 $0.00 59 3/4" Water Service Each 54 90 59 3/4" Water Meter Pit Each 54 90 $545.00 $26,487.00 $525.00 $25,515.00 60 61 2" Irrigation Service w/ Single Meter Pit Fire Hydrant Assembly Each 2 22 $2,250.00 Each 10 84 $2,750.00 $1,000.00 $23,000.00 62 8" Water Main Stub and Blowoff Valve Each 6 71 $1,400.00 $6,000.00 63 8" Air Vac Each 1 $3,900.00 $0.00 64 65 PRV w!vault Each 1 $29,500.00 Connection to Existing Main Each 1 $2,250.00 $0.00 $0.00 Subtotal $176,002.00 Miscellaneous ,w 66 Pothole Located Existing High Pressure Gas Main Each 1 83.82352 67 4' Shallow Utility Trench 2847 0 $400.00, $6.00 $5,700.00 $0.00 68 4' electric conduit installation (conduit furnished by utility) L.F. 2847 0 $1.00 69 4" Telephone Conduit to include installation . L.F. 2847 0 $2.00 $0.00 $0.00 70 Transformer Vault Excavation Each 10 58 71 4" Conduit Sleeving @ Roadway Intersections L.F. 850 0 $400.00, $2,300.00 $7.00 $0.00 72 6" Conduit Sleeving @ Roadway Intersections L.F. 850 0 $8.75 73 North American Green S-150 Erosion Control Blanket S.Y. 2715 0 $2.00 $0.00 $0.00 Subtotal $8,000.00 Amount to Date $490,078.00 Ieinwaver1056.x1s CIVIL ENGINEERING May 5, 2004 An Employee -Owned Garfield County Building and Planning Department 109 8th Street, Suite 303 Glenwood Springs, CO 81601 Attn: Mark Bean. RE: Valley View Village — Phase A - Partial Release HCE Project No. 2021056.0811 Gentlemen: LAND SURVEYING I am writing this request for partial release on behalf of Darter, L.L.C., developer of Valley View Village. Please find the attached cost estimate of improvements completed to date. HCE certifies that all materials supplied and work performed is in accordance with the plans and specifications for those items inspected by HCE during periodic construction observations. Battlement Mesa Consolidated Metropolitan District performed inspection of the water and sewer system installation separately. Inspection reports from the district have been submitted to the County Engineer Jeff Nelson upon receipt. All costs for which the release is being requested have been incurred in connection with the construction of the Improvements. No funds are being requested for work not completed, or for materials not installed or stored on site. Please consider this letter certification by the Project Engineer, High Country Engineering, Inc. (HCE), that all of the foregoing requirements have been met. This statement of completion shall in no way relieve any other party from meeting requirements imposed by contract or other means. Ron Weidler, P.E. Construction Manager cc: Terry Lawrence, Darter, LLC 1517 Blake Avenue, Suite 101 Glenwood Springs, CO 81601 970.945.8676 phone 970.945.2555 fax www.hceng.com t?ECE ei AY 2 2404 BU/LU,vG&p'OuNT 61NNING 14 Inverness Drive East, Suite F-120 Englewood, CO 80112 303.925.0544 phone 303.925.0547 fax ey View Village Subdivision -Phase CONTRACT QUANTITIES May 13, 2004 HCE JOB NO: 2021056.00 ITEM NUMBER ITEM UNIT CONTRACT PERCENT UNIT COST COST QUANTITY COMPLETE Grading and Earthwork 1 Mobilization L.S. 1 90 3 Earthwork L.S. 1 68 $24,000.00 $21,600.00 $125,500.00. $85,000.00 4 Topsoil Stripping and Stockpile L.S. 1 74 $24,300.00 5 Drill seed and Hydromulch L.S. 1 0 $7,500.00 6 Erosion and Sediment Control L.S. 1 65 $3,500.00 $18,000.00 $0.00 $2,275.00 Subtotal $126,875.00 Grading and Earthwork 7 Sawcut, Remove and Dispose of Existing Asphalt S.Y. 1592 0 $3.00 $0.00 8 Sawcut, Remove and Dispose of Exsitng Curb & Gutter L.F. 590 0 $2.00 $0.00 9 Rotomill and Dispose of Existing Asphalt S.Y. 815 0 10 Mirafi Weed Barrier S.Y. $3.50 $0.00 1484 0 11 2.5" Asphalt S.Y. $1.50 $0.00 1113 0 12 3" Asphalt S.Y. $12.00 $0.00 3215 0 14 4" Asphalt S.Y. 5454 0 15 16 17 2" Asphalt at Battlement Mesa Parkway & Stone Quary Road 4" Asphalt at Battlement Mesa Parkway & Stone Quarry Road 6" Class 6 ABC under pedestrian path S.Y. $9.90 $0.00 $11.57 $0.00 810 0 S.Y. 1608 C.Y. $8.75 $0.00 0 186 0 19 8" Class 6 ABC under Asphalt C.Y. 1257 0 20 9" Class 6 ABC under Asphalt C.Y. 875 21 9" Class 6 ABC under Asphalt patch on BMP and SQR C.Y. 402 22 2'-6" Mountable Curb & Gutter L.F. 985 23 2'-6" Mountable Curb & Gutter & 4' Sidewalk L.F. 2380 0 $11.57 $0.00 $34.00 $0.00 $34.50 $0.00 $34.50 $0.00 0 $34.50 $0.00 0 0 $14.75 $0.00 $24.50: $0.00 24 2'-0" Vertical Curb & Gutter L.F. 1515 0 $13.00 $0.00 25 2'-0" Vertical Curb & Gutter & 4' Sidewalk L.F. 245 0 $21.00 $0.00 26 6" Barrier Curb L.F. 550 0 28 Concrete Cross Pan with Aprons S.F. 4345 0 29 30 Handicap Ramp Each 16 0 $10.50 $0.00 $4.50. $0.00 $750.00 $0.00 Curb Opening Each 1 0 31 Curb Opening across Sidewalk Each 1 0 32 Class 1 Ground Sign Each 28 0 33 Pedestrian Signs -Flashing Each 2 34 Remove/Replace Guardrail L.S. 1 0 0 $1,200.00 $0.00 $1,344.00 $0.00 $200.00 $1,900.00 $0.00 $0.00 35 Pedestrian Cross Walk L.S. 36 Traffic Control L.S. 1 0 $4,500.00: $0.00 $3,200.00 1 37 Pavement Striping L.S. 1 29 $21,000.00 $0.00 $6,000.00 0 $6,500.00 $0.00 Subtotal $6,000.00 Drainage and Storm Sewer 38 18" ADS N-12 L.F. 177 46 $32.00 $2,600.00 39 54" CMP Culvert (2 Pipes) L.F. 160 40 Concrete Headwall w/ Trash Rack for 2-54" CMP's Each 1 70 $78.00 0 $7,500.00 $8,736.00 $0.00 41 Concrete Headwall for 2-54" CMP's Each 1 42 43 Type 16 Combination Inlet Each 2 0 $7,500.00 100 $2,900.00 $0.00 $5,800.00 ADS Pond Outflow Control Structure Each 2 44 9" (d50) Grouted Riprap L.S. 1 0 $2,200.00 0 $3,500.00 $0.00 $0.00 45 18" (d50) Grouted Riprap L.S. 1 46 Raise Existing Storm Inlet Rim Each 1 0 0 $6,500.00 $0.00 $1,500.004 $0.00 47 ramat Geotextile Fabric S.Y. 135 48 Pipe Bollards L.S. 2 0 $22.00 0 $450.00 $0.00 $0.00 Subtotal $17,136.00 Ieinwaver1056.xls Vey View Village Subdivision -Phase CONTRACT QUANTITIES May 13, 2004 HCE JOB NO: 2021056.00 ITEM NUMBER ITEM UNIT CONTRACT PERCENT UNIT COST COST QUANTITY COMPLETE Sewer 49 8" SDR 35 Sewerline L.F. 2510 97 $29.50 50 8" Sewer Stub with Cap Each 5 90 $2,500.00 $72,000.00 $11,250.00 51 4' Dia. Manhole Each 18 95 $2,400.00 52 Remove and replace existing manhole Each 90 $3,900.00 $41,000.00 $3,510.00 53 4" Sewer Service Each 54 90 $550.00 54 Raise Existing Sewer Manhole Rim Each 90 $1,750.00 $26,730.00 $1,575.00 Subtotal $156,065.00 Domestic Water 55 8" C900 Waterline L.F. 4550 64 $24.00 56 12" C900 Waterline L.F. 115 0 $38.00 $70,000.00 $0.00 57 8" Gate Valve Each 25 64 $1,500.00 58 12" Gate Valve Each 0 $2,900.00 $24,000.00 $0.00 59 3/4" Water Service Each 54 90 59 3/4" Water Meter Pit Each 54 90 $545.00 $525.00 $26,487.00 $25,515.00 60 2" Irrigation Service w/ Single Meter Pit Each 2 22 $2,250.00 61 Fire Hydrant Assembly Each 10 84 $2,750.00 $1,000.00 $23,000.00 62 8" Water Main Stub and Blowoff Valve Each 6 71 $1,400.00 63 8" Air Vac Each 1 $3,900.00 $6,000.00 $0.00 64 PRV w/vault Each 1 $29,500.00 65 Connection to Existing Main Each $2,250.00 $0.00 $0.00 Subtotal' $176,002.00 Miscellaneous 66 Pothole Located Existing High Pressure Gas Main Each 17 83.82352 $400.00 67 4' Shallow Utility Trench L.F. 2847 0 $6.00 $5,700.00 $0.00 68 4' electric conduit installation (conduit furnished by utility) L.F. 2847 0 69 4" Telephone Conduit to include installation .F. 2847 0 $1.00 $2.00 $0.00 $0.00 70 Transformer Vault Excavation Each 10 58 71 4" Conduit Sleeving @ Roadway Intersections L.F. 850 0 $400.00 $7.00 $2,300.00 $0.00 72 6" Conduit Sleeving ( Roadway Intersections L.F. 850 0 73 North American Green S-150 Erosion Control Blanket S.Y. 2715 0 $8.75 $0.00 $2.00 $0.00 Subtotal $8,000.00 Amount to Date $490,078.00 leinwaver1056.xis Darter, LLC 786 Valley Court Grand Junction, CO 81505 (970) 523-5555 FAX: (970) 523-0103 Valley View Village, Phase A APPLICATION FOR PAYMENT Date: 1/23/04 APPLICATION FOR PROGRESS PAYMENT — DRAW NO.: 1 Tamerrel Excavating Inc., General Contractor, pursuant to paragraph 14 of Supplementary Conditions to Agreement, Job No. 2021056.0612, hereby makes application for Progress Payment in the following amounts. Contractor agrees that Garfield County acceptance of constitute acceptance of improvements constructed to date for purposes of this applications does not constitute acceptance under paragraph 5 of the SIA: INVOICES TO BE PAID: See attached spreadsheet and attached invoices TOTAL DRAW REQUEST: $121,680.00 TAMERREL EXCAVATING, INC. C By: l z_telt__ Date: c; - / '/ 6'1 / CONSTRUCTION OBSERVATION REPORT High Country Engineering, Inc. hereby recommends to Owner that said application for Progress Pa ment be approved and submits its attached Observation Report in �� � :. f. • :� ��-t • b . o �e�• �i i By:-xs% Date: >1-/7-('y • • ACKNOWLEDGMENT OF PARTIAL SATISFACTION SUBDIVISION IMPROVEMENTS AGREEMENT KNOW ALL MEN BY THESE PRESENT that: WHEREAS, Edward and Ida Lee Hoaglund (hereinafter "owner") and Darter, LLC (hereinafter "developer") , entered into a Subdivision Improvements Agreement with the Board of County Commissioners of Garfield County, Colorado (hereinafter "Board"), recorded in Book 1546 at Page 964 as Reception No. 643045 of the Garfield County records on December 16, 2003, for the improvements of the Valley View Village subdivision; and WHEREAS, the obligations of the Owner have been satisfied in part, as verified in attached statement from Ron Weidler, P.E., High Country Engineering, dated September 17, 2004, that work has been partially completed consistent with improvements described in the Subdivision Improvements Agreement. NOW THEREFORE, at the request of the Owner and in consideration of the premises and prior agreements, the Board hereby acknowledges the partial satisfaction of the Subdivision Improvements Agreement entered into by Owner and the Board for the release of security in the amount of $587,053.50 for the completion of improvements described in the Subdivision Improvements Agreement, and retaining $231,310.11 for the improvements remaining. STATE OF COLORADO ) )ss COUNTY OF GARFIELD ) By: Chairman The foregoing instrument was acknowledged before me this day of , 2004, by John Martin, as Chairman of the Board of County Commissioners of Garfield County, Colorado. WITNESS my hand and official seal. My commission expires Garfield County Clerk 7.1411A1-- • • • CIVIL ENGINEERING September 17, 2004 • • An Employee -Owned Company Garfield County Building and Planning Department 109 8th Street, Suite 303 Glenwood Springs, CO 81601 Attn: Mark Bean. RE: Valley View Village — Phase A - Partial Release #2 HCE Project No. 2021056.0811 Gentlemen: LAND SURVEYING I am writing this request for partial release on behalf of Darter, L.L.C., developer of Valley View Village. Please find the attached cost estimate of improvements completed to date. HCE certifies that all materials supplied and work performed is in accordance with the plans and specifications for those items inspected by HCE during periodic construction observations. Battlement Mesa Consolidated Metropolitan District performed inspection of the water and sewer system installation separately. Inspection reports from the district have been submitted to the County Engineer Jeff Nelson upon receipt. All costs for which the release is being requested have been incurred in connection with the construction of the Improvements. No funds are being requested for work not completed, or for materials not installed or stored on site. Please consider this letter certification by the Project Engineer, High Country Engineering, Inc. (HCE), that all of the foregoing requirements have been met. This statement of completion shall in no way relieve any other party from meeting requirements imposed by contract or other means. Ron Weidler, P.E. Construction Manager cc: Terry Lawrence, Darter, LLC 1517 Blake Avenue, Suite 101 :Glenwood Springs, CO: 81601 Englewood, CO 80112 14 Inverness Drive East, Suite F-120 • • Valley View Village Subdivision -Phase`, 'A' CONTRACT QUANTITIES tember 17, 2004 HCE JOB NO: 2021056.00 ITEM NUMBER ITEM UNIT CONTRACT PERCENT UNIT COST COST QUANTITY COMPLETE Grading and Earthwork Mobilization L. 100 $24,000.00 $24.000.00 3 Earthwork 4 5 Topsoil Stripping and Stockpile Drill seed and Hydromulch L.S. 1 100 $125,500.00 $125,500.00 L.S. 1 100 L.S. 1 0 $24,300.00, $24,300.00 $7,500.00 $0.00 6 Erosion and Sediment Control L.S. 1 100 $3,500.00 $3,500.00 Subtotal $177,300.00 Grading and Earthwork Sawcut, Remove and Dispose of Existing Asphalt 1592 100 $3.00 $4,776.00 Sawcut, Remove and Dispose of Exsitng Curb & Gutter L.F. 590 100 $2.00 $1,180.00 9 10 Rotomill and Dispose of Existing Asphalt Mirafi Weed Barrier S.Y. 815 100 $3.50 S.Y. 1484 0 $1.50 $2,852.50 $0.00 11 2.5" Asphalt S.Y. 1113 0 $12.00 12 14 3" Asphalt S.Y. 3215 100 4" Asphalt S.Y. 5454 0 $9.90 $0.00 $31,828.50 $11.57 15 2" Asphalt at Battlement Mesa Parkway & Stone Quary Road S.Y. 810 0 $8.75 $0.00 . $0.00 16 4" Asphalt at Battlement Mesa Parkway & Stone Quarry Road S.Y. 1608 0 $11.57 17 6" Class 6 ABC under pedestrian path C.Y. 186 100 $34.00 $0.00 $6,324.00 19 8" Class 6 ABC under Asphalt C.Y. 1257 100 $34.50 20 9" Class 6 ABC under Asphalt C.Y. 875 100 $34.50 $43,366.50 $30,187.50 21 22 9" Class 6 ABC under Asphalt patch on BMP and SQR 2'-6" Mountable Curb & Gutter C.Y. 402 100 $34.50 L.F. 985 100 $14.75 $13,869.00 ,$14,528.75 23 2'-6" Mountable Curb & Gutter & 4' Sidewalk L.F. 2380 100 $24.50 24 2'-0" Vertical Curb & Gutter L.F. 1515 100 $13.00 $58,310.00 $19,695.00 25 2'-0" Vertical Curb & Gutter & 4' Sidewalk L.F. 245 100 $21.00 $5,145.00 26 6" Barrier Curb L.F. 550 100 $10.50 $5,775.00 28 Concrete Cross Pan with Aprons S.F. 4345 100 .50 29 Handicap Ramp Each 16 100 $750.00 $19,552.50 $12,000.00 30 Curb Opening Each 1 100 $1,200.00 $1,200.00 31 Curb Opening across Sidewalk Each 1 100 $1,344.00 $1,344.00 32 Class 1 Ground Sign Each 28 0 $200.00 $0.00 33 Pedestrian Signs -Flashing Each 2 0 $1,900.00 $0.00 34 Remove/Replace Guardrail L.S. 1 0 $4,500.00 $0.00 35 Pedestrian Cross Walk L.S. 1 0 $3,200.00 $0.00 36 Traffic Control L.S. 1 100 $21,000.00 37 Pavement Striping L.S. 1 0 $21,000.00 $6,500.001 $0.00 Subtotal $292,934.25 Drainage and Storm Sewer 38 18" ADS N-12 L.F. 177 100 $32.00 $5,664.00 39 54" CMP Culvert (2 Pipes) L.F. 160 100 $78.00 $12,480.00 40 Concrete Headwall w/ Trash Rack for 2-54" CMP's Each 1 0 $7,500.00 41 Concrete Headwall for 2-54" CMP's Each 1 0 $7,500.00 $0.00 $0.00 42 Type 16 Combination Inlet Each 2 100 $2,900.00 43 ADS Pond Outflow Control Structure Each 2 50 $2,200.00 $5,800.00 $2,200.00 44 9" (d50) Grouted Riprap L.S. 1 90 $3,500.00 45 18" (d50) Grouted Riprap L.S. 1 90 $6,500.00 $3,150.00 $5,850.00 46 Raise Existing Storm Inlet Rim Each 1 100 $1,500.00 47 ramat Geotextile Fabric S.Y. 135 0 $22.00 $1,500.00 $0.00 111 48 Pipe Bollards L.S. 2 0 $450.00 $0.00 Subtotal $36,644.00 Ieinwaver1056.xls • 1 Valley View Village Subdivision -Phase 'A' CONTRACT QUANTITIES Member 17, 2004 HCE JOB NO: 2021056.00 ITEM NUMBER ITEM UNIT CONTRACT PERCENT UNIT COST COST QUANTITY COMPLETE Sewer 49 8" SDR 35 Sewerline L.F. 2510 $29.50 $74,045.00 50 51 8" Sewer Stub with Cap 4' Dia. Manhole Each 5 100 $2,500.00 $12,500.00 Each 18 100 $2,400.00 52 Remove and replace existing manhole Each 1 100 $3,900.00 $43,200.00 $3,900.00 53 4" Sewer Service Each 54 100 $550.00 54 Raise Existing Sewer Manhole Rim Each 1 100 $1,750.00 $29,700.00 $1,750.00 Subtotal $165,095.00 Domestic Water 55 " C900 Waterline 4550 100 $24.00 $109,200.00 56 12" C900 Waterline L.F. 115 100 $38.00 $4,370.00 57 8" Gate Valve Each 25 100 58 12" Gate Valve Each 1 100 $1,500.00. $37,500.00 $2,900.00 59 3/4" Water Service Each 54 100 59 3/4" Water Meter Pit Each 54 100 $545.004 $29,430.00 $525.00 $28,350.00 60 2" Irrigation Service w/ Single Meter Pit Each 2 100 $2,250.00 61 Fire Hydrant Assembly Each 10 100 $2,750.00 $4,500.00 $27,500.00 62 8" Water Main Stub and Blowoff Valve Each 6 100 $1,400.00 63 8" Air Vac Each 1 100 $3,900.00 $8,400.00 $3,900.00 64 PRV w/vault Each 1 100 65 Connection to Existing Main Each 1 100 $29,500.00 $29,500.00 $2,250.00 $2,250.00 Subtotal. $287,800.00 2tliscella eous 66 Pothole Located Existing High Pressure Gas Main Each 100 $400.00 67 4' Shallow Utility Trench L.F. 2847 100 $6.00 $6,800.00 $17,082.00 68 4' electric conduit installation (conduit furnished by utility) L.F. 2847 100 $1.00 69 4" Telephone Conduit to include installation L.F. 2847 100 $2.00 $2,847.00 $5,694.00 70 Transformer Vault Excavation Each 9 100 $400.00 $3,600.00 71 4" Conduit Sleeving @ Roadway Intersections L.F. 850 100 $7.00 $5,950.00 72 6" Conduit Sleeving @ Roadway Intersections L.F. 850 100 $8.75 73 North American Green S-150 Erosion Control Blanket S.Y. 2715 0 $2.00 $7,437.50 $0.00 Subtotal $49,410.50 Change Order #2 Structural Backfill for foundations 6239 100 $4.25 $26,515.75 Boulder Retaining Walls 290 0 $18.00 $0.00 54" CMP Culvert (2 Pipes) L.F. 80 100 $78.00 $6,240.00 Class 2 Backfill m Road C.Y. 1056 100 $32.00 $33,792.00 Topsoil Strip and Stockpile C.Y. 800 100 $1.75 $1,400.00 Subtotal $67,947.75 Amount to Date Ieinwaver1056.xls $1.077,131.50 VVV Phase A, Letter of Credit Reductions, Tracking Sheet Draw Certificate # Letter of Credit Original LOC Available LOC amount $1,308,441.61 Reduction Cert. # 1 (05/18/04) $490,078.00 Available LOC amount $818,363.61 Reduction Cert. # 2 (10/04/04) $587,053.50 Available LOC amount $231,310.11 Reduction Cert. # 3 (05/02/05) $231,310.11 Available LOC amount $0.00 Remaining Total Balance LOC A $0.00 _ • • ACKNOWLEDGMENT OF SATISFACTION SUBDIVISION IMPROVEMENTS AGREEMENT KNOW ALL MEN BY THESE PRESENT that: WHEREAS, Edward and Ida Lee Hoaglund (hereinafter "Owner") and Darter, LLC (hereinafter "Developer"), entered into a Subdivision Improvements Agreement (SIA) with the Board of County Commissioners of Garfield County, Colorado (hereinafter "Board"), recorded in Book 1546 at Page 694 as Reception No. 643045 of the Garfield County records on December 16, 2003, for the improvements of Phase A of Valley View Village Subdivision; and WHEREAS, an irrevocable Letter of Credit was delivered to the County in the amount of $1,306,241.61 in order to secure the subdivision improvements to be constructed by the Developer as required in the SIA; and WHEREAS, on May 18, 2004, the Board approved the first partial release of the Letter of Credit resulting in a balance of $818,363.61 and on October 4, 2004, the Board approved a second partial release resulting in a balance of $231,310.11; and WHEREAS, the obligations of the Owner and Developer have been satisfied, as verified in the attached statement from Ron Weidler, P. E., High Country Engineering dated April 25, 2005, that work has been completed consistent with improvements described in the Subdivision Improvements Agreement. NOW THEREFORE, at the request of the Owner and Developer and in consideration of the premises and prior agreements, the Board hereby acknowledges the satisfaction of the Subdivision Improvements Agreement entered into by Owner, Developer and the Board for the third and final release of security in the amount of $231,310.11 for work completed consistent with improvements described in the Subdivision Improvements Agreement. STATE OF COLORADO ) COUNTY OF GARFIELD ) )ss By: Chairman The foregoing instrument was acknowledged before me this 2nd day of May, 2005, by John Martin, as Chairman of the Board of County Commissioners of Garfield County, Colorado. WITNESS my hand and official seal. My commission expires Garfield County Clerk CIVIL ENGINEERING January 20, 2005 Revised April 25, 2005 An Employee -Owned Company Garfield County Building and Planning Department 108 8th Street, Suite 201 Glenwood Springs, CO 81601 Attn: Fred Jarman RE: Valley View Village — Phase A - Partial Release #3 HCE Project No. 2021056.0650 Gentlemen: LAND SURVEYING I am writing this request for partial release #3 in the amount of $231,310.11 on behalf of Darter, L.L.C., the developer of Valley View Village. The project has been completed and an acceptance letter has been issued by the Garfield County Road and Bridge Department and an initial acceptance letter beginning the warranty period has been issued for the Metropolitan District for all public improvements. Please find the attached cost estimate of improvements and acceptance letters for this third and final partial release. Listed below please find the tabulation of the balance of the letter of credit for the Subdivision Improvements Agreement: SIA Amount Improvements To Date SIA Balance $1,308,441.61 $1,308,441.61 $0 HCE certifies that all materials supplied and work performed is in accordance with the plans and specifications for those items inspected by HCE during periodic construction observations. All costs for which the release is being requested have been incurred in connection with the construction of the Improvements. No funds are being requested for work not completed, or for materials not installed or stored on site. Please consider this letter certification by the Project Engineer, High Country Engineering, Inc. (HCE), that all of the foregoing requirements have been met. This statement of completion shall in no way relieve any other party from meeting requirements imposed by contract or other means. Sincerely, Ron Weidler, P.E. Construction Manager cc: RTer},ry Lawrence, Darter, LLC 1517 Blake AvenueegiYttf 416tr, Darter, LLC Glenwood Springs, CO 81601 970.945.8676 phone 970.945.2555 fax www.hceng.com RE..: * fir` .D APR 2 6 2005 GAN-ILLOCOUNTY BUILDING & PLANNING 14 Inverness Drive East, Suite F-120 Englewood, CO 80112 303.925.0544 phone 303.925.0547 fax Valley View VillageSubdivision-Phase 'A�` Leter of Credit Reduction #3 January 20, 2005 Revised: April 25, 2005 HCE JOB NO: 2021056.00 ITEM NUMBER Grading and Earthwork 1 Mobilization 2 Demolition of Esistill 2, Home ITEM 3 !Earthwork 4 5 Topsoil Stripping and Stockpile Drill seed and Hydromulch UNIT L.S. LS. L.S. L.S. CONTRACT QUA riTr 1 TO DATE ............................ CURRENT ............................. QI: AN -FHA' 11 UNIT COST : i COST ................................................................ 0 524.000.00 50.00 1 .518,000.001 .518,00000 ................ 0 $125,500.00: $0.00 01 $24,300.001 $0.00 L.S. 6 !Erosion and Sediment Control 1 1 1 $7,500.00 $7,500.00 L.S. ! 1 1 0 Grading and Earthwo 7 1 Sawcut, Remove and Dispose of Existing Asphalt 8 I Sawcut, Remove and Dispose of Exsimg Curb & Gutter 9 !Rotomill and Dispose of Existing Asphalt 10 1Mirati Weed Barrier $3,500.00 $0.00 S.Y. 1592; 1592 0 Subtotal $3.00 L.F. 5901 5901 0 $2.001 S.Y. S.Y. 8151 8151 0 1484 14841 1484 $25,500.00 $0.00 $0.00 $3.501 $0.00 $1.50 52,226.00 11 2.5" Asphalt S.Y. 12 13" Asphalt 13 14 3" Asphalt in Parking Areas 4" Asphalt S.Y. S.Y. 1113111131 1113.................... 3215 32151 0 $12.00! 513,356.00 $9.901 50.00 2196 2196 2196 S.Y. 5454 15 12" Asphalt at Battlement Mesa Parkway & Stone Quary Road S.Y. 810 5454 810 5454 810 $9.90 $21,740.40 $11.571 $63,102.78 $8.75 $7,087.50 16 4" Asphalt at Battlement Mesa Parkway & Stone Quarry Road S.Y. 17 16" Class 6 ABC under pedestrian path 18 6" Class 6 ABC under asphalt 19 18" Class 6 ABC under Asphalt 20 19" Class 6 ABC under Asphalt C.Y. C.Y. .......... C.Y. C.Y. 16081 16081 16081 $11.571 $18,604.56 186 1861 0 $34.001 $0.00 366 1257 3661 4 12571 366 $34.50 $12,627.00 0 534.501 $0.00 8751 875 0 $34.501 $0.00 21 19" Class 6 ABC under Asphalt patch on BMP and SQR 22 12'-6" Mountable Curb & Gutter 23 2'-6" Mountable Curb & Gutter & 4' Sidewalk 24 12'-0" Vertical Curb & Gutter 25 12'-0" Vertical Curb & Gutter & 4' Sidewalk C.Y. 402 4021 L.F.......1. 985' ............._._ 985' LF: 2380 2380....._........._....._» L.F. ! 15151 1515 L.F. 245 245 0 534.501 $0.00 0 4 ..................-514.751 ....__.._........._.........50.00 0 524.501 $0.00 0 ..................... 513.001..............................._50.00 0 $21.00 $0.00 26 16" Barrier Curb 27 16" Ribbon Curb L.F. 28 ! Concrete Cross Pan with Aprons L.F. S.F. 29 Handicap Ramp 30 !Curb Opening Each ........... Each 550 550 0 510.50 8701 870 870 4345 4345 0 16 161 0 1 1! 0 $0.00 $10.00 $8,700.00 $4.501 $0.00 5750.00«........._. $0.00 $1,200.001 $0.00 31 32 Curb Opening across Sidewalk Class 1 Ground Sign Each ........... Each 33 1 Pedestrian Signs -Flashing 34 !Remove/Replace Guardrail 35 Pedestrian Cross Walk 36 Traffic Control 37 !Pavement Striping Each ........... L.S. L.S. L.S. L.S. 38 i18" ADS N-12 39 154" CMP Culvert (2 Pipes) 40 !Concrete Headwall w/ Trash Rack for 2-54" CMP's 41 !Concrete Headwall for 2-54" CMP's 1 28 11 0 $1,344.001 50.00 281 284 $200.001 $5:600.00 2! 51,900.001 $3,800.00 1 54,500.001 $4,500.00 1 $3,200.00 $3,200.00 11 11 0 1 $21,000.001 $0.00 56,500.001 56,500.00 L.F. 1 1771 L.F. 1 1601 Each 177 0 1601 0 1 42 Type 16 Combination Inlet 43 ADS Pond Outflow Control Structure 44 9" (d50) Grouted Riprap Each Each Each 1 1 11 1 21 2 1 0 L.S. 45 !18"(d50) Grouted Riprap 46 Raise Existing Storm Inlet Rim L.S. 47 Pyramat Geotextile Fabric Each 2! 2 1 1 1,..._ 1 li 1 1 0.1 0.1 Subtotal $171,044.24 532.00:$0.00 578.001 ......................50.00 $7,500.001 $7,500.00 57,500.001 $7,500.00 $2,900.00 50.00 52,200.00 52,200.00 53,500.001 $350.00 $6,500.00 5650.00 0 51,500.001 $0.00 S.Y. 48 Pipe Bollards L.S. 1351 135 2 49 North American Green S-150 Erosion Control Blanket S.Y. 2715 50 18" SDR 35 Sewerline 51 18" Sewer Stub with Cap 2 2715 1351 522.001 $2,970.00 21 5450.001 $900.00 27151 52.001 $5,430.00 25101 25101 52 4' Dia. Manhole Each 5 51 Each 18 18 53 !Remove and replace existing manhole 54 14" Sewer Service 55 •:Raise Existing Sewer Manhole Rim i Each Each Each 1 60 1 60 1 1 Subtotal $27,500.00 $29.501 •'$0.00 0 52,500.00 $0.00 0 52,400.00! $0.00 01 $3,900.001 $0.00 6 i $550.00! $3,300.00 • 0! $1,750.00 $0.00 Subtotal $3,300.00 Ieinwaver1056-A.xls alley Vie nt Vrllage Subdivision -Phase 'A', Leto; of Credit Reduction 63 January 20, 2005 Revised: April 25, 2005 HCE JOB NO: 2021056.00 ITEM ITEM 1 UNIT NUMBER: G� a 56 18" C900 Waterline CONTRACT TO DATE 1 CURRENT UNIT COST COST QUANTITY QUANTITY 1 QUANTITY i 45501 57 12" C900 Waterline 58 18" Gate Valve 59 12" Gate Valve L.F. Each Each 1151 25 1 45501. 1151 254 0 0 $24.001......_........_..._.__ $0.00 538.001 50.00 $1,500.00 $0.00 50.00 0 52,900.00 60 3/4" Water Service 61 2" Irrigation Service w/ Single Meter Pit 62 Fire Hydrant Assembly Each ........... Each ........... Each 541 54 11 1 01 $545.00 01 $0.00 52,250.001 $0.00 10 10 01 63 8" Water Main Stub and Blowoff Valve 64 18" Air Vac Each ........... Each 6 6 1 1 0 0 52,750.001 $0.00 $1,400.001 $0.00 $3,900.00; $0.00 65 PRV w/vault 66 •:Connection to Existing Main Miscellaneous 67 ;Pothole Located Existing High Pressure Gas Main 68 14' Shallow Utility Trench 69 4' electric conduit installation (conduit furnished by utility) 1 L.F. Each ........... Each Each L.F. 70 14" Telephone Conduit to include installation L.F. 11 11 1 0 1': 0 17j 17j 36501 36501 529,500.001 $0.00 $2,250.00 01 803 36501 36501 803 36501 36501 803 Subtotal $0.00 50.00 5400.001 50.00 56.00,....._..._.......... 54,818.00 $1.001 $803.00 52.001 51,606.00 71 !Transformer Vault Excavation 72 14" Conduit Sleeving Roadway Intersections 73 6" Conduit Sleeving (a Roadway Intersections r Each L.F. 19`: ,..19 850`:. 8501 L.F. 850 10 0 850 0 5400.001 $4,000.00 57.001 50.00 $8.751 50.00 Subtotal) $11,227.00 1 Subtotal: $238,571.24 5% Contingency $11,928.56 21/2 Construction Testing] 55,964.28 • Total 5256,464.08 Ieinwaver1056-A.xls elk WestWater Engineering RtONEa roaW 211 2516 FORESIGHT CIRCLE, #1 GRAND JUNCTION, COLORADO 81505 (970) 241-7076 FAX (970) 241-7097 March 14, 2005 Bruce Smith Battlement Mesa Metro. District P.O. Box 6116 Battlement Mesa, CO 81636 RE: Notice of Initial Acceptance of Valley View Village Subdivision, Phase A Water and Sewer Line Extensions - Extension #03-01 Dear Bruce, This is to inform you that the Water and Sewer Line Extensions for Phase A of the Valley View Village Subdivision have been completed by Tammeral Construction for Darter, LLC in accordance with the Battlement Mesa Metropolitan District's Standards and Specifications as of February 15, 2005. The initial acceptance is contingent upon Darter, LLC meeting the conditions summarized in Ron Weidler's memorandum to us dated February 9, 2005. The water and sewer lines constructed as part of the extension have been tested and accepted as required by the Water and Sewer Line Extension Agreement(s). Darter, LLC will warrant and guarantee for a period of one year from the above date of initial acceptance that the water and sewer lines are free from all defects, and shall make any such repairs as may be necessary for reason of said defects, including repairs of any trench settlement. Enclosed is a copy of the Water and Sewer Line Extension Agreement(s) for the 54 taps served. We have also enclosed copies of the water and sewer line test results and soil compaction tests for your reference. A copy of the as -built Plans will be sent to you under separate cover. Respectfully, -\'D,-„9 Stephen T. LaBonde STL/alp Encl. cc: Darin Carei, Grace Homes Ron Weidler, High Country Engineering Andy Schwalley, Garfield County Building Department Ted Anderson, Battlement Mesa Metro. District Amie Arneson, Battlement Mesa Metro. District \\Wucsavcllemp\Batllcman MwV.eutrslSmithGritialAccept.VVA.wpd Ron Weidler • • CDSL, • PO Page 1 of 1 .,m: Jake Mall [jmall@garfield-county.com] Sent: Wednesday, April 06, 2005 3:26 PM To: Ron Weidler Subject: Curb cut Ron: The curb cut and back fill on the crosswalk on Stone Quarry has been completed to our satisfaction. The entire project looks great and should serve public very well. Thanks for all your cooperation and dedication to the project. Jake B. Mall District Road Foreman Garfield County Road & Bridge Dept. 4/7/2005